广西科技大学筹
毕业设计论文
环江至大沙坡二级公路NO. 14合同段
广西*柳州
2012年4月12日
精品目 录可编辑
摘 要„„„„„„„„„„„„„„„„„„„„„„„„„„„„„„„3
第一部分 绪论„„„„„„„„„„„„„„„„„„„„„„„„„„„4
一、课题背景„„„„„„„„„„„„„„„„„„„„„„„„„„„„„4
二、课题意义„„„„„„„„„„„„„„„„„„„„„„„„„„„„„4
三、课题研究主要内容„„„„„„„„„„„„„„„„„„„„„„„„„4
第二部分设计资料„„„„„„„„„„„„„„„„„„„„„„„„„„5
一、地形、地貌„„„„„„„„„„„„„„„„„„„„„„„„„„„„5
二、河流及水系„„„„„„„„„„„„„„„„„„„„„„„„„„„„5
三、气象„„„„„„„„„„„„„„„„„„„„„„„„„„„„„„„5
四、地震„„„„„„„„„„„„„„„„„„„„„„„„„„„„„„„5
五、设计标准„„„„„„„„„„„„„„„„„„„„„„„„„„„„„6
六、筑路材料„„„„„„„„„„„„„„„„„„„„„„„„„„„„„6
第三部分平、纵、横三维断面设计„„„„„„„„„„„„„„„„„„„8
一、选线„„„„„„„„„„„„„„„„„„„„„„„„„„„„„„„8
二、平面线形设计的基本要求„„„„„„„„„„„„„„„„„„„„„„8
1.平曲线线形设计一般原则„„„„„„„„„„„„„„„„„„„„„8
2.平纵横综合设计„„„„„„„„„„„„„„„„„„„„„„„„„8
三、设计方案甲„„„„„„„„„„„„„„„„„„„„„„„„„„„„9
1.平面线形设计„„„„„„„„„„„„„„„„„„„„„„„„„„9
2.纵断面设计„„„„„„„„„„„„„„„„„„„„„„„„„„13
四、设计方案乙„„„„„„„„„„„„„„„„„„„„„„„„„„„15
1.平面线形设计„„„„„„„„„„„„„„„„„„„„„„„„„15
2.纵断面设计„„„„„„„„„„„„„„„„„„„„„„„„„„17
五、路线方案比选和论证„„„„„„„„„„„„„„„„„„„„„„„18
六、道路等级的确定„„„„„„„„„„„„„„„„„„„„„„„„„18
七、纵断面设计„„„„„„„„„„„„„„„„„„„„„„„„„„„19
1.线形设计„„„„„„„„„„„„„„„„„„„„„„„„„„„19
2.纵坡设计纵坡设计的一般要求„„„„„„„„„„„„„„„„„„19
3.纵坡设计的方法和步骤„„„„„„„„„„„„„„„„„„„„„19
4.竖曲线设计要求„„„„„„„„„„„„„„„„„„„„„„„„20
5.纵断面设计步骤„„„„„„„„„„„„„„„„„„„„„„„„21
八、竖曲线计算„„„„„„„„„„„„„„„„„„„„„„„„„„„22
九、横断面设计„„„„„„„„„„„„„„„„„„„„„„„„„„„23
1.查规范得各项技术指标„„„„„„„„„„„„„„„„„„„„24
2.横断面设计步骤„„„„„„„„„„„„„„„„„„„„„„„„25
3.超高加宽计算„„„„„„„„„„„„„„„„„„„„„„„„„25
十、土石方的计算和调配„„„„„„„„„„„„„„„„„„„„„„„26
第四部分路基设计„„„„„„„„„„„„„„„„„„„„„„„„„„27
一、路基设计„„„„„„„„„„„„„„„„„„„„„„„„„„„„27
1.路基横断面布置„„„„„„„„„„„„„„„„„„„„„„„„„27
2.路基最小填土高度„„„„„„„„„„„„„„„„„„„„„„„„28
3.路基边坡„„„„„„„„„„„„„„„„„„„„„„„„„„„„28
4.路基压实标准及压实度„„„„„„„„„„„„„„„„„„„„„28
5.公路用地宽度„„„„„„„„„„„„„„„„„„„„„„„„„28
6.路基填料„„„„„„„„„„„„„„„„„„„„„„„„„„„„29
7.路基处理„„„„„„„„„„„„„„„„„„„„„„„„„„„„29
8.路基防护„„„„„„„„„„„„„„„„„„„„„„„„„„„„30
9.路基施工的一般规定„„„„„„„„„„„„„„„„„„„„„„„31
10.填方路基的施工„„„„„„„„„„„„„„„„„„„„„„„„32
11.边沟的施工„„„„„„„„„„„„„„„„„„„„„„„„„„32
二、路基路面排水系统设计„„„„„„„„„„„„„„„„„„„„„„33
1.路基排水设计„„„„„„„„„„„„„„„„„„„„„„„„„„33
2.路面排水设计„„„„„„„„„„„„„„„„„„„„„„„„„„33
第五部分 挡土墙设计„„„„„„„„„„„„„„„„„„„„„„„„34
一、仰斜A式挡土墙设计„„„„„„„„„„„„„„„„„„„„„„„35
