管线qq空间打开是空白页

qq空间打开是空白页  时间:2021-04-15  阅读:()
湖北省地方标准DB42DB42/T875—2019代替DB42/T875-2013湖北省城镇地下管线探测技术规程TechnicalspecificationforundergroundpipelinedetectionandsurveyingintownsandcitiesofHubeiProvince(报批稿)2019-04-08发布2019-07-08实施湖北省住房和城乡建设厅湖北省市场监督管理局联合发布ICS93.
020P11备案号:DB42/T875—2019I目次前言············································································································III1范围··········································································································12规范性引用文件···························································································13术语和定义·································································································14基本规定····································································································25技术准备····································································································55.
1一般规定·································································································55.
2地下管线资料收集···············································································55.
3地下管线现况调绘···············································································65.
4现场踏勘···························································································65.
5探查仪器校验·····················································································75.
6探查方法试验·····················································································75.
7技术设计书编制··················································································76地下管线探查······························································································86.
1一般规定···························································································86.
2实地调查···························································································96.
3地球物理探查····················································································126.
4质量检查··························································································167地下管线测量·····························································································187.
1一般规定··························································································187.
2控制测量··························································································187.
3管线点测量·······················································································217.
4地下管线放线测量与竣工测量·······························································227.
5质量检查··························································································248数据处理与建库··························································································268.
1一般规定··························································································268.
2数据处理··························································································268.
3管线图编绘·······················································································288.
4管线成果表编制·················································································308.
5数据建库··························································································309成果验收与提交··························································································329.
1一般规定··························································································329.
2成果质量检验····················································································329.
3验收································································································329.
4成果提交··························································································34附录A(规范性附录)地下管线数据分类代码及设色标准·········································35DB42/T875—2019II附录B(规范性附录)管线要素分类与代码···························································36附录C(规范性附录)地下管线图例····································································62附录D(规范性附录)管线属性数据字典······························································72附录E(规范性附录)管线数据结构····································································75附录F(资料性附录)明显管线点调查表······························································81附录G(资料性附录)隐蔽管线点探查记录表························································82附录H(资料性附录)地下管线检查记录表···························································83附录I(资料性附录)地下管线成果表·································································85附录J(资料性附录)地下管线竣工测量成果表·····················································86附录K(资料性附录)地下管线图样图·································································87附录L(规范性附录)地下管线探测作业安全保护措施············································88附录M(规范性附录)条款表述所有的助动词························································89参考文献········································································································90DB42/T875—2019III前言根据湖北省质量技术监督局《关于下达2016年湖北省地方标准制修订项目计划(第一批)的通知》(鄂质监标函[2016]238号)的要求,标准编制组经广泛调查研究,认真总结实践经验,参考有关国家标准和行业标准,在广泛征求意见的基础上,对原地方标准《湖北省城镇地下管线探测技术规程》(DB42/T875-2013)进行了修订.
本规程按照GB/T1.
1-2009《标准化工作导则第1部分:标准的结构和编写》给出的规则修订.
本规程代替DB42/T875-2013《湖北省城镇地下管线探测技术规程》.
本规程与DB42/T875-2013相比主要变化如下:——原规程的"1范围"、"4总则"两章合并,修订为"1范围";——"2规范性引用文件"章中增加了GB/T24356《测绘成果质量检查与验收》、GB/T29806《信息技术地下管线数据交换技术要求》、CJJ61《城市地下管线探测技术规程》、CJJ/T7《城市工程地球物理探测标准》,删除了GB/T20257.
1-2007《国家基本比列尺地图图式第1部分:1:5001:10001:2000地形图图式》、GB/T20258.
1-2007《基础地理信息要素数据字典第1部分:1:5001:10001:2000基础地理信息要素数据字典》、GB/T14395-2009《城市地理要素编码规则城市道路、道路交叉口、街坊、市政工程管线》、RISN-TG011《城市地下管线探测工程监理导则》;——"3术语和定义"章中调整了城镇地下管线、地下管线探测、地下管线详查、地下管线放线测量、地下管线竣工测量、SLAM技术及现状调绘等内容,删除了地下管线信息管理系统的定义;——"4基本规定"章中调整了地下管线探测任务及内容,修订了探测精度要求等技术内容,增加了地下管线探测工程监理条款,删除了地下管线信息系统的要求及规定;——增加了"5技术准备"章节,原"4基本规定"章中技术准备内容移至本章,并细化了地下管线探测技术准备的要求;——在地下管线探查和地下管线测量两章中增加了探测电子手簿应用及GNSSRTK测量的相关规定,调整了地下管线探查的章节设置,修订补充了相关技术内容,调整了地下管线测量章节设置,修订补充了相关技术内容;DB42/T875—2019IV——原"10探测成果检查与验收"更名为"成果验收与提交",增加了成果提交技术要求;修订补充了相关技术要求;——原"10.
5探测质量评定"内容分别移至6.
4、7.
5和9.
2三节中,并修订补充了相关技术要求;——删除原"11地下管线信息管理系统建设与动态管理";——对原规程附录作了调整.
本规程由湖北省住房和城乡建设厅提出并归口管理.
本规程起草单位:湖北省城乡建设发展中心、武汉科岛地理信息工程有限公司、湖北省航测遥感院、湖北省测绘产品质量监督检验站、湖北省神龙地质工程勘察院.
本规程参与单位:中国地质大学(武汉)、襄阳市城乡建设档案馆、武汉大学、陆诚工程技术有限公司.
本规程主要起草人:何倩、夏金儒、洪亮、钱自红、申传明、杨谈政.
本规程参加起草人:刘江平、梁增伟、郭艳平、李予青、卢贵清、李建松、伍昕、倪峰、刘才平、喻彦、王晓闯、徐涛、李成香、唐维钰、何鸿雁、刘光辉、高玉雄.
本规程主要审查人员:王厚之、李四维、姜燕平、迟炳章、王联群.
本规程实施应用中的疑问,可咨询湖北省住房和城乡建设厅,联系电话:027-68873063,邮箱:1012726846@qq.
com;在执行过程中如有意见和建议请反馈至湖北省城乡建设发展中心,电话:027-68870911,邮箱:sfzzxcjda@qq.
com.
DB42/T875—20191湖北省城镇地下管线探测技术规程1范围本规程规定了湖北省城镇地下管线探测的技术准备、地下管线探查、地下管线测量、数据处理与建库及成果验收与提交要求.
本规程适用于湖北省城市和集镇规划、建设和管理的地下管线探测及建库工作.
湖北省城镇地下管线探测除应符合本规程外,尚应符合国家现行有关标准的规定.
2规范性引用文件下列文件对于本规程的应用是必不可少的.
凡是注明日期的引用文件,仅注日期的版本适用于本规程.
凡是不注明日期的引用文件,其最新版本(包括所有的修改单)适用于本规程.
GB/T24356测绘成果质量检查与验收GB/T29806信息技术地下管线数据交换技术要求CJJ/T7城市工程地球物理探测标准CJJ/T8城市测量规范CJJ61城市地下管线探测技术规程CJJ/T73卫星定位城市测量技术规范3术语和定义下列术语和定义适用于本规程.
3.
1城镇地下管线undergroundpipelineintownsandcities是指城市和集镇范围内敷设于地下的给水、排水、燃气、热力、电力、通信、工业等管道(沟、廊)、线缆等及其附属设施,简称"地下管线".
DB42/T875—201923.
2地下管线探测undergroundpipelinedetectionandsurveying是指采用探查和测量方法确定地下管线空间位置、空间关系及其属性的过程.
3.
3地下管线详查detailedsurveyofundergroundpipeline是指为满足工程建设规划、设计、施工的需要,采用适当的技术方法,对指定区域内的地下管线进行详细探测的过程.
3.
4地下管线放线测量undergroundpipelinesetting-outsurvey指将规划设计图上的地下管线测放于实地的测量过程.
3.
5地下管线竣工测量undergroundpipelinecompletionsurvey新、改、扩建地下管线及其附属物在覆土前确定其空间位置、空间关系及属性信息,按规定进行数据处理并向管理(权属)单位提交管线成果的过程.
3.
6SLAM技术simultaneouslocalizationandmappingSLAM技术又称同步定位与制图技术,集成激光扫描仪、全景相机、里程编码器和惯性导航等装置,通过扫描所在环境的特征点,反算激光扫描仪所在位置,推算激光点云的位置信息,利用相关算法实现定位、测量与制图的三维移动测量技术.
3.
7现况调绘actualitysurveyanddrawing指对现有地下管线资料进行收集、分类、整理、调查并编绘到基本比例尺底图上,为野外探测作业提供参考依据的过程.
4基本规定4.
1地下管线探测的对象是敷设于地下的给水、排水、燃气、热力、电力、通信、工业、其它(综合管廊、综合管沟等)等各种管道或线缆.
4.
2地下管线探测包括地下管线普查、地下管线详查、地下管线放线测量、地下管线竣工测量等,并应符合下列规定:DB42/T875—20193a)地下管线普查包括综合地下管线普查与修补测、厂区或住宅小区地下管线普查、专业地下管线普查.
综合地下管线普查范围一般为市政道路、广场等公共区域;厂区或住宅小区地下管线普查范围是厂区或小区内管线所敷设的区域;专业管线普查范围是专业管线所敷设的区域;b)地下管线详查范围应包括工程建设施工开挖和受开挖影响的地下管线区域,其探测要求可根据工程设计和施工管理的需要另行规定,但不得低于本规程的要求;c)地下管线放线测量范围包括规划图中新建、改建或扩建地下管线测放的实地区域;d)地下管线竣工测量范围包括新建、改建或扩建地下管线敷设的区域.
4.
3地下管线探测内容应符合下列规定:a)地下管线普查应查明地下管线的类别、平面位置、埋深、偏距、走向、规格、材质、传输物质特征、敷设方式、建设年代等,测量地下管线平面坐标和高程,并应建立管线数据库;b)地下管线详查时,除应查明普查规定的探测内容外,还应查明与工程建设施工有关的信息;c)地下管线放线测量应依据经批准后的规划设计图施测,并符合CJJ/T8的技术要求;d)地下管线竣工测量成果应符合地下管线数据库更新的技术要求.
4.
4地下管线探测应采用2000国家大地坐标系(CGCS2000)和1985国家高程基准.
采用其他平面坐标和高程基准时,应与2000国家大地坐标系和1985国家高程基准建立换算关系.
4.
5地下管线探测成图的比例尺和分幅,应与当地城镇基本地形图比例尺和分幅一致.
4.
6地下管线探测的取舍标准应根据湖北省各城镇的具体情况确定.
地下管线详查、地下管线放线和竣工测量可根据工程目的和委托方要求对探测对象进行取舍.
地下管线普查取舍宜符合本规程表1的要求.
表1地下管线普查取舍标准管线种类取舍标准给水管径≥50mm排水(含雨、污水及雨污合流)方沟≥400*400mm或管径≥200mm燃气全测电力全测通信全测热力全测DB42/T875—20194表1地下管线普查取舍标准(续)管线种类取舍标准工业全测其他全测4.
7图根控制点相对于邻近控制点平面点位中误差和高程中误差不应大于50mm.
4.
8地下管线探测应以中误差作为衡量探测精度的标准,且以二倍中误差作为极限误差.
探测精度应符合下列规定:a)明显管线点的埋深量测精度应符合本规程表2的规定;b)隐蔽管线点的探查精度应符合本规程表3的规定;c)地下管线点的测量精度:平面位置测量中误差不应大于50mm(相对于该管线点起算点),高程测量中误差不应大于50mm(相对于该管线点起算点).
表2明显管线点埋深量测的精度要求精度等级埋深限差δtd适应条件Ⅰ±5cm在地面能观察到管顶(底)且用钢尺能直接量测.
Ⅱ±10cm虽地面能观察到管线出露但无法从地表直接量测,如通信人孔等大型窨井.
Ⅲ±15cm大口径深埋排水管道、电力隧道等.
表3隐蔽管线点探查的精度要求精度等级平面位置限差δts埋深限差δth适用条件Ⅰ0.
10h0.
15h无干扰、单根金属管道或电缆,且埋深不大于3.
0m.
Ⅱ0.
15h0.
25h管块(或套管)敷设多根电缆,或管线埋深在3.
0m~10m间.
Ⅲ0.
20h0.
30h有明显干扰,但可分辨目标管线信号,或管线埋深大于10m.
注:h为地下管线的中心埋深,单位为厘米,当h<100cm时则为以100cm代入计算.
4.
9地下管线探测的基本程序宜包括:接受任务(委托)、技术准备、地下管线探查、地下管线测量、数据处理、地下管线数据库建立、技术总结报告编制和成果质量检查与验收.
探测任务较简单或工作量较小时,上述程序可简化.
4.
10地下管线普查应包括以下工作内容:a)地下管线资料收集和地下管线现况调绘;DB42/T875—20195b)方法试验及地下管线普查技术设计书编制;c)地下管线实地调查和地球物理探查;d)地下管线测量;e)地下管线探测的质量检验;f)地下管线探测质检报告编写;g)地下管线数据库建立;h)数据质量检验;i)地下管线探测技术总结报告编制;j)成果验收与提交.
4.
11地下管线探测工程应实行工程监理制,可根据实际工程工作量的情况,简化监理流程或小型工程省略监理流程.
4.
12地下管线探测应实行两级检查、一级验收制度.
4.
13新(改、扩)建地下管线应建立放线测量和竣工测量制度.
4.
14地下管线探测成果应按规定的数据格式进行采集与存储,且符合地下管线数据库建设及系统管理与应用的要求.
4.
15在地下管线探测过程中,对涉密的测绘成果应采取相应保密措施.
5技术准备5.
1一般规定5.
1.
1地下管线探测应做技术准备,包括:资料收集、现况调绘、现场踏勘、仪器精度校验、方法试验和技术设计书编制等,具体内容可根据探测工程类型确定.
5.
1.
2在地下管线普查全面开展前应进行样区试验工作.
样区试验应包括地下管线普查的所有工作程序和内容.
5.
2地下管线资料收集5.
2.
1地下管线探测前,应全面收集测区范围内已有的测绘资料和地下管线资料,对所收集的资料标注来源(提供单位、提供人、收集人、时间等),分析评价所收集资料的准确度、可利用程度等.
DB42/T875—201965.
2.
2收集的资料应包括下列内容:a)现有的控制测量资料和适用比例尺的地形图;b)已有的地下管线图、技术说明和成果表;c)管线设计图、施工图、竣工图、设计与施工变更文件及技术说明资料.
5.
3地下管线现况调绘5.
3.
