扶贫360免费建站

360免费建站  时间:2021-05-03  阅读:()

4.
项目库表"1""镇康县2018年至2020年精准脱贫攻坚项目库汇总表""填报单位:临沧市镇康县填表人:杨通""序号","项目类别及名称","建设性质","建设地点",,"单位","规模","项目概况(主要建设内容及补助标准)","建档立卡直接受益",,"时间进度",,"需要投入资金(万元)",,,,"其中:申请补助资金","责任人",,"行业责任部门","绩效目标","备注"户","人","开工年度","完工年度","合计","2018年","2019年","2020年",,"村委会干部","驻村扶贫工作队员",,,,,,"乡","村",1,2,3,4,5,6,7,"8=9+10+11",9,10,11,12,13,14,15,16,762,"合计"335016,1297587,122248.
8005,49209.
8155,48594.
645,24444.
34,122248.
8005,216,"一、产业类项目","新建"123036,486906,26447.
69,7127.
95,10708.
63,8611.
11,26447.
69,122,"(一)种植养殖加工服务","新建"52200,204400,14564.
82,2490.
65,7096.
53,4977.
64,14564.
82,2,"1.
粮食","新建"亩",2000,"—",309,1269,230,0,230,0,230,1,"小软米产业","新建","忙丙乡","帮海","亩",1000,"以合作社运作模式,种植1000亩小软米.
",193,790,2019,2019,115,,115,,115,"村委会支书","驻村扶贫工作队长","农业局","完成小软米种植1000亩,项目验收合格率100%,建档立卡贫困户受益人口≥790人","镇财整合(2019)1号"2,"小软米产业","新建","勐捧镇","勐捧村","亩",1000,"以合作社运作模式,种植1000亩小软米.
",116,479,2019,2019,115,,115,,115,"村支书","驻村扶贫工作队长","农业局","完成小软米种植1000亩,项目验收合格率100%,建档立卡贫困户受益人口≥479人","镇财整合(2019)1号"3,"2.
蔬菜","新建"522,1985,704.
85,0,0,704.
85,704.
85,1,"军赛乡岔路村果蔬冷藏交易市场(沪滇)","新建","军赛乡","岔路村","项",1,"在岔路村新建果蔬冷藏交易市场1个,其中新建3间共750平方米冷库房,投入113万元;新建1间80平方米制冰房,投入80万元;配套果蔬交易区、水、电、路、护墙等附属工程,投入65万元.
产权归村集体所有,采取"村集体+合作社+农户"的模式.
",56,183,2020,2020,258,,,258,258,"村支书","驻村扶贫工作队长","县扶贫办","项目完成率100%,项目验收合格率100%","沪滇项目"2,"勐捧镇勐捧村蔬菜生产基地建设(沪滇)","新建","勐捧镇","勐捧村","亩",50,"1.
新建钢架大棚100个,投入200万元;2.
配套喷、滴灌等灌溉设施,投入7万元.
产权归村集体所有,采用"村集体+合作社+农户"的模式,引入市场主体,签订协议,租赁或合作经营,收益应考虑设备折旧和贫困群众利益.
",116,472,2020,2020,207,,,207,207,"村支书","驻村扶贫工作队长","县扶贫办","项目完成率100%,项目验收合格率100%","沪滇项目"3,"2020年发展蔬菜产业项目","新建","木场乡",,"项",1,"以企业为主体,采取"公司+合作社+基地+农户+学校"的模式,发展种植马铃薯5000亩",350,1330,2020,2020,239.
85,,,239.
85,239.
85,"村支书","驻村扶贫工作队长","农业局","完成马铃薯5000亩,项目验收合格率100%","镇财整合【2020】9号"1,"3.
药材","新建"260,1007,50,0,50,0,50,1,"黄精种植","新建","木场乡","木场村","亩",150,"木场村黄精种植250亩,每亩400株,每株5元,每亩补助2000元.
",260,1007,2019,2019,50,,50,,50,"村支书","驻村扶贫工作队长","产业办","完成黄精种植,项目验收合格100%,建档立卡贫困户受益人口≥1007人","镇财整合(2019)5号"74,"4.
烤烟","新建"15469,59601,3569.
97,400.
65,1783.
53,1385.
79,3569.
97,1,"凤尾镇6个村1600亩香料烟种植基地管网建设项目","新建","凤尾镇","6个村","公里",104,"PE50管架设12公里,单价25元/米;PE40管架设15公里,单价20元/米;PE32管架设29公里,单价18元/米;PE25管架设39公里,单价12元/米;PE20管架设43公里,单价8元/米;建设大砖支砌蓄水池建设80个,单价2000元/个;1立方压力池建设20个,单价300元/个.
",112,425,2019,2019,210,,210,,210,"村支书","驻村扶贫工作队长","农业局","完成香料烟种植基地管网建设,项目验收合格100%,建档立卡贫困户受益人口≥425人","镇财整合(2019)12号"2,"勐堆乡勐堆村、尖山村烤房群建设","新建","勐堆乡","勐堆、尖山村","座",15,"2018年建设的勐堆尖山村烤房5座,2019年新建勐堆村烤房10座.
",15,59,2018,2019,57,,57,,57,"村支书","驻村扶贫工作队长","产业办","完成烤房群建设,项目验收合格100%,建档立卡贫困户受益人口≥59人","镇财整合(2019)5号"3,"烤房建设","新建","勐堆乡","尖山村","座",5,"尖山考房群:密集型烤房5座",38,168,2018,2018,10,10,,,10,"村支书","驻村扶贫工作队长","产业办","完成烤房建设,项目验收合格100%,建档立卡贫困户受益人口≥168人","镇政财预字(2018)2号"4,"烤房建设","新建","勐堆乡","勐堆村","项",1,"烤房设备、烤房、编烟棚、厕所等.
",15,59,2019,2019,38,,38,,38,"村支书","驻村扶贫工作队长","产业办","完成烤房建设,项目验收合格100%,建档立卡贫困户受益人口≥59人","镇财整合(2019)1号"5,"烤房配套电力架设工程","新建","勐堆乡","勐堆村","项",1,"10kv线路、50kVA配电变压器、JP柜50kVA",16,60,2019,2019,14,,14,,14,"村支书","驻村扶贫工作队长","产业办","完成烤房配套电力架设工程,项目验收合格100%,建档立卡贫困户受益人口≥60人","镇财整合(2019)1号"6,"烤烟责任目标考核奖励资金","新建","勐堆乡","5个村","项",1,"责任目标考核奖励资金",74,296,2019,2019,10,,10,,10,"村支书","驻村扶贫工作队长","产业办","项目验收合格100%","镇财整合(2019)2号"7,"2019年烤烟生产备耕补助","新建","勐堆乡","5个村","项",1,"2019年烤烟生产备耕补助",74,296,2019,2019,4,,4,,4,"村支书","驻村扶贫工作队长","产业办","项目验收合格100%","镇财整合(2019)2号"8,"勐堆坝区烟区水网建设","新建","勐堆乡","勐堆村","项",1,"勐堆坝区烟区水网、架设PEC30塑管线长5公里、PEC20塑管架设8公里,新建压力池1个1立方米、蓄水水池10个、每个10立方米",47,178,2019,2020,22,,22,,22,"夏应忠","李建朝","产业办","完成烟区水网建设,项目验收合格100%,建档立卡贫困户受益人口≥178人","镇财整合(2019)4号"9,"尖山村烟区水网建设","新建","勐堆乡","尖山村","项",1,"新建尖山村新寨坝烟区水网、架设PEC30塑管线长2公里、PEC20塑管架设4公里,新建压力池1个1立方米、蓄水水池8个、每个10立方米、",38,168,2019,2020,12,,12,,12,"马强","段春林","产业办","完成烟区水网建设,项目验收合格100%,建档立卡贫困户受益人口≥168人","镇财整合(2019)8号"10,"勐堆乡勐堆村烤房群配电工程","新建","勐堆乡","勐堆村","项",1,"新置烤房备用电源发电机一台",89,333,2019,2019,3,,3,,3,"村支书","驻村扶贫工作队长","产业办","完成烟区水网建设,项目验收合格100%,建档立卡贫困户受益人口≥333人","镇政财农字〔2019〕32号"11,"烤烟责任目标考核奖励资金","新建","忙丙乡","3个村","项",1,"责任目标考核奖励资金",310,930,2019,2019,10,,10,,10,"村支书","驻村扶贫工作队长","烟办","项目验收合格100%","镇财整合(2019)2号"12,"2019年烤烟生产备耕补助","新建","忙丙乡","3个村","项",1,"2019年烤烟生产备耕补助",310,930,2019,2019,4,,4,,4,"村支书","驻村扶贫工作队长","烟办","项目验收合格100%","镇财整合(2019)2号"13,"烤房建设","新建","忙丙乡","忙丙村","座",10,"岔路寨:密集型烤房10座",235,947,2018,2018,14,14,,,14,"高华东","李双","烟办","完成烤房建设,项目验收合格100%,建档立卡贫困户受益人口≥947人","镇政财预字(2018)2号"14,"勐捧镇酸格林村烤房建设项目","新建","勐捧镇","酸格林村","座",10,"2019年新建烤房10座,补助标准:3.
8万元/座.
",124,532,2019,2019,38,,38,,38,"村支书","驻村扶贫工作队长","烟办","完成烤房建设,项目验收合格100%,建档立卡贫困户受益人口≥532人","镇政财农字〔2019〕32号"15,"新建密集型烤房","新建","勐捧镇","酸格林村","座",80,"酸格林村新建密集型烤房80座,配套烤房休息室、地坪、配电室、捡烟棚、厕所、挡墙等附属工程建设.
",42,153,2018,2019,160,160,,,160,"村支书","驻村扶贫工作队长","烟办","完成烤房建设,项目验收合格100%,建档立卡贫困户受益人口≥153人","镇财整合[2018]3号"16,"烤房配套用电架设","新建","勐捧镇","酸格林村","千米",1.
28,"酸格林村烤房配套用电架设10KV线路1.
07千米,0.
4KV线路0.
21千米,80KVA配电变压器2台,100KVA配电变压器1台,JP柜80KVA2台、100KVA1台.
",42,153,2018,2019,44.
28,44.
28,,,44.
28,"村支书","驻村扶贫工作队长","烟办","完成烤房配套用电架设,项目验收合格100%,建档立卡贫困户受益人口≥153人","镇财整合[2018]3号"17,"烤房配套用电架设","新建","勐捧镇","蒿子坝村","千米",0.
43,"蒿子坝村烤房配套用电架设10KV线路0.
38千米,0.
4KV线路0.
05千米,80KVA配电变压器1台,JP柜80KVA1台.
",17,50,2018,2019,14.
54,14.
54,,,14.
54,"村支书","驻村扶贫工作队长","烟办","完成烤房配套用电架设,项目验收合格100%,建档立卡贫困户受益人口≥50人","镇财整合[2018]3号"18,"烤房配套用电架设","新建","勐捧镇","丫口村","千米",2.
27,"丫口村烤房配套用电架设10KV线路2.
27千米,80KVA配电变压器1台,JP柜80KVA1台.
",70,263,2018,2019,39.
51,39.
51,,,39.
51,"村支书","驻村扶贫工作队长","烟办","完成烤房配套用电架设,项目验收合格100%,建档立卡贫困户受益人口≥263人","镇财整合[2018]3号"19,"烤房配套用电架设","新建","勐捧镇","核桃箐村","千米",0.
11,"核桃箐村烤房配套用电架设10KV线路0.
03千米,0.
4KV线路0.
08千米,50KVA配电变压器1台,JP柜50KVA1台.
",17,70,2018,2019,5.
09,5.
09,,,5.
09,"村支书","驻村扶贫工作队长","烟办","完成烤房配套用电架设,项目验收合格100%,建档立卡贫困户受益人口≥70人","镇财整合[2018]3号"20,"烤房建设","新建","勐捧镇","酸格林村","座",10,"苦菜林:密集型烤房10座",248,1064,2018,2018,20,20,,,20,"村支书","驻村扶贫工作队长","烟办","完成烤房建设,项目验收合格100%,建档立卡贫困户受益人口≥1064人","镇政财预字(2018)2号"21,"烤房建设","新建","勐捧镇","蒿子坝村","座",20,"冷山:密集型烤房20座",246,961,2018,2018,37.
85,37.
85,,,37.
85,"村支书","驻村扶贫工作队长","烟办","完成烤房建设,项目验收合格100%,建档立卡贫困户受益人口≥961人","镇政财预字(2018)2号"22,"烤房建设","新建","勐捧镇","蒿子坝村","座",20,"章龙:密集型烤房10座",246,961,2018,2018,20,20,,,20,"村支书","驻村扶贫工作队长","烟办","完成烤房建设,项目验收合格100%,建档立卡贫困户受益人口≥961人","镇政财预字(2018)2号"23,"烤房建设","新建","勐捧镇","丫口村","座",10,"马二林山:密集型烤房10座",250,1086,2018,2018,20,20,,,20,"村支书","驻村扶贫工作队长","烟办","完成烤房建设,项目验收合格100%,建档立卡贫困户受益人口≥1086人","镇政财预字(2018)2号"24,"烤房建设","新建","勐捧镇","酸格林村","项",1,"烤房设备、烤房、编烟棚、厕所等.
",248,1064,2019,2019,38,,38,,38,"村支书","驻村扶贫工作队长","烟办","完成烤房建设,项目验收合格100%,建档立卡贫困户受益人口≥1064人","镇财整合(2019)1号"25,"烤房建设","新建","勐捧镇","忙耿村","项",1,"烤房设备、烤房、编烟棚、厕所等.
",78,305,2019,2019,76,,76,,76,"村支书","驻村扶贫工作队长","烟办","完成烤房建设,项目验收合格100%,建档立卡贫困户受益人口≥305人","镇财整合(2019)1号"26,"烤房建设","新建","勐捧镇","石桥村","项",1,"烤房设备、烤房、编烟棚、厕所等.
",141,534,2019,2019,19,,19,,19,"村支书","驻村扶贫工作队长","烟办","完成烤房建设,项目验收合格100%,建档立卡贫困户受益人口≥534人","镇财整合(2019)1号"27,"烤房配套电力架设工程","新建","勐捧镇","酸格林村","项",1,"10kv线路、50kVA配电变压器、JP柜50kVA",248,1064,2019,2019,14,,14,,14,"村支书","驻村扶贫工作队长","烟办","完成烤房配套电力架设工程,项目验收合格100%,建档立卡贫困户受益人口≥1064人","镇财整合(2019)1号"28,"烤房配套电力架设工程","新建","勐捧镇","忙耿村","项",1,"10kv线路、50kVA配电变压器、JP柜50kVA",78,305,2019,2019,28,,28,,28,"村支书","驻村扶贫工作队长","烟办","完成烤房配套电力架设工程,项目验收合格100%,建档立卡贫困户受益人口≥305人","镇财整合(2019)1号"29,"忙耿洼子寨自然村烤烟管网建设","新建","勐捧镇","忙耿村","项",1,"忙耿洼子寨自然村烤烟管网建设",78,305,2019,2019,9,,9,,9,"村支书","驻村扶贫工作队长","产业办","完成烤烟管网建设,项目验收合格100%,建档立卡贫困户受益人口≥305人","镇财整合(2019)12号"30,"丫口村烤烟管网建设","新建","勐捧镇","丫口村","项",1,"丫口村烤烟管网建设(大中山6万,梅子树15万,大岗山24万)",98,320,2019,2019,45,,45,,45,"村支书","驻村扶贫工作队长","产业办","完成烤烟管网建设,项目验收合格100%,建档立卡贫困户受益人口≥320人","镇财整合(2019)12号"31,"勐捧镇酸格林字家寨自然村烤烟管网建设项目","新建","勐捧镇","酸格林村","项",1,"酸格林字家寨自然村烤烟管网建设8公里,3万元/公里.
",39,127,2019,2019,23.
66,,23.
66,,23.
66,"村支书","驻村扶贫工作队长","产业办","完成烤烟管网建设,项目验收合格100%,建档立卡贫困户受益人口≥127人","镇财整合(2019)8号"32,"勐捧镇酸格林章奎大寨自然村烤烟管网建设项目","新建","勐捧镇","酸格林村","项",1,"酸格林章奎大寨自然村烤烟管网建设5公里,3万元/公里.
",43,147,2019,2019,15,,15,,15,"村支书","驻村扶贫工作队长","产业办","完成烤烟管网建设,项目验收合格100%,建档立卡贫困户受益人口≥147人","镇财整合(2019)8号"33,"勐捧镇酸格林自然村烤烟管网建设项目","新建","勐捧镇","酸格林村","项",1,"酸格林自然村烤烟管网建设",45,153,2019,2019,30,,30,,30,"村支书","驻村扶贫工作队长","产业办","完成烤烟管网建设,项目验收合格100%,建档立卡贫困户受益人口≥153人","镇财整合(2019)12号"34,"勐捧镇酸格林麻栗树自然村烤烟管网建设项目","新建","勐捧镇","酸格林村","项",1,"酸格林麻栗树自然村烤烟管网建设",38,124,2019,2019,15,,15,,15,"村支书","驻村扶贫工作队长","产业办","完成烤烟管网建设,项目验收合格100%,建档立卡贫困户受益人口≥124人","镇财整合(2019)12号"35,"勐捧镇酸格林苦菜林自然烤烟管网建设项目","新建","勐捧镇","酸格林村","项",1,"酸格林苦菜林自然烤烟管网建设",43,147,2019,2019,12,,12,,12,"村支书","驻村扶贫工作队长","产业办","完成烤烟管网建设,项目验收合格100%,建档立卡贫困户受益人口≥147人","镇财整合(2019)12号"36,"岔沟村烤烟生产用水建设项目","新建","勐捧镇","岔沟村","项",1,"新建抽水提灌站2个,变压器2台,抽水机2台,架线0.
8公里.
主管线DN65mm4公里.
",118,437,2019,2019,74,,74,,74,"村支书","驻村扶贫工作队长","水务局","完成烤烟生产用水建设,项目验收合格100%,建档立卡贫困户受益人口≥437人","镇财整合(2019)12号"37,"蒿子坝村烤烟生产用水建设项目","新建","勐捧镇","蒿子坝村","项",1,"新建主DN100mm6000米,DN40mm2000米,压力池一个5立方米,蓄水池一个1000立方米,",246,961,2019,2019,155,,155,,155,"村支书","驻村扶贫工作队长","水务局","完成烤烟生产用水建设,项目验收合格100%,建档立卡贫困户受益人口≥961人","镇财整合(2019)12号"38,"烤烟生物质燃料加工建设项目","新建","勐捧镇","酸格林村","项",1,"建设一体化厂房(生产车间、产品仓库)2500平方米,计划投资50万元.
",248,1064,2019,2019,50,,50,,50,"村支书","驻村扶贫工作队长","产业办","完成烤烟生物质燃料加工建设,项目验收合格100%,建档立卡贫困户受益人口≥961人","镇财整合(2019)15号"39,"勐捧镇丫口村大岗山烤房群10千伏配电工程","新建","勐捧镇","丫口村","项",1,"10kV架空绝缘线路架设、配电变压器、JP柜81kVA、新置烤房备用电源发电机一台、带电作业人工费等.
",101,434,2019,2019,16.
64,,16.
64,,16.
64,"村支书","驻村扶贫工作队长","产业办","完成烤房群10千伏配电工程,项目验收合格100%,建档立卡贫困户受益人口≥434人","镇财整合(2019)12号"40,"勐捧镇酸格林村字家寨烤房群10千伏配电工程","新建","勐捧镇","酸格林村","项",1,"10kV架空绝缘线路架设、配电变压器、JP柜82kVA、新置烤房备用电源发电机一台、带电作业人工费等.
",99,452,2019,2019,27,,27,,27,"村支书","驻村扶贫工作队长","产业办","完成烤房群10千伏配电工程,项目验收合格100%,建档立卡贫困户受益人口≥452人","镇财整合(2019)5号"41,"勐捧镇丫口村大中山烤房10千伏配电工程","新建","勐捧镇","丫口村","项",1,"10kV架空绝缘线路架设、配电变压器、JP柜80kVA、新置烤房备用电源发电机一台、带电作业人工费等.
",97,430,2019,2019,12,,12,,12,"村支书","驻村扶贫工作队长","产业办","完成烤房群10千伏配电工程,项目验收合格100%,建档立卡贫困户受益人口≥430人","镇政财农字〔2019〕32号"42,"2019年上海市对口支援云南省项目","新建","勐捧镇","丫口村","项",1,"在勐捧镇丫口村采用"村集体+合作社+贫困户"的模式,烤烟合作社流转烟地600亩,新型烤房建设30座720平方米以及150平方米的烤烟预检棚,资产权属归村集体所有,分红额度比例初步计划为村集体占30%、合作社占70%(以实际签订的协议为准),项目可惠及476户2242人,其中:建档立卡户252户1134人.
",252,1134,2018,2019,200,,200,,200,"村支书","驻村扶贫工作队长","扶贫办","完成上海市对口支援云南省项目,项目验收合格100%,建档立卡贫困户受益人口≥1134人","沪滇项目"43,"烤烟责任目标考核奖励资金","新建","勐捧镇","14个村","项",1,"责任目标考核奖励资金",1039,3117,2019,2019,23,,23,,23,"村支书","驻村扶贫工作队长","产业办","项目验收合格100%","镇财整合(2019)2号"44,"2019年烤烟生产备耕补助","新建","勐捧镇","14个村","项",1,"2019年烤烟生产备耕补助",1039,3117,2019,2019,7,,7,,7,"村支书","驻村扶贫工作队长","产业办","项目验收合格100%","镇财整合(2019)2号",45,"包包寨村烟区管网修复项目","改建","勐捧镇","包包寨村","公里",9,"包包寨村烟区管网修复9公里",27,92,2019,2019,16,,16,,16,"村支书","驻村扶贫工作队长","产业办","完成烟区管网修复,项目验收合格100%,建档立卡贫困户受益人口≥92人","镇财整合(2019)12号",46,"忙丙村烟区管网修复项目","改建","勐捧镇","忙丙村","公里",6,"忙丙村烟区管网修复6公里",51,167,2019,2019,10.
23,,10.
23,,10.
23,"村支书","驻村扶贫工作队长","产业办","完成烟区管网修复,项目验收合格100%,建档立卡贫困户受益人口≥167人","镇财整合(2019)12号",47,"岔沟村烟区管网修复","改建","勐捧镇","岔沟村","公里",45,"岔沟村烟区管网修复45公里",118,437,2019,2019,95,,95,,95,"村支书","驻村扶贫工作队长","产业办","完成烟区管网修复,项目验收合格100%,建档立卡贫困户受益人口≥437人","镇财整合(2019)12号",48,"勐捧镇石桥村烤房群配电工程","新建","勐捧镇","石桥村","项",1,"0.
4kV架空绝缘线路架设、新置烤房备用电源发电机一台、带电作业人工费等.
",56,214,2019,2019,8,,8,,8,"村支书","驻村扶贫工作队长","产业办","完成烤房群配电,项目验收合格100%,建档立卡贫困户受益人口≥214人","镇政财农字〔2019〕32号",49,"勐捧镇蒿子坝村新寨烤房群10千伏配电工程","新建","勐捧镇","蒿子坝村","项",1,"10kV架空绝缘线路架设、配电变压器、JP柜83kVA、新置烤房备用电源发电机一台、带电作业人工费等.
",98,384,2019,2019,7,,7,,7,"村支书","驻村扶贫工作队长","产业办","完成烤房群10千伏配电工程,项目验收合格100%,建档立卡贫困户受益人口≥384人","镇政财农字〔2019〕32号",50,"勐捧镇烤房建设项目","新建","勐捧镇","酸格林、蒿子坝、象脚水、石桥","座",55,"2016年建设烤房55座,其中,酸格林25座、蒿子坝10座、象脚水10座、石桥10座,补助标准:2万元/座.
",248,1064,2019,2019,110,,110,,110,"村支书","驻村扶贫工作队长","产业办","完成烤房建设,项目验收合格100%,建档立卡贫困户受益人口≥1064人","镇政财农字〔2019〕32号",51,"勐捧镇蒿子坝村烤房建设项目","新建","勐捧镇","蒿子坝村","座",35,"2018年建设的蒿子坝村烤房建设35座,其中新寨20座,章龙15座,补助标准:5万元/座.
",246,961,2019,2019,175,,175,,175,"村支书","驻村扶贫工作队长","产业办","完成烤房建设,项目验收合格100%,建档立卡贫困户受益人口≥961人","镇政财农字〔2019〕32号",52,"烤烟基础设施建设","新建","勐捧镇","蒿子坝村","公里",5.
72,"修善蒿子坝村烤烟烟区道路5.
72公里.
",246,961,2019,2019,20,,20,,20,"村支书","驻村扶贫工作队长","产业办","完成烤房建设,项目验收合格100%,建档立卡贫困户受益人口≥961人","镇财整合(2019)22号",53,"烤烟责任目标考核奖励资金","新建","木场乡","6个村","项",1,"责任目标考核奖励资金",127,381,2019,2019,2,,2,,2,"村支书","驻村扶贫工作队长","产业办","项目验收合格100%","镇财整合(2019)2号"54,"2019年烤烟生产备耕补助","新建","木场乡","6个村","项",1,"2019年烤烟生产备耕补助",127,381,2019,2019,1,,1,,1,"村支书","驻村扶贫工作队长","产业办","项目验收合格100%","镇财整合(2019)2号"55,"烤房架电","新建","南伞镇","户育村","项",1,"南伞镇户育村烤房配套用电架设10KV线路0.
08千米,100KVA配电变压器1台,JP柜100KVA1台,真空断路器1台,高压计量器1台.
",124,498,2018,2018,9.
78,9.
78,,,9.
78,"村支书","驻村扶贫工作队长","产业办","完成烤房架电,项目验收合格100%,建档立卡贫困户受益人口≥498人","镇财整合[2018]3号",56,"烤房建设","新建","南伞镇","户育村","座",4,"户育:密集型烤房4座",124,502,2018,2018,5.
6,5.
6,,,5.
6,"村支书","驻村扶贫工作队长","产业办","完成烤房建设,项目验收合格100%,建档立卡贫困户受益人口≥502人","镇政财预字(2018)2号",57,"南伞镇红岩村烤房群0.
4千伏配电工程","新建","南伞镇","红岩村","项",1,"0.
4kV架空绝缘线路架设、新置烤房备用电源发电机一台、带电作业人工费等.
",91,370,2019,2019,8,,8,,8,"村支书","驻村扶贫工作队长","产业办","完成烤房群0.
4千伏配电,项目验收合格100%,建档立卡贫困户受益人口≥307人","镇财整合(2019)5号",58,"烤烟责任目标考核奖励资金","新建","南伞镇","3个村","项",1,"责任目标考核奖励资金",235,705,2019,2019,6,,6,,6,"村支书","驻村扶贫工作队长","产业办","完成烤烟责任目标考核奖励资金,项目验收合格100%","镇财整合(2019)2号",59,"2019年烤烟生产备耕补助","新建","南伞镇","3个村","项",1,"2019年烤烟生产备耕补助",235,705,2019,2019,4,,4,,4,"村支书","驻村扶贫工作队长","产业办","完成2019年烤烟生产备耕补助,项目验收合格100%","镇财整合(2019)2号",60,"烤烟责任目标考核奖励资金","新建","县烟办",,"项",1,"责任目标考核奖励资金",1785,5429,2019,2019,10,,10,,10,"村支书","驻村扶贫工作队长","产业办","完成烤烟责任目标考核奖励资金,项目验收合格100%","镇财整合(2019)2号"61,"勐捧镇烤房建设","新建","勐捧镇","丫口村、忙耿村、酸格林、根基村","座",80,"板房式大烤房主题建设及配电房.