二、重力式挡土墙设计„„„„„„„„„„„„„„„„„„„„„„„„37
第六部分 涵洞设计„„„„„„„„„„„„„„„„„„„„„„„„„38
一、盖板涵设计„„„„„„„„„„„„„„„„„„„„„„„„„„„38
二、盖板涵涵台计算„„„„„„„„„„„„„„„„„„„„„„„„„„41
三、圆管涵设计„„„„„„„„„„„„„„„„„„„„„„„„„„„43
第七部分 公路路面结构设计计算„„„„„„„„„„„„„„„„„„„„44
一、水泥混凝土路面设计„„„„„„„„„„„„„„„„„„„„„„„44
二、沥青路面设计„„„„„„„„„„„„„„„„„„„„„„„„„„51
三、水泥混凝土与沥青路面方案的最终选择„„„„„„„„„„„„„„„60
结束语„„„„„„„„„„„„„„„„„„„„„„„„„„„„„„61
致 谢„„„„„„„„„„„„„„„„„„„„„„„„„„„„„„„62
参考文献„„„„„„„„„„„„„„„„„„„„„„„„„„„„„„„63
中文摘要
[摘要] 本次设计的任务是环江至大沙坡二级公路NO. 14合同段桩号为K39+000K41+304.675。沿线地质构造较复杂岩性种类多主要以石灰岩为主全长2304.675m,设计时速为60km/h.路基宽10.0米行车道宽7.0米路面两侧硬路肩宽分别为0.75米和土路肩宽分别为0.75米。面层采用水泥混凝土基层为水泥稳定粒料底基层为15cm级配碎石材料。主要完成的设计包括确定公路等级、选择路线的线形、平曲线要素计算、绘制路线纵断面图、竖曲线要素计算、绘制路线典型横断面图、土石方调配、路线超高计算、设计路面结构、路面防护工程设计、路基排水设计、工程预算和施工组织设计 同时设计涵洞共6座其中暗板涵3座 圆管涵3座。
[关键字] 平曲线竖曲线排水路基水泥混凝土路面涵洞
Chinese Abstract
[Abstract] This design task is Huanjiang to Da ShaPo secondary roads NO. 14contract section,pile no. in the K39 + 000 ~ K41 + 304.675. Along the routeof geological structure is more complex, more kinds lithology, mainly inlimestoneprimarily, the length is 2304.675m, designspeed is 60km/h.Thewidthof the roadbed is 10.0 meters , the width of the running lane is 7.0 m , thewidth of the the road on both sides of the hard road shoulder is 0.75 metersrespectivelyandthewidthof thedirtroadshoulder is0.75 metersrespectively.The roads has portland cement concrete surface course and cement stabilizedbase, subbase layer is 15 cm graded gravel materials. The design of the maincompleted including: sure the highway grade, choose the route alignment ofhighway, flat curve elements calculation, draw route map, vertical curveelements within profile calculated, draw line cross-sectional figure, typicalconditions deployment, high calculation, design route pavement structure, roadsurface protection engineering design, roadbed drainage design, project budgetand the construction organization design, and at the same time,design sixculverts, which contains three dark board culverts, three circular tubeculverts.
[Keywords] : Plane curve, vertical curve, drainage, roadbed, cement concretepavement, culverts.