1地下管线现况调绘应对已有的地下管线资料进行分类、整理,编绘地下管线现况调绘图.
5.
3.
2地下管线现况调绘图编绘应符合下列规定:a)应将管线位置、空间关系、附属物等转绘到相应比例尺地形图上,编制地下管线现况调绘图;b)地下管线现况调绘图上应注明管线权属单位、管线类别、规格、材质、传输物质特征、建设年代等属性,并注明管线资料来源;c)地下管线现况调绘图宜根据管线竣工图、竣工测量成果或已有的外业探测成果编绘,无竣工图、竣工测量成果或外业探测成果时,可根据施工图及有关资料,按管线与邻近的附属物、明显地物点、现有路边线的相互关系编绘;d)地下管线现况调绘图使用的图例应符合本规程附录C的规定.
5.
4现场踏勘5.
4.
1现场踏勘应包括下列内容:a)核查收集资料的完整性、可信度和可利用程度;b)核查调绘图上明显管线点与实地的一致性;c)核查控制点的位置和保存状况,并验算其精度;d)核查地形图的现势性;e)察看测区地形、地貌、交通、环境、气候及地下管线分布与敷设情况,调查现场地球物理条件和各种可能的干扰因素,以及探测中可能存在的安全隐患.
5.
4.
2现场踏勘完成后应进行下列工作:a)在地下管线现况调绘图上标注与实地不一致的管线点;b)记录控制点保存情况和点位变化情况;DB42/T875—20197c)判定地形图可用性;d)拟定探查方法试验场地;e)制定安全生产措施.
5.
5探查仪器校验5.
5.
1探查仪器在投入使用前应进行校验,仪器的校验包括稳定性校验及精度校验.
经校验不合格的探查仪器不得投入使用.
5.
5.
2探查仪器的稳定性校验应采用相同的工作参数对同一位置的地下管线进行不少于2次的重复探查,重复探查相对误差不应大于5%.
5.
5.
3探测前应进行仪器精度校验,精度应符合本规程表3的规定.
5.
6探查方法试验5.
6.
1地下管线探查应根据现场踏勘结果,对拟定的探查方法与技术进行有效性试验,确定采用的探查方法与技术,提出拟采用的探查仪器设备.
5.
6.
2探查方法试验可与探查仪器校验同时进行,并应符合下列规定:a)试验场地和试验条件应具有代表性和针对性;b)试验应在测区范围内的已知管线段上进行;c)试验宜针对不同类型、不同材质、不同埋深的地下管线和不同地球物理条件分别进行;d)拟投入使用的不同类型、不同型号的探查仪器均应参与试验.
5.
6.
3探查方法试验结束后,应对试验结果进行验证和校核,评价、确定有效的探查方法和技术参数,并编写探查方法试验报告.
验证和校核内容应包括探查方法和仪器的有效性、技术措施的可行性与有效性、探查结果的可靠性与精度.
5.
7技术设计书编制5.
7.
1探测技术设计书应在地下管线资料收集、现况调绘、现场踏勘、探查仪器校验、探查方法试验的基础上编制.
技术设计书宜包括下列内容:a)工程概述:说明任务来源、工作目的与任务、工作量、作业范围、作业内容和完成期限等情况,说明工作环境条件、地球物理条件、管线及其敷设状况等;DB42/T875—20198b)已有资料及其可利用情况;c)执行的标准、规范或其他技术文件;d)探测仪器、设备等计划;e)作业方法与技术措施要求;f)施工组织与进度计划;g)质量、安全和保密措施;h)拟提交的成果资料;i)有关的设计图表.
5.
7.
2技术设计书应审批后实施.
实施前应对探测作业员进行技术交底.
6地下管线探查6.
1一般规定6.
1.
1地下管线探查应现场确定目标管线在地面上的投影位置及埋深,并应按任务要求查明相应管线的其他属性.
6.
1.
2地下管线探查应在充分收集和分析已有相关资料的基础上,采用实地调查与地球物理探查相结合的方式.
6.
1.
3明显管线点应采用实地调查方法获取其属性信息;隐蔽管线点应采用地球物理探查方法探明其位置及埋深.
6.
1.
4地下管线探查应查明各种地下管线的敷设状况和在地面上的投影位置及埋深,同时应查明管线种类、空间关系、材质、规格、载体特征、电缆根数、管块孔数、权属单位及附属设施等,绘制探查草图并在地面上设置管线点标志,其中敷设在同一管块(沟)中不同权属的电力或通信电缆应分别查明,并在成果表的备注栏内注明.
6.
1.
5在没有特征点的管线段上,视地下管线探测任务不同,地下管线的管线点间距应符合以下规定:a)地下管线普查、专业管线探测或竣工测量时,管线点间距应小于或等于75m.
主城区管线探测时,管线点间距应小于或等于50m;b)各类园区、厂区管线探测,管线点间距应小于或等于50m;c)地下管线详查时,管线点间距应小于或等于10m;DB42/T875—20199d)当地下管线弯曲时,应在圆弧起讫点和中点上设置管线点,当圆弧较大或不规则弯曲时,适当增加管线点,以能反映其弯曲特征为原则;e)当管线被建筑物压盖时,应在管线进出建筑物的边界处设置管线点.
6.
1.
6管线点的地面标志,应保证在管线探测成果验收前不毁损、不移位和易于识别.
附桩及标注以不影响市容、市貌为原则.
当管线点的实地位置不易寻找或不便设置地面标志时,应在探查记录表中记录其与邻近固定地物的距离和方位,并应绘制位置示意图.
6.
1.
7地下管线探查成果应符合下列要求:a)管线点编号宜由管线代号和管线点序号组成.
管线代号应按照本规程附录A的规定,由两位字母编码组成,管线点序号用阿拉伯数字标记.
管线点编号在全测区范围内应是唯一的;b)地下管线探查应在作业现场记录探查结果,探查记录表应按照本规程附录G格式填写,记录方式可为纸质记录或电子记录.
纸质记录表应使用墨水钢笔或铅笔填写,电子记录可按规定格式导出记录表.
原始记录不得随意更改,确需更改时,应在纸质记录表上注记原因,或在电子记录手簿上经核对后修订;c)地下管线探查应现场绘制纸质或电子的探查草图,草图应详细标注各种管线的走向、空间关系、管线点编号;d)管线点、探查记录表、探查草图的对应信息应一致.
6.
1.
8地下管线探查所使用的仪器设备应按CJJ/T7的相关规定进行检校和保养.
6.
1.
9地下管线探查应实施过程质量控制,对探查结果进行质量检查与评价,保证探查成果质量符合规定的要求.
6.
1.
10探查作业完成并经质量评定合格后,应提供一份在相应比例尺地形图上标有管线点、管线走向、位置及空间关系的探查草图给测量作业组.
探查与测量作业应密切配合,使工序顺利衔接.
6.
2实地调查6.
2.
1实地调查应对照地下管线现况调绘图,详细调查明显管线点的相关属性信息,并按照本标准附录F格式填写"明显管线点调查表",同时确定应使用仪器探查的管线段.
6.
2.
2实地调查应根据地下管线类别分别调查相应的属性项目.
各类地下管线实地调查的属性项目可按本规程表4规定执行,厂区、小区管线普查时可在本规程表4的基础上扩展.
DB42/T875—201910表4地下管线实地调查项目管线类别埋深断面孔(条)材质附属物载体特征建设年代权属单位内底外顶管径宽*高压力流向电压给水——————排水管道—————压力—————沟道—————燃气—————热力——————工业压力————自流—————沟道—————电力管块————沟道————直埋—————通信管块—————沟道—————直埋——————其它综合管沟——————特殊管线——————不明管线———综合管廊——————注:表示地下管线普查应查明的项目.
表示地下管线普查宜查明的项目.
表示建设工程地下管线详查应查明的项目.
表示建设工程地下管线详查宜查明的项目.
—无需调查的项目.
6.
2.
3明显管线点设置除应符合本规程第6.
1.
5条规定外,尚应符合下列规定:a)检查井应在其中心位置设置管线点,其他附属设施(物)的管线点应设置在其地面投影的几何中心;b)管沟(廊)应在其几何中心设置定位点或在其空间边线特征处设置测量点,准确定DB42/T875—201911位;c)宽度大于1m的沟道(管廊)应实测平面位置和埋深,宽度大于或等于0.
5m的电力沟道宜实测平面位置和埋深;d)当管廊出入口、管廊附属设施(物)的大小大于或等于1m的应实测范围线,小于1m的应实测位置中心点;e)当管线附属设施(物)的管线点偏离管线中心线在地面的投影位置,偏距大于或等于0.
4m时,应分别设定管线点.
6.
2.
4实地调查中应调查地下管线的附属设施(物),按本规程表5执行.
表5常见地下管线附属设施(物)管线类别附属设施(物)给水水源井、给水泵站、水塔、清水池、净化池、阀门、水表、消火栓、排气阀、排泥阀、预留接头、阀门井、检修井排水排水泵站、沉淀池、化粪池、净化构筑物、暗沟地面出口、检查井、跌水井、水封井、冲洗井、沉泥井、进出水口、雨(污)水篦、排污装置燃气、热力及工业管道调压房、煤气站、锅炉房、动力站、储气柜、冷却塔、涨缩器、排气(排水、排污)装置、凝水井、检修井(窨井)、阀门、管堵电力变电所(站)、配电室、电缆检修井、各种塔(杆)、杆上变压器、露天地面变压器、检修井、人孔通信变换站、控制室、电缆检修井、各种塔(杆)、增音站交接箱、分线箱、检修井、人孔、手孔管沟(廊)检修井6.
2.
5实地调查应查明地下管线的种类.
按功能或用途区分管线大类、小类,且应符合本规程附录A的规定.
6.
2.
6实地调查应查明地下管线的敷设方式,敷设方式可分为直埋、管块、管道和管沟等,并应符合本规程附录D表D.
2的相关规定.
6.
2.
7在明显管线点上量测管线规格应符合下列规定:a)管道及管廊(沟)应量测其断面尺寸.
圆形断面应量测其公称直径,管廊(沟)、沟道应量测矩形断面内壁的宽和高,计量单位均用毫米表示;b)电缆管块(组)应量测其外廓的宽和高,计量单位用毫米表示;并宜查明其总孔数、电缆条数及占用孔数,直埋电缆的规格用电缆条数表示;c)多孔箱涵应量测其单孔的断面尺寸和占用孔数.
6.
2.
8井室单边长超过2.
0m且平面投影面积超过4.
0m2,或有两个以上入口(多井盖)检修井,应实测检修井地下空间的实际范围.
线缆类和排水管道在进出检修井的实际位置宜设DB42/T875—201912置管线点.
6.
2.
9在明显管线点上实地量测地下管线埋深应符合下列规定:a)应根据管线的类别不同,按本规程表4的规定量测管线的外顶埋深或内底埋深;b)地下管线埋深可采用计量器具直接量测,量测结果精确到小数点后两位,量测精度应符合本规程表2的相关规定;c)当各类可开启的地下管线检查井、阀门、手孔、凝水缸等附属设施(物)内部淤积掩埋或覆盖地下管线,导致无法直接量测时,应采用其他方法查明其埋深,在记录上注明量测方法.
6.
2.
10实地调查中应调查地下管线材质,管线材质应符合本规程附录D表D.
1的相关规定.
6.
2.
11地下管线载体特征、敷设年代、状态、权属单位等宜根据现况调绘图填写记录,管线状态可按照本规程附录D表D.
3的规定填写,权属单位可按照本规程附录D表D.
4的规定填写.
排水管道、工业管道应记录其流向,燃气管道和压力工业管道宜记录其压力,电力电缆宜记录其电压.
6.
3地球物理探查6.
3.
1探查隐蔽地下管线,可采用地球物理仪器或直接开挖的方法.
地球物理方法应根据任务要求、探查对象和地球物理条件,并经过方法试验确定;直接开挖是对仪器探查结果进行验证或在地电条件非常复杂、仪器探查结果不可靠的情况下进行.
6.
3.
2地球物理探查应具备下列条件:a)目标管线与其周围介质之间有明显的物性差异;b)目标管线所产生的异常场有足够的强度,或可从干扰场和背景场中清楚地分辨出来;c)经方法试验证明其有效,探查精度应符合本规程表3的规定.
6.
3.
3每一测区开始探查前,所使用的仪器,或是新购仪器,或是仪器经大修、长期停用重新投入使用前,应对仪器的性能和各项指标按说明书的要求作全面检查,进行精度校验.
每天作业前后,应检查仪器的电池、电压.
6.
3.
4仪器的选用,除应与方法试验所确定的方法相适应外,还应满足下列要求:a)有较高的分辨率、较强的抗干扰能力;b)满足本规程表3的探查精度;DB42/T875—201913c)有足够大的发射功率(或磁矩);d)有多种发射频率可供选择;e)轻便、性能稳定、重复性好、操作简便、有良好的显示功能;非电磁感应类专用地下管线探查仪应符合CJJ/T7的技术要求;f)有快速定位、定深的操作功能;g)结构坚固、有良好的密封性能,能适应各种自然环境.
6.
3.
5探查地下管线应遵循下列原则:a)从已知到未知;b)从简单到复杂;c)优先采用轻便、有效、快速、成本低的方法;d)复杂条件下宜采用多种探查方法相互验证.
6.
3.
6探查金属管道和电缆应根据管线的类型、材质、管径、埋深、出露情况、地电环境等因素按下列规定选择探查方法:a)金属管道、线缆探查,宜优先选用电磁感应法的感应法、夹钳法、直接法或探地雷达法;深埋金属管道探查,可选择综合物探方法;b)有高阻抗的金属管道探查,宜选用高频电磁感应法或探地雷达法,具备铁磁性的管道且干扰较小时,可选择磁法;c)管径(相对埋深)较大的金属管道探查,可选择电磁感应法的直接法、感应法,也可选用探地雷达法、直流电阻率法、磁法或浅层地震法;埋深(相对管径)较大的金属管道探查,宜选择大功率低频电磁感应法;d)热力金属管道或高温输油管道探查,可选择电磁感应法或红外辐射测温法;e)电力电缆宜先采用工频法进行搜索,初步定位后再用电磁感应法精确定位、定深,当电缆有出露端时,宜采用电磁感应法的夹钳法;通信电缆探查,宜选择主动源电磁感应法.
f)在盲区探查金属管线时,宜先采用电磁感应法或工频法进行搜索,搜索可采取平行搜索法或圆形搜索法,发现异常后宜采用电磁感应法进行追踪,精确定位、定深.
6.
3.