其中:丫口村大岗山10座(辐射丫口寨)、丫口村下三村10座、丫口村梅子树10座(辐射落水坑)、忙耿村大田包包20座、酸格林字家寨10座、根基村原址重建20座.
",3,2653,2020,2020,304,,,304,304,"村支书","驻村扶贫工作队长","县地方产业发展服务中心","项目完成率100%,项目验收合格率100%","镇财整合【2020】3号"62,"勐捧镇丫口村下三村烤房10千伏配电工程","新建","勐捧镇","丫口村下三村","千米",1.
47,"烤房10千伏配电工程架设(包含10kV架空绝缘线、变压器、JP柜、智能型真空断路器、高压计量装置等).
",25,106,2020,2020,19.
11,,,19.
11,19.
11,"村支书","驻村扶贫工作队长","县地方产业发展服务中心","项目完成率100%,项目验收合格率100%","镇财整合【2020】3号"63,"勐捧镇忙耿村大田包包烤房11千伏配电工程","新建","勐捧镇","忙耿村大田包包","千米",2,"烤房10千伏配电工程架设(包含10kV架空绝缘线、变压器、JP柜、智能型真空断路器、高压计量装置等).
",78,302,2020,2020,25.
89,,,25.
89,25.
89,"村支书","驻村扶贫工作队长","县地方产业发展服务中心","项目完成率100%,项目验收合格率100%","镇财整合【2020】3号"64,"勐捧镇岔沟村新型烤烟烤房建设(沪滇)","新建","勐捧镇","岔沟村","座",60,"新建新型烤房60座(包括烤房、配电房、输电线路、烤烟预检棚等设施).
产权归村集体所有,项目建成后可解决1500亩的烤烟烘烤问题.
",118,437,2020,2020,288,,,288,288,"村支书","驻村扶贫工作队长","县扶贫办","项目完成率100%,项目验收合格率100%","沪滇项目"65,"南伞镇红岩村刷布场烤房建设","新建","南伞镇","红岩村","座",10,"板房式大烤房主题建设及配电房.
",75,281,2020,2020,38,,,38,38,"村支书","驻村扶贫工作队长","县地方产业发展服务中心","项目完成率100%,项目验收合格率100%","镇财整合【2020】3号",66,"勐堆乡勐堆村烤房建设","新建","勐堆乡","勐堆村","座",10,"板房式大烤房主题建设及配电房.
",89,333,2020,2020,38,,,38,38,"村支书","驻村扶贫工作队长","县地方产业发展服务中心","项目完成率100%,项目验收合格率100%","镇财整合【2020】3号",67,"购买香料烟调制棚、穿烟机项目","新建","镇康县",,"台",9051,"1.
购买旧穿烟机717台,资金24.
17万元;2.
购买调制棚8334个,资金75.
42万元.
",80,240,2020,2020,99.
59,,,99.
59,99.
59,"村支书","驻村扶贫工作队长","县地方产业发展服务中心","项目完成率100%,项目验收合格率100%","镇财整合【2020】3号",68,"勐捧镇购置烤房设备","新建","勐捧镇","酸格林村、忙耿村、丫口村","项",1,"需购置烤房备用电源发电机14台,其中:2019年6台(酸格林字家寨1台、白水1台、忙耿村林格寨1台、丫口村梅子树1、大中山1台、大岗山1台);2020年8台(酸格林白水1台、忙耿村平子田1台、大田包包1台、蒿子坝村冷山1台、大包包移民点1台、丫口村丫口寨1台、落水坑1台、上南喷1台.
",576,2456,2020,2020,30,,,30,30,"村支书","驻村扶贫工作队长","县地方产业发展服务中心","完成购置烤房备用电源发电机14台,增加农民收入,项目验收合格率100%.
","镇财整合【2020】10号、13号",69,"南伞镇烤房及配电设施基础设施建设项目","新建","南伞镇","南伞村","项",1,"南伞镇新建板房型烤房15座投资57万元,架设400伏线路600米安装变压器2台投入27万元",86,337,2020,2020,84,,,84,84,"村支书","驻村扶贫工作队长","县地方产业发展服务中心","完成房型烤房15座,架设400伏线路600米安装变压器2台,增加农民收入,项目验收合格率100%.
","镇财整合【2020】9号",70,"勐堆乡烤房及配电设施基础设施建设项目","新建","勐堆乡","铜厂村、勐堆村","项",1,"勐堆乡种植烤烟1800亩,需烤房15座,其中:铜厂村5座、勐堆村10座,需投资57万元.
",182,741,2020,2020,57,,,57,57,"村支书","驻村扶贫工作队长","县地方产业发展服务中心","完成烤房15座,增加农民收入,项目验收合格率100%.
","镇财整合【2020】9号",71,"忙丙乡烤房及配电设施基础设施建设项目","新建","忙丙乡","乌木村","项",1,"忙丙乡新建乌木村板房型烤房10座投资38万元,配套电力架设10千伏线路1.
2公里及安装变压器投资32万元.
",247,932,2020,2020,70,,,70,70,"村支书","驻村扶贫工作队长","县地方产业发展服务中心","完成烤房10座,增加农民收入,项目验收合格率100%.
","镇财整合[2020]12号",72,"勐捧镇丫口村、忙耿村、酸格林村、蒿子坝村、忙丙村、石桥村烤房、配电基础设施建设项目","新建","勐捧镇","丫口村、忙耿村、酸格林村、蒿子坝村、忙丙村、石桥村","项",1,"新建丫口村丫口寨烤房配套电力架设10千伏、400伏线路450米及安装变压器投资12万元,落水坑烤房配套电力架设10千伏、400伏线路750米及安装变压器投资24万元,上南碰烤房配套电力架设10千伏、400伏线路850米及安装变压器投资26万元;新建忙耿村平子田烤房配套电力架设10千伏、400伏线路750米及安装变压器投资24万元;酸格林村白水烤房配套电力架设10千伏、400伏线路560米及安装变压器投资19万元;蒿子坝村酸杷树窝坑新建板房型烤房20座投资76万元,配套电力架设10千伏、400伏线路300米及安装变压器投资17万元;蒿子坝村冷山建板房型烤房10座投资38万元,石桥村烤房修缮8万元,配套电力架设10千伏、400伏线路350米及安装变压器投资12万元;忙丙村龙洞寨烤房配套电力架设10千伏线路500米及安装变压器投资17万元.
",1013,4115,2020,2020,265,,,265,265,"村支书","驻村扶贫工作队长","县地方产业发展服务中心","完成电力线路架设4510米及配套变压器,烤房建设30座,烟区产业道路5.
6公里,项目验收合格率100%","镇财整合【2020】9号",73,"忙丙乡烟区烤房维修项目","新建","忙丙乡","忙丙村","项",1,"忙丙乡种植烤烟1700亩,烤房为2010建设的密集型烤房,目前,以出现漏雨漏气情况,需维修80座,并且需更换发电机、锅炉、烟架加固等设备维修.
",934,3767,2020,2020,35,,,35,35,"村支书","驻村扶贫工作队长","农业农村局","完成烤房修缮80座及配套设施,项目验收合格率100%","镇财整合【2020】10号",74,"忙丙乡新烟区水利管网建设项目","新建","忙丙乡","乌木村","项",1,"忙丙乡乌木村新开发种植烤烟226亩,需架设烟区管网30公里.
",934,3767,2020,2020,32.
2,,,32.
2,32.
2,"村支书","驻村扶贫工作队长","农业农村局","完成管网建设30公里,项目验收合格率100%","镇财整合[2020]12号",1,"5.
油菜","新建"423,1592,140,,,140,140,1,"镇康县油菜种植项目","新建","镇康县","勐捧镇、南伞镇、勐堆乡、忙丙乡、木场乡","项",1,"勐捧镇种植2100亩、南伞镇300亩、勐堆乡300亩、忙丙乡400亩、木场乡400亩",423,1592,2020,2020,140,,,140,140,"村支书","驻村扶贫工作队长","农业农村局","完成油菜种植3500亩,增加农民收入,项目验收合格率100%","镇财整合[2020]11号"1,"6.
甘蔗","新建"9575,38069,1700,1700,0,0,1700,1,"糖料核心基地建设项目","新建","镇康县",,"项",1,"各乡(镇)糖料核心基地建设28333亩.
",9575,38069,2018,2018,1700,1700,,,1700,"村支书","驻村扶贫工作队长","发改局","项目验收合格率100%","临财建发[2018]99号","7.
棉花","新建","8.
花生","新建","9.
麻类","新建","10.
花卉","新建"6,"11.
水果","新建"736,2968,185,70,115,0,185,1,"蜜桔种植","新建","军赛乡","军赛村","亩",240,"军赛乡军赛村四季蜜桔种植240亩",68,242,2018,2018,50,50,,,50,"村支书","驻村扶贫工作队长","民宗局","完成蜜桔种植,项目验收合格100%,建档立卡贫困户受益人口≥242人","镇财整合[2018]1号"2,"橘子种植","新建","勐堆乡","蚌孔村","株",20000,"完成农户种植2万株桔子苗",31,104,2018,2018,20,20,,,20,"村支书","驻村扶贫工作队长","民宗局","完成高山蜜桔种植2万株,项目验收合格率100%,建档立卡贫困户受益人口≥104人","临财农发(2017)186号"3,"高山蜜桔特色产业","新建","勐堆乡","蚌孔村","亩",200,"高山蜜桔200亩(种苗和有机肥扶持)",16,59,2019,2019,20,,20,,20,"村支书","驻村扶贫工作队长","民宗局","完成高山蜜桔种植200亩,项目验收合格率100%,建档立卡贫困户受益人口≥59人","镇财整合(2019)1号"4,"猕猴桃种植","新植","忙丙乡","4村","亩",400,"猕猴桃种植400亩",235,947,2019,2019,40,,40,,40,"村支书","驻村扶贫工作队长","林业局","完成猕猴桃种植,项目验收合格率100%,建档立卡贫困户受益人口≥947人","镇财整合(2019)2号"5,"白岩自然村猕猴桃特色产业种植项目","新植","忙丙乡","忙丙村","亩",200,"新植猕猴桃200亩,补助种苗及附属设施1500元每亩",235,947,2019,2019,25,,25,,25,"村支书","驻村扶贫工作队长","林业局","完成猕猴桃种植,项目验收合格率100%,建档立卡贫困户受益人口≥947人","镇财整合(2019)9号"6,".
南伞镇白岩村四季蜜桔特色产业","新建","南伞镇","白岩村","亩",100,"四季蜜桔种植100亩(种苗和有机肥扶持)",151,669,2019,2019,30,,30,,30,"村支书","驻村扶贫工作队长","民宗局","完成四季蜜桔特色产业种植,项目验收合格率100%,建档立卡贫困户受益人口≥669人","镇财整合(2019)1号",9,"12.
干果","新建"亩",,"—",10490,40864,675,300,130,245,675,1,"坚果管护","扩改建","凤尾镇","仁和村","亩",877,"每亩补助150元",135,565,2018,2020,13.
155,13.
155,,,13.
155,"马正强","杨文勋","林业局","完成坚果管护,项目验收合格率100%","临财农发[2017]145、182号","坚果管护","扩改建","凤尾镇","大柏树村","亩",300,"每亩补助150元",48,171,2018,2020,4.
5,4.
5,,,4.
5,"李成武","王建华","林业局","完成坚果管护,项目验收合格率100","临财农发[2017]145、182号","坚果管护","扩改建","凤尾镇","大坝村","亩",400,"每亩补助150元",47,185,2018,2018,6,6,,,6,"李进强","吕金奎","林业局","完成坚果管护,项目验收合格率100","临财农发[2017]145、182号","坚果管护","扩改建","凤尾镇","芦子园村","亩",138.
5,"每亩补助150元",43,131,2019,2019,2.
0775,2.
0775,,,2.
0775,"邵老成、李开义","驻村扶贫工作队长","林业局","完成坚果管护,项目验收合格率100","临财农发[2017]145、182号"2,"核桃管护","扩改建","凤尾镇","仁和村","亩",950,"每亩补助150元",135,565,2019,2020,14.
25,14.
25,,,14.
25,"马正强","杨文勋","林业局","完成核桃管护,项目验收合格率100%","临财农发[2017]145、182号","核桃管护","扩改建","凤尾镇","芦子园村","亩",39.
5,"每亩补助150元",43,131,2018,2018,0.
5925,0.
5925,,,0.
5925,"邵老成、李开义","驻村扶贫工作队长","林业局","完成核桃管护,项目验收合格率100%","临财农发[2017]145、182号","核桃管护","扩改建","凤尾镇","大柏树村","亩",96,"每亩补助150元",48,171,2019,2019,1.
44,1.
44,,,1.
44,"李成武","王建华","林业局","完成核桃管护,项目验收合格率100%","临财农发[2017]145、182号","核桃管护","扩改建","凤尾镇","大坝村","亩",85,"每亩补助150元",47,185,2019,2019,1.
275,1.
275,,,1.
275,"李进强","吕金奎","林业局","完成核桃管护,项目验收合格率100%","临财农发[2017]145、182号","核桃管护","扩改建","凤尾镇","小水井村","亩",1850,"每亩补助150元",189,765,2018,2020,27.
52,27.
52,,,27.
52,"施镇强","王海清","林业局","完成核桃管护,项目验收合格率100%","临财农发[2017]145、182号"3,"核桃管护","新建","勐堆乡","勐堆乡","亩",12666,"核桃管护每亩150元",420,1638,2018,2020,50,50,,,50,"村支书","驻村扶贫工作队长","林业局","完成核桃管护,项目验收合格率100%,建档立卡贫困户受益人口≥1638人","临财农发[2017]145、182号"4,"坚果管护","新建","勐堆乡","勐堆乡","亩",6933,"坚果管护每亩补助150元",610,2379,2018,2020,50,50,,,50,"村支书","驻村扶贫工作队长","林业局","完成坚果管护,项目验收合格率100%,建档立卡贫困户受益人口≥2379人","临财农发[2017]145、182号"5,"核桃提质增效","管护","忙丙乡","忙丙村","亩",8934,"核桃管护8934亩,每亩补助150元.
",237,949,2018,2020,79.
19,79.
19,,,79.
19,"村支书","驻村扶贫工作队长","林业局","完成核桃提质增效,项目验收合格率100%","临财农发[2017]145、182号","坚果提质增效","管护","忙丙乡","乌木村","亩",2577,"坚果管护2577亩,每亩补助150元.
",248,919,2018,2020,20,20,,,20,"村支书","驻村扶贫工作队长","林业局","完成核桃提质增效,项目验收合格率100%","临财农发[2017]145、182号","坚果提质增效","管护","忙丙乡","帮海村","亩",1343,"坚果管护1343亩,每亩补助150元.
",193,790,2018,2020,10,10,,,10,"村支书","驻村扶贫工作队长","林业局","完成核桃提质增效,项目验收合格率100%","临财农发[2017]145、182号","坚果提质增效","管护","忙丙乡","忙汞村","亩",1905,"坚果管护1905亩,每亩补助150元.
",83,325,2018,2020,10,10,,,10,"村支书","驻村扶贫工作队长","林业局","完成核桃提质增效,项目验收合格率100%","临财农发[2017]145、182号","坚果提质增效","管护","忙丙乡","马鞍山村","亩",1865,"坚果管护1865亩,每亩补助150元.
",215,791,2018,2020,10,10,,,10,"村支书","驻村扶贫工作队长","林业局","完成核桃提质增效,项目验收合格率100%","临财农发[2017]145、182号"6,"坚果种植","新建","南伞镇","班龙村","亩",300,"澳洲坚果种植300亩(种苗扶持)",232,902,2019,2019,30,,30,,30,"村支书","驻村扶贫工作队长","民宗局","完成坚果种植,项目验收合格率100%,建档立卡贫困户受益人口≥902人","镇财整合(2019)1号",7,"坚果、核桃提质增效项目","新建","镇康县",,"项",1,"坚果、核桃提质增效",3512,13680,2019,2019,65,,65,,65,"村支书","驻村扶贫工作队长","林业局","完成坚果、核桃提质增效项目,项目验收合格率100%","镇财整合(2019)1号"8,"核桃、坚果提质增效项目","新建","镇康县",,"项",1,"核桃、坚果提质增效",3512,13680,2019,2019,35,,35,,35,"村支书","驻村扶贫工作队长","林业局","完成坚果、核桃提质增效项目,项目验收合格率100%","镇财整合(2019)20号"9,"勐捧镇岔沟村核桃加工厂建设(沪滇)","新建","勐捧镇","岔沟村","项",1,"投入100万元新建加工厂厂房1000平方米(含清洗车间、产品包装储藏车间、冷冻储藏车间);投入145万元购买核桃烘干设备2台、核桃剥壳设备5台、榨油设备2组、生产车间运送设施1组.
产权归村集体所有,采用"龙头企业+村集体+合作社+农户"的模式,引入市场主体,签订协议,租赁或合作经营,收益应考虑设备折旧和贫困群众利益.
",493,1942,2020,2020,245,,,245,245,"村支书","驻村扶贫工作队长","县扶贫办","项目完成率100%,项目验收合格率100%","沪滇项目","13.
桑蚕","新建"亩"3,"14.
茶叶","新建"亩",,"—",118,475,50,20,30,0,50,1,"野茶种植","新建","勐堆乡","竹瓦村","株",27000,"完成农户种植2.
7万株野茶苗",14,59,2018,2018,10,10,,,10,"村委会支书","驻村扶贫工作队长","民宗局","完成高山蜜桔种植2.
7万株,项目验收合格率100%,建档立卡贫困户受益人口≥59人","临财农发(2017)186号"2,"野茶特色产业","新建","勐堆乡","竹瓦村","亩",50,"茶叶种植50亩(种苗和有机肥扶持)",24,95,2019,2019,20,,20,,20,"村支书","驻村扶贫工作队长","民宗局","完成野茶种植50亩,项目验收合格率100%,建档立卡贫困户受益人口≥95人","镇财整合(2019)1号"3,"沪滇协作项目野茶种植","新建","勐堆乡","竹瓦村","项",1,"结对帮扶3年,每年资金10万元",80,321,2018,2020,20,10,10,,20,"马新强","彭新明","扶贫办","完成野茶种植120亩、茶叶初制加工厂提升1个,项目验收合格率100%,建档立卡贫困户受益人数≥321人","沪滇项目","15.
油茶","新建"0,"16.
竹子","新建"0,0,0,0,0,0,0,,"17.
油桐","新建"9,"18.
加工业(种植)","新建"个"13197,52208,4667,0,4490,177,4667,1,"大柏树村荒田茶厂建设","新建","凤尾镇","大柏树村荒田自然村","项",6,"新建毛石挡墙500立方,新建C20混凝土地坪2000平方,新建厕所1幢,新建生活住房200平方,围墙400m,饮水1km",48,171,2019,2019,110,,110,,110,"李成武","王建华","产业办","完成茶厂建设,项目验收合格率100%,建档立卡贫困户受益人口≥171人","镇财整合(2019)5号"2,"马艾自然村茶叶初制所建设","新建","忙丙乡","新水村","个",1,"新建茶叶初制所厂房430平米,购置茶叶加工设备,修缮装修砖木房屋80平米",142,562,2019,2019,50,,50,,50,"村支书","驻村扶贫工作队长","产业办","完成茶叶初制所建设,项目验收合格率100%,建档立卡贫困户受益人口≥562人","镇财整合(2019)5号"3,"马鞍山茶叶初制所","新建","忙丙乡","马鞍山村","个",1,"新建茶叶初制所建设200平方米,晒棚300平方米,混泥土地板300平方米,配套附属设施",213,812,2019,2019,80,,80,,80,"高华东","古丽涛","产业办","完成茶叶初制所建设,项目验收合格率100%,建档立卡贫困户受益人口≥812人","镇财整合(2019)2号"4,"大树垭口深山制香加工厂建设项目","新建","木场乡","木场村","个",1,"建设加工坊80平方米,仓库1间40平方米,制香设备1套,地坪400平方米,围墙100米,彩钢瓦大鹏300平方米.
",260,1007,2019,2019,50,,50,,50,"村支书","驻村扶贫工作队长","产业办","完成深山制香加工厂建设,项目验收合格率100%,建档立卡贫困户受益人口≥1007人","镇财整合(2019)5号"5,"龙塘村茶叶初制所建设项目","新建","木场乡","龙塘村","个",1,"加工坊80平方米,地坪400平方米,购置一套茶叶制作设备(包含:1.
压饼设备一套;2.
风选风筛设备一套;3.
包装设备一套;4.
揉茶设备2套;5.
炒茶设备1套).
",172,618,2019,2019,50,,50,,50,"村支书","驻村扶贫工作队长","产业办","完成茶叶初制所建设,项目验收合格率100%,建档立卡贫困户受益人口≥618人","镇财整合(2019)5号"6,"沪滇项目坚果加工基地建设项目","新建","南伞镇",,"项",1,"在南伞镇采用"龙头企业+村集体+合作社+贫困户"的模式,计划扶持坚果加工基地1个,合作社流转坚果7000亩.
",2319,9168,2019,2019,1000,,1000,,1000,"村支书","驻村扶贫工作队长","扶贫办","完成坚果加工基地建设,项目验收合格率100%,建档立卡贫困户受益人口≥9168人","沪滇项目",7,"沪滇项目班龙村茶叶初制所","新建","南伞镇","班龙村","项",1,"在南伞镇班龙村采用"村集体+合作社+贫困户"的模式,流转茶园200亩,厂房建设700平方米,购买茶叶加工设备一套.
",232,883,2019,2019,120,,120,,120,"村支书","驻村扶贫工作队长","扶贫办","完成茶叶初制所建设,项目验收合格率100%,建档立卡贫困户受益人口≥883人","沪滇项目",8,"镇康县糖料核心基地建设项目","新建","镇康县",,"万亩",5.
05,"建设高标准蔗田5.
05万亩(田间工程)",9575,38069,2019,2020,3030,,3030,,3030,"村委会支书","驻村扶贫工作队长","发改局","项目验收合格100%","镇财整合(2019)13号",9,"军赛民族乡彩靠村核桃加工厂建设项目(沪滇)","新建","军赛乡","彩靠村","个",1,"采用"龙头企业+村集体+合作社+农户"的模式,新建钢架大棚厂房1000㎡(含地面硬化及围墙),需投资50万元;新建150㎡管理房1幢(含附属工程),按需投资22.
5万元;购买安装核桃烘干设备2套,需投资20万元;新建核桃油加工厂房(含冷库)200㎡,需投资30万元;购置压榨设备1套,需投资30万元;购置核桃剥壳设备5台,需投资25万元;.
项目建成后可恵及彩靠、南榨、中厂3个村1341户5648人,其中建档立卡户435户1680人.
",236,918,2020,2020,177,,,177,177,"杨光才","驻村扶贫工作队长","县扶贫办","项目完成率100%,项目验收合格率100%","沪滇项目"2,"19.
生猪","新建"0,"—",160,679,469,0,0,469,469,1,"勐堆乡竹瓦村生态土猪养殖(沪滇)","新建","勐堆乡","竹瓦村","项",1,"投入75万元新建猪舍1500平方米;投入44万元购买种猪(生态土猪种猪)220头,其中种母猪200头,种公猪20头,养殖规模1000头;投入6万元架设饮水管道3公里、蓄水池1个30立方米;投入24万元新建栅栏2000米;投入3万元实施饲草基地建设;投入25万元新建产业道路1.
5公里;投入34万元架设通电线路2公里;投入20万元新建管理房250平方米.
产权归村集体所有,采用"龙头企业+村集体+合作社+农户"的模式,基地集中养殖,社员分散养殖,合作社统一收购、统一销售.
",80,321,2020,2020,231,,,231,231,"村支书","驻村扶贫工作队长","县扶贫办","项目完成率100%,项目验收合格率100%","沪滇项目"2,"勐堆乡茶叶林村生猪养殖场建设(沪滇)","新建","勐堆乡","茶叶林村","项",1,"新建猪舍1600㎡(成品猪及籽猪分离猪舍),配套附属工程,投入90万元;新建消毒室20平方米(配套消毒设备)投入15万元;饲料加工、仓库及管理房200平方米,投入26万元;购买种母猪(大约克夏猪种猪)400头,每头1500元,投入60万元;架设饮水管道6公里、蓄水池1个30立方米,投入8万元;新建挡墙长50米,投入6万元;饲草基地建设,投入3万元;新建进厂道路建设800米,投入30万元.
项目建成后,权属归村集体所有,采取"村集体+合作社+农户"运营模式.
",80,358,2020,2020,238,,,238,238,"村支书","驻村扶贫工作队长","县扶贫办","项目完成率100%,项目验收合格率100%","沪滇项目","20.
羊","新建"只",0,"—",0,0,0,0,0,0,0,2,"21.
牛","新建"0,"—",562,2210,954,0,0,954,954,1,"军赛乡彩靠村肉牛养殖(沪滇)","新建","军赛乡","彩靠村","项",1,"1.
新建钢架结构牛棚1200平方米(含场地平整、基础开挖、圈舍内硬化、饲料房、消毒室、晒粪场、兽医室等场所和相关设备),投入120万元;2.
建设通电线路、饮水管网和蓄水池等工程,投入44万元;3.
购买种母牛(西蒙塔尔种牛)120头,投入180万元.
产权归村集体所有,采取"村集体+合作社+农户"的模式运营.
",435,1680,2020,2020,344,,,344,344,"村支书","驻村扶贫工作队长","县扶贫办","项目完成率100%,项目验收合格率100%","沪滇项目"2,"勐堆乡帮东村肉牛养殖(沪滇)","新建","勐堆乡","帮东村","项",1,"新建钢架结构牛棚1500平方米(含场地平整、基础开挖、圈舍内硬化、隔离架、消毒间建设、消毒池和牲畜粪便收集池等),投入157万元;架设通电线路2公里,投入34万元;饮水管架设3公里,蓄水池1个30立方米,投入6万元;养殖规模250头,购买种母牛(安格斯种牛)250头,投入365万元;新建饲料仓库200平方米,投入16万元;购买青饲料加工设备2台,投入20万元;新建饲草基地600亩,投入12万元.
产权归村集体所有,采取"龙头企业+村集体+合作社+农户"的模式.
",127,530,2020,2020,610,,,610,610,"村支书","驻村扶贫工作队长","县扶贫办","项目完成率100%,项目验收合格率100%","沪滇项目","22.
驴","新建"头",0,"—",0,0,0,,0,0,0,,"23.
骆驼","新建"3,"24.
家禽","新建"1,"—",215,826,848,0,76,772,848,1,"林下土鸡养殖厂建设","新建","勐堆乡","蟒蛇山村","项",1,"榨地山集中土鸡养殖2万羽、架设饮水管道9公里;通电架设3公里、鸡舍1200㎡、工人住宿房70㎡、栅栏10000米、孵化、消毒设备等.