第一部分 绪论
一、课题背景
环江毛南族自治县位于广西西北部地处桂西北云贵高原东南麓东邻融水、罗城县南接宜州、河池市西隔打狗河与南丹县相望,北与贵州荔波、从江两县毗连。环江至大沙坡二级公路是西南出海大通道的便捷支线也是自治区人民政府为加快交通基础设施建设向社会公开承诺的县县通二级公路的重要路网建设项目之
一。该路线起于环江县思恩镇经古宾、都川终于大沙坡与贵州省荔波至大沙坡公路相接。环江至大沙坡二级公路的建成对促进河池路网及至广西公路的合理布局。进一步改善路网结构改善黔桂两省区沿线人民的生产、生活和投资环境促进两地资源的开发利用加快脱贫致富步伐推动经济进一步发展具有重要意义。
二、课题意义
通过本题目使我在进行公路施工图设计方面进行一次全面的系统的训练使我们能综合运用大学所学课程,系统地巩固基本理论和专业知识培养分析问题和解决问题的独立工作能力;提高计算、绘图、查阅文献、使用规范手册和编写技术文件及计算机辅助设计计算等基本技能,掌握公路设计原则、设计方法、步骤。同时树立正确的设计思想及严谨负责、实事求是、刻苦钻研、勇于创新的作风,具体解决各种级别公路的设计。为今后工作打下良好的基础并能提高我的综合运用知识的能力同时也有助于以后在工作岗位能很快的适应工作环境。
三、课题研究主要内容
1路线方案的拟定与比选
2平面设计
3纵断面设计
4路基横断面设计
5路基超高、加宽设计
6路基排水系统设计、路基路面结构及材料组成设计
7工程施工组织与工程概预算编制
第二部分 设计资料
一、地形、地貌
公路沿线经过黔中高原南部边缘的斜坡地带总地势为北高南低四周山岭绵延中部偏南为丘陵地质构造较复杂岩性种类多主要以石灰岩为主。
二、河流及水系
公路沿线水系发育小河溪流众多地下水为孔隙水受大气降水及地表水水体补给 以孔隙水为主。
三、气象
路线测区地处低纬度地带属亚热带季风气候夏长多雨冬短无严寒热量充足多年平均气温约22° C最热月为7月平均气温约29° C最冷月为1月平均气温约12° C。多年平均降雨量约1510 mm,其中4-9月份为雨季降雨量约1200 mm,全年总蒸发量约1430 mm.风向在冬春季93月东南风占主导夏秋季48月东风占主导风速随季节变化一般冬季风速大于夏季风速瞬时极大风速约29m/s。
四、地震
地震基本烈度属Ⅵ度。
五、设计标准
表2-1主要技术指标表
六、筑路材料
本工程项目所使用的筑路材料主要是碎石、片石、砂等。
1、石料场沿线石料主要是花岗岩、石灰岩等岩石裸露无土覆盖层质地坚硬强度较高耐磨能力强可开采为碎片石。加工后的石料适用于桥梁、涵洞、路面、防护工程等。各石料强度较好储存量丰富 均有现成的机耕道或二级公路通往料场。
2、砂料场环江河砂含泥量大产量不足经实验不满足路面规范要求采用陆川砂交通便利其它工程可采用机制砂。
3、全线水泥拟采用金城水泥厂水泥在使用前应对该厂的水泥进行物理和化学试验符合标准规定后并附带有该水泥合格证书才能使用 以免影响工程质量。
4、施工时碎片石、砂等材料必须取样试验符合标准规定后才能使用。沥青、钢材等外购材料必须符合质量标准并附有合格证书。
老鹰主机HawkHost是个人比较喜欢的海外主机商,如果没有记错的话,大约2012年左右的时候算是比较早提供支付宝付款的主机商。当然这个主机商成立时间更早一些的,由于早期提供支付宝付款后,所以受众用户比较青睐,要知道我们早期购买海外主机是比较麻烦的,信用卡和PAYPAL还没有普及,大家可能只有银联和支付宝,很多人选择海外主机还需要代购。虽然如今很多人建站少了,而且大部分人都用云服务器。但是老鹰主机...
HostKvm是一家成立于2013年的国外主机服务商,主要提供基于KVM架构的VPS主机,可选数据中心包括日本、新加坡、韩国、美国、中国香港等多个地区机房,均为国内直连或优化线路,延迟较低,适合建站或者远程办公等。本月商家针对全场VPS主机提供8折优惠码,优惠后美国洛杉矶VPS月付5.2美元起。下面列出几款不同机房VPS主机产品配置信息。套餐:美国US-Plan0CPU:1cores内存:1GB硬...
ZJI本月新上线了香港葵湾机房站群服务器,提供4个C段238个IPv4,支持使用8折优惠码,优惠后最低每月1400元起。ZJI是原Wordpress圈知名主机商家:维翔主机,成立于2011年,2018年9月更名为ZJI,提供中国香港、台湾、日本、美国独立服务器(自营/数据中心直营)租用及VDS、虚拟主机空间、域名注册等业务,所选数据中心均为国内普遍访问速度不错的机房。葵湾二型(4C站群)CPU:I...