7非金属管道的探查方法宜采用电磁波法或地震波法等,亦可按下列原则进行选择:a)有出入口的非金属管道探查,宜采用示踪电磁法;DB42/T875—201914b)钢筋混凝土或带金属骨架的管道探查,可采用磁偶极感应法;c)管径较大的非金属管道探查,除可采用探地雷达法外,还可根据工作条件采用直流电阻率法或浅层地震法等;d)热力管道或高温输油管道宜采用主动源电磁法和红外测量法.
6.
3.
8水中管道探查宜使用旁侧声纳法,水底下管道探查宜采用地震映像法、高精度磁法或浅层剖面法.
具体操作方法及要求应符合CJJ/T7的相关规定.
6.
3.
9非开挖施工管线,宜结合施工竣工资料,综合采用多种探查方法定点,对于竖向变化大的管线,应酌情增大定点密度.
6.
3.
10非开挖施工电力、通信类管群,应分别对每组管孔进行探查,分别定点.
6.
3.
11采用电磁感应法,除应具备本规程第6.
3.
2条规定外,目标管线长度应远大于其埋深.
实施电磁感应法应符合下列规定:a)采用直接法时,应保持信号施加点处的电性接触良好;接地电极应布设合理,且确保接地条件良好;b)采用夹钳法时,应确保夹钳套在目标管线出露端上,并应保证夹钳接头形成通路;c)采用感应法时,应使发射机与目标管线耦合良好,接收机与发射机保持最佳收发距,当周围存在干扰时,应确定并采取减小或排除干扰的措施;d)区分两条或两条以上平行管线时,宜采用直接法或夹钳法,通过分别对各条管线施加信号来加以区分;因场地条件限制,不宜采用直接法和夹钳法时,可采用感应法,通过改变发射装置的位置和状态以及发射的频率和功率,分析电磁异常的强度和宽度等变化特征加以区分.
6.
3.
12利用电磁感应法探查地下管线,可采用峰值法和零值法定位,两种方法宜综合应用,通过对比分析,确定管线的平面位置.
a)地下管线平面位置的确定分为两种探查方式,即扫描(搜索)方式和追踪方式.
一般应先用扫描(搜索)的方式,探测出管线大致位置后,再进行追踪定位;b)地下管线定位方法有两种,即峰值法(极大值法)和零值法(哑点法),为减少干扰因素的影响应采用峰值法,在无干扰的情况下也可用零值法加以验证.
6.
3.
13利用电磁感应法探查地下管线,应在平面定位的基础上,采用直读法、特征点法、比值法或多种测深方法综合应用进行定深,定深应符合下列规定:a)探查目标管线埋深应先在实地确定管线的平面位置;b)定深应在对管线精确定位后进行,在管线走向变化的各方向均应测量埋深.
定深DB42/T875—201915点的管线点位置宜选择在被查管线前后至少4倍管线中心埋深范围内是单一的直管线,中间无分支或弯曲,且相邻平行管线之间的间距应大于被查管线埋深的1.
5倍,使其干扰能被有效抑制.
上述条件未能满足时,仪器的读数可作参考;c)采用直读法定深时,应保持接收机天线垂直,并根据方法试验确定的修正系数校正直读结果.
6.
3.
14被查金属管线邻近有较多平行管线或管线分布情况较复杂时,宜采用直接法、夹钳感应法等方式进行探查.
应符合下列规定:a)采用直接法时,应把信号施加点上的绝缘层刮干净,保持良好的电性接触;接地电极应布设合理,接地点上应有良好的接地条件;b)采用夹钳感应法时,夹钳应套在被查管线上,保证夹钳接头通路;c)当定深的管线点周围管线复杂、测深出现极不正常的情况下,宜直接开挖进行量测.
6.
3.
15使用探地雷达法除应具备本规程第6.
3.
2条规定外,目标管线应在其探测深度范围内,管线规格应满足分辨率的要求,并应符合下列规定:a)根据探测场地地下介质与管线的材质、管径和埋深,选用与之相匹配的中心工作频率和天线,并通过在已知地下管线上的试验剖面,确定最佳时窗、介电常数和电磁波速度;b)现场应全面、清晰记录工作情况和各种干扰源以及其他不利因素;c)根据目标管线的材质、规格和探测环境,合理选用工作方式;d)根据目标管线的埋深和电磁波速度确定采集时窗,确保目标管线反射波组在所设置的时窗内;e)采样率不宜小于天线中心频率的6倍,确保波形完整;f)相邻扫描点距应小于介质中电磁波波长的1/2,且天线应匀速移动,与仪器的扫描率相匹配;g)工作时宜使用屏蔽天线或天线阵列.
6.
3.
16雷达探测工作结束后,应编写雷达探测工作技术报告,并附每条雷达记录剖面图和成果表,成果表中要有波速、双程走时、管线平面位置和埋深、同等地电条件已知管线的实验数据等.
DB42/T875—2019166.
3.
17复杂条件下,可按下列条件选用地球物理探查方法:a)埋深较浅的管线密集区域,可综合采用电磁感应法、探地雷达法;b)埋深较大的大口径非开挖管线,可采用弹性波法、直流电阻率法或示踪电磁法与井中磁梯度法;有出入口的小口径非开挖管线,可采用示踪电磁法.
6.
3.
18采用弹性波法、直流电阻率法、磁法、轨迹探测法、红外辐射测温法等物探方法进行管线探查时,应符合CJJ/T7的相关规定,并编制工作技术报告.
6.
3.
19地球物理探查除获取隐蔽管线点的位置和埋深外,管线其他属性信息可根据地球物理探查资料解释推断,也可根据收集资料现场追溯相关明显管线点,或者采用钎探、打样洞方式揭露管线后,按本规程第6.
2节的规定进行调查.
6.
4质量检查6.
4.
1地下管线探查应按本规程第4.
12条的规定,采用明显管线点重复调查、隐蔽管线点重复探查方式进行质量检查.
6.
4.
2质量检查时应在测区明显管线点和隐蔽管线点中分别随机抽取不少于各自总点数的5%.
抽取的管线点应具代表性且在测区内分布均匀.
检查应在不同时间、由不同的作业人员完成,检查内容应包括探查的几何精度检查和属性调查结果检查.
6.
4.
3明显管线点应检查量测埋深,隐蔽管线点应检查探查平面位置和埋深.
根据检查结果按本规程公式(1)、公式(2)和公式(3)分别计算明显管线点的埋深量测中误差、隐蔽管线点的平面位置中误差和埋深中误差,按本规程公式(4)、公式(5)计算隐蔽管线点的平面位置限差δts和埋深限差δth.
管线点探查几何精度应符合本规程第4.
8条第a款、第b款的相关规定.
(1)(2)DB42/T875—201917(3)(4)(5)式中:——明显管线点的埋深偏差(mm);——隐蔽管线点的平面位置偏差(mm);——隐蔽管线点的埋深偏差(mm);——明显管线点检查点数;——隐蔽管线点检查点数;δts——隐蔽管线点的平面位置探查限差;δth——隐蔽管线点的埋深探查限差;——各检查点管线中心埋深(mm),当<1000mm时,取=1000mm.
6.
4.
4检查明显管线点的属性调查结果应对照记录表逐项实地核对,并应核对管线点间空间关系,属性调查结果不应出现漏项、错项.
发现遗漏、错误应及时进行补充、更正.
6.
4.
5隐蔽管线点的探查精度可采取增加重复探查量或开挖等方式进行验证,并应符合下列规定:a)验证点应具有代表性并均匀分布,每个测区中验证点数不宜少于隐蔽管线点总数的0.
5%,且不宜少于2个;b)验证内容应包括几何精度和属性精度.
6.
4.
6质量检查不合格时应分析原因,并进行补充探查或重新探查.
补充探查或重新探查应按照本规程第6.
4.
1条~第6.
4.
5条的规定重新进行质量检查.
6.
4.
7探查质量检查宜按本规程附录H格式填写检查记录表,并在探查成果中如实反映质量检查过程和评价结果.
城市综合地下管线普查时,应编写探查质量检查报告,质量检查报告内容应包括工程概况、检查工作概述、问题及处理措施、精度统计和质量评价.
6.
4.
8探查质量检查除满足上述规定外,还应符合GB/T24356的相关规定.
DB42/T875—2019187地下管线测量7.
1一般规定7.
1.
1地下管线测量一般包括控制测量、已有地下管线测量、地下管线放线与竣工测量、测量成果的检查验收等内容.
7.
1.
2地下管线测量前,应收集测区内已有控制点和地形图资料,对缺少控制点和地形图的测区,基本控制网的建立和地形图的施测,以及对已有控制点、地形图的检测和修补测,均应按CJJ/T8的有关规定执行.
7.
1.
3地下管线测量应实地测量管线点的平面位置与高程,测量精度应符合本规程第4.
8条第c款的规定.
7.
2控制测量7.
2.
1地下管线控制测量应在城市等级控制网的基础上布设图根控制点.
城市等级控制点密度不足时,应按CJJ/T8和CJJ/T73的要求加密等级控制点.
图根控制测量宜在城市等级控制点下进行,可采用光电测距三角高程图根导线测量、极坐标法、GNSSRTK测量等方法.
7.
2.
2图根导线测量应符合下列规定:a)图根导线应布设成附合导线、闭合导线或结点网,并应符合本规程表6的规定;b)当图根导线布设成结点网时,结点与高级点之间或结点与结点之间的长度不应大于附合导线规定长度的0.
7倍.
表6图根导线测量的技术要求附合导线长度(m)平均边长(m)导线相对闭合差方位角闭合差绝对值(″)测距仪器类型方法与测回数≤1200≤100≤1/4000≤±40Ⅱ单程观测1注:1)n为测站数;2)仪器类型Ⅱ为测距仪的等级,其每千米测距中误差md(mm):57.
2.
3因地形限制导线无法附合时,可布设不多于四条边的支导线,但总长不应超过本规程表6规定附合导线长度的1/2,且最大边长不应超过本规程表6规定平均边长的2倍.
支导线边长采用光电测距仪测距时,可单程观测一测回,水平角观测的首站应联测两个已知方向,其他站应分别测左、右角各一测回,其固定角不符值与测站圆周角闭合差均不应超过±40″.
7.
2.
4导线计算可采用简易平差法.
DB42/T875—2019197.
2.
5图根水准测量应符合下列规定:a)应起闭于等级高程点,宜沿地下管线布设为附合路线、闭合环或结点网,不应超过两次附合;b)对起闭于一个水准点的闭合环,应先行检测该点高程的正确性.
高级点间附合路线或闭合环线长度不应大于8km,结点间路线长度不应大于6km,支线长度不应大于4km.
c)应使用不低于DS10级水准仪(i角应小于30″),并应按中丝读数法单程观测,支线应返测,并应估读至毫米.
及普通水准标尺单程观测,估读至厘米.
仪器至标尺的距离不宜超过100M,前后视距离宜相等.
水准路线闭合差应在±40mm之内(L为路线长度,单位为km);在山地每千米超过16站时,路线闭合差应在±12mm内(n为测站数);d)水准路线计算可采用简易平差法.
7.
2.
6高程控制采用图根三角高程测量时,可与图根导线测量同时进行,仪器高和棱镜高应采用经检验的钢尺量取.
图根三角高程测量应符合本规程表7的规定.
表7图根三角高程测量的主要技术要求仪器类型中丝法测回数垂直角较差、指标差较差(")对向观测高差、单向两次高差较差(mm)附合路线或环线闭合差绝对值(mm)DJ6对向1单向2≤25≤0.
4S≤±40注:1)S为边长(km);2)D为导线总长(km).
7.
2.
7采用GNSSRTK加密图根控制点和碎部点应符合下列规定:a)利用GNSSRTK加密图根控制点时,有效的观测卫星数不应少于5颗;卫星高度角不应小于15;PDOP值不应大于6;并且持续显示固定解时,方可进行定位测量;b)图根控制采用GNSS测量或RTK来测定,其技术要求参见CJJ73-2010第6.
1.
2条款的规定,并应符合表8的规定;表8CORS网络RTK平面控制测量技术要求等级相邻点间距离(m)点位中误差(mm)边长相对中误差测回数图根≥10050≤1/4000≥2碎部—图上0.
5—≥1c)RTK测量时,开始作业前,应至少在一个已知点上进行检核,并应符合表9的相DB42/T875—201920关规定;表9CORS网络RTK平面控制点校核限差检核位置平面位置较差(mm)在控制点上≤50在碎部点上图上≤0.
5d)网络RTK测量接收机设备宜选用固定误差不超过10mm、比例误差系数不超过2mm/km的接收机;e)RTK一测回观测应符合下列规定:1)观测前应对仪器进行初始化;2)观测值应在得到RTK固定解且收敛稳定后开始记录;3)每测回的自动观测个数不应少于10个观测值,并应取平均值作为定位结果;4)经度、纬度应记录到0.
00001",平面坐标和高程应记录到0.
001m.
f)测回间应符合下列规定:1)测回间应对仪器重新进行初始化,测回间的时间间隔应超过60s;2)测回间的平面坐标分量较差不应超过20mm,垂直坐标分量较差不应超过30mm,应取各测回结果的平均值作为最终成果.
g)当初始化时间超过3min仍不能获得固定解时,宜断开通讯链路,重新启动GNSS接收机,再次进行初始化.
此外,还可以提高卫星高度截止角,或增加仪器的高度、或选择不同的多路径效应消除模式进行测量.
当重新启动3次不能获得固定解时,应选择其他位置进行测量;h)RTK图根控制测量还应符合下列规定:1)控制点应布设不少于3个或不少于2对相互通视的点;2)控制点测量应采用三脚架方式架设天线进行作业;测量过程中仪器的圆气泡应严格稳定居中;3)控制点应采用常规方法进行边长、角度或导线联测检核,导线联测应按低一个等级的常规导线测量技术要求执行,技术参数应符合表10的相关规定.
表10CORS网络RTK平面控制点检核测量技术要求等级边长检核角度检核导线联测检核测距中误差(mm)边长较差的相对中误差(〃)测角中误差(〃)角度较差限差(〃)角度闭合差(〃)边长相对闭合差图根201/25002060601/2000DB42/T875—201921i)网络RTK高程测量技术要求应符合表11的相关规定;表11CORS网络RTK高程测量技术要求等级总测回数每测回观测历元数高程拟合残差测回间高程互差图根点≥2≥20≤1/12基本等高距≤1/10基本等高距碎部点≥1≥5≤1/10基本等高距—j)网络RTK测量开始作业时,至少应在一个同等级已知点上进行检核,平面位置较差不应大于50mm.
7.
3管线点测量7.
3.