",43,171,2019,2019,76,,76,,76,"村支书","驻村扶贫工作队长","农业局","完成管理房建设150平方米、鸡舍200平方米、公厕40平方米、架设饮水7公里、孵化设备1套,项目验收合格率100%,建档立卡贫困户受益人口≥171人","镇财整合(2019)1号"2,"军赛乡岔路村蛋鸡扶贫车间建设(沪滇)","新建","军赛乡","岔路村","项",1,"1.
新建厂房5000平方米,包括养殖区、饲料加工厂、消毒室、防疫室、包装车间、办公用房、通水、通电等场所和相关设备;2.
购买蛋鸡20000羽集中养殖.
产权归村集体所有,采取"村集体+合作社+农户"的模式运营,统一销售.
",56,183,2020,2020,330,,,330,330,"村支书","驻村扶贫工作队长","县扶贫办","项目完成率100%,项目验收合格率100%","沪滇项目"3,"勐捧镇勐捧村蛋鸡养殖设施建设(沪滇)","新建","勐捧镇","勐捧村","项",1,"1.
新建育雏鸡舍一栋,1000平方米;新建蛋鸡舍4栋,每栋1000平方米(包括消毒室、防疫室、通水、通电等相关设施),投入392万元.
2.
购买鸡苗投入50万元.
项目建成后产权归村集体所有,存栏规模5万羽,年产蛋450吨,采取"村集体+合作社+农户"的模式,引入市场主体,签订协议,租赁或合作经营,收益应考虑设备折旧和贫困群众利益.
",116,472,2020,2020,442,,,442,442,"村支书","驻村扶贫工作队长","县扶贫办","项目完成率100%,项目验收合格率100%","沪滇项目"0,"25.
鱼类","新建"亩",0,"—",0,0,0,0,0,0,0,5,"26.
其他","新建"460,1709,312,0,182,130,312,1,"中厂村花椒种植项目","新建","军赛乡","中厂村","亩",100,"中厂自然村后山100亩花椒种植",121,456,2019,2019,20,,20,,20,"村支书","驻村扶贫工作队长","农业局","完成花椒种植项目,项目验收合格率100%,建档立卡贫困户受益人口≥172人","镇财整合(2019)9号"2,"特色产业食用玫瑰花种植项目","新建/扩改建","军赛乡","岔路村","亩",50,"种植食用玫瑰花50亩,建设玫瑰花初制所135平方米.
",56,183,2019,2019,50,,50,,50,"村支书","驻村扶贫工作队长","农业局","完成特色产业食用玫瑰花种植,项目验收合格率100%,建档立卡贫困户受益人口≥183人","镇财整合(2019)5号"3,"蚕桑种植","新植","忙丙乡","乌木村","亩",660,"蚕桑种植660亩",248,936,2019,2019,80,,80,,80,"村支书","驻村扶贫工作队长","农业局","完成蚕桑种植,项目验收合格率100%,建档立卡贫困户受益人口≥936人","镇财整合(2019)2号"4,"竹鼠养殖","新建","勐捧镇","半个山村","项",1,"成立专业合作社,新建圈舍600㎡,500元/㎡;种苗1000只,120元/只.
",28,109,2019,2019,32,,32,,32,"村支书","驻村扶贫工作队长","农业局","完成竹鼠养殖,项目验收合格率100%,建档立卡贫困户受益人口≥109人","镇财整合(2019)1号"5,"军赛乡岔路村养殖小区建设(沪滇)","新建","军赛乡","岔路村","项",1,"新建生猪养殖小区1个,项目占地面积4.
2亩.
新建厂房1440平方米,投入87.
4万元;新建化粪池1个,投入6万元;新建挡墙600立方米,投入29.
4万元;道路硬化400平方米,同时配套排污、水电等设施,投入7.
2万元.
产权归村集体所有.
",7,25,2020,2020,130,,,130,130,"村支书","驻村扶贫工作队长","县扶贫办","项目完成率100%,项目验收合格率100%","沪滇项目","27.
加工业(养殖)","新建"个"1,"28.
服务","新建"127,530,10,0,10,0,10,1,"沪滇协作项目耕地机购买","新建","勐堆乡","帮东村","项",1,"结对帮扶2年,每年资金10万元",127,530,2019,2020,10,,10,,10,"马新强","彭新明","扶贫办","完成耕地机购买1台,项目验收合格率100%,建档立卡贫困户受益人数≥530人","沪滇项目"3,"(二)休闲农业与乡村旅游","新建"个",,"—",318,1265,110,0,50,60,110,3,"1.
旅游扶贫","新建"个",,"—",318,1265,110,0,50,60,110,1,"镇康县凤尾镇芦子园村壮大村集体经济小落水生态旅游农家乐建设项目","新建","凤尾镇","芦子园村","个",1,"拟在镇康县凤尾镇芦子园村小落水自然村建设集食宿、电商销售功能于一体的农特产品服务站1个,新建食宿及电商服务用房174平方米.
其中:建设住宿用房130平方米(标间4个、每个26平方米,单间1个、26平方米);电商用房1间、22平方米;餐厅1间22平方米.
",43,131,2019,2019,50,,50,,50,"邵老成","驻村扶贫工作队长","农业局","完成小落水生态旅游农家乐建设,项目验收合格率100%,建档立卡贫困户受益人口≥131人","镇财整合(2019)15号"2,"南伞镇红岩村刺树丫口旅游厕所","新建","南伞镇","红岩村","项",1,"建设男4蹲坑、1残卫、1洗手盆;女5蹲坑、1残卫、1洗手盆;第三卫生间1个,管理间1个).
",226,925,2020,2020,30,,,30,30,"村支书","驻村扶贫工作队长","县文化旅游局","项目完成率100%,项目验收合格率100%","镇财整合【2020】6号",3,"勐捧镇龙镇桥服务区旅游厕所","新建","勐捧镇","丫口村","项",1,"建设男4蹲坑、1残卫、1洗手盆;女5蹲坑、1残卫、1洗手盆;第三卫生间1个,管理间1个).
",49,209,2020,2020,30,,,30,30,"村支书","驻村扶贫工作队长","县文化旅游局","项目完成率100%,项目验收合格率100%","镇财整合【2020】6号",,"(三)光伏项目","新建","1.
光伏扶贫","新建"23,"(四)生态扶贫项目","新建"10632,42361,1947,1910,37,0,1947,1,"镇康县2018年退牧还草(草地治理工程)","新建","凤尾镇","小水井","平方米",108,"建设棚圈108平方米,配套机械设备1台.
",189,765,2018,2019,2.
41,2.
41,,,2.
41,"村支书","驻村扶贫工作队长","农业局","完成建设棚圈108平方米,配套机械设备1台,项目验收合格率100%,建档立卡贫困户受益人口≥765人","临财建发[2017]100号"2,"云南省镇康县2018年石漠化综合治理项目","新建","凤尾镇","凤尾村","公里",4.
3,"沟渠建设4.
3公里",151,558,2018,2019,228.
58,228.
58,,,228.
58,"村支书","驻村扶贫工作队长","水务局","完成沟渠建设4.
3公里,项目验收合格率100%,建档立卡贫困户受益人口≥558人","临财建发[2017]104号,镇政发改字[2018]43号",3,"云南省镇康县2018年石漠化综合治理项目","新建","勐堆乡","大寨村","公里",5,"沟渠建设5公里",55,210,2018,2019,264,264,,,264,"村支书","驻村扶贫工作队长","水务局","完成沟渠建设5公里,项目验收合格率100%,受益建档立卡贫困户人数≥210人","临财建发[2017]104号,镇政发改字[2018]43号"4,"镇康县2018年退牧还草(草地治理工程)","新建","忙丙乡","马鞍山村","平方米",1350,"建设棚圈1350平方米,配套机械设备1台.
",213,812,2018,2019,27.
25,27.
25,,,27.
25,"村支书","驻村扶贫工作队长","农业局","完成建设棚圈1350平方米,配套机械设备1台,项目验收合格率100%,受益建档立卡贫困户人数≥812人","临财建发[2017]100号"5,"镇康县2018年退牧还草(草地治理工程)","新建","忙丙乡","忙汞村","平方米",100,"建设棚圈100平方米,配套机械设备2台.
",83,335,2018,2019,2.
5,2.
5,,,2.
5,"村支书","驻村扶贫工作队长","农业局","完成建设棚圈100平方米,配套机械设备2台,项目验收合格率100%,受益建档立卡贫困户人数≥335人","临财建发[2017]100号"6,"镇康县2018年退牧还草(草地治理工程)","新建","忙丙乡","蔡何村","平方米",2674,"建设棚圈2674平方米,配套机械设备1台.
",235,985,2018,2019,53.
73,53.
73,,,53.
73,"村支书","驻村扶贫工作队长","农业局","完成建设棚圈2674平方米,配套机械设备1台,项目验收合格率100%,受益建档立卡贫困户人数≥985人","临财建发[2017]100号"7,"镇康县2018年退牧还草(草地治理工程)","新建","忙丙乡","麦地村","平方米",780,"建设棚圈780平方米.
",217,916,2018,2019,15.
6,15.
6,,,15.
6,"村支书","驻村扶贫工作队长","农业局","完成建设棚圈780平方米,项目验收合格率100%,受益建档立卡贫困户人数≥916人","临财建发[2017]100号"8,"镇康县2018年退牧还草(草地治理工程)","新建","勐捧镇","岔沟村","亩",23210,"围栏封育16210亩,人工种草7000亩,建设棚圈3611平方米,配套机械设备37台,制作宣传牌4块.
",118,437,2018,2019,443.
72,443.
72,,,443.
72,"村支书","驻村扶贫工作队长","农业局","完成草地治理工程,项目验收合格率100%,受益建档立卡贫困户人数≥437人","临财建发[2017]100号"9,"镇康县2018年退牧还草(草地治理工程)","新建","勐捧镇","蒿子坝村","亩",3070,"围栏封育3070亩,建设棚圈60平方米,配套机械设备1台,制作宣传牌1块.
",246,961,2018,2019,17.
1,17.
1,,,17.
1,"村支书","驻村扶贫工作队长","农业局","完成草地治理工程,项目验收合格率100%,受益建档立卡贫困户人数≥916人","临财建发[2017]100号"10,"镇康县2018年退牧还草(草地治理工程)","新建","勐捧镇","酸格林村","亩",10760,"围栏封育10760亩,建设棚圈335平方米,配套机械设备6台,制作宣传牌1块.
",248,1064,2018,2019,62.
3,62.
3,,,62.
3,"村支书","驻村扶贫工作队长","农业局","完成草地治理工程,项目验收合格率100%,受益建档立卡贫困户人数≥1064人","临财建发[2017]100号"11,"镇康县2018年退牧还草(草地治理工程)","新建","勐捧镇","南梳坝","亩",3100,"围栏封育3100亩,建设棚圈250平方米,配套机械设备5台,制作宣传牌1块.
",49,181,2018,2019,22.
05,22.
05,,,22.
05,"村支书","驻村扶贫工作队长","农业局","完成草地治理工程,项目验收合格率100%,受益建档立卡贫困户人数≥181人","临财建发[2017]100号"12,"镇康县2018年退牧还草(草地治理工程)","新建","勐捧镇","忙丙村","平方米",130,"建设棚圈130平方米,配套机械设备2台.
",51,167,2018,2019,3.
1,3.
1,,,3.
1,"村支书","驻村扶贫工作队长","农业局","完成草地治理工程,项目验收合格率100%,受益建档立卡贫困户人数≥167人","临财建发[2017]100号"13,"2018年石漠化综合治理项目","新建","勐捧镇","勐捧村、忙丙村、岩子头村","亩",10600,"勐捧镇实施封山育林10600亩,其中,勐捧镇村697.
5亩,忙丙村3830.
5亩,岩子头村6072亩.
",624,2388,2018,2018,107.
99,107.
99,,,107.
99,"村支书","驻村扶贫工作队长","林业局","完成石漠化综合治理项,项目验收合格率100%,受益建档立卡贫困户人数≥2388人","镇政发改字[2018]43号"14,"2018年石漠化综合治理项目","新建","勐捧镇","丫口村,蒿子坝,岔沟村,南梳坝","亩",4850,"勐捧镇实施人工造林4850亩,其中丫口村2450亩,蒿子坝村612亩,岔沟村1098.
5亩,南梳坝村689.
5亩",663,2665,2018,2018,349.
43,349.
43,,,349.
43,"村支书","驻村扶贫工作队长","林业局","完成石漠化综合治理项,项目验收合格率100%,受益建档立卡贫困户人数≥2665人","镇政发改字[2018]43号"15,"镇康县2018年退牧还草(草地治理工程)","新建","木场乡","木场村","亩",4670,"围栏封育1250亩,人工种草3420亩,建设棚圈2136平方米,配套机械设备20台,制作宣传牌2块.
",260,1007,2018,2019,191.
37,191.
37,,,191.
37,"村支书","驻村扶贫工作队长","农业局","完成草地治理工程,项目验收合格率100%,受益建档立卡贫困户人数≥1007人","临财建发[2017]100号"16,"镇康县2018年退牧还草(草地治理工程)","新建","木场乡","芹菜塘村","亩",1830,"围栏封育1450亩,人工种草380亩,制作宣传牌2块.
",190,732,2018,2019,23.
05,23.
05,,,23.
05,"村支书","驻村扶贫工作队长","农业局","完成草地治理工程,项目验收合格率100%,受益建档立卡贫困户人数≥732人","临财建发[2017]100号"17,"镇康县2018年退牧还草(草地治理工程)","新建","木场乡","黑马塘村","亩",2700,"围栏封育2700亩,建设棚圈620平方米,配套机械设备10台,制作宣传牌1块.
",166,698,2018,2019,28.
7,28.
7,,,28.
7,"村支书","驻村扶贫工作队长","农业局","完成草地治理工程,项目验收合格率100%,受益建档立卡贫困户人数≥698人","临财建发[2017]100号"18,"镇康县2018年退牧还草(草地治理工程)","新建","南伞镇","茶山村","亩",4400,"围栏封育4400亩,建设棚圈496平方米,配套机械设备3台,制作宣传牌1块.
",232,951,2018,2019,32.
97,32.
97,,".
",32.
97,"村支书","驻村扶贫工作队长","农业局","完成草地治理工程,项目验收合格率100%,受益建档立卡贫困户人数≥951人","临财建发[2017]100号",19,"镇康县2018年退牧还草(草地治理工程)","新建","南伞镇","甘塘村","亩",3400,"围栏封育3400亩,制作宣传牌1块.
",199,841,2018,2019,17.
3,17.
3,,,17.
3,"村支书","驻村扶贫工作队长","农业局","完成草地治理工程,项目验收合格率100%,受益建档立卡贫困户人数≥841人","临财建发[2017]100号",20,"镇康县2018年退牧还草(草地治理工程)","新建","南伞镇","热水河","亩",2860,"围栏封育2860亩,制作宣传牌1块.
",74,278,2018,2019,14.
6,14.
6,,,14.
6,"村支书","驻村扶贫工作队长","农业局","完成草地治理工程,项目验收合格率100%,受益建档立卡贫困户人数≥278人","临财建发[2017]100号",21,"镇康县2018年退牧还草(草地治理工程)","新建","南伞镇","哈里村","平方米",100,"建设棚圈100平方米,配套机械设备1台.
",139,538,2018,2019,2.
25,2.
25,,,2.
25,"村支书","驻村扶贫工作队长","农业局","完成草地治理工程,项目验收合格率100%,受益建档立卡贫困户人数≥538人","临财建发[2017]100号",22,"镇康县草原病虫害防治","新建","镇康县",,"项",1,"设备更新8台(套)",3115,12436,2019,2019,7,,7,,7,"村支书","驻村扶贫工作队长","农业局","完成设备更新8台(套),项目验收合格率100%","镇财整合(2019)1号"23,"镇康县2019年脱贫攻坚草原奖补牧户信息核实与录入","新建","镇康县",,"项",1,"对全县草原承包户的相关草原信息进行逐村逐户核实录入",3115,12436,2019,2019,30,,30,,30,"村支书","驻村扶贫工作队长","农业局","项目验收合格率100%","镇财整合(2019)1号"68,"(五)其他","新建"59886,238880,9825.
87,2727.
3,3525.
1,3573.
47,9825.
87,,,,,1,"大谷地安置点集中养殖场建设项目","新建","凤尾镇","大坝村","户",36,"36户,每户12㎡,每平方656元及附属工程.
",36,139,2019,2019,35,,35,,35,"李进强","吕金奎","农业局","完成安置点集中养殖场建设项目,项目验收合格率100%,受益建档立卡贫困户人数≥139人","镇财整合(2019)1号","大谷地安置点集中养殖场建设项目","新建","凤尾镇","大坝村","户",36,"36户,每户12m2,每平方米656元及附属工程,镇财整合[2019]1号已安排35万元.
",36,139,2019,2019,52,,52,,52,"李进强","吕金奎","农业局","完成安置点集中养殖场建设项目,项目验收合格率100%,受益建档立卡贫困户人数≥139人","镇政财农字〔2019〕32号"2,"轩莱安置点集中养殖场建设项目","新建","凤尾镇","凤尾村","户",32,"32户,每户12㎡,每平方656元及附属工程.
",32,124,2019,2019,30,,30,,30,"李国文","杨士吉","农业局","完成安置点集中养殖场建设项目,项目验收合格率100%,受益建档立卡贫困户人数≥124人","镇财整合(2019)1号","轩莱安置点集中养殖场建设项目","新建","凤尾镇","凤尾村","户",32,"32户,每户12m2,每平方米656元及附属工程,镇财整合[2019]1号已安排30万元.
",32,124,2019,2019,54,,54,,54,"李国文","杨士吉","农业局","完成安置点集中养殖场建设项目,项目验收合格率100%,受益建档立卡贫困户人数≥124人","镇政财农字〔2019〕32号"3,"村集体经济","新建","凤尾镇","大柏树村","个",1,"承包改良经营茶园73.
5亩.
1.
承包茶园73.
5亩,地租每年400元/亩,承包5年,小计147000元;2.
改良茶园、茶叶采摘、制作、销售,当年工时费每亩680.
3元,小计50000元.
",48,161,2018,2018,19.
7,19.
7,,,19.
7,"李成武","王建华","扶贫办","完成村集体经济项目,项目验收合格率100%,受益建档立卡贫困户人数≥161人","镇财整合[2018]1号"4,"村集体经济","新建","凤尾镇","大坝村","个",1,"一、流转茶园30亩,产权归集体所有,每亩按5000元补助,投资15万元;二、建设茶叶初制加工厂.
建设茶叶初制加工厂厂房、仓库、生活用房共400平方米,单价500元,投资20万元;购置茶叶生产、加工设备6台套,预算投资15万元.
三、经营管理.
按照"党支部+合作社+基地+贫困户"的发展模式,成立茶叶专业合作社,把贫困户纳入合作社内,由专业合作社经营、管理茶园及茶叶初制加工厂.
",37,156,2018,2018,19.
7,19.
7,,,19.
7,"李进强","吕金奎","扶贫办","完成村集体经济项目,项目验收合格率100%,受益建档立卡贫困户人数≥156人","镇财整合[2018]1号"5,"村集体经济","新建","凤尾镇","小水井村","个",1,"贫困村集体经济建设:100亩酸骂榴管护",192,752,2018,2018,20,20,,,20,"施镇强","王海清","农业局","完成村集体经济项目,项目验收合格率100%,受益建档立卡贫困户人数≥752人","镇政财联字[2018]12号"6,"村集体经济","新建","凤尾镇","仁和村","个",1,"贫困村集体经济建设:承包改良茶园60亩,建设茶叶基地.
",135,566,2018,2018,20,20,,,20,"马正强","杨文勋","农业局","完成村集体经济项目,项目验收合格率100%,受益建档立卡贫困户人数≥566人","镇政财联字[2018]12号"7,"第一批新增沪滇项目","新建","凤尾镇","大柏树村","项",1,"基础设施及产业发展",48,171,2018,2018,480,480,,,480,"村支书","驻村扶贫工作队长","扶贫办","完成基础设施及产业发展项目,项目验收合格率100%,受益建档立卡贫困户人数≥171人","沪滇项目"8,"镇康县凤尾镇浪坝寨畜牧养殖农民专业合作社养牛项目","新建","凤尾镇","凤尾村","项",1,"1、采取"村委会+合作社+农户"的养殖模式,带动周边40户农户发展养殖.
2.
主要采取"集中托管托养""母牛还犊""发展分散育肥带动养殖""入股分红稳增收"等模式发展壮大养殖规模.
引进种母牛150头,2万元/头,投资300万元;引进种公牛5头,4万元/头,投资20万元.
",60,223,2019,2019,320,,320,,320,"村支书","驻村扶贫工作队长","农业局","完成畜牧养殖农民专业合作社养牛项目,项目验收合格率100%,受益建档立卡贫困户人数≥223人","镇政财农字〔2019〕32号"9,"村集体经济","新建","军赛乡","彩靠村","个",1,"集体经济建设",740,3014,2018,2018,20,20,,,20,"村支书","驻村扶贫工作队长","扶贫办","完成村集体经济,项目验收合格率100%,受益建档立卡贫困户人数≥3014人","镇政财联字[2018]12号"10,"村集体经济","新建","军赛乡","中厂村","个",1,"集体经济建设",363,1465,2018,2018,20,20,,,20,"村支书","驻村扶贫工作队长","扶贫办","完成村集体经济,项目验收合格率100%,受益建档立卡贫困户人数≥1465人","镇政财联字[2018]12号"11,"村集体经济","新建","军赛乡","南榨村","个",1,"集体经济建设",244,1041,2018,2018,20,20,,,20,"村支书","驻村扶贫工作队长","扶贫办","完成村集体经济,项目验收合格率100%,受益建档立卡贫困户人数≥1041人","镇政财联字[2018]12号"12,"蜂种繁育场建设项目","新建","勐堆乡","竹瓦村","个",1,"建设蜂种繁育场100平方米,配套建设小蜂房500-1000个,带动100户建档立卡贫困户在内的农户发展蜂子养殖.
",80,321,2019,2019,10,,10,,10,"村支书","驻村扶贫工作队长","农业局","完成大棚建设400平方米,小蜂房1000个,项目验收合格率100%,建档立卡贫困户受益人口≥321人","镇财整合(2019)1号"13,"张笑安置点养殖小区建设项目","新建","勐堆乡","帮东村","个",1,"30户,每户7㎡,每平方656元及附属工程.
",15,66,2019,2019,20,,20,,20,"村支书","驻村扶贫工作队长","农业局","完成养殖小区建设210平方米,项目验收合格率100%,建档立卡贫困户受益人口≥66人","镇财整合(2019)1号","张笑安置点养殖小区建设项目","新建","勐堆乡","帮东村","个",1,"30户,每户7㎡,每平方656元及附属工程,镇财整合[2019]1号已安排20万元.
",15,66,2019,2019,36.
5,,36.
5,,36.
5,"村支书","驻村扶贫工作队长","农业局",,"镇政财农字〔2019〕32号"14,"忙豁安置点养殖小区建设项目","新建","勐堆乡","帮东村","个",1,"30户,每户12㎡,每平方656元及附属工程.
",69,269,2019,2019,30,,30,,30,"村支书","驻村扶贫工作队长","农业局","完成养殖小区建设360平方米,项目验收合格率100%,建档立卡贫困户受益人口≥94人","镇财整合(2019)1号","忙豁安置点养殖小区建设项目","新建","勐堆乡","帮东村","个",1,"30户,每户12㎡,每平方656元及附属工程,镇财整合[2019]1号已安排30万元.
",69,269,2019,2019,12.
8,,12.
8,,12.
8,"村支书","驻村扶贫工作队长","农业局","完成养殖小区建设360平方米,项目验收合格率100%,建档立卡贫困户受益人口≥94人","镇政财农字〔2019〕32号"15,"弄岗丫口安置点养殖小区建设项目","新建","勐堆乡","彭木山村","个",1,"18户,每户12㎡,每平方656元及附属工程.
",4,16,2019,2019,20,,20,,20,"村支书","驻村扶贫工作队长","农业局","完成养殖小区建设216平方米,项目验收合格率100%,建档立卡贫困户受益人口≥16人","镇财整合(2019)1号"16,"秀水坝安置点养殖小区建设项目","新建","勐堆乡","勐堆村","个",1,"53户,每户12㎡,每平方656元及附属工程.
",11,43,2019,2019,50,,50,,50,"村支书","驻村扶贫工作队长","农业局","完成养殖小区建设636平方米,项目验收合格率100%,建档立卡贫困户受益人口≥43人","镇财整合(2019)1号","秀水坝安置点养殖小区建设项目","新建","勐堆乡","勐堆村","个",1,"53户,每户12㎡,每平方656元及附属工程,镇财整合[2019]1号已安排50万元.
",11,43,2019,2019,20,,20,,20,"村支书","驻村扶贫工作队长","农业局","完成养殖小区建设636平方米,项目验收合格率100%,建档立卡贫困户受益人口≥43人","镇政财农字〔2019〕32号"17,"生态土猪养殖项目","新建","勐堆乡","竹瓦村","个",1,"土猪养殖项目(配套1饮水、道路、通电建设、业务房、产品展示厅及配套设施、猪舍)",80,321,2019,2019,20,,20,,20,"马新强","张利军","农业局","完成大棚建设390平方米、栅栏580米、种猪购买100头,项目验收合格率100%,建档立卡贫困户受益人口≥321人","镇财整合(2019)1号"18,"镇康县勐堆乡蚌孔村边民互市市场建设项目","新建","勐堆乡","蚌孔村","个",1,"1.
互市场地旁平整20亩30万元;2.
彩钢瓦大棚1200㎡,45万元;3.
摊位案板200个15万元;4.
挡墙434㎡,50万元;5.
三类公厕一座,蹲坑20个23万元;6.
大畜生交易场200㎡,6万元;7.
饮水工程一件8万元;8.
通电工程一件22万元;9.
道路硬化2000㎡,26万元.
",89,317,2019,2019,195,,195,,195,"杨新军","驻村扶贫工作队长","民宗局","完成蚌孔村边民互市市场建设项目1个,项目验收合格率100%,项目受益建档立卡贫困户人数≥317人","镇财整合(2019)1号"19,"村集体经济","新建","勐堆乡","尖山村","个",1,"核桃加工厂",5,169,2018,2018,19.
7,19.
7,,,19.
7,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格率100%","镇财整合[2018]1号"20,"村集体经济","新建","勐堆乡","竹瓦","个",1,"茶叶初加工",80,313,2018,2018,20,20,,,20,"马新强","张李军","扶贫办","建成茶叶初加工厂1个,项目验收合格率100%,建档立卡贫困户受益人数≥313人","镇政财联字[2018]12号"21,"勐堆乡茶叶林村茶叶加工厂建设项目","新建","勐堆乡","茶叶林村","个",1,"1.
钢架大棚厂房500平方米,按280元/平方米计算,投资14万元(申请中央资金14万元);2.
10口炒锅锅台,排水设施,估算投资11万元(申请中央资金11万元);3.
炒清机3台、揉茶机2台、筛茶机2台、压茶机2台、炒茶锅10口、烤炉4台等,估算投资7.
7万元(申请中央资金7.
7万元);4.