1管线点测量内容应包括测定并计算管线点的平面坐标和高程、提供管线点测量成果.
7.
3.
2管线点的平面坐标、高程测量宜采用导线串测法、极坐标法或SLAM技术测量等方法测定,并应符合下列规定:a)采用导线串测法测量管线点平面坐标的作业方法和要求应符合本规程第7.
2.
2条的规定;b)使用全站仪采用极坐标法测量管线点平面坐标和高程时,水平角和垂直角可观测半测回,测距长度不宜超过150m,定向边宜采用长边,仪器高和觇牌高量至毫米;c)采用水准测量法测定管线点的高程时,管线点可作为转点;管线点密集时可采用中视法观测;d)采用SLAM技术测量管线点平面坐标和高程时,测量起止点应为同一图根控制点,并至少联测一个图根控制点进行定向和检核,扫描距离不应超过设备标称距离.
7.
3.
3管线点测量可使用电子手簿记录数据,经检查和处理生成数据文件,并应符合下列规定:a)数据应进行检查,删除错误数据,及时补测错、漏数据,超限的数据应重测;用经检查完整正确的测量数据,生成管线测量数据文件;数据文件应及时存盘、备份;b)生成的数据文件应包含本规程第6.
2节所获得的管线属性数据;c)生成的数据文件应便于检索、修改、增删、通信与交换;数据文件的格式应符合任务规定.
7.
3.
4管线点的平面坐标和高程均计算至毫米,取至厘米.
DB42/T875—2019227.
3.
5横断面应垂直道路中心线布置.
规划道路应测至两侧沿路建筑物或红线外,非规划道路可根据需要确定.
在横断面上应测出道路的特征点、管线点高程,地面高程变化点以及遇到的各种设施,各高程点可按中视法实测,高程检测较差不应大于40mm.
7.
3.
6地下管线相应比例尺带状地形图测绘的宽度:规划道路以测出两侧第一排建筑物或红线外30m为宜,非规划路根据任务需要确定.
测绘内容按管线需要取舍,测绘精度与基本地形图精度要求相同.
7.
4地下管线放线测量与竣工测量7.
4.
1地下管线探测期间和探测后新建的各种地下管线应按照经批准的线路设计图实地放线测量后进行施工,应在覆土前测量管线点的实际位置和高程,绘制竣工图,并按附录J格式要求编制竣工测量成果表,向城建档案管理部门及相关单位移交报送.
7.
4.
2地下管线放线测量宜采用解析法,并应根据任务要求收集有关资料,制定测量方案.
7.
4.
3地下管线放线测量平面控制测量应符合下列规定:a)平面控制点的等级不应低于三级,可采用导线测量或卫星定位动态测量等方法布设.
在控制点稀少地区,三级导线可同级附合一次;b)采用导线测量方法布设平面控制点时,应符合CJJ/T8的相关规定;采用卫星定位动态测量方法布设平面控制点时,应符合CJJ/T73的规定,导线点可不埋石;c)直接采用已有平面控制点测设时,应校核平面控制点间的角度和边长并记录.
控制点的校核限差应符合本规程表12的规定.
边长小于50m的,实测边长与条件边长较差绝对值不应大于20mm.
表12控制点的校核限差检测角与条件角较差(〞)实测边长与条件边长较差的相对误差校核坐标与条件坐标的点位较差绝对值(mm)高差较差绝对值(mm)≤30≤1/4000≤50注:n为测站数.
7.
4.
4地下管线点放线测量内业计算应符合下列规定:a)应依据城市规划主管部门出具的条件、报建图等资料计算拟建管线起点、特征点、附属物点、拐点、终点坐标;b)桩点应编号,且同一工程的桩点编号不应重复;c)拟建管线不满足规划条件时,应经城市规划主管部门调整后再予放线.
DB42/T875—2019237.
4.
5地下管线点放线测量桩点测设与校核测量应符合下列规定:a)拟建管线的特征点或附属物点,特别是涉及规划条件的转折点,应实地放线并现场标识;b)用导线点测设的桩点,宜变换测站和后视方向,并采用极坐标法进行校核,具备条件时应检核桩点间图形关系;校核限差应符合本规程表13的规定.
表13校核限差检测角与条件角较差(〞)实测边长与条件边长较差的相对误差校核坐标与条件坐标计算的坐标点位较差绝对值(mm)≤60≤1/2500≤507.
4.
6地下管线点放线测量成果资料应符合下列规定:a)编制的条件坐标成果表、放线点位实测成果表宜包括点号、管线点类别、材质、管线规格、管线点间距离、坐标等;非正式桩点可只提供相关距离,绘制拟建管线放线示意图;b)资料内容可包括条件坐标成果表、放线点位实测成果表、控制点成果表、工作说明及工作略图、内业计算簿、外业测算簿、工程测量交桩书、检验报告表,并应按顺序装订;c)工作说明宜描述控制测量、桩点测设情况、作业中的特殊问题等;d)工作略图内容宜包括拟建管线位置、规划要素等.
7.
4.
7地下管线竣工测量宜采用解析法,并应收集有关资料,制定测量方案.
7.
4.
8地下管线竣工测量应符合下列规定:a)地下管线竣工测量精度应符合本规程第4.
8条第c款的规定;b)地下管线竣工测量应在覆土前进行.
当条件不具备时,应在覆土前设置管线待测点并将设置的位置引到地面上,点之记;c)平面控制测量、图根点布设方法和要求应符合本规程第7.
2节的有关规定;d)地下管线竣工测量应按本规程第6.
2节的有关规定,实地逐项调查属性内容;e)对于采用非开挖技术施工的地下管线竣工测量,精度应符合本规程第4.
8条第c款的规定.
7.
4.
9地下管线竣工测量成果资料应符合下列规定:a)地下管线竣工测量应测量管线的起讫点、各种特征点、附属物及其它地面建(构)筑物;b)地下管线竣工测量成果表宜包括点号、管线点类别、材质、管线规格、管线点间DB42/T875—201924距离、坐标等;c)资料内容可包括地下管线点成果表、地下管线成果图、工作说明、内业计算簿、外业测算簿、检验报告和平面设计图,并应按顺序装订;d)工作说明宜描述控制测量、管线点的施测情况、作业中的特殊问题等;e)地下管线成果图绘制应符合本规程第4.
7条的规定,内容宜包括竣工管线略图、规划要素等;f)成果数据应满足数据入库的要求.
7.
4.
10直埋管线如因急需覆土来不及施测时,可采用以下方法测定:a)用两条细绳拉出尽量垂直交叉的十字线,让其交点的位置与管线点一致,在每条细绳的两端分别设立两对固定标志点,测出管线点与十字线交点的高差,竣工后用这两对固定标志点拉出交点恢复管线点;b)用固定地物或邻近控制点采用距离交会法准确拴住点位,测出管线点与固定地物点的高差,在实地做出标志和填写点位明细表,待以后还原点位再进行连测;c)在管线点的相应位置上敷设直立的铁杆,确定管线点的地面位置,并记录敷设的深度,待以后测定管线点的平面位置和高程;d)采用物探方法进行补测.
7.
4.
11地下管线竣工测量完成后,应向当地城建档案管理部门及相关单位提交下列成果资料:a)地下管线测量原始记录;b)地下管线工程竣工平面图;c)地下管线竣工测量成果表;d)竣工图、成果表的电子数据.
7.
5质量检查7.
5.
1测量成果质量检查应在过程控制的基础上,检查地下管线点测量精度.
质量检查应符合下列要求:a)检查点应在测区内均匀分布、随机抽取,数量不得少于测区内管线点总数的5%;b)检查时应复测管线点的平面位置和高程,并按本规程公式(6)和公式(7)分别计算管线点的平面位置测量中误差mcs和高程测量中误差mch.
DB42/T875—201925(6)(7)式中:——重复测量管线点平面位置较差;——重复测量管线点高程较差;n——重复测量点(或边)数.
7.
5.
2平面位置测量中误差和高程测量中误差应符合本规程第4.
8条第c款的规定.
7.
5.
3测量成果质量评定a)设站重复观测,测量点位平面中误差和高程中误差在规定的限差之内,管线点测量成果质量合格,若中误差超过规定的限差,应再增加5%的管线点进行重复观测检查,两次检查相加,若平面位置和高程中误差在规定的限差之内,视为管线点测量成果质量合格,否则整个测区的管线点测量返工重测直至合格;b)地下管线测量成果除重复观测点位平面中误差和高程中误差符合本规程第7.
5.
1条外,还应符合下列要求:1)各种原始手簿应齐整;2)各项计算应正确;3)坐标、高程测量的各项误差应符合本规程第4.
8条第c款的规定;4)展绘误差应在限差以内.
7.
5.
4测量成果质量检查除满足上述要求外,还应符合GB/T24356的相关规定.
7.
5.
5质量检查应做好检查记录,并根据工程要求编写地下管线测量的质量检查报告,质量检查报告应包括下列内容:a)工程概况;b)技术依据;c)抽样情况;d)检查内容及方法;e)精度统计与质量评价;f)主要质量问题及处理情况;g).
DB42/T875—2019268数据处理与建库8.
1一般规定8.
1.
1数据处理应包括建立管线数据文件、编绘管线图、编制管线成果表等内容.
8.
1.
2数据处理使用的软件应具有数据输入、数据查错、图形编辑、属性编辑、管线图生成、查询统计、成果输出等基本功能.
8.
1.
3地下管线探测应在数据处理基础上建立管线数据库.
8.
1.
4地下管线数据应经过查错程序检查,严格对照原始调查与探测记录检查,确保数据和资料的准确,并应符合地下管线数据库建设的格式要求.
8.
2数据处理8.
2.
1城镇地下管线的分类应按管线大类和小类分别表示,管线代号应采用管线类别汉语拼音首字母表示,管线代码应符合本规程附录A的相关规定,管线大类代码应采用1位数字表示,管线小类代码应采用2位数字表示.
8.
2.
2管线点应采用本规程图1所示的8位两段组合结构进行编号;第1位、第2位为管线小类代号,第3位至第8位为标识管线点的顺序号,用6位数字表示.
图1管线点编号结构图8.
2.
3管线段应采用该段管线的起止管线点编号组合表示,第1位至第8位为起始管线点的编号,第9位为"-",第10位至第17位为终止管线点的编号.
起止管线点编号应符合本规程第8.
2.
2条的规定.
8.
2.
4管线面应采用6位"字母+数字"进行编号表示,其中,第1位、第2位为管线小类代号,第3至第6位为标识管线面的顺序号,用4位数字表示.
8.
2.
5管线要素应在管线分类基础上,按照功能或用途进行分类.
管线要素分类编码应符合本规程附录B的规定,应采用本规程图2所示的结构,由管线的基础地理信息要素代码、管线分类代码和管线要素代码组成,用8位数字表示,并应符合下列规定:自然顺序号管线小类代号DB42/T875—201927图2管线要素编码结构图a)要素类型码应采用1位数字表示不同的要素类型,要素为管线段时用"1"表示,要素为管线点时用"2"表示,要素为管线面时用"3"表示;b)管点类型码应采用1位数字表示不同的管点类型,管点类型为管线段或管线面时用"0"表示,管点为特征点时用"1"表示,管点为附属物时用"2"表示.
8.
2.
6管线线型应采用1位数字按顺序统一编码表示,编码应按附录C中表C.
2的规定执行.
8.
2.
7管线材质代号、敷设方式代号、使用状态及权属单位应按本规程附录D的规定进行编码.
8.
2.
8管线数据应按管线小类,以管线点、线、面、辅助点、辅助线和注记区分不同数据类型,划分和命名数据图层.
综合管廊(沟)数据可按点、线结构进行区分.
8.
2.
9数据处理应按照本规程附录E的规定,分别设计管线点、线、面、辅助点、辅助线和注记图层的数据结构,并应符合下列规定:a)应根据需要分别确定相应的字段数量、字段名称、字段类型、字段长度、小数位数、完整性约束、阈值;b)每种数据类型中的字段名称或其语义不得重复;c)表示坐标、高程、埋深、角度的字段类型应采用数值型,表示时间的字段类型应采用文本型或日期型,其他字段的字段类型应采用字符型;d)字段长度、小数位数、完整性约束、阈值应满足可完整描述内容的需要;e)非空字段应全部填写,可空字段可选择填写.
8.
2.
10数据处理形成的管线数据文件应经过拓扑检查和属性检查,管线属性信息应与地下管线探测原始记录相一致.
管线数据文件应符合下列规定:自然顺序号,2位数字管线点类型码,1位数字,区分不同的管点要素类型码,1位数字,区分不同的管线要素类型管线小类码,2位数字,用于表示管线小类管线大类码,1位数字,用于表示管线类别国家基础地理信息要素分类中的管线代码,1位数字,为'5'DB42/T875—201928a)完整性要求:图层无丢漏,数据范围覆盖工作区,属性项完整,必填项属性值无遗漏;b)逻辑一致性要求:管线要素分类与代码、数据分层及命名、数据结构应符合规定的要求;要素间的拓扑关系应正确;数据项的取值应在阈值范围内;c)属性精度要求:管线属性项内容应正确.
8.
3管线图编绘8.
3.
1管线图应包括综合地下管线图、专业地下管线图、管线横断面图.
8.
3.
2管线图应按照本规程附录K的样式编绘,使用的符号、颜色及线型应分别符合本规程附录A、附录C的相关规定.
8.
3.
3综合地下管线图、专业地下管线图的图廓整饰应包括图名、作业单位、比例尺、图幅接合表,管线图上注记除应符合本规程表14的规定外,还应符合下列规定:a)注记不应压盖管线及其附属设施的符号;b)跨图幅的注记应在各图幅内分别注记;c)在编绘管线图过程中,如地形图与管线矛盾或重合的地物符号、道路名称、注记等应适当处理,以保证管线图图面清晰;d)管线注记应平行于管线走向,字头应朝向图的上方,南北走向的管线,注记的字头朝向东方,跨图幅的注记应在各幅图内分别注记.
表14管线图注记要求类型方式字体字高(mm)标注要求管线点号字符、数字混合正等线2字朝正北管段标注字符、数字混合正等线2平行于管线走向,字头应垂直于管线,指向图的上方扯旗注记字符、数字混合细等线3——断面号罗马数字正等线3由断面起、讫点号构成断面号,如:Ⅰ-Ⅰ'图幅接合表数字细等线1.
5——8.
3.
4综合地下管线图应反映各种已有管线及管线附属物,其编绘除应符合本规程第8.
3.
2条和第8.
3.
3条的规定外,还应符合下列规定:a)暗渠应按照本规程附录C表C.
2的规定依比例尺绘出边线;在图上宽度小于2mm时,用单实线表示;DB42/T875—201929b)管廊(沟)应按照本规程附录C表C.
2的规定依比例尺绘出边线;在图上宽度小于2mm,用单实线表示;管廊(沟)中的管线仍按照本规程第8.
3.
2条的规定表示;c)预埋且未穿线缆的通信管块、电力管沟除应按照本规程附录C表C.
2的规定的虚线标绘外,还应加注"空管";d)管线点密集区域的管线点可择要注记;e)绘制管线横断面图时,应在管线图上标注其位置及编号;f)当管线密集或上下重叠时,应在图内以扯旗方式说明管线排列分布情况,扯旗标注应选在图内空白或负载较小处,标注内容应符合下列规定:1)管线代号、材质、规格、埋深;2)电缆类管线应加注敷设方式、电缆条数或孔数、电压;3)燃气、污水、热力、工业等压力管线,在规格后加注压力值.
g)图上管线点号应以类别区分标注且在图幅内不得重复,相应的子类应在管线成果表上标明.
8.
3.
5专业地下管线图应按专业编绘,也可按相近专业组合编绘,除应符合本规程第8.
3.
4条的有关规定外,还应符合下列规定:a)图上长度大于等于50mm的排水管线段应在管线段的中点处标注流向符号;b)压力管线应在管径或断面尺寸后加注压力信息.
8.
3.
6编绘管线横断面图应符合下列规定:a)应标注纵横比例尺;b)表示内容应包括断面号、地面地形变化、管线类别、地面高程、与断面相交的地下建(构)筑物、路边线、各种管线的位置及相对关系、管线高程、管线规格、管线点水平间距等.
c)断面编号应用罗马数字顺序号表示;d)图中的直埋线缆以1mm的实心圆表示,其余管线按实际比例绘制;管道用空心圆表示,管廊(沟)用空心矩形表示,直径或边长的图上尺寸小于1mm的以1mm表示;各种建(构)筑物、地物、地貌按实际比例绘制.
8.
3.
7编绘的管线图应经图面检查和实地对照检查合格,合格的管线图应符合下列规定:a)使用的图例符号、注记应正确;b)管线空间关系应正确;DB42/T875—201930c)不应遗漏管线;d)管线点坐标、高程应正确;e)管线属性内容应正确;f)工作区或图幅接边处两侧的管线类别、空间位置应一一对应,同一管线的属性内容应一致.
8.
4管线成果表编制8.
4.
1管线成果表应依据探测成果和数据处理结果编制,内容及格式应符合本规程附录I的规定.
8.
4.
2管线成果表中采用表示空间关系的连接点号时,应填写相应管线段的属性信息.
8.
4.
3管线成果表应按照本规程表4中各类地下管线实地调查属性项目规定填写管线的管顶或管底高程,管廊(沟)应同时填写管顶和管底高程.
8.
4.
4管线成果表中,井内管线点应按照实际位置填写坐标,并应分别填注井内连接的所有管线,在备注栏以邻近管线点号说明其连接方向.
8.
4.
5管线成果表应以城镇基本地形图图幅为单位,分专业进行整理,并应装订成册.
管线成果表装订成册后应在封面标注相应图幅号并编写制表说明.
8.
4.
6管线成果表应按给水、排水、燃气、热力、电力、通信、工业、其他等专业管线顺序装订.
8.
4.
7管线成果表应经过100%检查合格,相关信息应与地下管线探测原始记录相一致.
管线成果表中的数据项内容应完整、正确.
8.
5数据建库8.
5.
1管线数据建库应在需求分析基础上进行数据库设计,数据库设计应符合下列要求:a)各专业管线专题数据库应相对独立;b)管线数据应分类、分层存储,分层应符合本规程第8.
2.
8条的规定;c)管线数据结构应符合本规程第8.
2.
9条的相关规定;d)使用的符号应符合本规程附录C的相关规定;e)管线要素编码应唯一.
8.
5.
2管线数据库应根据设计选择数据库平台,数据库平台应符合下列规定:DB42/T875—201931a)应支持矢量、栅格空间数据结构;b)应具备海量空间数据管理能力;c)应具备数据备份与恢复功能;d)应支持异构数据互联及数据格式相互转换.
8.
5.
3管线属性数据库建设应符合下列规定:a)管线点编号应保证其唯一性;b)材质、敷设方式、使用状态的属性信息应分别建立数据字典;c)管线分类应符合本规程附录A的相关规定;d)建立拓扑关系不应降低源数据精度.
8.
5.
4管线图形数据库建设应符合下列规定:a)图层命名应符合本规程第8.
2.
8条的规定;b)管线数据库应与地形图等其它空间数据库保持相对独立;c)应建立管线图数据表和管线图图层数据表,数据表结构应符合本规程附录E的相关规定.
8.
5.
5管线数据交换应采用GB/T29806规定的格式,交换数据应符合下列规定:a)数据内容应包括:交换格式与版本,编码标准、坐标与高程信息,管线的点、线、面数据和其他属性及相关描述信息;b)使用的坐标系统、高程基准应符合本规程第4.
4条的规定;c)管线要素分类与编码应符合本规程附录B的规定;d)管线属性数据结构应符合本规程第8.
2.
9条的规定.
8.
5.
6建立管线数据库时,应根据管线应用、分发、交换的需要建立元数据库,并应确保元数据的内容正确、完整.
管线元数据应符合GB/T29806的相关规定.
8.
5.
7新的管线数据应按照本规程第8.
2节进行数据处理后更新管线数据库.
更新时应保留历史数据形成管线历史数据库.
8.
5.
8管线数据库建立与更新应进行质量检查,检查应符合下列规定:a)地下管线数据分层正确,图形要素不重复、不遗漏;b)地下管线属性要素分类与代码正确,属性项和属性值完整、正确;c)管线点、管线段之间空间关系正确.
DB42/T875—2019329成果验收与提交9.
1一般规定9.
1.
1探测成果应实行两级检查一级验收制度.
两级检查为承担单位项目作业部门的过程检查和承担单位质检部门的最终检查,检查内容包括探查成果、测绘成果、地下管线编绘成果及数据库成果四个部分.
对于普查探测成果,在两级检查合格后,经工程监理认可或第三方质检机构检验合格,由承担单位提出验收申请,报请建设方组织验收.
9.
1.
2检查验收的依据是本规程、合同书、任务书、经批准的技术设计书及有关技术标准.
9.
1.
3由建设方组织行业专家及相关单位对地下管线探测成果进行验收.
9.
1.
4地下管线探测成果应在验收通过后,按相关要求提交.
9.
2成果质量检验9.
2.
1探测成果质量检验的样本抽取、检验内容应符合GB/T24356的相关规定.
9.
2.
2地下管线探测成果的质量检验应采用同精度或高精度复查的方法,管线图检查应采用图面检查与实地对照检查相结合方式,数据库成果检验应采用检查软件进行.
9.
2.
3质量检验时,应侧重检验疑难管线、复杂条件管线和危险管线.
9.
2.
4质量检验应依据本规程第6.
4节、第7.
5节的规定进行,根据检验结果对探测成果质量做出评定,质量评定还应符合GB/T24356的相关规定.
9.
2.
5质量检验完成后应编制检验报告,检验报告内容应包括检验目的、技术依据、检验方法、质量评定结果.
9.
3验收9.
3.
1验收应提交以下探测成果资料:a)任务书或合同书、技术设计书;b)所利用的已有成果图、表资料、起算数据、仪器检校资料;c)探查草图、管线点探查记录表(或者相应的电子记录)、控制点和管线点的观测记录和计算资料、各种检查和开挖验证记录及权属单位审图记录等;d)质量检查报告;e)管线成果图、成果表及数据文件、数据库;DB42/T875—201933f)地下管线探测总结报告.
其内容应包括:1)工程概况:工程的依据、目的和要求;工程的地理位置、地球物理和地形条件;开、竣工日期及实际完成的工作量;2)探测方法和技术措施:作业技术依据;平面坐标和高程的起算依据;采用的探测仪器和方法;地下管线图的编绘、计算机数据文件编制和成图方法、技术;3)探测质量检查、质量评定和检查结论;4)应说明和遗留的问题;5)结论与建议;6)提交的成果清单;7)附图附表.
9.
3.
2质量检验报告及工程监理报告应作为提交验收资料的一部分.
9.
3.
3验收合格的成果应满足以下要求:a)提交的成果资料完整,签章齐全,符合归档要求;b)完成合同书规定的各项任务,成果经质量检验符合质量要求;c)各项记录和计算资料完整、清晰、正确;d)采用的技术方法与技术措施符合标准规范要求;e)成果精度指标达到技术标准、规范和技术设计书的要求;f)发现的问题已做出处理和改正;g)总结报告内容齐全,能反映工程的全貌,结论正确,建议合理可行.
9.
3.
4验收后应出具验收报告,验收报告应包括下列内容:a)验收目的;b)验收组织:组织验收部门、参加单位、验收组成员;c)验收时间及地点;d)成果验收概况;e)发现的问题及处理意见;f)验收结论;g)验收组成员签名表.
DB42/T875—2019349.
4成果提交9.
4.
1地下管线探测成果应提交归档,归档内容应包括本规程第9.
3.
1条、第9.
3.
2条规定的全部资料和验收报告.
9.
4.
2地下管线探测成果应按规定向城建档案管理机构移交,成果移交时应列出资料清单或目录,逐项清点,并办理交接手续.
DB42/T875—201935附录A(规范性附录)地下管线数据分类代码及设色标准表A.
1给出了地下管线数据分类代码及设色标准表.
表A.
1地下管线数据分类代码及设色标准表地下管线数据类别颜色(RGB值)大类小类名称代号代码名称代号代码给水JS1原水JY01天蓝(0,255,255)输水SS02中水ZS03配水JP04直饮水JZ05消防水XS06绿化水LS07循环水JH08排水PS2雨水YS01褐(76,57,38)污水WS02雨污合流HS03燃气RQ3煤气MQ01粉红(255,0,255)液化气YH02天然气TR03热力RL4热水RS01桔黄(255,128,0)蒸汽ZQ02电力DL5供电GD01大红(255,0,0)路灯LD02交通信号XH03电车DC04广告GG05通信TX6电话DH01绿(0,255,0)有线电视DS02信息网络XX03广播GB04工业GY7氢气QQ01黑(0,0,0)氧气YQ02乙炔GQ03乙烯YX04苯BQ05氯气LQ06氮气DQ07二氧化碳EY08氨气AQ09甲苯JB10其他QT8综合管沟ZH01黑(0,0,0)不明管线BM02紫(102,0,204)DB42/T875—201936附录B(规范性附录)管线要素分类与代码表B.
1至B.
9给出了管线要素编码规则表、给水管线要素分类及代码、排水管线要素分类及代码、燃气管线要素分类及代码、热力管线要素分类及代码、电力管线要素分类及代码、通信管线要素分类及代码、工业管道要素分类及代码、其他管线要素分类及代码.
表B.
1给出了管线要素编码规则表.
表B.
1管线要素编码规则表类别管线要素编码位及含义123-4567-8国家基础地理信息要素分类中的代码类别代码要素类型码管线点类型码要素序号大类代码小类代码给水51原水011-中心线2-管线点3-中心点4-辅助要素5-注记1-特征2-附属设施3-其他特征(要素类型码为"1"时,管点类型码为"0")01-99输水02中水03配水04直饮水05消防水06绿化水07循环水08排水52雨水01污水02合流03其他99燃气53煤气01液化气02天然气03热力54蒸汽01热水02电力55供电01路灯02交通信号03电车04广告05通信56电话01有线电视02信息网络03广播04工业57氢气01氧气02乙炔03乙烯04苯05氯气06氮气07二氧化碳08氨气09甲苯10其他58综合管沟01不明管线02DB42/T875—201937表B.
2给出了给水管线要素分类及代码.
表B.
2给水管线要素分类及代码管线小类要素名称代码管线小类要素名称代码原水原水管段51011000原水测压点51012109窨井51012201水质监测点51012110阀门51012202伸缩器51012111阀门井51012203出地51012112阀门孔51012204盖堵51012113水表51012205原水面状要素51013000水表井51012206输水输水管线51021000排气阀51012207窨井51022201排污阀51012208消防栓51022202沉淀池51012209阀门51022203水塔51012210阀门井51022204水池51012211阀门孔51022205净化池51012212水表51022206泵站51012213水表井51022207水源井51012214地下消防栓51022208弯头51012101消防井51022209三通51012102消防栓51022210四通51012103带阀泄气51022211变径51012104止回阀51022212预留口51012105排气阀51022213进水口51012106排污阀51022214出水口51012107沉淀池51022215测流点51012108水塔51022216DB42/T875—201938表B.
2给水管线要素分类及代码(续)管线小类要素名称代码管线小类要素名称代码输水水池51022217输水盖堵51022116净化池51022218输水面状要素51023000泄气51022219中水中水管线51031000水表集51022220窨井51032201泵站51022221消防栓51032202水厂出水51022222阀门51032203增压站出水51022223水表51032204水源井51022224污水井51032205弯头51022101雨水井51032206三通51022102污篦51032207四通51022103雨篦51032208变径51022104溢流井51032209预留口51022105闸门井51032210进水口51022106跌水井51032211出水口51022107通风井51032212测流点51022108冲洗井51032213测压点51022109沉泥井51032214水质监测点51022110渗水井51032215伸缩器51022111出气井51032216停止塞51022112水封井51032217变材51022113沉淀池51032218转折点51022114水塔51032219出地51022115水池51032220DB42/T875—201939表B.
2给水管线要素分类及代码(续)管线小类要素名称代码管线小类要素名称代码中水净化池51032221配水阀门孔51042206排水泵站51032222水表51042207化粪池51032223水表井51042208弯头51032101排气阀51042209三通51032102排污阀51042210四通51032103沉淀池51042211变径51032104水塔51042212预留口51032105水池51042213进水口51032106净化池51042214出水口51032107泵站51042215测流点51032108水源井51042216测压点51032109弯头51042101水质监测点51032110三通51042102伸缩器51032111四通51042103出地51032112变径51042104盖堵51032113预留口51042105中水面状要素51033000进水口51042106配水配水管线51041000出水口51042107窨井51042201测流点51042108消防栓51042202测压点51042109消防井51042203水质监测点51042110阀门51042204伸缩器51042111阀门井51042205出地51042112盖堵51042113变径51052104配水面状要素51043000预留口51052105DB42/T875—201940表B.