新建框架结构办公用房1幢2层,140平方米,估算投资21.
3万元(申请中央资金17.
3万元,村集体投入资金4万元);5.
新建公厕1座,蹲坑6个24平方米,估算投资6万元(村集体投入资金6万元).
",80,356,2019,2020,50,,50,,50,"普应山","郭陈林","组织部","项目验收合格率100%","镇财整合(2019)15号"22,"蔬菜产业发展项目","新建","勐堆乡","勐堆村","亩",46,"有村级以"村+合作社+基地+大户(农户)"的方式建设标准蔬菜钢架大棚46亩(含喷滴灌),按先建后补方式给予补助.
项目由村级统筹建设管理,达到持续增加村级集体经济收入,带动周边贫困农户就地就业和持续增收.
",89,333,2019,2019,160,,160,,160,"村支书","驻村扶贫工作队长","农业局","项目验收合格率100%","镇财整合(2019)1号"23,"蚌孔村2019年扶持壮大村级集体经济项目","新建","勐堆乡","蚌孔村","个",1,"1.
新建彩钢瓦棚1200平方米;2.
固定摊位200个;3.
地基平整20亩;4.
支砌挡墙1000立方米;5.
三类公厕一座,20个蹲坑;6.
大牲畜交易场200平方米;7.
饮水工程1件;8.
通电工程;9.
道路硬化2000平方米.
",87,315,2019,2019,50,,50,,50,"村支书","驻村扶贫工作队长","组织部","项目验收合格率100%","镇财整合(2019)15号"24,"竹瓦村葫锋养殖建设项目","新建","勐堆乡","竹瓦村","个",1,"1.
新建葫蜂养殖蜂棚一个200平方米;2.
搭建野外养殖蜂巢700个;3.
购买棚内材料、工具、种蜂等.
",80,324,2019,2019,50,,50,,50,"村支书","驻村扶贫工作队长","农业局","项目验收合格率100%","镇财整合(2019)15号"25,"村集体经济","新建","忙丙乡","乌木村","个",1,"集体经济建设",249,960,2018,2018,19.
7,19.
7,,,19.
7,"李红琼","古丽涛","扶贫办","项目验收合格率100%","镇财整合[2018]1号"26,"村集体经济","新建","忙丙乡","忙汞村","个",1,"集体经济建设",186,787,2018,2018,20,20,,,20,"李红琼","古丽涛","扶贫办","项目验收合格率100%","镇政财联字[2018]12号"27,"村集体经济","新建","忙丙乡","新水村","个",1,"集体经济建设",358,1496,2018,2018,20,20,,,20,"李红琼","古丽涛","扶贫办","项目验收合格率100%","镇政财联字[2018]12号"28,"沪滇协作项目","新建","忙丙乡","麦地村蔡何村","个",1,"基础设施及产业发展",456,1879,2018,2018,1100,1100,,,1100,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格率100%","沪滇项目"29,"第二批新增沪滇项目","新建","忙丙乡","马鞍山村","个",1,"建设茶叶生产、加工、展示、展销、体验厂馆,流转茶叶采摘体验基地50亩,开展茶叶制作、茶艺培训,培养致富带头人,投资250万元;人居环境提升和核心产业园基础设施建设,投资50万元.
",215,791,2018,2018,300,300,,,300,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格率100%","沪滇项目"30,"2019年上海市对口支援云南省项目","新建","忙丙乡","马鞍山村","个",1,"在忙丙乡马鞍村采用"村集体+合作社+贫困户"的模式,建设厂房450平方米,购买茶叶精加工设备一套.
资产权属归村集体所有.
贫困户、村集体按照协议分红.
实施产业园周边人居环境提升和配套基地基础设施建设,农户改厕改圈36户,排污管网建设1200米,污水处理设施1套,太阳能路灯20盏.
",215,791,2019,2019,260,,260,,260,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格率100%","沪滇项目"31,"大包包安置点养殖小区建设项目","新建","勐捧镇","蒿子坝村","项",1,"53户,每户12㎡,每平方656元及附属工程.
",24,76,2019,2019,100,,100,,100,"村支书","驻村扶贫工作队长","农业局","项目验收合格率100%","镇财整合(2019)1号"32,"集体经济组织","新建","勐捧镇","核桃箐村","个",1,"贫困村集体经济建设1个",42,173,2018,2018,19.
7,19.
7,,,19.
7,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格率100%","镇财整合[2018]1号"33,"集体经济组织","新建","勐捧镇","忙耿村","个",1,"贫困村集体经济建设1个",80,320,2018,2018,19.
7,19.
7,,,19.
7,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格率100%","镇财整合[2018]1号"34,"集体经济组织","新建","勐捧镇","石桥村","个",1,"贫困村集体经济建设1个补助标准:20万元/个",140,557,2018,2018,20,20,,,20,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格率100%","镇政财联字[2018]12号"35,"集体经济组织","新建","勐捧镇","丫口村","个",1,"贫困村集体经济建设1个补助标准:20万元/个",252,1061,2018,2018,20,20,,,20,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格率100%","镇政财联字[2018]12号"36,"集体经济组织","新建","勐捧镇","岩子头村","个",1,"贫困村集体经济建设1个补助标准:20万元/个",472,1715,2018,2018,20,20,,,20,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格率100%","镇政财联字[2018]12号"37,"镇康县勐捧镇包包寨新寨坝养殖农民专业合作社养牛项目","新建","勐捧镇","包包寨村","个",1,"1、采取"村委会+合作社+农户"的养殖模式,带动周边40户农户发展养殖.
2.
采取合作社建设场地并负责养殖,政府出资购买种母牛和种公牛以及相关检疫防疫设施,扩大养殖规模,利益分配为"年盈利5%作为村级集体经济收入.
引进种母牛100头,2万元/头,投资200万元;引进种公牛3头,4万元/头,投资12万元.
",27,91,2019,2019,212,,212,,212,"村支书","驻村扶贫工作队长","农业局","项目验收合格率100%","镇政财农字〔2019〕32号"38,"勐捧镇丫口村村集体经济建设项目","新建","勐捧镇","丫口村","个",1,"勐捧镇丫口村龙镇桥综合服务区,"旅游+集体经济"建设项目,新建框架结构综合楼1幢480平方米,场地绿化300平方米,停车场、休闲栈道等220平方米,路灯安装8盏.
投资预算180万元(申请财政扶贫资金70万元,整合资金110万元)",250,1086,2019,2020,70,,70,,70,"村委会支书","驻村扶贫工作队长","农业局","项目验收合格率100%","镇财整合(2019)14号"39,"蔬菜产业发展项目","新建","木场乡","勐撒村","亩",30,"有村级以"村+合作社+基地+大户(农户)"的方式建设标准蔬菜钢架大棚30亩(含喷滴灌),按先建后补方式给予补助.
项目由村级统筹建设管理,达到持续增加村级集体经济收入,带动周边贫困农户就地就业和持续增收.
",176,754,2019,2019,107,,107,,107,"罗军","驻村扶贫工作队长","农业局","项目验收合格率100%","镇财整合(2019)1号"40,"大湾塘(芭蕉林山)安置点养殖小区建设项目","新建","木场乡","芹菜塘村","个",1,"46户,每户12㎡,每平方656元及附属工程.
",190,740,2019,2019,40,,40,,40,"村支书","驻村扶贫工作队长","农业局","项目验收合格率100%","镇财整合(2019)1号","大湾塘(芭蕉林山)安置点养殖小区建设项目","新建","木场乡","芹菜塘村","个",1,"46户,每户12m2,每平方米656元及附属工程,镇财整合[2019]1号已安排40万元.
",190,740,2019,2019,8,,8,,8,"村支书","驻村扶贫工作队长","农业局","项目验收合格率100%","镇政财农字〔2019〕32号"41,"打小坝安置点养殖小区建设项目","新建","木场乡","乌木兰村","个",1,"78户,每户12㎡,每平方656元及附属工程.
",97,388,2019,2019,83.
6,,83.
6,,83.
6,"村支书","驻村扶贫工作队长","农业局","项目验收合格率100%","镇财整合(2019)1号"42,"集贸市场建设","新建","木场乡","乌木兰村","个",1,"集贸市场建设",97,388,2018,2018,20,20,,,20,"村支书","驻村扶贫工作队长","民宗局","项目验收合格率100%","镇财整合(2018)1号"43,"村集体经济","新建","木场乡","芹菜塘村","个",1,"集体经济建设",507,2079,2018,2018,20,20,,,20,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格率100%","镇政财联字[2018]12号"44,"村集体经济","新建","木场乡","黑马塘村","个",1,"集体经济建设",384,1731,2018,2018,20,20,,,20,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格率100%","镇政财联字[2018]12号"45,"村集体经济","新建","木场乡","龙塘村","个",1,"集体经济建设",443,1968,2018,2018,19.
7,19.
7,,,19.
7,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格率100%","镇财整合[2018]1号"46,"村集体经济","新建","木场乡","杨柳桥村","个",1,"集体经济建设",420,1718,2018,2018,19.
7,19.
7,,,19.
7,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格率100%","镇财整合[2018]1号"47,"2019年上海市对口支援云南省项目","新建","木场乡","木场村","项",1,"基础设施及产业发展",261,975,2019,2020,890,,890,,890,"李正明","驻村扶贫工作队长","扶贫办","项目验收合格率100%","沪滇项目"48,"第一批新增沪滇项目","新建","木场乡","木场村","个",1,"基础设施及产业发展",261,975,2018,2018,300,300,,,300,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格率100%","沪滇项目"49,"欣安安置点养殖小区建设项目","新建","南伞镇","田坝村","个",1,"37户,每户12㎡,每平方656元及附属工程.
",238,1009,2019,2019,30,,30,,30,"村支书","驻村扶贫工作队长","农业局","项目验收合格率100%","镇财整合(2019)1号",,"欣安安置点养殖小区建设项目","新建","南伞镇","田坝村","个",1,"37户,每户12m2,每平方米656元及附属工程,镇财整合(2019)1号已安排30万元.
",238,1009,2019,2019,45.
8,,45.
8,,45.
8,"村支书","驻村扶贫工作队长","农业局","项目验收合格率100%","镇政财农字〔2019〕32号",50,"边民互市小集镇建设","新建","南伞镇","营盘村","个",1,"1.
框架结构房屋建设700㎡,120万元;2.
市场场地硬化3260㎡,49万元;3.
排污管道建设600m,26万元.
",163,598,2019,2019,195,,195,,195,"村支书","驻村扶贫工作队长","民宗局","项目验收合格率100%","镇财整合(2019)1号",,"镇康县南伞镇营盘村2019年度扶持壮大村集体经济项目","新建","南伞镇","营盘村","个",1,"1.
彩钢瓦棚1765平方米;2.
建设固定摊位98个;3.
场地硬化6250平方米.
",163,598,2019,2019,50,,50,,50,"村支书","驻村扶贫工作队长","农业农村局","建档立卡贫困户受益人口≥597人","镇财整合(2019)15号",51,"镇康县南伞村2019年度扶持壮大村集体经济项目","新建","南伞镇","南伞村","个",1,"搭建彩钢瓦棚4600平方米",86,337,2019,2019,50,,50,,50,"村支书","驻村扶贫工作队长","组织部","建档立卡贫困户受益人口≥337人","镇财整合(2019)15号",52,"村级集体经济组织","新建","南伞镇",5,"个",5,"麻栗坪村、道水村、班龙村、茶山村、轩岗村",855,3500,2018,2018,99.
7,99.
7,,,99.
7,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号",53,"镇康县红岩村2019年度扶持壮大村集体经济项目","新建","南伞镇","红岩村","个",1,"1.
彩钢瓦棚1500平方米,估算投资25.
5万元.
2.
圈舍1000平方米,估算投资15万元.
3.
围墙500米,估算投资10万元.
4.
挡墙毛石支砌200立方米,估算投资8万元.
5.
围栏1800米,估算投资18万元.
6.
场地硬化300平方米,估算投资7.
5万元.
",226,925,2019,2019,50,,50,,50,"杨文刚","驻村扶贫工作队长","组织部","建档立卡贫困户受益人口≥925人","镇财整合(2019)15号",54,"镇康县2019年脱贫攻坚畜牧产业发展秋季动物防疫疫苗购置","新建","镇康县",,"项",1,"开展畜禽疫病防疫700800头(只、羽).
其中:猪瘟防疫212300头,每头补助0.
5元;蓝耳病防疫180000头,每头补助1元;猪肺疫防疫50000头,每头补助0.
1元;注射牛出败1000头,每头补助0.
6元;牛气肿疽防疫1000头,每头补助1.
5元;羊四防苗(羊肠毒血症等防疫)6000只,每只补助;0.
5元鸡瘟防疫200000羽,每羽补助0.
1元;禽霍乱防疫50000羽,每羽补助0.
03元;猪牛羊炭疽病防疫500头、只,每头、只补助0.
5元.
",9575,38069,2019,2019,30,,30,,30,"村支书","驻村扶贫工作队长","农业局","项目验收合格率100%","镇财整合(2019)1号"55,"镇康县农资土产公司军弄热水河村农资经营改造","新建","镇康县",,"项",1,"镇康县农资土产公司军弄热水河村农资经营改造",74,276,2018,2018,10,10,,,10,"村支书","驻村扶贫工作队长","供销社","项目验收合格率100%","临财产业发[2018]2号"56,"镇康县农产品质量安全检验检测机构资质能力建设项目","新建","镇康县",,"项",1,"1.
编制质量管理手册、程序文件和作业指导书,建立质量管理体系;2.
进行县、乡检验检测、监管人员培训;3.
建立标准信息库;4.
通过计量认证和机构认可.
",9575,38069,2019,2019,20,,20,,20,"村支书","驻村扶贫工作队长","农业局","项目验收合格率100%","镇财整合(2019)10号"57,"镇康县农民专业合作社规范化建设项目","新建","镇康县",,"项",1,"全县12个编进村合作社各项制度上墙、社员证印制等合作社规范工作.
",9575,38069,2019,2019,5.
4,,5.
4,,5.
4,"村支书","驻村扶贫工作队长","农业局","项目验收合格率100%","镇财整合(2019)10号"58,"康县2019年集成农机推广体系改革与建设","新建","镇康县",,"项",1,"镇康县2019年集成农机推广体系改革与建设资金",9575,38069,2019,2020,63,,63,,63,"村支书","驻村扶贫工作队长","农业局","项目验收合格率100%","镇财整合(2019)15号"59,"镇康县2020年农业水价综合改革节约用水补贴","新建","勐捧镇、南伞镇","岩子头村、田坝村、轩岗村","项",1,"勐捧镇岩子头村茶叶种植专业合作社6350亩节水补贴、田坝圆梦澳洲坚果种植专业合作社550亩节水补贴、轩岗村用水协会5350亩节水补贴.
",643,2532,2020,2020,12,,,12,12,"村支书","驻村扶贫工作队长","县水务局","项目完成率100%,项目验收合格率100%","镇财整合【2020】1号",60,"勐捧镇丫口村大岗山提水灌溉建设项目","新建","勐捧镇","丫口村","项",1,"新建输水主管7公里,1000m水池一座,200m水池一座;新建提水站一座;架设高压输电线路1.
5公里,安装变压器一台,灌溉片区烤烟面积1500亩",250,1085,2020,2020,300,,,300,300,"村支书","驻村扶贫工作队长","农业局","完成输水管道建设7公里,水池2座,提水站1座,输电线路1.
5公里,变压器1台,项目验收合格率100%","镇财整合【2020】10号",61,"南伞镇户育村畜禽圈舍改造项目","新建","南伞镇","户育村","项",1,"对户育村184户养殖户圈舍实施改扩建,改扩建面积1342平方米",52,197,2020,2020,26.
47,,,26.
47,26.
47,"村支书","驻村扶贫工作队长","农业局","完成184户养殖户圈舍改造1342平方米.
项目验收合格率100%","镇财整合【2020】9号",62,"木场乡黑马塘村高效节水灌溉项目","新建","木场乡","黑马塘村","项",1,"建设取水池2个、架设引水主管14220M、建设100m3蓄水池2个、建设田间灌溉管网18500M.
",39,134,2020,2020,60,,,60,60,"村支书","驻村扶贫工作队长","农业局","完成水池4座,引水管网32720米,项目验收合格率100%","镇财整合【2020】11号",63,"镇康县2020年高标准农田建设项目","新建","镇康县","勐捧镇、南伞镇、忙丙乡、凤尾镇、木场乡","项",1,"建设高标准农田2.
28万亩,其中:高效节水灌溉0.
73万亩.
",9575,38069,2020,2020,1800,,,1800,1800,"村支书","驻村扶贫工作队长","农业局","完成高标准农田建设2.
28万亩,项目验收合格率100%","(镇政财预字〔2020〕73号)县级配套",64,"镇康县2020年糖料蔗高优蔗园建设项目","镇康县",,,"项",1,"1.
土地平整(坡改梯)工程建设:计划实施坡改梯工程2.
27万亩,其中:改造提升工程1.
5万亩,新建坡改梯0.
77万亩.
2.
园间道路工程建设:计划新建园间道路14km.
",,,2020,2020,1195,,,1195,1195,"村支书","驻村扶贫工作队长","县地方产业发展服务中心","坡改梯工程2.
27万亩,项目验收合格率100%","镇财整合【2020】15号",65,"凤尾镇小水井村集体经济项目","新建","凤尾镇","小水井村","项",1,"改造小水井酒厂厂房647平方米及附属设施,实现提质增效.
",71,283,2020,2020,60,,,60,60,"村支书","驻村扶贫工作队长","县工业和科技信息化局","完成项目建设,壮大村集体经济,验收合格率100%","镇财整合【2020】15号",66,"镇康县忙丙乡马鞍山村水产养殖项目","新建","忙丙乡","马鞍村","项",1,"新建虾塘1个,面积1亩;鳝鱼塘1个,面积0.
8亩;修缮加固鱼塘4个,面积4.
2亩;相关配套附属工程.
",54,197,2020,2020,20,,,20,20,"村支书","驻村扶贫工作队长","县农业农村局","完成项目建设,验收合格率100%","镇财整合【2020】15号",67,"南伞镇德胜社区电子商务服务站项目","新建","南伞镇","德胜社区","项",1,"与新城社区"项目抱团"建设,每年可获得租赁经营收入4.
2万元,根据市场情景可每年增加收入,并实现资产保质增值.
",,,2020,2020,50,,,50,50,"村支书","驻村扶贫工作队长","县农业农村局","完成电子商务服务站建设1个,验收合格率100%","镇财整合【2020】17号",68,"南伞镇新城社区电子商务服务站项目","新建","南伞镇","新城社区","项",1,"与德胜社区"项目抱团"建设,每年可获得租赁经营收入4.
2万元,根据市场情景可每年增加收入,并实现资产保质增值.
",,,2020,2020,50,,,50,50,"村支书","驻村扶贫工作队长","县农业农村局","完成电子商务服务站建设1个,验收合格率100%","镇财整合【2020】17号",10,"二、就业扶贫"人次",47984,"—",16271,56377,176.
91,122.
03,54.
88,0,176.
91,,"(一)贫困村创业致富带头人项目","(二)扶贫车间","(三)外出务工补助","(四)就业创业补助","(五)就业创业培训"人次",0,"—",0,0,,"县内"人次",0,"—",0,0,,"县外省内"人次",0,"—",0,0,,"省外"人次",0,"—",0,0,,"境外"人次"10,"(六)技能培训"人次",47984,"—",16271,56377,176.
91,122.
03,54.
88,0,176.
91,1,"引导性技能培训","新建","凤尾镇","仁和村","人次",61,"务工技能培训、种植技术及管护培训,每人补助200元",112,466,2018,2019,1.
22,1.
22,,,1.
22,"马正强","杨文勋","扶贫办","项目验收合格率100%","财政整合[2018]3号","引导性技能培训","新建","凤尾镇","凤尾村","人次",298,"种植、养殖技术培训50人,每人补助300元、种植管护培训248人,每人补助200元",153,571,2018,2019,1.
5,1.
5,,,1.
5,"李国文","杨士吉","扶贫办","项目验收合格率100%","财政整合[2018]3号","引导性技能培训","新建","凤尾镇","芦子园村","人次",50,"种植、养殖技术培训20人,每人补助300元、种植管护培训30人,每人补助200元",36,119,2018,2019,0.
6,0.
6,,,0.
6,"邵老成、李开义","驻村扶贫工作队长","扶贫办","项目验收合格率100%","财政整合[2018]3号","引导性技能培训","新建","凤尾镇","大柏树村","人次",58,"种植、养殖技术培训30人,每人补助300元、种植管护培训28人,每人补助200元",48,161,2018,2018,0.
9,0.
9,,,0.
9,"李成武","王建华","扶贫办","项目验收合格率100%","财政整合[2018]3号","引导性技能培训","新建","凤尾镇","大坝村","人次",150,"种植、养殖技术培训10人,每人补助300元、种植管护培训140人,每人补助200元",36,151,2018,2020,0.
3,0.
3,,,0.
3,"李进强","吕金奎","扶贫办","项目验收合格率100%","财政整合[2018]3号","引导性技能培训","新建","凤尾镇","小水井村","人次",192,"种植、养殖技术培训90人,每人补助300元、种植管护培训102人,每人补助200元",64,251,2018,2020,2.
7,2.
7,,,2.
7,"施镇强","王海清","扶贫办","项目验收合格率100%","财政整合[2018]3号"2,"引导性技能培训","新建","军赛乡","—","人次",200,"种养殖技术培训200人,300元/人.
",200,200,2018,2018,6,6,,,6,"村委会支书","驻村扶贫工作队长","扶贫办","项目验收合格率100%","财政整合[2018]3号"3,"引导性技能培训","新建","勐堆乡","—","人次",200,"核桃、坚果管护培训200人",238,238,2018,2018,6,6,,,6,"村委会支书","驻村扶贫工作队长","扶贫办","完成建档立卡贫困户坚果、甘蔗、生猪养殖培训,满意度100%,建档立卡贫困户受益人口≥238人","财政整合[2018]3号"4,"就业培训","新建","忙丙乡","9村","人次",200,"种植、养殖技术培训200人,300元/人.
",200,876,2018,2018,6,6,,,6,"村委会支书","驻村扶贫工作队长","扶贫办","项目验收合格率100%","财政整合[2018]3号"5,"引导性技能培训","新建","勐捧镇","—","人次",4369,"引导性技能培训(种植、养殖)4369人次",1472,5712,2018,2020,7.
5,7.
5,,,7.
5,"村委会支书","驻村扶贫工作队长","扶贫办","项目验收合格率100%","财政整合[2018]3号"6,"就业培训","新建","木场乡","—","人次",1174,"引导性技能培训(种植、养殖)",1174,1174,2018,2020,6,6,,,6,"李国平","驻村扶贫工作队长","扶贫办","项目验收合格率100%","财政整合[2018]3号"7,"引导性培训","新建","南伞镇","—","人次",250,"种植养殖技术培训250人,300元/人",250,250,2018,2018,7.
5,7.
5,,,7.
5,"村委会支书","驻村扶贫工作队长","扶贫办","项目验收合格率100%","财政整合[2018]3号",8,"引导性技能培训","新建","镇康县","—","人次",2527,"核桃、坚果管护培训2527人",2527,7581,2018,2018,75.
81,75.
81,,,75.
81,"村委会支书","驻村扶贫工作队长","林业局","项目验收合格率100%","财政整合[2018]2号"9,"引导性技能培训","新建","商务局","—","人次",186,"技能培训186人,800元/人.
",186,558,2019,2019,14.
88,,14.
88,,14.
88,"村委会支书","驻村扶贫工作队长","扶贫办","项目验收合格率100%","镇财整合(2019)1号"10,"镇康县农村集体产权制度改革建设项目","新建","镇康县","—","人次",38069,"1.
全县71个行政村、899个村民小组农村集体资产业务培训、摸底、系统录入工作;2.
进行经营性资产量化、成员资格证书印制发放.
",9575,38069,2019,2019,40,,40,,40,"村委会支书","驻村扶贫工作队长","农业局","项目验收合格率100%","镇财整合(2019)10号"4,"三、易地扶贫搬迁",,,,"户",1294,—,129,439,8076,8076,229,0,229,0,229,,,,,4,"(一)集中安置"户",1294,"—",129,439,8076,8076,229,0,229,0,229,1,"基础设施建设","新建","南伞镇",,"户",350,"易地扶贫搬迁基础设施建设1.
74万元/户",35,119,2019,2019,60.
75,,60.
75,,60.
75,"村委会支书","驻村扶贫工作队长","发改局","项目验收合格率100%","镇财整合(2019)5号"2,"基础设施建设","新建","凤尾镇",,"户",232,"易地扶贫搬迁基础设施建设0.
73万元/户",23,92,2019,2019,16.
9,,16.
9,,16.
9,"村委会支书","驻村扶贫工作队长","发改局","项目验收合格率100%","镇财整合(2019)5号"3,"基础设施建设","新建","忙丙乡",,"户",311,"易地扶贫搬迁基础设施建设1.
65万元/户",31,98,2019,2019,51.
3,,51.
3,,51.
3,"村委会支书","驻村扶贫工作队长","发改局","项目验收合格率100%","镇财整合(2019)5号"4,"基础设施建设","新建","木场乡",,"户",401,"易地扶贫搬迁基础设施建设2.
5万元/户",40,130,2019,2019,100.
05,,100.
05,,100.
05,"村委会支书","驻村扶贫工作队长","发改局","项目验收合格率100%","镇财整合(2019)5号","(二)分散安置"1,"四、公益岗位"人",140,"—",45,140,,,84,0,84,0,84,,,,,1,"(一)公益岗位"人",140,"—",45,140,,,84,0,84,0,84,,,,,,"1.
护林员"人",0,"—",0,0,,"2.
护路员"人",0,"—",0,0,,"3.
护草员","4.
护水员","5.
护边员"人",0,"—",0,0,,"6.
护理员","7.
保洁员","8.
治安协管员"1,"9.
其他"人",140,"—",45,140,84,0,84,0,84,1,"上海对口帮扶云南省劳务协作项目","新建","镇康县",,"人",140,"乡村公共服务岗位(500月/人)",45,140,2019,2019,84,,84,,84,,,"人社局",,"沪滇项目",34,"五、教育扶贫"人",1431,"—",2294,5516,495.
8,124.
6,265.
7,105.
5,495.
8,34,"(一)享受"雨露计划"职业教育补助"人",1431,"—",2294,5516,495.
8,124.
6,265.
7,105.
5,495.
8,20,"1.
高校学历教育补助"人",931,"—",1865,4808,371.
2,0,265.
7,105.
5,371.
2,1,"秋季学期雨露计划","—","凤尾镇","大柏树","人",2,"镇康县2018学年秋季学期雨露计划2人",2,6,2019,2019,0.
45,,0.
45,,0.
45,"李成武","王建华","教体局","项目验收合格率100%","镇财整合(2019)1号","秋季学期雨露计划","—","凤尾镇","凤尾村","人",6,"镇康县2018学年秋季学期雨露计划6人",6,22,2019,2019,0.
9,,0.
9,,0.
9,"李国文","杨士吉","教体局","项目验收合格率100%","镇财整合(2019)1号","秋季学期雨露计划","—","凤尾镇","芦子园","人",9,"镇康县2018学年秋季学期雨露计划9人",8,30,2019,2019,1.