2给水管线要素分类及代码(续)管线小类要素名称代码管线小类要素名称代码直饮水直饮水管段51051000进水口51052106窨井51052201出水口51052107消防栓51052202测流点51052108消防井51052203测压点51052109阀门51052204水质监测点51052110阀门井51052205伸缩器51052111阀门孔51052206出地51052112水表51052207盖堵51052113水表井51052208直饮水面状要素51053000排水阀51052209消防水消防水管段51061000排污阀51052210窨井51062201沉淀池51052211消防栓51062202水塔51052212消防井51062203水池51052213阀门51062204净化池51052214阀门井51062205泵站51052215阀门孔51062206水源井51052216水表51062207沉淀池51052217水表井51062208弯头51052101排气阀51062209三通51052102排污阀51062210四通51052103沉淀池51062211DB42/T875—201941表B.
2给水管线要素分类及代码(续)管线小类要素名称代码管线小类要素名称代码消防水水塔51062212绿化水水表51072204水池51062213污水井51072205净化池51062214雨水井51072206泵站51062215污篦51072207水源井51062216雨篦51072208弯头51062101溢流井51072209三通51062102闸门井51072210四通51062103跌水井51072211变径51062104通风井51072212预留口51062105冲洗井51072213进水口51062106沉泥井51072214出水口51062107渗水井51072215测流点51062108出气井51072216测压点51062109水封井51072217水质监测点51062110沉淀池51072218伸缩器51062111水塔51072219出地51062112水池51072220盖堵51062113净化池51072221消防水面状要素51063000排水泵站51072222绿化水绿化水管段51071000化粪池51072223窨井51072201弯头51072101消防栓51072202三通51072102阀门51072203四通51072103变径51072104通风井51082212DB42/T875—201942表B.
2给水管线要素分类及代码(续)管线小类要素名称代码管线小类要素名称代码预留口51072105冲洗井51082213进水口51072106沉泥井51082214出水口51072107渗水井51082215测流点51072108出气井51082216测压点51072109水封井51082217水质监测点51072110沉淀池51082218伸缩器51072111水塔51082219出地51072112水池51082220盖堵51072113净化池51082221绿化水面状要素51073000排水泵站51082222循环水循环水管段51081000化粪池51082223窨井51082201弯头51082101消防栓51082202三通51082102阀门51082203四通51082103水表51082204变径51082104污水井51082205预留口51082105雨水井51082206进水口51082106污篦51082207出水口51082107雨篦51082208测流点51082108溢流井51082209测压点51082109闸门井51082210水质监测点51082110跌水井51082211伸缩器51082111循环水出地51082112其它其它51990000循环水面状要素51083000DB42/T875—201943表B.
3给出了排水管线要素分类及代码.
表B.
3.
排水管线要素分类及代码管线小类要素名称代码管线小类要素名称代码雨水雨水管段52011000雨水沉淀池52012214弯头52012101化粪池52012215变径52012102净化池52012216预留口52012103压力调节塔52012217进水口52012104地下井室52012218出水口52012105泵站52012219出水闸52012106雨水面状要素52013000出地52012107污水污水管段52021000三通52012108弯头52022101四通52012109变径52022102窨井52012201预留口52022103检修井52012202进水口52022104出气井52012203出水口52022105雨水篦52012204出水闸52022106雨水井52012205出地52022107溢流井52012206三通52022108闸门井52012207四通52022109跌水井52012208窨井52022201通风井52012209检修井52022202冲洗井52012210出气井52022203沉泥井52012211污水篦52022204渗水井52012212污水井52022205水封井52012213溢流井52022206DB42/T875—201944表B.
3.
排水管线要素分类及代码(续)管线小类要素名称代码管线小类要素名称代码污水闸门井52022207合流出地52032107跌水井52022208三通52032108通风井52022209四通52032109冲洗井52022210窨井52032201沉泥井52022211检修井52032202渗水井52022212出气井52032203水封井52022213雨水井52032204沉淀池52022214污水井52032205化粪池52022215雨篦52032206净化池52022216污篦52032207压力调节塔52022217溢流井52032208污水处理厂52022218闸门井52032209隔油池52022219跌水井52032210地下井室52022220通风井52032211泵站52022221冲洗井52032212污水面状要素52023000沉泥井52032213合流合流管段52031000渗水井52032214弯头52032101水封井52032215变径52032102沉淀池52032216预留口52032103化粪池52032217进水口52032104净化池52032218出水口52032105压力调节塔52032219出水闸52032106隔油池52032220合流地下井室52032221合流面状要素52033000泵站52032222其它其它52990000DB42/T875—201945表B.
4给出了燃气管线要素分类及代码.
表B.
4燃气管线要素分类及代码管线小类要素名称代码管线小类要素名称代码煤气高压管段53011001煤气调压箱53012205中压管段53011002调压器53012206低压管段53011003压力表53012207变径53012101阴极测试桩53012208变质53012102波形管53012209弯头53012103调压柜53012210预留口53012104计量站53012211盲板53012105加气站53012212管帽53012106LNG应急气源站53012213立管53012107CNG加气站53012214登高53012108补偿器53012215沉降箱53012109调压站53012216计量箱53012110气源53012217信息球53012111储备站53012218阴极保护53012112门站53012219牺牲阳极53012113地下井室53012220三通53012114燃气柜53012221四通53012115燃气站53012222盖堵53012116燃气桩53012223检测井53012201涨缩站53012224阀门井53012202煤气面状要素53013000阀门53012203液化气高压管段53021001凝水缸53012204中压管段53021002DB42/T875—201946表B.
4燃气管线要素分类及代码(续)管线小类要素名称代码管线小类要素名称代码液化气低压管段53021003液化气调压器53022207变径53022101压力表53022208变质53022102阴极测试桩53022209弯头53022103波形管53022210预留口53022104调压柜53022211盲板53022105计量站53022212管帽53022106加气站53022213立管53022107LNG应急气源站53022214登高53022108CNG加气站53022215沉降箱53022109调压站53022216计量箱53022110气源53022217信息球53022111储备站53022218阴极保护53022112门站53022219牺牲阳极53022113地下井室53022220三通53022114燃气柜53022221四通53022115燃气站53022222盖堵53022116燃气桩53022223检测井53022201涨缩站53022224阀门井53022202液化气面状要素53023000阀门53022203天然气高压管段53031001凝水缸53022204中压管段53031002补偿器53022205低压管段53031003调压箱53022206管线53031004DB42/T875—201947表B.
4燃气管线要素分类及代码(续)管线小类要素名称代码管线小类要素名称代码天然气变径53032101天然气检测井53032201变质53032102阀门井53032202弯头53032103阀门53032203预留口53032104凝水缸53032204盲板53032105调压箱53032205管帽53032106调压器53032206立管53032107高压调压器53032207登高53032108中压调压器53032208沉降箱53032109压力表53032209计量箱53032110阴极测试桩53032210信息球53032111波形管53032211阴极保护53032112调压柜53032212牺牲阳极53032113计量站53032213DYT三通53032114加气站53032214三通53032115LNG应急气源站53032215四通53032116CNG加气站53032216套筒53032117调压站53032217放散管53032118气源53032218极性保护53032119储备站53032219管末53032120门站53032220绝缘接头53032121地下井室53032221接头53032122水井53032222燃气站53032224补偿器53032227燃气桩53032225天然气面状要素53033000涨缩站53032226其它其它53990000DB42/T875—201948表B.
5给出了热力管线要素分类及代码.
表B.
5热力管线要素分类及代码管线小类要素名称代码管线小类要素名称代码热水热水管段54011000热水锅炉房54012215弯头54012101热电厂54012216三通54012102热电站54012217四通54012103冷暖站54012218变径54012104热水面状要素54013000预留口54012105蒸汽蒸汽管段54021000出地点54012106弯头54022101盖堵54012107三通54022102冷却塔54012108四通54022103窨井54012201变径54022104阀门井54012202预留口54022105阀门54012203出地点54022106检修井54012204盖堵54022107凝水缸54012205冷却塔54022108吹扫井54012206窨井54022201疏水54012207阀门井54022202真空表54012208阀门54022203固定节54012209检修井54022204安全阀54012210凝水缸54022205排潮孔54012211吹扫井54022206供热泵站54012212疏水54022207供热调压站54012213真空表54022208供热交换站54012214固定节54022209DB42/T875—201949表B.
5热力管线要素分类及代码(续)管线小类要素名称代码管线小类要素名称代码蒸汽安全阀54022210蒸汽热电厂54022216排潮孔54022211热电站54022217供热泵站54022212冷暖站54022218供热调压站54022213蒸汽面状要素54022219供热交换站54022214其它其它54990000锅炉房54022215DB42/T875—201950表B.
6给出了电力管线要素分类及代码.
表B.
6电力管线要素分类及代码管线小类要素名称代码管线小类要素名称代码供电高压管段55011001供电铁塔55012216中压管段55011002钢管杆55012217低压管段55011003电缆终端塔55012218其它管段55011004沟槽55012219弯头55012101地下井室55012220分支55012102上杆55012221电力沟55012103电力面状要素55013000预留口55012104路灯高压管段55021001变压器55012201中压管段55021002检修井55012202低压管段55021003接线箱55012203其它管段55021004通风井55012204弯头55022101控制柜55012205分支55022102环网柜55012206电力沟55022103开关器55012207预留口55022104人孔井55012208变压器55022201手孔55012209检修井55022202变电所55012210接线箱55022203配电房55012211通风井55022204变电站55012212控制柜55022205箱式开关站55012213环网柜55022206电线杆55012214开关器55022207灯杆55012215人孔井55022208DB42/T875—201951表B.
6电力管线要素分类及代码(续)管线小类要素名称代码管线小类要素名称代码路灯手孔55022209交通信号电力沟55032103变电所55022210预留口55032104配电房55022211变压器55032201变电站55022212检修井55032202箱式开关站55022213接线箱55032203电线杆55022214通风井55032204灯杆55022215控制柜55032205铁塔55022216环网柜55032206钢管杆55022217开关器55032207电缆终端塔55022218人孔井55032208沟槽55022219手孔55032209地下井室55022220变电所55032210上杆55022221配电房55032211路灯控制箱55022222变电站55032212地灯55022223箱式开关站55032213路灯55022224电线杆55032214路灯面状要素55023000灯杆55032215交通信号高压管段55031001铁塔55032216中压管段55031002钢管杆55032217低压管段55031003电缆终端塔55032218其它管段55031004沟槽55032219弯头55032101地下井室55032220分支55032102上杆55032221DB42/T875—201952表B.
6电力管线要素分类及代码(续)管线小类要素名称代码管线小类要素名称代码交通信号交通信号灯55032222电车钢管杆55042217交通信号面状要素55033000电缆终端塔55042218电车电车管段55041000沟槽55042219弯头55042101地下井室55042220分支55042102上杆55042221电力沟55042103电车面状要素55043000预留口55042104广告高压管段55051001变压器55042201中压管段55051002检修井55042202低压管段55051003接线箱55042203其它管段55051004通风井55042204弯头55052101控制柜55042205分支55052102环网柜55042206电力沟55052103开关器55042207预留口55052104人孔井55042208变压器55052201手孔55042209检修井55052202变电所55042210接线箱55052203配电房55042211通风井55052204变电站55042212控制柜55052205箱式开关站55042213环网柜55052206电线杆55042214开关器55052207灯杆55042215人孔井55052208铁塔55042216手孔55052209DB42/T875—201953表B.
6电力管线要素分类及代码(续)管线小类要素名称代码管线小类要素名称代码广告变电所55052210广告电缆终端塔55052218配电房55052211沟槽55052219变电站55052212地下井室55052220箱式开关站55052213上杆55052221电线杆55052214广告牌55052222灯杆55052215广告面状要素55053000铁塔55052216其它其它55990000钢管杆55052217DB42/T875—201954表B.
7给出了通信管线要素分类及代码.
表B.
7通信管线要素分类及代码管线小类要素名称代码管线小类要素名称代码电话电话管段56011000有线电视分支56022102直通56012101预留口56022103分支56012102人孔56022201预留口56012103手孔56022202人孔56012201分线箱56022203手孔56012202接线箱56022204分线箱56012203交接箱56022205接线箱56012204井56022206交接箱56012205机楼56022207机楼56012206线杆56022208线杆56012207控制室56022209控制室56012208差转台56022210差转台56012209发射塔56022211发射塔56012210放大器56022212放大器56012211交换站56022213交换站56012212基站56022214基站56012213地下井室56022215地下井室56012214上杆56022216上杆56012215有线电视面状要素56023000电话亭56012216信息网络信息网络管段56031000电话面状要素56013000直通56032101有线电视有线电视管段56021000分支56032102直通56022101预留口56032103DB42/T875—201955表B.
7通信管线要素分类及代码(续)管线小类要素名称代码管线小类要素名称代码信息网络人孔56032201广播预留口56042103手孔56032202人孔56042201分线箱56032203手孔56042202接线箱56032204分线箱56042203交接箱56032205接线箱56042204机楼56032206交接箱56042205线杆56032207井56042206控制室56032208机楼56042207差转台56032209线杆56042208发射塔56032210控制室56042209放大器56032211差转台56042210交换站56032212发射塔56042211基站56032213放大器56042212地下井室56032214交换站56042213上杆56032215基站56042214电话亭56032216地下井室56042215信息网络面状要素56033000上杆56042216广播广播管段56041000广播面状要素56043000直通56042101其它其它56990000分支56042102DB42/T875—201956表B.
8给出了工业管道要素分类及代码.
表B.
8工业管道要素分类及代码管线小类要素名称代码管线小类要素名称代码氢气氢气管段57011000氧气补偿器57022205检修井57012201锅炉房57022206阀门井57012202泵站57022207阀门57012203冷却塔57022101流量计57012204动力站57022102补偿器57012205弯头57022103锅炉房57012206三通57022104泵站57012207四通57022105冷却塔57012101变径57022106动力站57012102预留口57022107弯头57012103出地点57022108三通57012104管堵57022109四通57012105氧气面状要素57023000变径57012106乙炔乙炔管段57031000预留口57012107检修井57032201出地点57012108阀门井57032202管堵57012109阀门57032203氢气面状要素57013000流量计57032204氧气氧气管段57021000补偿器57032205检修井57022201锅炉房57032206阀门井57022202泵站57032207阀门57022203冷却塔57032101流量计57022204动力站57032102DB42/T875—201957表B.
8工业管道要素分类及代码(续)管线小类要素名称代码管线小类要素名称代码乙炔弯头57032103乙烯出地点57042108三通57032104管堵57042109四通57032105乙烯面状要素57043000变径57032106苯苯管段57051000预留口57032107检修井57052201出地点57032108阀门井57052202管堵57032109阀门57052203乙炔面状要素57033000流量计57052204乙烯乙烯管段57041000补偿器57052205检修井57042201锅炉房57052206阀门井57042202泵站57052207阀门57042203冷却塔57052101流量计57042204动力站57052102补偿器57042205弯头57052103锅炉房57042206三通57052104泵站57042207四通57052105冷却塔57042101变径57052106动力站57042102预留口57052107弯头57042103出地点57052108三通57042104管堵57052109四通57042105苯面状要素57053000变径57042106氯气氯气管段57061000预留口57042107检修井57062201DB42/T875—201958表B.
8工业管道要素分类及代码(续)管线小类要素名称代码管线小类要素名称代码氯气阀门井57062202氮气泵站57072207阀门57062203冷却塔57072101流量计57062204动力站57072102补偿器57062205弯头57072103锅炉房57062206三通57072104泵站57062207四通57072105冷却塔57062101变径57072106动力站57062102预留口57072107弯头57062103出地点57072108三通57062104管堵57072109四通57062105氮气面状要素57073000变径57062106二氧化碳二氧化碳管段57081000预留口57062107检修井57082201出地点57062108阀门井57082202管堵57062109阀门57082203氯气面状要素57063000流量计57082204氮气氮气管段57071000补偿器57082205检修井57072201锅炉房57082206阀门井57072202泵站57082207阀门57072203冷却塔57082101流量计57072204动力站57082102补偿器57072205弯头57082103锅炉房57072206三通57082104DB42/T875—201959表B.
8工业管道要素分类及代码(续)管线小类要素名称代码管线小类要素名称代码二氧化碳四通57082105氨气氨气面状要素57093000变径57082106甲苯甲苯管段57101000预留口57082107检修井57102201出地点57082108阀门井57102202管堵57082109阀门57102203二氧化碳面状要素57083000流量计57102204氨气氨气管段57091000补偿器57102205检修井57092201锅炉房57102206阀门井57092202泵站57102207阀门57092203冷却塔57102101流量计57092204动力站57102102补偿器57092205弯头57102103锅炉房57092206三通57102104泵站57092207四通57102105冷却塔57092101变径57102106动力站57092102预留口57102107弯头57092103出地点57102108三通57092104管堵57102109四通57092105甲苯面状要素57103000变径57092106其它其它管段57991000预留口57092107检修井57992201出地点57092108阀门井57992202管堵57092109阀门57992203DB42/T875—201960表B.
8工业管道要素分类及代码(续)管线小类要素名称代码管线小类要素名称代码其他流量计57992204其他三通57992104补偿器57992205四通57992105锅炉房57992206变径57992106泵站57992207预留口57992107冷却塔57992101出地点57992108动力站57992102管堵57992109弯头57992103其他面状要素57993000DB42/T875—201961表B.
9给出了其他管线要素分类及代码.
表B.
9其他管线要素分类及代码管线小类要素名称代码管线小类要素名称代码综合管沟(廊)综合管沟(廊)管线58011000不明管线弯头58022104变径58012101三通58022105预留口58012102四通58022106综合管沟(廊)面状要素58013000预留口58022107不明管线不明管线58021000动力站58022108出地58022101检修井58022201变径58022102阀门58022202盖堵58022103不明管线面状要素58023000DB42/T875—201962附录C(规范性附录)地下管线图例表C.
1至C.
2给出了地下管线点符号图例表和地下管线线型代码和图例表.
表C.
1给出了地下管线点符号图例表.
表C.
1地下管线点符号图例表管线类别点符号名称图例图上大小(mm)定位基准给水(JS)检修井2.
0几何中心阀门井2.
0几何中心消防井2.
0几何中心水表井2.
0几何中心水源井2.
0几何中心排气阀2.
0几何中心排污阀2.
0几何中心水塔2.
0几何中心水表2.
0几何中心水池2.
0几何中心阀门孔3.
0*2.
0几何中心泵站3.
0*2.
0几何中心消火栓2.
0*3.
6圆心阀门1.
6*3.
0圆心测压点2.
0几何中心测流点2.
0几何中心水质监测点2.
0*1.
6几何中心进水口2.
0∠60°夹角顶点DB42/T875—201963表C.
1地下管线点符号图例表(续)管线类别点符号名称图例图上大小(mm)定位基准出水口2.
0∠60°夹角顶点沉淀池2.
0*2.
0几何中心盖堵2.
0*1.
0长边中点出地1.
0*3.
0圆心变径1.
0+2.
0圆心弯头1.
0几何中心三通1.
0几何中心四通1.
0几何中心多通1.
0几何中心预留口1.
6+6.
0圆心非普查1.
0+6.
0圆心一般管线点1.
0几何中心入户1.
0几何中心井边点1.
0几何中心井内点1.
0几何中心排水(PS)污水井2.
0几何中心雨水井2.
0几何中心雨篦2.
0*1.
0几何中心污篦2.
0*1.
0几何中心溢流井2.
0+1.
0圆心闸门井2.
0*2.
0长方形几何中心跌水井2.
0几何中心DB42/T875—201964表C.
1地下管线点符号图例表(续)管线类别点符号名称图例图上大小(mm)定位基准通风井2.
0几何中心冲洗井2.
0几何中心沉泥井2.
0几何中心渗水井2.
0几何中心出气井2.
0+1.
0圆心水封井2.
0几何中心排水泵站3.
0*2.
0几何中心化粪池2.
0几何中心净化池2.
0*2.
0几何中心进水口2.
0∠60°夹角顶点出水口2.
0∠60°夹角顶点阀门1.
6*3.
0圆心变径1.
0+2.
0圆心出地1.
0*3.
0圆心拐点1.
0几何中心三通1.
0几何中心四通1.
0几何中心多通1.
0几何中心预留口1.
6+6.
0圆心非普查1.
0+6.
0圆心一般管线点1.
0几何中心井边点1.
0几何中心井内点1.
0几何中心DB42/T875—201965表C.
1地下管线点符号图例表(续)管线类别点符号名称图例图上大小(mm)定位基准燃气(RQ)阀门井2.
0几何中心检修井2.
0几何中心阀门1.
6*3.
0圆心压力表2.
0几何中心阴极测试桩2.
0*1.
6几何中心波形管2.
0*2.
0几何中心凝水缸3.
0*1.
6几何中心调压箱2.
0*2.
0几何中心调压站2.
0*2.
0几何中心燃气柜2.
0几何中心燃气站2.
0*2.
0几何中心燃气桩2.
0*2.
0下方中点涨缩站2.
0*2.
0几何中心弯头1.
0几何中心三通1.
0几何中心四通1.
0几何中心多通1.
0几何中心变径1.
0+2.
0圆心出地1.
0*3.
0几何中心盖堵2.
0*1.
0长边中点预留口1.
6+6.
0圆心非普查1.
0+6.
0圆心DB42/T875—201966表C.
1地下管线点符号图例表(续)管线类别点符号名称图例图上大小(mm)定位基准一般管线点1.
0几何中心入户1.
0几何中心井边点1.
0几何中心井内点1.
0几何中心热力(RL)检修井2.
0几何中心阀门井2.
0几何中心吹扫井2.
0*2.
0几何中心阀门1.
6*3.
0圆心调压装置2.
0*2.
0几何中心疏水1.
6*3.
0圆心真空表1.
6*3.
0圆心固定节1.
6*3.
0几何中心安全阀1.
6*3.
0下方中点排潮孔1.
6*2.
0圆心换热站3.
0*2.
0几何中心变径1.
0+2.
0圆心出地1.
0*3.
0圆心盖堵2.
0*1.
0长边中点弯头1.
0几何中心三通1.
0几何中心四通1.
0几何中心多通1.
0几何中心预留口1.
6+6.
0圆心DB42/T875—201967表C.
1地下管线点符号图例表(续)管线类别点符号名称图例图上大小(mm)定位基准非普查1.
0+6.
0圆心一般管线点1.
0几何中心入户1.
0几何中心井边点1.
0几何中心井内点1.
0几何中心电力(DL)变电站2.
0*2.
0几何中心配电室3.
0*2.
0几何中心变压器2.
0*3.
0几何中心人孔井2.
0几何中心手孔2.
0*2.
0几何中心通风井2.
0几何中心接线箱2.
0*2.
0几何中心路灯控制箱2.
0*2.
0下方中点路灯3.
0*4.
0下方圆心交通信号灯2.
0*4.
0下方中点地灯2.
0+1.
0下方中点线杆2.
0*3.
6下方中点广告牌2.
0*2.
0圆心上杆1.
0*3.
0圆心转折点1.
0几何中心分支点1.
0几何中心预留口1.
6+6.
0圆心非普查1.
0+6.
0圆心DB42/T875—201968表C.
1地下管线点符号图例表(续)管线类别点符号名称图例图上大小(mm)定位基准一般管线点1.
0几何中心井边点1.
0几何中心井内点1.
0几何中心通信(TX)人孔井2.
0几何中心手孔2.
0*2.
0几何中心接线箱2.
0*3.
0几何中心电话亭2.
0*2.
0几何中心监控器1.
4*3.
0圆心无线电杆1.
0*3.
0圆心差转台2.
0*2.
0下方中点发射塔1.
6*2.
0下方中点交换站2.
0*2.
0几何中心上杆1.
0*3.
0圆心转折点1.
0几何中心分支1.
0几何中心预留口1.
6+6.
0圆心非普查1.
0+6.
0圆心一般管线点1.
0几何中心井边点1.
0几何中心井内点1.
0几何中心工业(GY)检修井2.
0几何中心排污装置2.
0几何中心DB42/T875—201969表C.
1地下管线点符号图例表(续)管线类别点符号名称图例图上大小(mm)定位基准动力站3.
0*2.
0几何中心阀门1.
6*3.
0圆心弯头1.
0几何中心三通1.
0几何中心四通1.
0几何中心多通1.
0几何中心变径1.
0+2.
0圆心出地1.
0*3.
0圆心盖堵2.
0*1.
0长边中点预留口1.
6+6.
0圆心非普查1.
0+6.
0圆心一般管线点1.
0几何中心入户1.
0几何中心井边点1.
0几何中心井内点1.
0几何中心其他(QT)检修井2.
0几何中心阀门1.
6*3.
0圆心弯头1.
0几何中心三通1.
0几何中心四通1.
0几何中心多通1.
0几何中心变径1.
0+2.
0圆心DB42/T875—201970表C.
1地下管线点符号图例表(续)管线类别点符号名称图例图上大小(mm)定位基准出地1.
0*3.
0圆心盖堵2.
0*1.
0长边中点预留口1.
6+6.
0圆心非普查1.
0+6.
0圆心一般管线点1.
0几何中心入户1.
0几何中心井边点1.
0几何中心井内点1.
0几何中心通风口1.
0几何中心投料口1.
0几何中心透气阀1.
0几何中心防火门1.
0几何中心防水门1.
0几何中心集水井2.
0几何中心DB42/T875—201971表C.
2给出了地下管线线型代码和图例表.
表C.
2地下管线线型代码和图例表管线类型线型代码图例备注非空管、线缆实线0用于地下管线空管虚线1实线部分和虚线部分比例为3:1管沟(廊)边线虚线2实线部分和虚线部分比例为2:1架空管线虚线3实线部分和虚线部分比例为1:1非开挖管线点划线4实线部分和虚线部分比例为2:1井内连线不可见5用于保证管线连通性虚拟连线不可见6用于保证管线连通性废弃管线组合线型7标记位置为7:1DB42/T875—201972附录D(规范性附录)管线属性数据字典表D.
1至D.
4给出了管线材质数据字典表、管线敷设方式数据字典表、管线状态数据字典表、权属单位数据字典表.
表D.
1给出了管线材质数据字典表.
表D.
1管线材质数据字典表材质名称代号适用管线类型铸铁T给水钢G给水、燃气、热力砼T排水、给水、电力、通信聚乙烯塑料PE除热力、工业外的各专业聚氯乙烯塑料PVC玻璃钢BLG电力、给水球墨铸铁QM给水砖石ZS排水、电力、通信砖Z石S排水石棉SM陶瓷TC铜TZ电力、通信钢芯铝绞线VL电力光纤GX通信DB42/T875—201973表D.
2给出了管线敷设方式数据字典表.
表D.
2管线敷设方式数据字典表敷设方式代号说明直埋ZM管线直接敷设于地下的敷设方式,常用于给水、燃气、排水等管道.
管埋GM管线通过保护套管敷设于地下的敷设方式,套管以单管或管组的形式预先敷设于地下,常用于电力、电信电缆.
管块GK管线通过预制水泥标准管块的形式敷设于地下,常用于电力、电信电缆.
管沟GG管线形态为方沟或管线敷设于沟道中,常用于排水方沟,热力管道,电力、电信电缆等的敷设.
架空JK管线架设于地面之上,常用于电力、通信、热力等.
地面DM管线铺设于地表,管线点标志只能设置于管线,测量只能采集管线高程.
此时数据库内无地面高程.
上架SJ地下电缆上杆、管道出地垂直管线段部分,地下管线点埋深为正值,架空点埋深为负值.
小通道XTD其它管线借用排水管(沟)敷设.
综合管沟(廊)ZH不同种类管线集中敷设的通道或地下隧道.
人防RF地下人工防空通道.
井内连线JN检查井内的连接管线.
顶管(非开挖或定向钻)DG按预先设定的地下铺管轨迹靠钻头挤压形成一个小口径先导孔,随后在先导孔出口端的钻杆头部安装扩孔器回拉扩孔,当扩孔至尺寸要求后,在扩孔器的后端连接旋转接头、拉管头和管线,回拉铺设地下管线.
水下SX敷设于水面以下的管线.
DB42/T875—201974表D.
3给出了管线状态数据字典表.
表D.
3管线状态数据字典表状态名称代码在用0废弃1空管2其他3表D.
4给出了权属单位数据字典表.
表D.
4权属单位数据字典表单位名称代码**(某专业管线权属单位名称)01**(某专业管线权属单位名称)02**(某专业管线权属单位名称)03**(某专业管线权属单位名称)04.
.
DB42/T875—201975附录E(规范性附录)管线数据结构表E.
1至E.
10给出了管线点表数据结构表、管线线表数据结构表、管线面表数据结构表、管线辅助点表数据结构表、管线辅助线表数据结构表、管线注记点表数据结构表、综合管沟(廊)点表数据结构表、综合管沟(廊)线表数据结构表、管线图数据表结构表、管线图图层风格数据表结构表.
表E.
1给出了管线点表数据结构表.
表E.