95,,1.
95,,1.
95,"邵老成、李开义","驻村扶贫工作队长","教体局","项目验收合格率100%","镇财整合(2019)1号","秋季学期雨露计划","—","凤尾镇","仁和村","人",3,"镇康县2018学年秋季学期雨露计划3人",3,11,2019,2019,0.
6,,0.
6,,0.
6,"马正强","杨文勋","教体局","项目验收合格率100%","镇财整合(2019)1号","秋季学期雨露计划","—","凤尾镇","小水井村","人",8,"镇康县2018学年秋季学期雨露计划8人",7,28,2019,2019,1.
35,,1.
35,,1.
35,"施镇强","王海清","教体局","项目验收合格率100%","镇财整合(2019)1号"2,"秋季学期雨露计划",,"军赛乡",,"人",22,"镇康县2018学年秋季学期雨露计划22人",22,66,2019,2019,3.
75,,3.
75,,3.
75,"村支书","驻村扶贫工作队长","教体局","项目验收合格率100%","镇财整合(2019)1号"3,"秋季学期雨露计划",,"勐堆乡",,"人",45,"镇康县2018学年秋季学期雨露计划45人",45,135,2019,2019,7.
95,,7.
95,,7.
95,"村支书","驻村扶贫工作队长","教体局","完成雨露计划资助45人,项目满意度100%,建档立卡贫困户受益人口45人.
","镇财整合(2019)1号"4,"秋季学期雨露计划",,"忙丙乡",,"人",74,"镇康县2018学年秋季学期雨露计划74人",74,222,2019,2019,13.
5,,13.
5,,13.
5,"村支书","驻村扶贫工作队长","教体局","项目验收合格率100%","镇财整合(2019)1号"5,"秋季学期雨露计划",,"勐捧镇",,"人",63,"镇康县2018学年秋季学期雨露计划63人",63,189,2019,2019,10.
5,,10.
5,,10.
5,"村支书","驻村扶贫工作队长","教体局","项目验收合格率100%","镇财整合(2019)1号"6,"秋季学期雨露计划",,"木场乡",,"人",60,"镇康县2018学年秋季学期雨露计划60人",60,180,2019,2019,9,,9,,9,"村支书","驻村扶贫工作队长","教体局","项目验收合格率100%","镇财整合(2019)1号"7,"秋季学期雨露计划",,"南伞镇",,"人",57,"镇康县2018学年秋季学期雨露计划57人",57,171,2019,2019,9.
15,,9.
15,,9.
15,"村支书","驻村扶贫工作队长","教体局","项目验收合格率100%","镇财整合(2019)1号",8,"秋季学期雨露计划",,"县职教中心",,"人",97,"镇康县2018学年秋季学期雨露计划97人",97,291,2019,2019,14.
55,,14.
55,,14.
55,"村支书","驻村扶贫工作队长","教体局","项目验收合格率100%","镇财整合(2019)1号"9,"秋季学期雨露计划",,"县职教中心",,"人",32,"追加2018—2019学年"雨露计划"资助"东西协作"32人",32,96,2019,2019,5.
7,,5.
7,,5.
7,"村支书","驻村扶贫工作队长","教体局","项目验收合格率100%","镇财整合(2019)1号"10,"春季学期雨露计划",,"南伞镇",,"人",92,"2019年春季学期雨露计划补助资金",92,276,2019,2019,16.
95,,16.
95,,16.
95,"村委会支书","驻村扶贫工作队长","教体局","项目验收合格率100%","镇财整合(2019)8号"11,"春季学期雨露计划",,"勐捧镇",,"人",105,"2019年春季学期雨露计划补助资金",105,315,2019,2019,18.
6,,18.
6,,18.
6,"村委会支书","驻村扶贫工作队长","教体局","项目验收合格率100%","镇财整合(2019)8号"12,"春季学期雨露计划",,"凤尾镇",,"人",30,"2019年春季学期雨露计划补助资金",30,90,2019,2019,4.
95,,4.
95,,4.
95,"村委会支书","驻村扶贫工作队长","教体局","项目验收合格率100%","镇财整合(2019)8号"13,"春季学期雨露计划",,"勐堆乡",,"人",48,"2019年春季学期雨露计划补助资金",48,144,2019,2019,7.
95,,7.
95,,7.
95,"村委会支书","驻村扶贫工作队长","教体局","项目验收合格率100%","镇财整合(2019)8号"14,"春季学期雨露计划",,"忙丙乡",,"人",75,"2019年春季学期雨露计划补助资金",75,225,2019,2019,13.
95,,13.
95,,13.
95,"村委会支书","驻村扶贫工作队长","教体局","项目验收合格率100%","镇财整合(2019)8号"15,"春季学期雨露计划",,"木场乡",,"人",77,"2019年春季学期雨露计划补助资金",77,231,2019,2019,12.
9,,12.
9,,12.
9,"村委会支书","驻村扶贫工作队长","教体局","项目验收合格率100%","镇财整合(2019)8号"16,"春季学期雨露计划",,"军赛乡",,"人",26,"2019年春季学期雨露计划补助资金",26,78,2019,2019,4.
65,,4.
65,,4.
65,"村委会支书","驻村扶贫工作队长","教体局","项目验收合格率100%","镇财整合(2019)8号"17,"2019—2020学年"东西协作"政府一次性交通生活补助",,"镇康县",,"人",39,"2019—2020学年"东西协作"政府一次性交通生活补助",39,117,2019,2019,7.
8,,7.
8,,7.
8,"村委会支书","驻村扶贫工作队长","教体局","项目验收合格率100%","镇财整合(2019)20号"18,"2019—2020学年"东西协作""雨露计划"资助",,"镇康县",,"人",70,"2019—2020学年"东西协作""雨露计划"资助",70,210,2019,2019,35,,35,,35,"村委会支书","驻村扶贫工作队长","教体局","项目验收合格率100%","镇财整合(2019)20号"19,"2019-2020学年秋季学期雨露计划资助",,"镇康县",,"人",424,"2019-2020学年秋季学期雨露计划资助",424,1272,2019,2019,63.
6,,63.
6,,63.
6,"村委会支书","驻村扶贫工作队长","教体局","项目验收合格率100%","镇财整合(2019)20号"20,"职业中等学历教育补助",,"镇康县",,"人",403,"职业中等学历教育补助.
",403,403,2020,2020,105.
5,,,105.
5,105.
5,"村委会支书","驻村扶贫工作队长","教体局","项目验收合格率100%","镇财整合【2020】10号"7,"2.
职业高等学历教育补助"人",190,"—",117,178,29.
1,29.
1,0,0,29.
1,1,"高等教育资助",,"凤尾镇","小水井村","人",2,"每人补助2000-5000元",2,2,2018,2018,0.
6,0.
6,,,0.
6,"村支书","驻村扶贫工作队长","教体局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号;镇财整合[2018]4号"2,"高等教育资助",,"军赛乡",,"人",2,"每人补助2000-5000元",2,2,2018,2018,0.
6,0.
6,,,0.
6,"村支书","驻村扶贫工作队长","教体局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号;镇财整合[2018]3号"3,"高等教育资助",,"勐堆乡",,"人",97,"每人补助2000-5000元",24,24,2018,2018,1.
2,1.
2,,,1.
2,"村支书","驻村扶贫工作队长","教体局","完成高等职业资助24人,项目满意度100%,建档立卡贫困户受益人口24人.
","镇政财联字[2018]12号;镇财整合[2018]1号;镇财整合[2018]3号"4,"高等教育资助",,"忙丙乡","忙丙村","人",6,"每人补助2000-5000元",6,26,2018,2019,1.
8,1.
8,,,1.
8,"村支书","驻村扶贫工作队长","教体局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号;镇财整合[2018]3号","高等教育资助",,"忙丙乡","新水村","人",1,"每人补助2000-5000元",1,4,2018,2019,0.
3,0.
3,,,0.
3,"村支书","驻村扶贫工作队长","教体局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号;镇财整合[2018]3号","高等教育资助",,"忙丙乡","麦地村","人",3,"每人补助2000-5000元",3,14,2018,2019,0.
9,0.
9,,,0.
9,"村支书","驻村扶贫工作队长","教体局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号;镇财整合[2018]3号","高等教育资助",,"忙丙乡","乌木村","人",1,"每人补助2000-5000元",1,7,2018,2019,0.
3,0.
3,,,0.
3,"村支书","驻村扶贫工作队长","教体局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号;镇财整合[2018]3号","高等教育资助",,"忙丙乡","帮海村","人",1,"每人补助2000-5000元",1,5,2018,2019,0.
3,0.
3,,,0.
3,"村支书","驻村扶贫工作队长","教体局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号;镇财整合[2018]3号","高等教育资助",,"忙丙乡","回掌村","人",2,"每人补助2000-5000元",2,9,2018,2019,0.
6,0.
6,,,0.
6,"村支书","驻村扶贫工作队长","教体局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号;镇财整合[2018]3号","高等教育资助",,"忙丙乡","忙汞村","人",2,"每人补助2000-5000元",2,8,2018,2019,0.
6,0.
6,,,0.
6,"村支书","驻村扶贫工作队长","教体局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号;镇财整合[2018]3号","高等教育资助",,"忙丙乡","马鞍山村","人",1,"每人补助2000-5000元",1,5,2018,2019,0.
3,0.
3,,,0.
3,"村支书","驻村扶贫工作队长","教体局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号;镇财整合[2018]3号"5,"高等教育资助",,"勐捧镇",,"人",7,"每人补助2000-5000元",7,7,2018,2018,2.
1,2.
1,,,2.
1,"村支书","驻村扶贫工作队长","教育局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号;镇财整合[2018]3号"6,"高等教育资助",,"木场乡",,"人",28,"每人补助2000-5000元",28,28,2018,2018,8.
4,8.
4,,,8.
4,"村支书","驻村扶贫工作队长","教育局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号;镇财整合[2018]3号"7,"高等教育资助",,"南伞镇",,"人",37,"每人补助2000-5000元",37,37,2018,2018,11.
1,11.
1,,,11.
1,"村支书","驻村扶贫工作队长","教育局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号;镇财整合[2018]3号",7,"3.
职业中等学历教育补助"人",310,"—",312,530,95.
5,95.
5,0,0,95.
5,1,"中等职业资助","—","凤尾镇","大柏树村","人",1,"计划实施"雨露计划"1人,资助标准3000元/年.
",1,3,2018,2019,0.
3,0.
3,,,0.
3,"李成武","王建华","教体局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号;镇财整合[2018]4号","中等职业资助","—","凤尾镇","小水井村","人",11,"计划实施"雨露计划"10人,10人资助标准3000元/年,其中:4人一次性交通补助标准2000元/次/人.
",13,48,2018,2019,3.
8,3.
8,,,3.
8,"施镇强","王海清","教体局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号;镇财整合[2018]4号","中等职业资助","—","凤尾镇","大坝村","人",1,"计划实施"雨露计划"1人,资助标准3000元/年,其中:1人一次性交通补助标准2000元/次.
",1,4,2018,2019,0.
5,0.
5,,,0.
5,"村支书","驻村扶贫工作队长","教体局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号;镇财整合[2018]4号","中等职业资助","—","凤尾镇","凤尾村","人",13,"计划实施"雨露计划"13人,13人资助标准3000元/年,其中:1人一次性交通补助标准2000元/次/人.
",13,49,2018,2019,4.
1,4.
1,,,4.
1,"李国文","杨士吉","教体局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号;镇财整合[2018]4号","中等职业资助","—","凤尾镇","仁和村","人",4,"计划实施"雨露计划"4人,4人资助标准3000元/年,其中:1人一次性交通补助标准2000元/次/人.
",4,16,2018,2019,1.
4,1.
4,,,1.
4,"马正强","杨文勋","教体局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号;镇财整合[2018]4号"2,"中等职业资助",,"军赛乡",,"人",27,"一、落实免学费:每生每年2000元.
(建档立卡家庭经济困难学生全覆盖)二、落实国家助学金:每生每年2000元.
(建档立卡家庭经济困难学生全覆盖)三、落实雨露计划:每生每年3000元.
四、落实14年免费教育:免补教科书费每生每年300元.
",27,27,2018,2018,8.
9,8.
9,,,8.
9,"村支书","驻村扶贫工作队长","教体局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号;镇财整合[2018]3号"3,"中等职业资助",,"勐堆乡",,"人",54,"一、落实免学费:每生每年2000元.
(建档立卡家庭经济困难学生全覆盖)二、落实国家助学金:每生每年2000元.
(建档立卡家庭经济困难学生全覆盖)三、落实雨露计划:每生每年3000元.
四、落实14年免费教育:免补教科书费每生每年300元.
",54,54,2018,2018,13.
2,13.
2,,,13.
2,"村支书","驻村扶贫工作队长","教体局","完成中等职业资助54人,项目满意度100%,建档立卡贫困户受益人口54人.
","镇政财联字[2018]12号;镇财整合[2018]1号;镇财整合[2018]3号"4,"中等职业资助",,"忙丙乡","新水村","人",1,"一、落实免学费:每生每年2000元.
(建档立卡家庭经济困难学生全覆盖)二、落实国家助学金:每生每年2000元.
(建档立卡家庭经济困难学生全覆盖)三、落实雨露计划:每生每年3000元.
四、落实14年免费教育:免补教科书费每生每年300元.
",1,5,2018,2019,0.
3,0.
3,,,0.
3,"村支书","驻村扶贫工作队长","教体局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号;镇财整合[2018]3号","中等职业资助",,"忙丙乡","麦地村","人",4,"一、落实免学费:每生每年2000元.
(建档立卡家庭经济困难学生全覆盖)二、落实国家助学金:每生每年2000元.
(建档立卡家庭经济困难学生全覆盖)三、落实雨露计划:每生每年3000元.
四、落实14年免费教育:免补教科书费每生每年300元.
",4,18,2018,2019,1.
2,1.
2,,,1.
2,"村支书","驻村扶贫工作队长","教体局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号;镇财整合[2018]3号","中等职业资助",,"忙丙乡","蔡何村","人",7,"一、落实免学费:每生每年2000元.
(建档立卡家庭经济困难学生全覆盖)二、落实国家助学金:每生每年2000元.
(建档立卡家庭经济困难学生全覆盖)三、落实雨露计划:每生每年3000元.
四、落实14年免费教育:免补教科书费每生每年300元.
",7,32,2018,2019,2.
7,2.
7,,,2.
7,"村支书","驻村扶贫工作队长","教体局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号;镇财整合[2018]3号","中等职业资助",,"忙丙乡","乌木村","人",11,"一、落实免学费:每生每年2000元.
(建档立卡家庭经济困难学生全覆盖)二、落实国家助学金:每生每年2000元.
(建档立卡家庭经济困难学生全覆盖)三、落实雨露计划:每生每年3000元.
四、落实14年免费教育:免补教科书费每生每年300元.
",11,48,2018,2019,3.
3,3.
3,,,3.
3,"村支书","驻村扶贫工作队长","教体局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号;镇财整合[2018]3号","中等职业资助",,"忙丙乡","回掌村","人",5,"一、落实免学费:每生每年2000元.
(建档立卡家庭经济困难学生全覆盖)二、落实国家助学金:每生每年2000元.
(建档立卡家庭经济困难学生全覆盖)三、落实雨露计划:每生每年3000元.
四、落实14年免费教育:免补教科书费每生每年300元.
",5,22,2018,2019,1.
5,1.
5,,,1.
5,"村支书","驻村扶贫工作队长","教体局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号;镇财整合[2018]3号","中等职业资助",,"忙丙乡","忙汞村","人",3,"一、落实免学费:每生每年2000元.
(建档立卡家庭经济困难学生全覆盖)二、落实国家助学金:每生每年2000元.
(建档立卡家庭经济困难学生全覆盖)三、落实雨露计划:每生每年3000元.
四、落实14年免费教育:免补教科书费每生每年300元.
",3,14,2018,2019,0.
9,0.
9,,,0.
9,"村支书","驻村扶贫工作队长","教体局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号;镇财整合[2018]3号","中等职业资助",,"忙丙乡","马鞍山村","人",6,"一、落实免学费:每生每年2000元.
(建档立卡家庭经济困难学生全覆盖)二、落实国家助学金:每生每年2000元.
(建档立卡家庭经济困难学生全覆盖)三、落实雨露计划:每生每年3000元.
四、落实14年免费教育:免补教科书费每生每年300元.
",6,28,2018,2019,1.
8,1.
8,,,1.
8,"村支书","驻村扶贫工作队长","教体局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号;镇财整合[2018]3号"5,"中等职业资助",,"勐捧镇",,"人",49,"一、落实免学费:每生每年2000元.
(建档立卡家庭经济困难学生全覆盖)二、落实国家助学金:每生每年2000元.
(建档立卡家庭经济困难学生全覆盖)三、落实雨露计划:每生每年3000元.
四、落实14年免费教育:免补教科书费每生每年300元.
",49,49,2018,2018,15.
1,15.
1,,,15.
1,"村支书","驻村扶贫工作队长","教体局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号;镇财整合[2018]3号"6,"中等职业资助",,"木场乡",,"人",60,"一、落实免学费:每生每年2000元.
(建档立卡家庭经济困难学生全覆盖)二、落实国家助学金:每生每年2000元.
(建档立卡家庭经济困难学生全覆盖)三、落实雨露计划:每生每年3000元.
四、落实14年免费教育:免补教科书费每生每年300元.
",60,60,2018,2018,18.
6,18.
6,,,18.
6,"村支书","驻村扶贫工作队长","教育局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号;镇财整合[2018]3号"7,"中等职业资助",,"南伞镇",,"人",53,"一、落实免学费:每生每年2000元.
(建档立卡家庭经济困难学生全覆盖)二、落实国家助学金:每生每年2000元.
(建档立卡家庭经济困难学生全覆盖)三、落实雨露计划:每生每年3000元.
四、落实14年免费教育:免补教科书费每生每年300元.
",53,53,2018,2018,17.
9,17.
9,,,17.
9,"村支书","驻村扶贫工作队长","教育局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号;镇财整合[2018]3号",,"4.
劳动力短期技能培训","5.
贫困户家庭子女考取二本以上补助(提供本省资金管理办法),"6.
农民实用技术培训","(二)贫困村创业致富带头人创业培训","(三)参与"学前学会普通话"行动","(四)其他教育扶贫"人",0,"—",0,0,,"1.
义务教育阶段落实控辍保学,确保100%入学"人",0,"—",0,0,,"2.
初中高中后继续教育"人",0,"—",0,0,,"3.
高中阶段资助"人",0,"—",0,0,1,"六、健康扶贫"人次",38069,"—",9575,38069,,,40.
62,0,40.
62,0,40.
62,,,,,1,"(一)参加城乡居民基本医疗保险"人次",38069,"—",9575,38069,40.
62,0,40.
62,0,40.
62,1,"2019年资助建档立卡贫困人口参加基本医疗保险市级补助",,"镇康县",,"人",38069,"目标1:巩固参保率.
目标2:稳步提高保障水平.
目标3:确保城乡居民基本医疗保险工作顺利实施,切实提高医疗保障水平.
目标4:确保全市建档立卡贫困人口资助参保.
参保人数:3.
81万人",9575,38069,2019,2019,40.
62,,40.
62,,40.
62,"村支书","驻村扶贫工作队长","医保局","项目验收合格率100%","镇政财社字【2019】66号",,"(二)参加大病保险"人次",0,"—",0,0,,"(三)接受医疗救助"人次",0,"—",0,0,,"(四)参加其他补充医疗保险"人次",0,"—",0,0,,"(五)参加意外保险","(六)接受大病(地方病)救治"人次",0,"—",0,0,49,"七、危房改造"户",19250,"—",12353,33206,21579.
1005,8457.
2805,7256.
23,5865.
59,21579.
1005,49,"(一)农村危房改造"户",19250,"—",12353,33206,21579.
1005,8457.
2805,7256.
23,5865.
59,21579.
1005,11,"1.
拆除重建","新建"户",553,"—",298,1328,1425.
58,919.
2,506.
38,0,1425.
58,1,"拆除重建","新建","南伞镇",,"户",265,"拆除重建265户",265,1192,2018,2018,625,625,,,625,"村委会支书","驻村扶贫工作队长","住建局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号"2,"拆除重建","新建","勐堆乡",,"户",7,"补助4万元",7,23,2018,2018,28,28,,,28,"村委会支书","驻村扶贫工作队长","住建局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号"3,"拆除重建","新建","忙丙乡","7村","户",23,"建档立卡贫困户拆除重建23户,补助51.
2万元,目前已完工7户,在建16户.
",23,103,2018,2018,51.
2,51.
2,,,51.
2,"村委会支书","驻村扶贫工作队长","住建局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号"4,"除重建设","新建","凤尾镇","凤尾村","户",1,"新建砖混1户,4万元",1,4,2018,2018,4,4,,,4,"李国文","杨士吉","住建局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号"5,"拆除重建","新建","木场乡","龙塘村","户",1,"补助标准:3万元/户",1,3,2018,2018,3,3,,,3,"罗正祥","杨晓昆","住建局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号","拆除重建","新建","木场乡","绿荫塘村","户",1,"补助标准:3万元/户",0,0,2018,2018,3,3,,,3,"陈志德","李豫川","住建局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号","拆除重建","新建","木场乡","乌木兰村","户",1,"补助4万元",1,3,2018,2018,4,4,,,4,"王志荣","驻村扶贫工作队长","住建局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号"6,"拆除重建","新建","勐捧镇","岔沟村","户",5,"拆除重建安居房5户,补助标准:4万元/户",,,2018,2018,14,14,,,14,"张会强","罗金强","住建局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号","拆除重建","新建","勐捧镇","根基村","户",15,"拆除重建安居房15户,补助标准:4万元/户",,,2018,2018,30,30,,,30,"普建昌","李正光","住建局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号","拆除重建","新建","勐捧镇","核桃箐村","户",5,"拆除重建安居房5户,补助标准:4万元/户",,,2018,2018,10,10,,,10,"穆再文","李泽军","住建局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号","拆除重建","新建","勐捧镇","流水村","户",6,"拆除重建安居房6户,补助标准:4万元/户",,,2018,2018,12,12,,,12,"吴奇斌","驻村扶贫工作队长","住建局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号","拆除重建","新建","勐捧镇","忙丙村","户",9,"拆除重建安居房9户,补助标准:4万元/户",,,2018,2018,20,20,,,20,"张光华","罗银松","住建局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号","拆除重建","新建","勐捧镇","忙耿村","户",24,"拆除重建安居房24户,补助标准:4万元/户",,,2018,2018,48,48,,,48,"陈颈参","罗素","住建局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号","拆除重建","新建","勐捧镇","勐捧村","户",11,"拆除重建安居房11户,补助标准:4万元/户",,,2018,2018,28,28,,,28,"刘桂英","李国艳","住建局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号","拆除重建","新建","勐捧镇","南梳坝村","户",13,"拆除重建安居房13户,补助标准:4万元/户",,,2018,2018,26,26,,,26,"黄昆","驻村扶贫工作队长","住建局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号","拆除重建","新建","勐捧镇","象脚水村","户",5,"拆除重建安居房5户,补助标准:4万元/户",,,2018,2018,10,10,,,10,"杨永祥","李世旺","住建局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号","拆除重建","新建","勐捧镇","岩子头村","户",1,"拆除重建安居房1户,补助标准:4万元/户",,,2019,2018,3,3,,,3,"村委会支书","驻村扶贫工作队长","住建局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号"7,"拆除重建","新建","南伞镇","田坝村","户",16,"每户补助3.
16万元",,,2019,2019,50.
56,,50.
56,,50.
56,"村委会支书","驻村扶贫工作队长","发改局","项目验收合格率100%","镇财整合(2019)2号"8,"拆除重建","新建","勐堆乡","帮东村","户",60,"每户补助3.
173万元",,,2019,2019,190.
38,,190.
38,,190.
38,"村委会支书","驻村扶贫工作队长","发改局","项目验收合格率100%","镇财整合(2019)2号"9,"拆除重建","新建","木场乡","乌木兰村","户",30,"每户补助3.
16万元",,,2019,2019,94.
8,,94.
8,,94.
8,"村委会支书","驻村扶贫工作队长","发改局","项目验收合格率100%","镇财整合(2019)2号"10,"拆除重建","新建","勐捧镇","蒿子坝村","户",24,"每户补助3.
16万元",,,2019,2019,75.
84,,75.
84,,75.
84,"村委会支书","驻村扶贫工作队长","发改局","项目验收合格率100%","镇财整合(2019)2号"11,"拆除重建","新建","凤尾镇","小水井村","户",30,"每户补助3.
16万元",,,2019,2019,94.
8,,94.
8,,94.
8,"村委会支书","驻村扶贫工作队长","发改局","项目验收合格率100%","镇财整合(2019)2号"34,"2.
修缮加固","新建"户",15596,"—",12055,31878,19053.
5205,6438.
0805,6749.
85,5865.
59,19053.
5205,1,"加固修缮","新建","南伞镇",,"户",126,"加固改造126户",126,562,2018,2018,175.
98,175.
98,,,175.
98,"村委会支书","驻村扶贫工作队长","住建局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号"2,"加固修缮","新建","勐堆乡",,"户",113,"补助1—3万元",108,412,2018,2018,161.
7,161.
7,,,161.
7,"村委会支书","驻村扶贫工作队长","住建局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号"3,"加固修缮","新建","忙丙乡","9村","户",189,"建档立卡贫困户加固改造189户,补助309.
01万元,目前已入住122户,在建55户,未启动12户.
",189,824,2018,2018,309.
01,309.
01,,,309.
01,"村委会支书","驻村扶贫工作队长","住建局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号","加固修缮","新建","忙丙乡","忙丙村新水村麦地村蔡何村乌木村帮海村回掌村忙汞村马鞍山村","户",301,"除建档立卡户外的"四类对象改造301户,补助资金451.
1万元,",,,2018,2018,286.
4,286.
4,,,286.
4,"村委会支书","驻村扶贫工作队长","住建局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号"4,"加固修缮","新建","军赛乡",,"户",74,"补助1—3万元",74,288,2018,,101.
4,101.
4,,,101.
4,"村委会支书","驻村扶贫工作队长","住建局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号"5,"加固修缮","加固","凤尾镇","仁和","户",2,"3万元1户、1户补助1.
2万元每户",2,8,2018,2018,4.
2,4.
2,,,4.
2,"马正强","杨文勋","住建局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号","加固修缮","加固","凤尾镇","凤尾村","户",13,"3万元3户、1.
5万元修缮8户、增加补助0.
3万元2户",13,43,2018,2018,21.
6,21.
6,,,21.
6,"李国文","杨士吉","住建局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号","加固修缮","加固","凤尾镇","芦子园村","户",4,"土基房改造1户每户补助3万、加固改造2户每户补助1.
5万元、加固1户每户补助1.
2万元",4,14,2018,2018,7.
2,7.
2,,,7.
2,"邵老成、李开义","驻村扶贫工作队长","住建局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号","加固修缮","加固","凤尾镇","大柏树村","户",2,"进行危房加固改造1.
2万元2户",2,2,2018,2018,2.
4,2.
4,,,2.
4,"李成武","王建华","住建局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号","加固修缮","加固","凤尾镇","大坝村","户",2,"2户,1.
5万元/户",2,10,2018,2018,3,3,,,3,"李进强","吕金奎","住建局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号","加固修缮","加固","凤尾镇","小水井村","户",13,"土基房改造11户每户补助3万、2户改造1.
5万元/户",13,48,2018,2018,36,36,,,36,"施镇强","王海清","住建局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号"6,"加固修缮","新建","木场乡","黑马塘村","户",8,"补助1.
385万元/户",3,12,2018,2018,5.
7,5.
7,,,5.
7,"李国平","驻村扶贫工作队长","住建局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号","加固修缮","新建","木场乡","木场村","户",35,"补助15000元/户",27,95,2018,2018,57.
77,57.
77,,,57.
77,"李正明","李洪","住建局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号","加固修缮","新建","木场乡","芹菜塘村","户",17,"补助15000元/户",17,56,2018,2018,26.
93,26.
93,,,26.
93,"李子光","胡绍明","住建局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号","加固修缮","新建","木场乡","散路坝村","户",28,"每户补助1.
5万元",14,38,2018,2018,34.
97,34.
97,,,34.
97,"李文学","驻村扶贫工作队长","住建局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号","加固修缮","新建","木场乡","杨柳桥村","户",27,"每户补助1.
5万元",17,54,2018,2018,35.
97,35.
97,,,35.
97,"陶有华","梅新安","住建局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号","加固修缮","新建","木场乡","勐撒村","户",39,"每户补助1.
5万元",0,0,2018,2018,51.
5005,51.
5005,,,51.
5005,"罗军","驻村扶贫工作队长","住建局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号","加固修缮","新建","木场乡","打拢村","户",9,"每户补助1.
5万元",0,0,2018,2018,16.
2,16.
2,,,16.
2,"秧得昌","乐时培","住建局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号"7,"加固修缮","新建","勐捧镇","半个山村","户",7,"加固改造安居房7户,补助标准:1.
5万元/户",,,2018,2018,10.
5,10.
5,,,10.
5,"杨应松","高华","住建局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号","加固修缮","新建","勐捧镇","岔沟村","户",8,"加固改造安居房8户,补助标准:1.
5万元/户",,,2018,2018,12,12,,,12,"张会强","罗金强","住建局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号","加固修缮","新建","勐捧镇","核桃箐村","户",1,"加固改造安居房1户,补助标准:1.
5万元/户",,,2018,2018,1.
5,1.
5,,,1.
5,"穆再文","李泽军","住建局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号","加固修缮","新建","勐捧镇","流水村","户",5,"加固改造安居房5户,补助标准:1.
5万元/户",,,2018,2018,7.
5,7.
5,,,7.
5,"吴奇斌","驻村扶贫工作队长","住建局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号","加固修缮","新建","勐捧镇","勐捧村","户",7,"加固改造安居房7户,补助标准:1.
5万元/户",,,2018,2018,8.
9,8.
9,,,8.
9,"刘桂英","李国艳","住建局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号","加固修缮","新建","勐捧镇","南梳坝村","户",1,"加固改造安居房1户,补助标准:1.
5万元/户",,,2019,2019,6,6,,,6,"村委会支书","驻村扶贫工作队长","住建局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号","加固修缮","新建","勐捧镇","酸格林村","户",4,"加固改造安居房4户,补助标准:1.
5万元/户",,,2018,2018,5,5,,,5,"李文亮","李成芳","住建局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号","加固修缮","新建","勐捧镇","象脚水村","户",2,"加固改造安居房2户,补助标准:1.
5万元/户",,,2018,2018,3,3,,,3,"杨永祥","李世旺","住建局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号","加固修缮","新建","勐捧镇","岩子头村","户",1,"拆除重建安居房1户,补助标准:1.
5万元/户",,,2018,2018,1.
5,1.
5,,,1.
5,"高建江","董旺其","住建局","项目验收合格率100%","镇政财联字[2018]12号;镇财整合[2018]1号"8,"南伞镇危房改造","新建","南伞镇",,"户",,"其中:四类220万元,未锁定132.
8万元.
",,,2018,2018,352.
8,352.
8,,,352.
8,"村委会支书","驻村扶贫工作队长","住建局","项目验收合格率100%","财政整合[2018]5号财政整合[2018]2号"9,"勐捧镇危房改造","新建","勐捧镇",,"户",,"其中:四类660万元,未锁定244.
2万元.
",,,2018,2018,904.
2,904.
2,,,904.
2,"村委会支书","驻村扶贫工作队长","住建局","项目验收合格率100%","财政整合[2018]5号财政整合[2018]2号"10,"凤尾镇危房改造","新建","凤尾镇",,"户",,"其中:四类150万元,未锁定135.
8万元.
",,,2018,2018,285.
8,285.
8,,,285.
8,"村委会支书","驻村扶贫工作队长","住建局","项目验收合格率100%","财政整合[2018]5号财政整合[2018]2号"11,"勐堆乡危房改造","新建","勐堆乡",,"户",,"其中:四类290万元,未锁定229.
8万元.
",,,2018,2018,519.
8,519.
8,,,519.
8,"村委会支书","驻村扶贫工作队长","住建局","项目验收合格率100%","财政整合[2018]5号财政整合[2018]2号"12,"忙丙乡危房改造","新建","忙丙乡",,"户",,"其中:四类600万元,未锁定153.
4万元.
",,,2018,2018,753.
4,753.
4,,,753.
4,"村委会支书","驻村扶贫工作队长","住建局","项目验收合格率100%","财政整合[2018]5号财政整合[2018]2号"13,"木场乡危房改造","新建","木场乡",,"户",,"其中:四类997.
65万元,未锁定247.
8万元.
",,,2018,2018,1245.
45,1245.
45,,,1245.
45,"村委会支书","驻村扶贫工作队长","住建局","项目验收合格率100%","财政整合[2018]5号财政整合[2018]2号"14,"军赛乡危房改造","新建","军赛乡",,"户",,"其中:四类532.
8万元,未锁定450万元.
",,,2018,2018,982.
8,982.
8,,,982.
8,"村委会支书","驻村扶贫工作队长","住建局","项目验收合格率100%","财政整合[2018]5号财政整合[2018]2号"15,"南伞镇危房改造","新建-加固改造","南伞镇",,"户",466,"其中:用于2019年第一批4类重点对象农村危房改造资金37.
4万元",,,2018,2018,37.
4,,37.
4,,37.
4,"村委会支书","驻村扶贫工作队长","住建局","项目验收合格率100%","镇财整合(2019)1号"16,"勐捧镇危房改造","新建-加固改造","勐捧镇",,"户",1330,"其中:用于2019年第一批4类重点对象农村危房改造资金657.
4万元",,,2018,2018,657.
4,,657.
4,,657.
4,"村委会支书","驻村扶贫工作队长","住建局","项目验收合格率100%","镇财整合(2019)1号"17,"凤尾镇危房改造","新建-加固改造","凤尾镇",,"户",282,"其中:用于2019年第一批4类重点对象农村危房改造资金185万元.
",,,2018,2018,185,,185,,185,"村委会支书","驻村扶贫工作队长","住建局","项目验收合格率100%","镇财整合(2019)1号"18,"勐堆乡危房改造","新建-加固改造","勐堆乡",,"户",563,"其中:用于2019年第一批4类重点对象农村危房改造资金172.
1万元",,,2018,2018,172.
1,,172.
1,,172.
1,"村委会支书","驻村扶贫工作队长","住建局","项目验收合格率100%","镇财整合(2019)1号"19,"忙丙乡危房改造","新建-加固改造","忙丙乡",,"户",0,"其中:0",,,2018,2018,0,".
",0,,0,"村委会支书","驻村扶贫工作队长","住建局","项目验收合格率100%","镇财整合(2019)1号"20,"木场乡危房改造","新建-加固改造","木场乡",,"户",975,"其中:用于2019年第一批4类重点对象农村危房改造资金369.
05万元",,,2018,2018,369.
05,,369.
05,,369.
05,"村委会支书","驻村扶贫工作队长","住建局","项目验收合格率100%","镇财整合(2019)1号"21,"军赛乡危房改造","新建-加固改造","军赛乡",,"户",860,"其中:用于2019年第一批4类重点对象农村危房改造资金97.
5万元.
",,,2018,2018,97.
5,,97.
5,,97.
5,"村委会支书","驻村扶贫工作队长","住建局","项目验收合格率100%","镇财整合(2019)1号"22,"南伞镇危房改造","新建-加固改造","南伞镇",,"户",157,"其中:用于农村危房改造资金178.
12万元.
",,,2018,2018,178.
12,,178.
12,,178.
12,"村委会支书","驻村扶贫工作队长","住建局","项目验收合格率100%","镇财整合(2019)1号"23,"勐捧镇危房改造","新建-加固改造","勐捧镇",,"户",116,"其中:用于农村危房改造资金325万元.
",,,2018,2018,325,,325,,325,"村委会支书","驻村扶贫工作队长","住建局","项目验收合格率100%","镇财整合(2019)1号"24,"凤尾镇危房改造","新建-加固改造","凤尾镇",,"户",55,"其中:用于农村危房改造资金171万元.
",,,2018,2018,171,,171,,171,"村委会支书","驻村扶贫工作队长","住建局","项目验收合格率100%","镇财整合(2019)1号"25,"勐堆乡危房改造","新建-加固改造","勐堆乡",,"户",24,"其中:用于农村危房改造资金77万元.
",,,2018,2018,77,,77,,77,"村委会支书","驻村扶贫工作队长","住建局","项目验收合格率100%","镇财整合(2019)1号"26,"忙丙乡危房改造","新建-加固改造","忙丙乡",,"户",66,"其中:用于农村危房改造资金188.
05万元.
",,,2018,2018,188.
05,,188.
05,,188.
05,"村委会支书","驻村扶贫工作队长","住建局","项目验收合格率100%","镇财整合(2019)1号"27,"木场乡危房改造","新建-加固改造","木场乡",,"户",198,"其中:用于农村危房改造资金248.
05万元.
",,,2018,2018,248.
05,,248.
05,,248.
05,"村委会支书","驻村扶贫工作队长","住建局","项目验收合格率100%","镇财整合(2019)1号"28,"军赛乡危房改造","新建-加固改造","军赛乡",,"户",6,"其中:用于农村危房改造资金7.
155万元.
",,,2018,2018,7.
155,,7.
155,,7.
155,"村委会支书","驻村扶贫工作队长","住建局","项目验收合格率100%","镇财整合(2019)1号"29,"2019年危房改造","新建-加固改造","镇康县",,"户",,"2019年危房改造300户",,,2019,2019,1200.
925,,1200.
925,,1200.
925,"村委会支书","驻村扶贫工作队长","住建局","项目验收合格率100%","镇财整合(2019)1号"30,"农房抗震改造","新建-加固改造","镇康县",,"户",,"农房抗震改造",,,2019,2019,2691.
1,,2691.
1,,2691.
1,"村委会支书","驻村扶贫工作队长","住建局","项目验收合格率100%","镇财整合(2019)11号"31,"农村住房安全等级验收认定及农村危房等级认定项目","新建","镇康县",,"户",,"脱贫摘帽迎检冲刺阶段3.
7万户(间)农村住房安全等级验收认定及1.
2万户(间)农村危房等级认定费.
",,,2019,2020,145,,145,,145,"村委会支书","驻村扶贫工作队长","住建局","项目验收合格率100%","镇财整合(2019)15号"32,"镇康县农村危房改造项目","新建","镇康县",,"户",2620,"农村危房改造2620户.
",2620,8843,2020,2020,778.
51,,,778.
51,778.
51,"村委会支书","驻村扶贫工作队长","县住房城乡建设局","项目完成率100%,项目验收合格率100%","镇财整合【2020】4号",33,"镇康县农村危房改造项目","加固改造或新建","镇康县",,"户",6840,"置换农发行农户建房补助贷款(农村危房改造6840户、无偿补助资金8982.
5万元).
",6840,13476,2020,2020,4000,,,4000,4000,"村委会支书","驻村扶贫工作队长","县住房城乡建设局","项目完成率100%,项目验收合格率100%","镇财整合【2020】2号、镇财整合【2020】4号、镇财整合【2020】5号",34,"镇康县非4类重点对象农村危房改造项目","加固改造或新建","镇康县",,"户",,"对我县C级或D级非4类重点对象农村危房进行加固改造.
",1984,7093,2020,2020,1087.
08,,,1087.
08,1087.
08,"村委会支书","驻村扶贫工作队长","县住房城乡建设局","项目完成率100%,项目验收合格率100%","镇财整合【2020】5号",4,"(三)非"四类对象"无安全稳固住房","新建"户",3101,1100,1100,0,0,1100,住建局",,1,"非"四类对象"无安全稳固住房","新建","勐捧镇",,"户",2048,"非"四类对象"无安全稳固住房户共计:2048户",,,2018,2018,300,300,,,300,"村委会支书","驻村扶贫工作队长","住建局","项目验收合格率100%","镇开办联发[2018]8号"2,"非"四类对象"无安全稳固住房","新建","凤尾镇",,"户",,"补助15000元/户",,,2018,2018,300,300,,,300,"村委会支书","驻村扶贫工作队长","住建局","项目验收合格率100%","镇开办联发[2018]8号"3,"非"四类对象"无安全稳固住房","新建","南伞镇",,"户",1053,"非四类对象农户房屋建设1053户",,,2018,2018,300,300,,,300,"村委会支书","驻村扶贫工作队长","住建局","项目验收合格率100%","镇开办联发[2018]8号"4,"非"四类对象"无安全稳固住房","新建","勐堆乡",,"户",,"非"四类对象"无安全稳固住房",,,2018,2018,200,200,,,200,"村委会支书","驻村扶贫工作队长","住建局","项目验收合格率100%","镇开办联发[2018]8号"36,"八、金融扶贫"1111,1111,2093.
9574,674.
48,1356.
3974,63.
08,2093.
9574,31,"(一)扶贫小额信贷贴息"项",30,"—",1111,1111,569.
4774,0,506.
3974,63.
08,569.
4774,1,"扶贫小额信贷贴息","新建","南伞镇",,"项",1,"2016-2018年5月扶贫小额信贷贴息",,,2019,2019,77.
13,,77.
13,,77.
13,"村委会支书","驻村扶贫工作队长","扶贫办","项目验收合格率100%","镇财整合(2019)1号"2,"扶贫小额信贷贴息","新建","勐捧镇",,"项",1,"2016-2018年5月扶贫小额信贷贴息",,,2019,2019,27.
44,,27.
44,,27.
44,"村委会支书","驻村扶贫工作队长","扶贫办","项目验收合格率100%","镇财整合(2019)1号"3,"扶贫小额信贷贴息","新建","凤尾镇",,"项",1,"2016-2018年5月扶贫小额信贷贴息",,,2019,2019,35.
05,,35.
05,,35.
05,"村委会支书","驻村扶贫工作队长","扶贫办","项目验收合格率100%","镇财整合(2019)1号"4,"扶贫小额信贷贴息","新建","勐堆乡",,"项",1,"2016-2018年5月扶贫小额信贷贴息",,,2019,2019,6.
88,,6.
88,,6.
88,"村委会支书","驻村扶贫工作队长","扶贫办","完成小额信贷贴息6.
88万元,满意度100%,项目受益建档立卡贫困户人数≥73人","镇财整合(2019)1号"5,"扶贫小额信贷贴息","新建","忙丙乡",,"项",1,"2016-2018年5月扶贫小额信贷贴息",,,2019,2019,18.
73,,18.
73,,18.
73,"村委会支书","驻村扶贫工作队长","扶贫办","项目验收合格率100%","镇财整合(2019)1号"6,"扶贫小额信贷贴息","新建","木场乡",,"项",1,"2016-2018年5月扶贫小额信贷贴息",,,2019,2019,29.
51,,29.
51,,29.
51,"村委会支书","驻村扶贫工作队长","扶贫办","项目验收合格率100%","镇财整合(2019)1号"7,"扶贫小额信贷贴息","新建","军赛乡",,"项",1,"2016-2018年5月扶贫小额信贷贴息",,,2019,2019,1.
89,,1.
89,,1.
89,"村委会支书","驻村扶贫工作队长","扶贫办","项目验收合格率100%","镇财整合(2019)1号"8,"扶贫小额信贷贴息","新建","南伞镇",,"项",1,"2018年6月-12月扶贫小额信贷贴息",,,2019,2019,34.
67,,34.
67,,34.
67,"村委会支书","驻村扶贫工作队长","扶贫办","项目验收合格率100%","镇财整合(2019)1号"9,"扶贫小额信贷贴息","新建","勐捧镇",,"项",1,"2018年6月-12月扶贫小额信贷贴息",,,2019,2019,21.
48,,21.
48,,21.
48,"村委会支书","驻村扶贫工作队长","扶贫办","项目验收合格率100%","镇财整合(2019)1号"10,"扶贫小额信贷贴息","新建","凤尾镇",,"项",1,"2018年6月-12月扶贫小额信贷贴息",,,2019,2019,11.
69,,11.
69,,11.
69,"村委会支书","驻村扶贫工作队长","扶贫办","项目验收合格率100%","镇财整合(2019)1号"11,"扶贫小额信贷贴息","新建","勐堆乡",,"项",1,"2018年6月-12月扶贫小额信贷贴息",,,2019,2019,8.
54,,8.
54,,8.
54,"村委会支书","驻村扶贫工作队长","扶贫办","完成小额信贷贴息8.
54万元,满意度100%,项目受益建档立卡贫困户人数≥341人","镇财整合(2019)1号"12,"扶贫小额信贷贴息","新建","忙丙乡",,"项",1,"2018年6月-12月扶贫小额信贷贴息",,,2019,2019,12.
99,,12.
99,,12.
99,"村委会支书","驻村扶贫工作队长","扶贫办","项目验收合格率100%","镇财整合(2019)1号"13,"扶贫小额信贷贴息","新建","木场乡",,"项",1,"2018年6月-12月扶贫小额信贷贴息",,,2019,2019,16.
24,,16.
24,,16.
24,"村委会支书","驻村扶贫工作队长","扶贫办","项目验收合格率100%","镇财整合(2019)1号"14,"扶贫小额信贷贴息","新建","军赛乡",,"项",1,"2018年6月-12月扶贫小额信贷贴息",,,2019,2019,2.
54,,2.
54,,2.
54,"村委会支书","驻村扶贫工作队长","扶贫办","项目验收合格率100%","镇财整合(2019)1号"15,"扶贫小额信贷贴息","新建","南伞镇",,"项",1,"2019年上半年扶贫小额贷款贴息资金(应补323142元,从上批多拨资金中扣回24元)",,,2019,2019,32.
312,,32.
312,,32.
312,"村委会支书","驻村扶贫工作队长","扶贫办","项目验收合格率100%","镇财整合(2019)12号"16,"扶贫小额信贷贴息","新建","勐捧镇",,"项",1,"2019年上半年扶贫小额贷款贴息资金",,,2019,2019,19.
3935,,19.
3935,,19.
3935,"村委会支书","驻村扶贫工作队长","扶贫办","项目验收合格率100%","镇财整合(2019)12号"17,"扶贫小额信贷贴息","新建","凤尾镇",,"项",1,"2019年上半年扶贫小额贷款贴息资金",,,2019,2019,10.
4493,,10.
4493,,10.
4493,"村委会支书","驻村扶贫工作队长","扶贫办","项目验收合格率100%","镇财整合(2019)12号"18,"扶贫小额信贷贴息","新建","勐堆乡",,"项",1,"2019年上半年扶贫小额贷款贴息资金",,,2019,2019,8.
3321,,8.
3321,,8.
3321,"村委会支书","驻村扶贫工作队长","扶贫办","项目验收合格率100%","镇财整合(2019)12号"19,"扶贫小额信贷贴息","新建","忙丙乡",,"项",1,"2019年上半年扶贫小额贷款贴息资金",,,2019,2019,11.
9455,,11.
9455,,11.
9455,"村委会支书","驻村扶贫工作队长","扶贫办","项目验收合格率100%","镇财整合(2019)12号"20,"扶贫小额信贷贴息","新建","木场乡",,"项",1,"2019年上半年扶贫小额贷款贴息资金",,,2019,2019,14.
1951,,14.
1951,,14.
1951,"村委会支书","驻村扶贫工作队长","扶贫办","项目验收合格率100%","镇财整合(2019)12号"21,"扶贫小额信贷贴息","新建","军赛乡",,"项",1,"2019年上半年扶贫小额贷款贴息资金",,,2019,2019,2.
3725,,2.
3725,,2.
3725,"村委会支书","驻村扶贫工作队长","扶贫办","项目验收合格率100%","镇财整合(2019)12号"22,"扶贫小额信贷贴息","新建","军赛乡",,"项",1,"2019年二季度扶贫小额贷款贴息资金",,,2019,2019,0.
13,,0.
13,,0.
13,"村委会支书","驻村扶贫工作队长","扶贫办","项目验收合格率100%","镇财整合(2019)12号"23,"扶贫小额信贷贴息","新建","凤尾镇",,"项",1,"扶贫小额信贷贴息",,,2019,2019,4.
5745,,4.
5745,,4.
5745,"村委会支书","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇财整合(2019)20号"24,"扶贫小额信贷贴息","新建","军赛乡",,"项",1,"扶贫小额信贷贴息",,,2019,2019,1.
2256,,1.
2256,,1.
2256,"村委会支书","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇财整合(2019)20号"25,"扶贫小额信贷贴息","新建","忙丙乡",,"项",1,"扶贫小额信贷贴息",,,2019,2019,5.
6856,,5.
6856,,5.
6856,"村委会支书","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇财整合(2019)20号"26,"扶贫小额信贷贴息","新建","勐堆乡",,"项",1,"扶贫小额信贷贴息",,,2019,2019,4.
0354,,4.
0354,,4.
0354,"村委会支书","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇财整合(2019)20号"27,"扶贫小额信贷贴息","新建","勐捧镇",,"项",1,"扶贫小额信贷贴息",,,2019,2019,9.
2026,,9.
2026,,9.
2026,"村委会支书","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇财整合(2019)20号"28,"扶贫小额信贷贴息","新建","木场乡",,"项",1,"扶贫小额信贷贴息",,,2019,2019,6.
9106,,6.
9106,,6.
9106,"村委会支书","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇财整合(2019)20号"29,"扶贫小额信贷贴息","新建","南伞镇",,"项",1,"扶贫小额信贷贴息",,,2019,2019,15.
0911,,15.
0911,,15.
0911,"村委会支书","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇财整合(2019)20号"30,"扶贫小额信贷贴息","新建","镇康县",,"项",1,"2019年四季度扶贫小额贷款贴息",,,2019,2019,55.
762,,55.
762,,55.
762,"村委会支书","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇财整合(2019)21号"31,"2020年扶贫小额信贷贴息","新建","镇康县",,"项",1,"2020年扶贫小额信贷贴息.
",1111,1111,2020,2020,63.
08,,,63.
08,63.
08,"村委会支书","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇财整合【2020】9号","(二)扶贫龙头企业合作社等经营主体贷款贴息","(三)产业保险"2,"(四)扶贫小额信贷风险补偿金"700,650,50,0,700,1,"风险金(县级)","新建","镇康县",,"项",1,"危旧房改造风险金",,,2018,2018,650,650,,,650,"村委会支书","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇政财联字[2018]29号"2,"风险金(县级)","新建","镇康县",,"项",1,"项目资金以小额贷款风险保证金形式存入农行,农行按1:10比例放贷,扶持建档立卡贫困户发展产业.
",,,2019,2020,50,,50,,50,"村委会支书","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇财整合(2019)12号"3,"(五)其他"824.
48,24.
48,800,0,824.
48,,,,,1,"易地移民搬迁建房贷款利息","新建","镇康县",,"项",1,"易地移民搬迁建房贷款利息",,,2018,2018,24.
48,24.
48,,,24.
48,"村委会支书","驻村扶贫工作队长","发改局","项目验收合格100%","临财农发(2018)44号"2,"产业发展基金","新建","镇康县",,"项",1,"资金作为贷款担保金存入县级金融部门,按照1:10比例确定贷款规模,用于农户发展产业.
",,,2019,2020,500,,500,,500,"村委会支书","驻村扶贫工作队长","农业局","项目验收合格100%","镇财整合(2019)15号"3,"产业发展基金项目","新建","镇康县",,"项",1,"资金作为贷款担保金存入县级金融部门,按照1:10比例确定贷款规模,用于农户发展产业.
",,,2019,2020,300,,300,,300,"村委会支书","驻村扶贫工作队长","农业农村局","项目验收合格100%","镇财整合(2019)19号"95,"九、生活条件改善"36080,142235,7633.
49,3556.
21,3961.
28,116,7633.
49,24,"(一)入户路改造"2744,10507,2422.
83,390.
53,2032.
3,0,2422.
83,24,"1.
建档立卡贫困户入户路"2744,10507,2422.
83,390.
53,2032.
3,0,2422.
83,1,"村内道路硬化","新建","军赛乡","中厂","公里",3.
5,"龙洞、中厂、银匠寨、竹林头、蒿子坝、硝塘、三棵桩自然村串户路硬化宽3.
5米、总长1公里/每公里补助40万元",122,438,2019,2020,140,,140,,140,"禹征伟","李永刚","扶贫办","项目验收合格100%","镇财整合(2019)1号下达资金140万"2,"村内道路硬化","新建","军赛乡","彩靠村","公里",7.
1,"平掌寨、肖家寨、砍金山、白岩、木厂沟、上寨、大平掌、孟永、大水塘自然村串户路硬化宽3.
5米、总厂7.
1公里/每公里补助40万元",240,935,2019,2020,284,,284,,284,"杨光才","禹征宏","扶贫办","项目验收合格100%","镇财整合(2019)1号下达资金120万+164万"3,"村内串户路建设","新建","军赛乡","忙吉利村","公里",0.
75,"建设忙吉利自然村C25#混凝土串户路0.
75公里.
",67,232,2019,2019,30,,30,,30,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇财整合(2019)1号"4,"村内串户路建设","新建","军赛乡","南榨村","公里",0.
75,"南榨、蚂蟥箐、平掌、酒房坡、南翁串户路1公里/每公里补助40万元.
",79,309,2019,2019,30,,30,,30,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇财整合(2019)1号"5,"村内串户路建设","新建","军赛乡","军赛村","公里",0.
75,"建设食堂自然村C25#混凝土串户路0.
75公里.
",67,243,2019,2019,34,,34,,34,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇财整合(2019)1号"6,"村内串户路建设","新建","军赛乡","岔路村","公里",1,"建设岔路自然村C25#混凝土串户路1公里.
",55,184,2019,2019,44.
47,,44.
47,,44.
47,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇财整合(2019)1号"7,"军赛乡彩靠村串户路建设项目","新建","军赛乡","彩靠村","公里",4.
5,"彩靠村平掌寨一、二、三组1.
9公里串户路和上寨一、二组串户路2.
6公里串户路路面硬化及附属设施.
",236,917,2019,2019,150,,150,,150,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","镇财整合(2019)17号"8,"军赛乡忙吉利村村内串户路建设项目","新建/扩改建","军赛乡","忙吉利","公里",0.
75,"建设忙吉利自然村C25#混凝土串户路0.
75公里.