1管线点表数据结构表序号字段名称字段类型字段长度小数位数完整性约束说明1管线点编号字符型8非空必须填写,管线点编号2图上点号字符型20可据实际填写,图上点号3图幅号字符型20可据实际填写,图幅号4特征字符型20非空管线点特征5附属物字符型16管线附属物6地面高程数值型83非空管线点地面高程,单位米7要素编码字符型9非空管线要素代码8X坐标数值型153非空单位米9Y坐标数值型153非空单位米10符号角度数值型62点符号旋转角度11井底深数值型82单位米12偏心井位字符型20偏心井位点号13井盖形状字符型20方、圆等14井盖尺寸字符型20长宽、直径等(单位厘米)15井盖材质字符型20铁、砼、塑料等16井材质字符型20水泥、砖混17井深数值型82井盖向下的垂直段的距离:井脖深+井室深=井深18井尺寸数值型82井基底的内径尺寸,长宽或直径(单位米)19所在道路字符型32所在道路名20敷设年代字符型4年份21权属单位字符型60据实际填写22探测日期日期型10yyyy/mm/dd格式23探测单位字符型50非空据实际填写探测单位名称24监理单位字符型50可据需要选填25状态字符型8可据需要选填26备注字符型50可据需要选填DB42/T875—201976表E.
2给出了管线线表数据结构表.
表E.
2管线线表数据结构表序号字段名称字段类型字段长度小数位数完整性约束说明1起始管线点编号字符型8非空起始管线点编号2终止管线点编号字符型8非空终止管线点编号3起始管线点高程数值型153非空单位:米4终止管线点高程数值型153非空单位:米5起始管线点埋深数值型153非空单位:米6终止管线点埋深数值型153非空单位:米7起始管线点X坐标数值型153非空单位:米8起始管线点Y坐标数值型153非空单位:米9终止管线点X坐标数值型153非空单位:米10终止管线点Y坐标数值型153非空单位:米11要素编码字符型8非空——12线型数值型201-实线,0-虚线13材质字符型8非空按照实际填14压力字符型16管内压力15电压字符型16电力线电压16敷设方式字符型8非空按照实际填17管径数值型5圆管填写直径,非圆管填写宽高,单位:毫米18线缆条数数值型4据实际填19总孔数数值型4据实际填20已用孔数数值型4据实际填21孔径数值型4单位:毫米22敷设年代字符型4年份23权属单位字符型60非空填写权属单位名称24所在道路字符型32所在道路名25使用状态字符型8按实际填26探测日期日期型10yyyy/mm/dd格式27探测单位字符型50可据需要选填28监理单位字符型50可据需要选填29备注字符型50可据需要选填DB42/T875—201977表E.
3给出了管线面表数据结构表.
表E.
3管线面表数据结构表序号字段名称字段类型字段长度小数位数完整性约束说明1管线面标识字符型40非空管线面标识信息2管线面编号字符型8非空管线面编号3地面高程数值型153非空单位:米4X坐标数值型153非空单位:米5Y坐标数值型153非空单位:米6要素编码字符型9非空单位:米7深度数值型62非空井底深8材质字符型12非空据实填9状态字符型20据实填10敷设年代字符型4年份11权属单位字符型60权属单位名12备注字符型50据实选填表E.
4给出了管线辅助点表数据结构表.
表E.
4管线辅助点表数据结构表序号字段名称字段类型字段长度小数位数说明1点号字符型8点号2点符号代码字符型4虚拟窨井为相应窨井代码,其他为空3X坐标数值型153单位:米4Y坐标数值型153单位:米5地面高程数值型153单位:米6管线种类字符型2管线类别7图形类别字符型20图形类别包括一井多盖范围点、窨井符号、窨井轮廓点、排水沟边线点等.
DB42/T875—201978表E.
5给出了管线辅助线表数据结构表.
表E.
5管线辅助线表数据结构表序号字段名称字段类型字段长度小数位数说明1管线点号字符型8对应窨井点的管线点号2起始管线点号字符型8起始管线点号3终止管线点号字符型8终止管线点号4管线种类字符型2管线类别5线型数值型201-实线,0-虚线表E.
6给出了管线注记点表数据结构表.
表E.
6管线注记点表数据结构表序号字段名称字段类型字段长度小数位数说明1标识码字符型10非空2所连管线(点)代码字符型29非空3注记范围X最小坐标数值型103非空4注记范围Y最小坐标数值型103非空5注记范围X最大坐标数值型103非空6注记范围Y最大坐标数值型103非空7字体字符型10选填8是否斜体数值型1选填9是否加粗数值型1选填10是否加下划线数值型1选填11字体大小数值型4选填12字体颜色数值型8选填13旋转角数值型8选填14对齐方式字符型10选填15注记内容字符型30非空16备注字符型80选填DB42/T875—201979表E.
7给出了综合管沟(廊)点表数据结构表.
表E.
7综合管沟(廊)点表数据结构表序号字段名称字段类型字段长度小数位数说明1管沟廊点号字符型8管沟(廊)点号2X坐标数值型153单位:米3Y坐标数值型153单位:米4管线种类字符型2管线小类代号5特征字符型20如三通、转折点、量测点等6道路名称字符型20所在道路名7地面高程数值型153高程值8建设年代字符型4年份9备注字符型128可据实选填表E.
8给出了综合管沟(廊)线表数据结构表.
表E.
8综合管沟(廊)线表数据结构表序号字段名称类型字段长度小数位数说明1编号字符型8编号2起始管线点号字符型8起始管沟点号3终止管线点号字符型8终止管沟点号4管线种类字符型4管线小类代号5管线材质字符型20管线材质6管线规格字符型20断面尺寸7敷设方式字符型20敷设方式8起始管线点埋深数值型83起始管线点埋深9终止管线点埋深数值型83终止管线点埋深10是否预埋数值型20-非预埋管沟(廊)1-预埋管沟(廊)11道路名称字符型20所在道路名称12建设年代字符型4年份13备注字符型50据实选填DB42/T875—201980表E.
9给出了管线图数据表结构表.
表E.
9管线图数据表结构表序号字段名称字段类型字段长度小数位数完整性约束说明1管线图ID数值型40非空——2管线图名称字符型32非空——3管线图说明字符型64——表E.
10给出了管线图图层风格数据表结构表.
表E.
10管线图图层风格数据表结构表序号字段名称字段类型字段长度小数位数完整性约束说明1图层ID数值型4非空——2管线图ID数值型4非空与管线图数据表关联3图层名称字符型32非空一般沿用对应数据集的中文名称4图层说明字符型64——5条件字符型64为空则显示全部图层;非空则根据具体条件显示图层6颜色字符型12非空红绿蓝(RGB)值7最大显示比例数值型123不设置,将一直显示8最小显示比例数值型1239字体字符型32对于注记图层有效10注记内容字符型64对非注记图层,描述需生成注记的字段组合及格式;对注记图层,可以存放具体的注记内容DB42/T875—201981附录F(资料性附录)明显管线点调查表表F.
1给出了明显管线点调查表.
表F.
1明显管线点调查表管类:测区:图幅编号:日期:起点管线点号终点管线点号材质特征点管径(mm)埋深(m)载体特征总孔数已用孔数电缆条数附属物名称权属单位敷设方式敷设日期道路名称备注起点终点压力电压流向或载体性质操作者记录者校核者探测单位:DB42/T875—201982附录G(资料性附录)隐蔽管线点探查记录表表G.
1给出了隐蔽管线点探查记录表.
表G.
1隐蔽管线点探查记录表管类:测区:图幅编号:日期:发射机型号接收机型号管线点号连接方向管径(mm)材质特征点平面定位定深权属单位敷设方式敷设日期道路名称备注探测方法频率邻近地物或标志方法中心埋深(m)修正系数(m)修正后埋深(m)探查单位:操作者记录者校核者DB42/T875—201983附录H(资料性附录)地下管线检查记录表表H.
1至H.
2给出了地下管线探查检查记录表和地下管线开挖检查记录表.
表H.
1给出了地下管线探查检查记录表.
表H.
1地下管线探查检查记录表测区:检查方式:检查日期:检查点序号点所在图幅号管线点号类别材质平面定位偏距(cm)埋深(m)评定备注探查检查差值1234567891011作业单位:探查者:检查者:校核者:DB42/T875—201984表H.
2给出了地下管线开挖检查记录表.
表H.
2地下管线开挖检查记录表测区:图幅编号:检查日期:开挖点连接方向管类材质管径(mm)平面实际偏距(cm)深度比较(cm)质量评价图幅号备注探测深度实际深度差值作业单位:探查者:检查者:校核者:DB42/T875—201985附录I(资料性附录)地下管线成果表表I.
1给出了地下管线成果表.
表I.
1地下管线成果表图幅编号:管线种类:权属单位:图上点号物探点号连接点号特征点附属物名称坐标(m)高程(m)管径或断面尺寸(mm)材质压力或电压电缆根数总孔数/已用孔数敷设方式敷设日期道路名称备注X坐标Y坐标地面高程管线高程探测者:校核者:工程负责人:日期:DB42/T875—201986附录J(资料性附录)地下管线竣工测量成果表表J.
1给出了地下管线竣工测量成果表.
表J.
1地下管线竣工测量成果表图幅编号:管线种类:权属单位:点号连接点号特征点附属物名称坐标(m)高程(m)管径或断面尺寸(mm)材质压力或电压电缆根数总孔数/已用孔数敷设方式敷设日期道路名称备注X坐标Y坐标地面高程管线高程探测者:校核者:工程负责人:日期:DB42/T875—201987附录K(资料性附录)地下管线图样图图K.
1至K.
4给出了地下管线图样图.
(另附)DB42/T875—201988附录L(规范性附录)地下管线探测作业安全保护措施L.
1从事地下管线探测的工作人员,应熟悉工作岗位的安全保护规定,在市区或道路上进行地下管线探测的工作人员,应穿戴安全警示服,遵守城市交通法规.
L.
2进入企业厂区进行地下管线探测的工作人员,应熟悉该厂安全保护规定,遵守该企业工厂的厂规.
L.
3打开窨井盖进行实地调查作业时,应在井口周围设置安全防护围栏,并指定专人看管;夜间作业时,应在作业区域周边显著位置设置安全警示灯,地面作业人员应穿着高可视性警示服;作业完毕,应立即盖好窨井盖.
L.
4在井下作业调查或施放探头、电极导线时,严禁使用明火,并应进行有害、有毒及可燃气体的浓度测定;超标的管道应采用安全保护措施后方能作业.
L.
5严禁在氧气、燃气、乙炔等助燃、易燃、易爆管道上作充电点,进行直接法或充电法作业;严禁在塑料管道和燃气管道使用钎探.
L.
6使用的探测仪器工作电压超过36V时,作业人员应使用绝缘防护用品;接地电极附近应设置明显警告标志,并指定专人看管;井下作业的所有探测设备外壳必须接地.
DB42/T875—201989附录M(规范性附录)条款表述所有的助动词表M.
1至M.
3给出了条款表述所有的助动词的使用规则.
表M.
1所示的助动词表示声明符合规范需要满足的要求.
表M.
1要求助动词在特殊情况下使用的等效表述应不应不得不能表M.
2所示的助动词表示在几种可能性中推荐特别适用的一种,不提及也不排除其他可能性,或表示某个行动步骤是首选的但未必是所要求的,或(以否定形式)表示不赞成或但也不禁止某种可能性或行动步骤.
表M.
2推荐助动词在特殊情况下使用的等效表述宜建议表M.
3所示的助动词表示在标准的界限内所允许的行动步骤.
表M.
3允许助动词在特殊情况下使用的等效表述可可以允许DB42/T875—201990参考文献〔1〕《地下管线探测技术规程》DB37/T5088-2017山东省住房和城乡建设厅、山东省质量技术监督局联合发布)〔2〕《地下管线信息管理系统建设标准》(DB37/T5089-2017山东省住房和城乡建设厅、山东省质量技术监督局联合发布)

Gcore(75折)迈阿密E5-2623v4 CPU独立服务器

部落分享过多次G-core(gcorelabs)的产品及评测信息,以VPS主机为主,距离上一次分享商家的独立服务器还在2年多前,本月初商家针对迈阿密机房限定E5-2623v4 CPU的独立服务器推出75折优惠码,活动将在9月30日到期,这里再分享下。G-core(gcorelabs)是一家总部位于卢森堡的国外主机商,主要提供基于KVM架构的VPS主机和独立服务器租用等,数据中心包括俄罗斯、美国、日...

HyperVMart:加拿大vps,2核/3G/25G NVMe/G口不限流量/季付$10.97,免费Windows系统

hypervmart怎么样?hypervmart是一家成立了很多年的英国主机商家,上一次分享他家还是在2年前,商家销售虚拟主机、独立服务器和VPS,VPS采用Hyper-V虚拟架构,这一点从他家的域名上也可以看出来。目前商家针对VPS有一个75折的优惠,而且VPS显示的地区为加拿大,但是商家提供的测速地址为荷兰和英国,他家的优势就是给到G口不限流量,硬盘为NVMe固态硬盘,这个配置用来跑跑数据非常...

特网云,美国独立物理服务器 Atom d525 4G 100M 40G防御 280元/月 香港站群 E3-1200V2 8G 10M 1500元/月

特网云为您提供高速、稳定、安全、弹性的云计算服务计算、存储、监控、安全,完善的云产品满足您的一切所需,深耕云计算领域10余年;我们拥有前沿的核心技术,始终致力于为政府机构、企业组织和个人开发者提供稳定、安全、可靠、高性价比的云计算产品与服务。公司名:珠海市特网科技有限公司官方网站:https://www.56dr.com特网云为您提供高速、稳定、安全、弹性的云计算服务 计算、存储、监控、安全,完善...

qq空间打开是空白页为你推荐
objectflash深圳市福田区国民经济和社会发展accessdenied上网时电脑上显示access denied 是怎么回事prohibitedleaning on the door prohibited什么用法(语法),不甚感激flashftpFLASHFXP怎么用有没有详细的说明??asp.net什么是asp.net河南省全民健康信息平台建设指引(试行)小型汽车网上自主编号申请成都新车上牌办理流程和办理条件是如何的加多宝与王老吉王老吉和加多宝什么关系?徐州商标介绍徐州的一种产品
域名网站 fc2最新域名 Oray域名注册服务商 域名查询软件 俄罗斯vps 万网域名管理 企业主机 美国主机代购 国内php空间 蜗牛魔方 100x100头像 789电视 phpmyadmin配置 网络空间租赁 shopex主机 闪讯官网 wordpress中文主题 电信宽带测速软件 服务器硬件配置 gotoassist 更多