",67,232,2019,2019,60,,60,,60,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","镇财整合(2019)20号"9,"村内道路硬化","新建","勐堆乡","勐堆村","公里",1,"村内串户路建设",53,201,2018,2020,42,42,,,42,"夏应忠","郭萍","扶贫办","新建村内寨内硬板路1公里,项目验收合格率100%,受益建档立卡贫困户人数≥43人","镇财整合[2018]3号"10,"村内道路硬化","新建","勐堆乡","彭木山村","公里",3,"串户路建设3公里",5,26,2018,2018,120,120,,,120,"韦忠军","李耀江","扶贫办","项目验收合格100%","镇财整合[2018]3号"11,"大谷地安置点村内串户路建设","新建","勐捧镇","岩子头村","公里",4.
5,"大谷地安置点串户路长4.
5公里,浇筑C30混凝土路面浇筑18000㎡",456,1757,2019,2019,180,,180,,180,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇财整合(2019)1号"12,"大草坝安置点村内串户路建设","新建","勐捧镇","岩子头村","公里",4,"大草坝安置点串户路长4公里,路面宽3.
5米,浇筑C30混凝土路面浇筑1600平方米",456,1757,2019,2019,160,,160,,160,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇财整合(2019)1号"13,"杨柳桥村黄果园组串户路建设项目","扩改建","木场乡","黄果园自然村","公里",2,"C25混凝土路面,长2000米,宽3.
5米,厚度20厘米;",72,264,2019,2019,80,,80,,80,"陶有华","梅新安","交通局","项目验收合格100%","镇财整合(2019)20号"14,"散路坝村马么山组串户路建设项目","扩改建","木场乡","散路坝","公里",2,"C25混凝土路面,长2000米,宽3.
5米,厚度20厘米;",120,519,2019,2019,80,,80,,80,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","镇财整合(2019)20号"15,"木场乡绿荫塘村绿荫塘自然村村组道路建设","新建","木场乡","绿荫塘村","公里",3,"建设透水路面3公里,设计路基宽3.
5米,路面宽3米,M7.
5浆砌石方260立方米.
及附属设施.
",89,344,2019,2020,120,,120,,120,"村委会支书","驻村扶贫工作队长","交通局","项目验收合格100%","镇财整合(2019)14号"16,"安置点村内串户路建设","新建","南伞镇","营盘村","公里",2,"营盘村茶地平掌安置点村内串户路2公里6000平方米.
",20,43,2018,2018,78,78,,,78,"张邓河",,"扶贫办","项目验收合格100%","镇财整合[2018]3号",17,"大山自然村村内道路建设","新建","忙丙乡","乌木村","公里",1.
3,"新建大山自然村串户路1300m,配套边沟,挡墙.
浇筑硬板路宽3m,长800m.
",56,206,2019,2019,42,,42,,42,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇财整合(2019)1号"18,"帮波利自然村一、二、六组串户路建设","新建","忙丙乡","忙丙村","公里",1.
38,"新建C25混泥土浇注1.
38公里20cm,宽3m.
",32,142,2019,2019,92.
83,,92.
83,,92.
83,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇财整合(2019)1号"19,"蔡家寨自然村串户路建设","新建","忙丙乡","蔡何村","公里",1.
5,"新建C25混泥土浇筑1.
5公里,厚20cm,宽3m,共计4500㎡.
",84,334,2019,2019,101,,101,,101,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇财整合(2019)1号"20,"村内道路建设","新建","忙丙乡","乌木村","公里",1.
3,"新建大山自然村串户路1300米,配套边沟,挡墙.
浇筑硬板路宽3米,长800m.
",56,206,2019,2019,49,,49,,49,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇财整合(2019)1号"21,"帮波利自然村三、四组串户路建设","新建","忙丙乡","忙丙村","公里",1.
4,"新建C25混泥土浇注1.
4公里20cm,宽3m.
",32,142,2019,2019,95,,95,,95,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇财整合(2019)1号"22,"新水塘自然村串户路建设","新建","忙丙乡","新水村","公里",2.
5,"新水村新水塘自然村(包包寨)串户路2.
5公里",18,80,2019,2019,100,,100,,100,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇财整合(2019)1号"23,"乌木自然村串户路建设项目","新建","忙丙乡","乌木村","公里",3.
2,"新建C25厚20cm混凝土3.
2公里,宽3米,配套挡墙、排水管道等附属设施",247,932,2019,2019,160,,160,,160,"村支书","驻村扶贫工作队长","农业局","项目验收合格100%","镇财整合(2019)14号"24,"村内道路硬化","新建","凤尾镇","大坝村","平方米",9000,"大坝村大谷地安置点村内道路道路硬化1公里,路面宽4.
5米,每公里补助70万元;串户路2千米,路面宽3.
5米,每公里补助50万元.
",15,64,2018,2018,150.
53,150.
53,,,150.
53,"李进强","吕金奎","扶贫办","项目验收合格100%","财政整合[2018]3号"65,"(二)解决安全饮水"13794,53983,4628.
66,3145.
68,1366.
98,116,4628.
66,47,"1.
集中供水点"3521,13756,1376.
17,652.
17,608,116,1376.
17,1,"饮水安全巩固提升","扩改建","凤尾镇","凤尾村","公里",3,"凤尾村新村饮水主管修复3公里",7,14,2018,2018,12,12,,,12,"李国文","杨士吉","水务局","项目验收合格100%","临财建发[2018]49号水务局10月2日新增"2,"轻木林饮水工程建设","新建","凤尾镇","大柏树村","公里",13,"架设DN40钢管5公里,单价35元/米;DN25钢管6公里,单价25元/米;DN15钢管2公里,单价18元/米;",12,46,2019,2019,40,,40,,40,"李成武","王建华","水务局","项目验收合格100%","镇财整合(2019)12号"3,"荒田自然村饮水建设项目","新建","凤尾镇","大柏树村","个",1,"新建25方蓄水池一座,修复串户管网8.
3公里",48,163,2019,2019,20,,20,,20,"村支书","驻村扶贫工作队长","水务局","项目验收合格100%","镇财整合(2019)7号"4,"忙吉利村安全饮水工程","新建","军赛乡","忙吉利","个",1,"新建引水主管、新建大蓄水池",67,232,2019,2019,85,,85,,85,"村委会支书","驻村扶贫工作队长","水务局","项目验收合格100%","镇财整合(2019)12号"5,"小田组、南班木自然村安全饮水工程","新建","军赛乡","军赛村","个",1,"新建前池、蓄水池,PE90新建4.
5km,PE40新建6km,DN40新建6.
5km,DN32新建1.
5km等.
",67,243,2019,2019,58,,58,,58,"村委会支书","驻村扶贫工作队长","水务局","项目验收合格100%","镇财整合(2019)12号"6,"岔路村安全饮水工程","新建","军赛乡","岔路村","个",1,"新建引水主管、新建大蓄水池",55,184,2019,2019,65,,65,,65,"村委会支书","驻村扶贫工作队长","水务局","项目验收合格100%","镇财整合(2019)12号"7,"大水塘组安全饮水工程","新建/扩改建","军赛乡","彩靠村","千米",3,"DN主管道40#新建3.
2km,串户管20#、15#架设3km等.
",236,917,2019,2019,13,,13,,13,"村委会支书","驻村扶贫工作队长","水务局","项目验收合格100%","镇财整合(2019)12号"8,"饮水安全巩固提升","扩改建","勐堆乡","尖山村","人",223,"每公里5万元",38,168,2018,2020,52,52,,,52,"马强","李文学","水务局","完成安全饮水1件,项目验收合格率100%,建档立卡贫困户受益人数≥168人","财政整合[2018]4号"9,"饮水安全巩固提升","扩改建","勐堆乡","勐堆村","公里",6,"勐厂坝片区架设管线6公里,建设压力池1座",10,26,2018,2018,20,20,,,20,"夏应忠","郭萍","水务局","完成安全饮水1件,项目验收合格率100%,建档立卡贫困户贫困户受益人数≥26人","临财农发[2017]181号提前下达2018年中央财政水利发展资金1564万元"10,"饮水安全巩固提升","扩改建","勐堆乡","铜厂村","公里",6,"大包包自然村架设管线6公里",10,44,2018,2018,20,20,,,20,"李兵","张庆","水务局","完成安全饮水1件,项目验收合格率100%,建档立卡贫困户贫困户受益人数≥44人","临财农发[2017]181号提前下达2018年中央财政水利发展资金1564万元"11,"饮水安全巩固提升","扩改建","勐堆乡","大寨村","公里",6,"蒿坝林自然村架设管线6公里,建设取水坝1座",9,34,2018,2018,21,21,,,21,"杨新田","柯建振","水务局","完成安全饮水1件,项目验收合格率100%,建档立卡贫困户贫困户受益人数≥34人","临财农发[2017]181号提前下达2018年中央财政水利发展资金1564万元"12,"饮水工程","新建","勐捧镇","包包寨村","个",1,"50m3蓄水池一个,引水主管3km,串户管2km",27,91,2018,2018,18,18,,,18,"村支书","驻村扶贫工作队长","民宗局","项目验收合格100%","财政整合[2018]2号"13,"饮水工程","新建","勐捧镇","勐捧村","个",1,"50m3蓄水池一个",116,477,2018,2018,4,4,,,4,"村支书","驻村扶贫工作队长","水务局","项目验收合格100%","财政整合[2018]2号"14,"饮水工程","新建","勐捧镇","包包寨村","个",1,"50m3蓄水池一个,引水主管3km,串户管2km",27,91,2018,2018,15,15,,,15,"村支书","驻村扶贫工作队长","水务局","项目验收合格100%","财政整合[2018]2号"15,"饮水工程","新建","勐捧镇","包包寨村","个",1,"200m3蓄水池一个,引水主管3.
3km,串户管2km",27,91,2018,2018,40,40,,,40,"村支书","驻村扶贫工作队长","水务局","项目验收合格100%","财政整合[2018]2号"16,"饮水工程","新建","勐捧镇","包包寨村","个",1,"50m3蓄水池一个,引水主管3km,串户管2km",27,91,2018,2018,15,15,,,15,"村支书","驻村扶贫工作队长","水务局","项目验收合格100%","财政整合[2018]2号"17,"饮水工程","新建","勐捧镇","忙耿村","个",1,"100m3蓄水池一个,引水主管2km,串户管5km",78,302,2018,2018,24,24,,,24,"村支书","驻村扶贫工作队长","水务局","项目验收合格100%","财政整合[2018]2号"18,"饮水工程","新建","勐捧镇","忙耿村","个",1,"80m3蓄水池一个,引水主管2km,串户管1km",78,302,2018,2018,20,20,,,20,"村支书","驻村扶贫工作队长","水务局","项目验收合格100%","财政整合[2018]2号"19,"饮水工程","新建","勐捧镇","半个山村","个",1,"50m3蓄水池一个,串户管1.
5km",28,113,2018,2018,10,10,,,10,"村支书","驻村扶贫工作队长","水务局","项目验收合格100%","财政整合[2018]2号"20,"饮水工程","新建","勐捧镇","岩子头村","个",1,"引水主管4km",456,1757,2018,2018,8,8,,,8,"村支书","驻村扶贫工作队长","水务局","项目验收合格100%","财政整合[2018]2号"21,"饮水工程","新建","勐捧镇","勐捧村","个",1,"张家寨引水主管5km",116,477,2018,2018,14,14,,,14,"村支书","驻村扶贫工作队长","水务局","项目验收合格100%","财政整合[2018]2号"22,"饮水工程","新建","勐捧镇","石桥村","公里",3.
3,"南碰自然村饮水工程引水主管3.
3KM",140,531,2018,2018,6.
77,6.
77,,,6.
77,"村支书","驻村扶贫工作队长","水务局","项目验收合格100%","财政整合[2018]3号"23,"芹菜塘村小旺地间饮水工程","新建","木场乡","芹菜塘村","项",1,"PE32主管2公里,15元/米,DN15串户管1公里,18元/米;水池10立方米,800元/立方米",15,64,2019,2019,6,,6,,6,"村支书","驻村扶贫工作队长","水务局","项目验收合格100%","镇财整合(2019)1号"24,"木场村箐边水池建设","新建","木场乡","木场村","项",1,"水池50立方米,800元/立方米;PE25串户管3公里,13元/米",47,178,2019,2019,8,,8,,8,"村支书","驻村扶贫工作队长","水务局","项目验收合格100%","镇财整合(2019)1号"25,"木场村绿皮寨梅家地饮水工程","新建","木场乡","木场村","项",1,"架设管网2公里,1.
9万元/公里.
",2,8,2019,2019,3.
8,,3.
8,,3.
8,"村支书","驻村扶贫工作队长","水务局","项目验收合格100%","镇财整合(2019)1号"26,"黑马塘村板桥组饮水工程","新建","木场乡","黑马塘村","项",1,"架设管网4公里,1.
8万元/公里.
",26,89,2019,2019,7.
2,,7.
2,,7.
2,"村支书","驻村扶贫工作队长","水务局","项目验收合格100%","镇财整合(2019)1号"27,"九班组饮水项目","新建","木场乡","杨柳桥村","个",1,"30立方米蓄水池3座;2立方米取水池3座;PE40管架设12000米;PE32管架设10000米;DN15管架设3000米;",185,692,2019,2019,50,,50,,50,"村支书","驻村扶贫工作队长","水务局","项目验收合格100%","镇财整合(2019)12号"28,"饮水工程","新建","南伞镇","哈里村","件",1,"50m3蓄水池一个,引水主管3km,串户管2600m",24,88,2018,2018,17,17,,,17,"姚正东","张红虹","民宗局","项目验收合格100%","财政整合[2018]2号",29,"饮水安全巩固提升","扩改建","南伞镇","南伞村","公里",12,"茶山脚自然村管网架设12公里,蓄水池建设1座.
",14,62,2018,2018,50,50,,,50,"村支书","驻村扶贫工作队长","水务局","项目验收合格100%","临财建发[2018]49号水务局10月2日新增",30,"饮水安全巩固提升","新建","南伞镇","甘塘村","立方米",1,"忙拖寨自然村新建50m3蓄水池一个.
",45,179,2020,2020,6,6,,,6,"朱世祥","刘勇","水务局","项目验收合格100%","临财建发[2018]49号水务局10月2日新增",31,"哈里村俄岱自然村饮水工程","新建","南伞镇","哈里村","件",1,"建设2立方米前池一个,4000元/个,建设饮水主管3公里,每公里5万元",15,68,2020,2020,15.
4,15.
4,,,15.
4,"姚正东","张红虹","民宗局","项目验收合格100%","财政整合[2018]2号",32,"半坡"三通一平"","新建","南伞镇","哈里村","个",1,"滑坡农户宅基地土方开挖9140m,半坡饮水管道架设",15,68,2019,2019,15,,15,,15,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇财整合(2019)1号",33,"忙卡"三通一平"","新建","南伞镇","田坝村","个",1,"田坝村忙卡滑坡农户宅基地土方开挖37745.
54m,忙卡饮水管道架设",238,1009,2019,2019,50,,50,,50,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇财整合(2019)1号",34,"南伞镇沙坝田农户搬迁安置点"三通一平"工程","新建","南伞镇","红岩村","项",1,"南伞镇沙坝田农户搬迁安置点"三通一平"工程,基础设施建设.
",68,271,2019,2020,132,,132,,132,"村委会支书","驻村扶贫工作队长","交通局","项目验收合格100%","镇财整合(2019)15号",35,"村级公益事业一事一议建设财政奖补项目","新建","南伞镇","白沙水","个",1,"架设饮水主管1250米,串户管1150米,压力池1个3立方米,蓄水池1个40立方米.
",81,350,2018,2018,13,13,,,13,"村支书","驻村扶贫工作队长","财政局","项目验收合格100%","镇政财预字[2018]67号",36,"茶地平掌安置点人畜饮水项目","新建","南伞镇","营盘村","个",1,"架设DNΦ32mm管504米,DNΦ25mm管3342米,DNΦ15mm管1872米,PEΦ40mm管4300米,PEΦ32mm管2380米,,压力池1个100立方米.
",163,598,2019,2019,10,,10,,10,"村支书","驻村扶贫工作队长","水务局","项目验收合格100%","镇财整合(2019)12号",37,"茶山村向阳饮水工程项目","新建","南伞镇","茶山村向阳安置点","个",1,"饮水主管道架设6公里,饮水管8公里,串户管4公里,建设蓄水池2个",231,953,2019,2019,45,,45,,45,"村支书","驻村扶贫工作队长","水务局","项目验收合格100%","镇财整合(2019)12号",38,"镇康县公益性水利工程维修养护项目","改建","南伞镇","户育村","项",1,"南伞水库进库道路修复",124,504,2018,2019,8,8,,,8,"村支书","驻村扶贫工作队长","水务局","项目验收合格100%","临财农发[2017]181号提前下达2018年中央财政水利发展资金1564万元",39,"饮水安全巩固提升","扩改建","忙丙乡","回掌村","公里",40,"散户饮水、上龙塘自然村、下龙塘自然村、回掌村学校、芒果树自然村、大田自然村、桃子寨自然村建设蓄水池7座,架设管网40公里",100,404,2018,2018,196,196,,,196,"村支书","驻村扶贫工作队长","水务局","项目验收合格100%","临财建发[2018]49号水务局10月2日新增"40,"饮水安全巩固提升","扩改建","忙丙乡","乌木村","公里",4,"坝尾架设管网5km,大平掌、大园子、丫口连片饮水修复工程架设管网4公里",37,134,2018,2018,16,16,,,16,"村支书","驻村扶贫工作队长","水务局","项目验收合格100%","临财建发[2018]49号水务局10月2日新增"41,"饮水安全巩固提升","扩改建","忙丙乡","新水村","公里",7,"新水塘自然村饮水修复工程主管架设7公里",17,78,2018,2018,16,16,,,16,"村支书","驻村扶贫工作队长","水务局","项目验收合格100%","临财建发[2018]49号水务局10月2日新增"42,"饮水安全巩固提升","扩改建","忙丙乡","马鞍山村","公里",2,"马鞍山一、三组饮水修复工程建设蓄水池1座,架设管网2公里.
",80,293,2018,2018,10,10,,,10,"村支书","驻村扶贫工作队长","水务局","项目验收合格100%","临财建发[2018]49号水务局10月2日新增"43,"饮水安全巩固提升","扩改建","忙丙乡","忙汞村","公里",1,"忙汞坝饮水修复工程建设蓄水池1座,架设管网1公里.
",10,35,2018,2018,5,5,,,5,"村支书","驻村扶贫工作队长","水务局","项目验收合格100%","临财建发[2018]49号水务局10月2日新增"44,"南伞镇南伞村茶山一二组饮水工程","新建","南伞镇","南伞村","个",1,"新建100方蓄水池一座、建设引水主管9km、架设串户管网12km.
",14,63,2020,2020,45,,,45,45,"村支书","驻村扶贫工作队长","县水务局","项目完成率100%,项目验收合格率100%","镇财整合【2020】1号",45,"南伞镇班龙村大关房自然村饮水工程","新建","南伞镇","班龙村","个",1,"新建30方蓄水池一座、新建压力池一座、架设管网5km.
",16,69,2020,2020,15,,,15,15,"村支书","驻村扶贫工作队长","县水务局","项目完成率100%,项目验收合格率100%","镇财整合【2020】1号",46,"木场乡龙塘村龙塘组饮水工程","新建","木场乡","龙塘村","个",1,"架设饮水主管1.
5km、架设串户4.
5km.
",38,156,2020,2020,17,,,17,17,"村支书","驻村扶贫工作队长","县水务局","项目完成率100%,项目验收合格率100%","镇财整合【2020】1号",47,"忙丙乡忙丙村中山自然村饮水工程","新建","忙丙乡","忙丙村","个",1,"新建50方蓄水池一座、架设管网19km.
",237,949,2020,2020,39,,,39,39,"村支书","驻村扶贫工作队长","县水务局","项目完成率100%,项目验收合格率100%","镇财整合【2020】1号",14,"2.
灌溉渠道"9997,39153,3009.
62,2321.
64,687.
98,0,3009.
62,1,"军赛乡5个村委会2019/2020季香料烟生产用水(管网架设)","新建","军赛乡","军赛乡5个村","项",1,"新建30m蓄水池6个,投资36万元;架设(含配件)PEC32塑管线长4公里、PEC50塑管线长11.
1公里,投资24万元.
",624,2341,2019,2020,60,,60,,60,"村委会支书","驻村扶贫工作队长","产业办","项目验收合格100%","镇财整合(2019)4号"2,"镇康县2018年农田水利设施维护项目","改建","勐堆乡","大寨村","项",1,"灌溉渠道防渗1公里",32,98,2018,2019,14.
5,14.
5,,,14.
5,"村支书","驻村扶贫工作队长","水务局","完成灌溉渠道防渗1公里,项目验收合格率100%,受益建档立卡贫困户人数≥98人","临财农发[2017]181号提前下达2018年中央财政水利发展资金1564万元"3,"镇康县勐捧河小流域坡耕地水土流失治理工程","新建","勐捧镇","忙丙村","项",1,"实施坡改梯面积120.
40hm2(1806亩),项目区灌溉水源为大竹棚河.
计划新建取水坝1座,新建引水管道15.
95km,500m3蓄水池1座,400m3蓄水池1座,300m3蓄水池2座,200m3蓄水池3座,100m3蓄水池7座;改建机耕道路1条,长度为1913m,会车平台7处、下田口3座、预制涵管3处共15m;新建道路排水沟1913m;管护牌6座,管护碑2座.
",18,54,2018,2019,676.
27,676.
27,,,676.
27,"村支书","驻村扶贫工作队长","水务局","项目验收合格100%","临财建发(2018)59号下达中央资金1000万元"4,"镇康县2018年高效节水灌溉工程","新建","勐捧镇","石桥村、酸格林村、岩子头村","项",1,"石桥村、酸格林村、岩子头村建设高效节水灌溉0.
8万亩,建设取水坝4座,架设管网197公里,建设蓄水池33座.
",372,1114,2018,2019,948,948,,,948,"村支书","驻村扶贫工作队长","水务局","项目验收合格100%","临财农发[2017]181号提前下达2018年中央财政水利发展资金1564万元"5,"镇康县公益性水利工程维修养护项目","改建","勐捧镇","忙丙村","项",1,"四楞坝水库干渠、坝坡修复",51,170,2018,2019,8,8,,,8,"村支书","驻村扶贫工作队长","水务局","项目验收合格100%","临财农发[2017]181号提前下达2018年中央财政水利发展资金1564万元"6,"勐捧镇15个村委会2019/2020季香料烟生产用水(管网架设)","新建","勐捧镇","15个村","项",1,"新建200m蓄水池1个、100m蓄水池2个、50m蓄水池3个、30m蓄水池6个、20m蓄水池38个、10m蓄水池59个、5m蓄水池250个,投资100万元;架设(含配件)PEC50塑管线长20公里、PEC40塑管线长12.
5公里、PEC32塑管线长41公里、PEC25塑管线长19.
5公里,投资58万元.
",2007,7940,2019,2020,153,,153,,153,"村支书","驻村扶贫工作队长","产业办","项目验收合格100%","镇财整合(2019)12号"7,"勐撒村农田水利灌溉项目","改建","木场乡","勐撒村","项",1,"50立方米蓄水池1座;30立方米蓄水池2座;2立方米取水池2座;PE40管架设2430米;PE32管架设2670米;DN32管架设930米;PE15管架设10000米;",176,754,2019,2019,65,,65,,65,"村支书","驻村扶贫工作队长","水务局","项目验收合格100%","镇财整合(2019)12号"8,"木场乡9个村委会2019/2020季香料烟生产用水(管网架设)","改建","木场乡","木场乡9个村","项",1,"新建50m蓄水池6个、30m蓄水池15个、20m蓄水池10个、10m蓄水池10个、5m蓄水池5个,投资37.
85万元;架设(含配件)PEC80塑管线长1公里、PEC50塑管线长38.
6公里、PEC40塑管线长10.
1公里、PEC32塑管线长23.
5公里、PEC25塑管线长2公里、PEC20塑管线长13.
45公里,投资92.
15万元.
",1570,6245,2019,2020,154.
78,,154.
78,,154.
78,"村支书","驻村扶贫工作队长","产业办","项目验收合格100%","镇财整合(2019)4号,镇财整合(2019)5号"9,"镇康县2018年农田水利设施维护项目","改建","南伞镇","道水村","项",1,"灌溉渠道防渗1公里",32,98,2018,2019,14.
5,14.
5,,,14.
5,"村支书","驻村扶贫工作队长","水务局","项目验收合格100%","临财农发[2017]181号提前下达2018年中央财政水利发展资金1564万元",10,"南伞镇5个村委会2019/2020季香料烟生产用水(管网架设)","新建","南伞镇","南伞镇5个村","项",1,"新建蓄水池100m1个、50m蓄水池4个、30m蓄水池3个,投资34.
5万元;架设PEC32塑管线(含配件)长8.
8公里,投资5.
7万元.
",2308,9318,2019,2020,40.
2,,40.
2,,40.
2,"村支书","驻村扶贫工作队长","产业办","项目验收合格100%","镇财整合(2019)4号",11,"忙丙乡回掌村硝塘田沟渠修复项目","新建","忙丙乡","回掌村","项",1,"修复沟渠2400米、挡墙.
",98,396,2019,2019,15,,15,,15,"村支书","驻村扶贫工作队长","水务局","项目验收合格100%","镇财整合(2019)4号"12,"镇康县马鞍山小流域坡耕地水土流失治理工程","新建","忙丙乡","马鞍山村","项",1,"实施坡改梯面积120.
43hm2,田坎高度为0.
5m、1.
0m、1.
5m、1.
8m.
新建取水坝2座,新建提水泵站2座,300方蓄水池3座,150方蓄水池2座,新建引水管道7993m,其中:DN100热镀锌钢管4862m,PE100Φ110管1800m,PE100Φ75管1038m,PE100Φ75管293m.
",251,755,2018,2019,660.
37,660.
37,,,660.
37,"村支书","驻村扶贫工作队长","水务局","项目验收合格100%","临财建发(2018)59号下达中央资金1000万元"13,"忙丙乡6个村委会2019/2020季香料烟生产用水(管网架设)","新建","忙丙乡","6个村","项",1,"新建100m蓄水池1个、50m蓄水池2个、20m蓄水池2个、10m蓄水池20个、投资39.
5万元;架设(含配件)PEC40塑管线长18.
3公里、PEC32塑管线长13.
7公里、PEC25塑管线长15.
4公里、PEC20塑管线长18.
55公里,投资40.
5万元.
",1662,6655,2019,2020,80,,80,,80,"村支书","驻村扶贫工作队长","产业办","项目验收合格100%","镇财整合(2019)12号"14,"勐堆乡10个村委会2019/2020季香料烟生产用水(管网架设)","新建","勐堆乡","堆乡10个村","项",1,"新建蓄水池10m20个、2m压力池9个,投资51.
4万元;架设PEC32塑管线(含配件)长22.
5公里、PEC25塑管线长7.
5公里、PEC20塑管线长6.
2公里,投资68.
6万元.
",796,3215,2019,2020,120,,120,,120,"村支书","驻村扶贫工作队长","产业办","项目验收合格100%","镇财整合(2019)5号","3.
灌溉塘(堰、井)公里",0,0,0,0,0,0,4,"4.
低头水柜(水窖)口",239,"—",276,1074,242.
87,171.
87,71,0,242.
87,项目验收合格100%",1,"水窖工程","新建","勐捧镇","丫口村","口",18,"新建水窖18口",18,54,2018,2018,16.
17,16.
17,,,16.
17,"村支书","驻村扶贫工作队长","水务局","项目验收合格100%","财政整合[2018]2号","水窖工程","新建","勐捧镇","丫口村","口",16,"新建水窖16口",16,48,2018,2018,14,14,,,14,"村支书","驻村扶贫工作队长","水务局","项目验收合格100%","财政整合[2018]2号","水窖工程","新建","勐捧镇","丫口村","口",17,"新建水窖17口",17,51,2018,2018,15.
5,15.
5,,,15.
5,"村支书","驻村扶贫工作队长","水务局","项目验收合格100%","财政整合[2018]2号","水窖工程","新建","勐捧镇","丫口村","口",18,"新建水窖18口",18,54,2018,2018,16.
2,16.
2,,,16.
2,"村支书","驻村扶贫工作队长","水务局","项目验收合格100%","财政整合[2018]2号"2,"梅子树自然村水窖工程","新建","勐捧镇","丫口村","口",30,"梅子树自然村新建水窖30口",59,261,2019,2019,36,,36,,36,,,"水务局","项目验收合格100%","镇财整合(2019)7号"3,"饮水安全巩固提升","扩改建","南伞镇","户育村","口",112,"户育村计划建设小水窖112口,架设管网3公里",124,498,2018,2018,110,110,,,110,"村支书","驻村扶贫工作队长","水务局","项目验收合格100%","临财建发[2018]49号水务局10月2日新增",4,"南伞镇白岩村林家寨水窖工程","改扩建","南伞镇","白岩村","口",28,"新建、修复水窖28口",24,108,2019,2019,35,,35,,35,"村支书","驻村扶贫工作队长","水务局","项目验收合格100%","镇财整合(2019)7号",,"5.
小型提灌站"0,0,0,0,0,6,"(三)厨房厕所圈舍等改造"19542,77745,582,20,562,0,582,6,"1.
公共卫生厕所"19542,77745,582,20,562,0,582,1,"农村卫生厕所建设","新建","南伞镇","户育村","项",1,"水冲式卫生厕所2座70.
60m2",124,504,2019,2019,37,,37,,37,"村支书","驻村扶贫工作队长","住建局","项目验收合格100%","镇财整合(2019)1号",2,"镇康县工业园区边关大道旅游厕所建设项目","新建","镇康县",,"项",1,"工业园区边关大道(跨国溶洞景区)建设面积70平方米,建设等级为2A旅游厕所",9575,38069,2019,2019,20,,20,,20,,,"文体局","项目验收合格100%","镇财整合(2019)2号"3,"公主亭旅游厕所建设","新建","南伞镇","白岩村","项",1,"公主亭旅游厕所建设",151,654,2018,2018,20,20,,,20,"村支书","驻村扶贫工作队长","文体局","项目验收合格100%","临财行发(2018)2号",4,"南伞镇户育村下户育自然村农村人居环境整治项目","新建","南伞镇","户育村","项",1,"安装无害化卫生户厕199套.
",52,212,2019,2019,62,,62,,62,"村支书","驻村扶贫工作队长","住建局","项目验收合格100%","镇财整合(2019)18号",5,"镇康县木场桃花岛露营地旅游厕所建设项目","新建","木场乡","木场桃花岛景区","个",1,"计划建设面积70平方米;计划投资金额30万元;建设等级为2A旅游厕所(含:男厕位3个、女厕位5个、无障碍厕位各1个、第三卫生间1个)",65,237,2019,2019,20,,20,,20,"李正明","李洪","文体局","项目验收合格100%","镇财整合(2019)1号"6,"农村户厕改建项目","新建","镇康县",,"户",10575,"改建农村户厕10575座,县级配套400元/户.
",9575,38069,2019,2020,423,,423,,423,,,"农业局","项目验收合格100%","镇财整合(2019)15号"2,"十、综合保障性扶贫"4653,"—",1551,4653,,,4.
653,0,4.
653,0,4.
653,,,,,,"(一)享受农村居民最低生活保障"户",0,"—",0,0,,"(二)享受特困人员救助供养"人",0,"—",0,0,2,"(三)参加城乡居民基本养老保险",,,,,4653,,1551,4653,,,4.
653,0,4.
653,0,4.
653,,,,,1,"2019年低保对象特困人员等困难群体代缴城乡居民基本养老保险市级补助","续建","镇康县",,"人",3603,"符合城乡养老保险代缴人数3603人",1201,3603,2019,2019,3.
603,,3.
603,,3.
603,"村支书","驻村扶贫工作队长","镇康县城乡居民社会养老保险局","项目验收合格100%","镇政财社字【2019】67号"2,"2019年度建档立卡未标注脱贫贫困人口代缴城乡居民基本养老保险市级补助","续建","镇康县",,"人",1050,"符合代缴人数1050人",350,1050,2019,2019,1.
05,,1.
05,,1.
05,"村支书","驻村扶贫工作队长","镇康县城乡居民社会养老保险局","项目验收合格100%","镇政财社字【2019】68号","(四)接受留守关爱服务","(五)接受临时救助"252,"十一、村基础设施"124982,499006,62024.
9196,28252.
575,24089.
2846,9683.
06,62024.
9196,,,,,117,"(一)通村、组硬化路及护栏"45236,184160,—,—,36063.
5996,22337.
525,10078.
0746,3648,36063.
5996,117,"1.
村(组)路"45236,184160,36063.
5996,22337.
525,10078.
0746,3648,36063.
5996,1,"撤并建制村","扩建","凤尾镇","大坝村","公里",29,"路基、路面、排水及防护工程每公里补助40万",25,125,2018,2018,1160,1160,,,1160,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","临财建发[2017]192、118号"2,"道路建设","扩建","凤尾镇","凤尾村","公里",8,"兴边富民傣族寨至蒿子坝自然村道路建设路基、路面、排水及防护工程,每公里补助70万",28,140,2018,2018,272,272,,,272,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","临财建发[2017]40号"3,"村内道路硬化","新建","凤尾镇","凤尾村","公里",2.
2,"轩莱安置点村内道路硬化2.
2公里",32,124,2018,2018,120,120,,,120,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇财整合[2018]3号"4,"凤明线至仁和村小甘塘自然村道路建设项目","新建","凤尾镇","仁和村小甘塘自然村","公里",2.
7,"进村道路硬化2.
7公里,路基宽4米,路面宽3.
5米,天然砂砾石底基层(5-8cm),水凝稳定碎石厚15cm,面层采用C30混凝土路面(15公分),共浇筑混凝土路面浇筑9450平方米;及附属设施",23,102,2019,2019,200,,200,,200,"马正强","杨文勋","扶贫办","项目验收合格100%","镇财整合(2019)1号"5,"凤明线至仁和村白坟寨道路硬化工程","新建","凤尾镇","仁和村","公里",2.
3,"进村道路硬化2.
3公里,路基宽4米,路面宽3.
5米,天然砂砾石底基层(5-8cm),水泥稳定碎石厚15cm,面层采用C30混凝土路面(15公分),共浇筑混凝土路面浇筑8050平方米;及附属设施",27,142,2019,2019,170,,170,,170,"马正强","杨文勋","扶贫办","项目验收合格100%","镇财整合(2019)1号"6,"芦子园村道路硬化建设","新建","凤尾镇","芦子园村","公里",1.
5,"(一)道路工程:土方开挖清运360米,路宽3米,面层采用C25混凝土浇筑,厚0.
2m基层采用10厘m厚砂垫层;M7.
5浆砌石路肩挡墙20处320米.
(二)饮水工程:小河边自然村饮水工程架设2187.
5米,其中:50Φ钢管架设安装4米、25Φ钢管架设安装314米、20Φ钢管架设安装616.
5米、15Φ钢管架设安装1253米.
",12,46,2019,2019,65,,65,,65,"邵老成、李开义","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇财整合(2019)1号"7,"大柏树自然村村内道路建设工程","新建","凤尾镇","大柏树村","公里",2.
1,"土方开挖清运2.
1公里,宽度1m,平均厚度度0.
2m以内,共220m;路宽3m2.
1公里,面层采用C25混凝土浇筑,厚0.
2m;基层采用10厘m厚砂垫层;Φ500mm涵管共40节,70m;浆砌石挡墙50.
2m;C20混泥土浇筑防洪沟渠800m;C25钢筋混泥土盖板14m.
M7.
5毛石支砌挡墙34m;人工开挖土方360m.
",12,52,2019,2019,100,,100,,100,"李成武","王建华","扶贫办","项目验收合格100%","镇财整合(2019)1号"8,"进村道路建设","新建","凤尾镇","小落水","公里",3,"新建芦子园村委会至小落水自然村村组道路3公里,设计路基宽4米,路面宽3.
5米,路面采用水泥混凝土路面宽度为3.
5米,及附属工程附属工程",28,87,2019,2019,230,,230,,230,"邵老成、李开义","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇财整合(2019)1号"9,"小弯移民点村组公路建设项目","扩建","凤尾镇","凤尾村","公里",10.
725,"路基、路面、排水及防护工程,每公里补助35万",12,60,2018,2018,375.
375,375.
375,,,375.
375,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","临财建发(2017)192/118号"10,"国省县乡村道危桥改造项目小河边桥","拆除重建","凤尾镇","芦子园","座",1,"实施危桥改造一座",43,129,2019,2019,94,,94,,94,"邵老成、李开义","驻村扶贫工作队长","交通局","项目验收合格100%","镇财整合(2019)1号"11,"凤尾河南渡田桥建设","新建","凤尾镇","大坝村","座",1,"凤尾河南渡田桥建设",17,64,2019,2019,367,,367,,367,"李进强","吕金奎","交通局","项目验收合格100%","镇财整合(2019)1号"12,"道路硬化","扩建","军赛乡","中厂村","公里",11.
9,"军赛乡中厂村至军南线道路建设路基、路面、排水及防护工程,每公里补助88万",46,230,2018,2018,1054.
5,1054.
5,,,1054.
5,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","临财农宗发(2017)2/19号"13,"村内道路硬化","新建/扩改建","军赛乡","彩靠村","公里",1,"瓦厂林格安置点路硬化1公里,补助60万元.
",7,31,2018,2018,60,60,,,60,"杨光才","禹征宏","扶贫办","项目验收合格100%","镇财整合[2018]3号"14,"村内道路硬化","新建/扩改建","军赛乡","彩靠村","公里",2.
5,"孟永丫口安置点至瓦厂林格道路硬化2.
5公里,每公里补助150万元.
",22,81,2018,2018,150,150,,,150,"杨光才","禹征宏","扶贫办","项目验收合格100%","镇财整合[2018]3号"15,"大坝一组村组公路建设项目","扩建","军赛乡","岔路村","公里",9.
636,"路基、路面、排水及防护工程,每公里补助35万",9,45,2018,2018,337.
26,337.
26,,,337.
26,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","临财建发(2017)192/118号"16,"村内道路硬化","新建","勐堆乡","彭木山村","公里",1.
3,"路面设计宽度4米",88,361,2018,2020,66.
51,66.
51,,,66.
51,"韦忠军","李耀江","扶贫办","项目验收合格100%","财政整合[2018]2号"17,"勐堆乡蟒蛇山和尚寺道路硬化项目","新建/扩改建","勐堆乡","蟒蛇山村","公里",2,"蟒蛇山和尚寺自然村进村道路路面硬化2公里,路面宽3米及附属设施.
",42,166,2019,2020,120,,120,,120,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","镇财整合(2019)20号"18,"村内道路硬化","新建","勐堆乡","蟒蛇山村","公里",2,"蟒蛇山村老红糖厂安置点村内道路硬化2公里.
",3,12,2018,2018,80,80,,,80,"村支书","驻村扶贫工作队长","扶贫办","新建村内寨内硬板路2公里,项目验收合格率100%,受益建档立卡贫困户人数≥12人","镇财整合[2018]3号"19,"村内道路硬化","新建","勐堆乡","帮东村","公里",1.
5,"每平方米140元",127,530,2018,2020,64,64,,,64,"金国友","罗开平","扶贫办","新建村内寨内硬板路1.
5公里,项目验收合格率100%,受益建档立卡贫困户人数≥234人","财政整合[2018]2号"20,"平箐自然村道路建设","新建","勐堆乡","彭木山村","公里",2.
3,"新建平箐组道路长2.
3公里,设计路面宽3.
5米,浇筑C25#混凝土路面8050平方米,配套C15#混凝土边沟,挡墙建设326立方米.
",105,402,2019,2019,120,,120,,120,"村支书","驻村扶贫工作队长","扶贫办","新建村内寨内硬板路2.
3公里,项目验收合格率100%,受益建档立卡贫困户人数≥19人","镇财整合(2019)1号"21,"仓木厂大田安置点村内道路建设","新建","勐堆乡","铜厂村","公里",1.
5,"新建村内道路长1500m,设计路面宽3m,浇筑C25#混凝土路面4500㎡,配套C15#混凝土边沟285m.
",93,408,2019,2019,65,,65,,65,"村支书","驻村扶贫工作队长","扶贫办","新建村内寨内硬板路1.
5公里,项目验收合格率100%,受益建档立卡贫困户人数≥28人受益建档立卡贫困户人数≥28人","镇财整合(2019)1号"22,"村组道路硬化","扩改建","勐堆乡","蚌孔村","公里",10,"勐堆乡蚌孔村委会至轻木林村道路硬化",20,71,2018,2018,432,432,,,432,"村支书","驻村扶贫工作队长","交通局","完成硬板路建设10公里、项目验收合格率100%,受益建档立卡贫困户人数≥71人","临财建发[2018]46号"23,"道路建设","新建/扩改建","勐堆乡","竹瓦村","公里",1,"完成300米水泥路面建设(挡墙、侧沟)",80,321,2018,2018,50,50,,,50,"村支书","驻村扶贫工作队长","民宗局","完成硬板路建设1公里、项目验收合格率100%,受益建档立卡贫困户人数≥321人","临财农发(2018)67号"24,"直过民族","新建","勐堆乡","青树寨","项",1,"建设水泥混凝土路,设计路面宽3米,长750米;村内亮化",23,90,2018,2018,80,80,,,80,"村支书","驻村扶贫工作队长","民宗局","新建村内寨内硬板路750米,安装太阳能路灯20盏,项目验收合格率100%,受益建档立卡贫困户人数≥90人","临财农发(2017)186号"25,""忙帮线"未通客车建制村安全生命防护工程","新建","忙丙乡","乌木村","公里",32,"处治32公里隐患路段,每公里补助7万",102,408,2018,2018,230,230,,,230,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","临财建发[2018]117号"26,"撤并建制村","扩建","忙丙乡","小水井至蔡何村","公里",12.
9,"路基、路面、排水及防护工程每公里补助40万",37,185,2018,2018,516,516,,,516,,,"交通局","项目验收合格100%","临财建发[2017]192、118号"27,"村内道路硬化","新建/扩改建","忙丙乡",,"公里",2.
5,"村内道路建设2.
5公里.
",1672,6589,2018,2020,150,150,,,150,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇财整合[2018]3号"28,"村内道路硬化","新建","忙丙乡","乌木村","公里",1.
7,"乌木村坝尾安置点道路硬化1.
7公里.
",11,51,2018,2018,100,100,,,100,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇财整合[2018]3号",29,"山头寨自然村村内道路建设","新建","忙丙乡","乌木村","公里",1.
5,"建设山头寨自然村硬板路宽3m,长1.
5公里",50,189,2019,2019,38,,38,,38,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇财整合(2019)1号"30,"荒田组道路建设","新建","忙丙乡","麦地村","公里",2.
5,"新建荒田至小水沟进村硬板路建设2.
5公里,1公里路基宽6m,路面宽4m,配套边沟、路径培土、挡墙、涵管;1.
5公里路基宽4.
5m,路面宽3m,配套边沟、路径培土、挡墙、涵管",15,66,2019,2019,141,,141,,141,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇财整合(2019)1号"31,"忙丙乡乌木村坝尾自然村进村道路建设项目","新建","忙丙乡","乌木村","公里",1.
1,"新建乌木村坝尾自然村进村道路1.
1公里,路面宽3.
5米,米,配套边沟、挡墙.
",204,711,2019,2019,77,,77,,77,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","镇财整合(2019)20号"32,"忙丙乡蔡何村草坝山自然村串户路硬化项目","新建","忙丙乡","蔡何村","公里",1.
2,"草坝山自然村串户路建设干道C25厚20cm混凝土1.
2公里,宽3米;透水砖串户路0.
3公里;设计配套排水管道附属设施.
",235,979,2019,2019,90,,90,,90,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","镇财整合(2019)20号"33,"忙丙乡乌木村大山自然村村内道路建设项目","新建","忙丙乡","乌木村","公里",1.
3,"新建大山自然村串户路1.
3公里,配套边沟,挡墙.
浇筑硬板路宽3m,长800m.
",204,711,2019,2019,42,,42,,42,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","镇财整合(2019)20号"34,"村组道路硬化","扩改建","勐捧镇","酸格林村","项",1,"勐捧镇酸格林冷水沟至酸格林村道路硬化",248,1069,2018,2018,540,540,,,540,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","临财建发[2018]46号"35,"村组道路硬化","扩改建","勐捧镇","酸格林村","项",1,"勐捧镇酸格林村章奎小寨至洼子地道路硬化",248,1069,2018,2018,390,390,,,390,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","临财建发[2018]46号"36,"道路建设","扩建","勐捧镇","勐捧村","公里",4.
5,"兴边富民110界桩公路K1+600至杨柳桥自然村道路建设路基、路面、排水及防护工程,每公里补助78万",28,140,2018,2018,150,150,,,150,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","临财建发[2017]40号"37,"安置点村内道路硬化","新建","勐捧镇","岩子头村","公里",1,"岩子头村大岔安置点村内道路硬化1公里,路面宽3.
5米,浇筑C30混凝土路面浇筑3500平方米;",456,1757,2018,2018,59.
49,59.
49,,,59.
49,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格100%","财政整合[2018]2号"38,"安置点村内道路硬化","新建","勐捧镇","岩子头村","公里",2,"岩子头村红土坡安置点村内道路硬化2公里,路面宽3.
5米,浇筑C30混凝土路面浇筑7000平方米;",456,1757,2018,2018,120,120,,,120,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇财整合[2018]3号"39,"石桥村至石桥上田坝至小茶坟道路建设","新建","勐捧镇","石桥村","公里",2.
5,"建设水泥混凝土路面2.
5公里,设计路基宽4.
5m,路面宽3.
6m.
",140,531,2019,2019,175,,175,,175,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇财整合(2019)1号"40,"村内道路建设","新建","勐捧镇","根基村","公里",1.
1,"根基大水塘至小学长路,全长1100米,路面宽3.
5米路基4米.
",49,179,2019,2019,60,,60,,60,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇财整合(2019)1号"41,"苦菜岭自然村村组公路建设项目","扩建","勐捧镇","酸格林村","公里",6.
04,"路基、路面、排水及防护工程,每公里补助35万",8,40,2018,2018,211.
4,211.
4,,,211.
4,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","临财建发(2017)192/118号"42,"酸格林自然村村组公路建设项目","扩建","勐捧镇","酸格林村","公里",4.
038,"路基、路面、排水及防护工程,每公里补助35万",11,55,2018,2018,141.
33,141.
33,,,141.
33,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","临财建发(2017)192/118号"43,"麻栗树自然村村组公路建设项目","扩建","勐捧镇","酸格林村","公里",29.
055,"路基、路面、排水及防护工程,每公里补助35万",9,45,2018,2018,1016.
925,1016.
925,,,1016.
925,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","临财建发(2017)192/118号"44,"字家寨自然村村组公路建设项目","扩建","勐捧镇","酸格林村","公里",4.
989,"路基、路面、排水及防护工程,每公里补助35万",17,85,2018,2018,174.
615,174.
615,,,174.
615,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","临财建发(2017)192/118号"45,"章奎小寨自然村村组公路建设项目","扩建","勐捧镇","酸格林村","公里",7.
772,"路基、路面、排水及防护工程,每公里补助35万",22,110,2018,2018,272.
02,272.
02,,,272.
02,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","临财建发(2017)192/118号"46,"大沙坝胶场居民点村组公路建设项目","扩建","勐捧镇","酸格林村","公里",10.
232,"路基、路面、排水及防护工程,每公里补助35万",9,45,2018,2018,358.
12,358.
12,,,358.
12,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","临财建发(2017)192/118号"47,"背阴山自然村村组公路建设项目","扩建","勐捧镇","岔沟村","公里",5.
896,"路基、路面、排水及防护工程,每公里补助35万",13,65,2018,2018,206.
36,206.
36,,,206.
36,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","临财建发(2017)192/118号"48,"蒿子坝自然村村组公路建设项目","扩建","勐捧镇","岔沟村","公里",6.
141,"路基、路面、排水及防护工程,每公里补助35万",14,70,2018,2018,214.
935,214.
935,,,214.
935,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","临财建发(2017)192/118号"49,"轻木树林格自然村村组公路建设项目","扩建","勐捧镇","岔沟村","公里",4.
294,"路基、路面、排水及防护工程,每公里补助35万",17,85,2018,2018,150.
29,150.
29,,,150.
29,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","临财建发(2017)192/118号"50,"大寨自然村村组公路建设项目","扩建","勐捧镇","忙丙村","公里",6.
362,"路基、路面、排水及防护工程,每公里补助35万",8,40,2018,2018,222.
67,222.
67,,,222.
67,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","临财建发(2017)192/118号"51,"大山自然村村组公路建设项目","扩建","勐捧镇","忙丙村","公里",4.
172,"路基、路面、排水及防护工程,每公里补助35万",6,30,2018,2018,146.
02,146.
02,,,146.
02,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","临财建发(2017)192/118号"52,"电塘自然村村组公路建设项目","扩建","勐捧镇","忙丙村","公里",4.
468,"路基、路面、排水及防护工程,每公里补助35万",5,25,2018,2018,156.
38,156.
38,,,156.
38,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","临财建发(2017)192/118号"53,"根基村干沟自然村村内道路建设项目","新建","勐捧镇","根基村","公里",1.
2,"根基村干沟自然村村内道路建设1.
2公里,路基宽4米,路面3.
5米及附属工程.
",49,179,2019,2019,90,,90,,90,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","镇财整合(2019)15号"54,"镇康县勐捧镇酸格林村白水自然村至章龙自然村道路建设项目","新建","勐捧镇","酸格林村","公里",6.
5,"建设水泥混泥土道路6.
5公里,涉及路基宽4.
5米,路面宽3.
5米.
附属工程护墙及排水工程等.
",248,1069,2019,2019,260,,260,,260,"村支书","驻村扶贫工作队长","发改局","项目验收合格100%","镇财整合(2019)16号"55,"勐捧镇丫口村落水坑自然村道路硬化项目","新建","勐捧镇","丫口村","公里",6.
7,"落水坑自然村进村道路路面硬化6.
75公里.
",250,1085,2019,2019,400,,400,,400,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","镇财整合(2019)20号"56,"乌木兰村翁控道路硬化","新建/扩改建","木场乡","乌木兰村","公里",0.
8,"乌木兰村翁控自然村道路硬化857米",49,203,2018,2018,30,30,,,30,"村支书","驻村扶贫工作队长","民宗局","项目验收合格100%","镇财整合[2018]1号"57,"勐撒村大浪地安置点村内道路硬化","扩改建","木场乡","勐撒村","公里",1.
5,"勐撒村大浪地安置点硬化路面1.
5公里,宽3.
5米",26,73,2018,2018,63,63,,,63,"罗军","驻村扶贫工作队长","扶贫办","项目验收合格100%","财政整合[2018]2号"58,"乌木兰村打小安置点村内道路硬化","扩改建","木场乡","乌木兰村","公里",1.
2,"乌木兰村打小安置点硬化路面1.
2公里,4200平方米,100元/㎡",46,132,2018,2018,42,42,,,42,"王志荣","驻村扶贫工作队长","扶贫办","项目验收合格100%","财政整合[2018]2号"59,"乌木兰村打小安置点挡土墙支砌","新建","木场乡","乌木兰村","立方米",3000,"支砌挡土墙3000立方米,226元/立方米",52,236,2018,2018,68,68,,,68,"王志荣","驻村扶贫工作队长","扶贫办","项目验收合格100%","财政整合[2018]2号"60,"散路坝村林格寨组道路建设","新建","木场乡","撒路坝村","公里",1.
25,"撒路坝村林格寨组道路,宽3m长416m,1250平m,120元/㎡,合计150000元.
",35,151,2019,2019,15,,15,,15,"李文学","朱茂强","扶贫办","项目验收合格100%","镇财整合(2019)1号"61,"木场乡明孟线至野竹洼道路建设","新建","木场乡","大伙房、野竹洼","公里",3.
2,"建设水泥混凝土路面3.
2公里,设计路基宽4.
5m,路面宽3.
5m.
",46,168,2019,2019,210,,210,,210,"李正明","李洪","扶贫办","项目验收合格100%","镇财整合(2019)1号"62,"村翁控组道路建设","新建","木场乡","乌木兰村","公里",1.
5,"乌木兰村翁控组硬化路面1.
5公里宽3.
5m厚20厘m.
",49,203,2019,2019,63,,63,,63,"王志荣","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇财整合(2019)1号"63,"窝拖寨组道路建设","新建","木场乡","乌木兰村","公里",2,"乌木兰村窝拖寨组2公里.
",65,269,2019,2019,60,,60,,60,"王志荣","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇财整合(2019)1号"64,"相塘组道路建设","新建","木场乡","龙塘村","公里",2.
8,"龙塘村相塘组道路建设2.
8公里.
",58,224,2019,2019,67.
2,,67.
2,,67.
2,"李福保","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇财整合(2019)1号"65,"镇康县明信坝至孟定公路","扩建","木场乡","木场村、勐撒村、散路坝村","公里",20,"路基、路面、排水及防护工程每公里补助160万",259,1295,2018,2018,3200,3200,,,3200,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","临财建发(2017)192/118号"66,"明信坝至孟定公路","改建","木场乡",,"公里",16.
851,"四级公路,沥青路面,每公里建设标准300万元",4306,20081,2019,2019,2696,,2696,,2696,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","镇财整合(2019)1号"67,"尖山自然村村组公路建设项目","扩建","木场乡","勐撒村","公里",13.
844,"路基、路面、排水及防护工程,每公里补助35万",11,55,2018,2018,484.
54,484.
54,,,484.
54,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","临财建发(2017)192/118号"68,"大龙潭自然村村组公路建设项目","扩建","木场乡","勐撒村","公里",15.
204,"路基、路面、排水及防护工程,每公里补助35万",13,65,2018,2018,532.
14,532.
14,,,532.
14,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","临财建发(2017)192/118号"69,"村内道路硬化","扩改建","木场乡","绿荫塘","公里",1,"绿荫塘村新村安置点道路硬化1公里,宽3.
5米",26,67,2018,2018,42,42,,,42,"陈志德","李豫川","扶贫办","项目验收合格100%","财政整合[2018]2号"70,"道路硬化","新建/扩改建","南伞镇","下寨自然村","公里",1.
94,"大河边自然村300米、下寨自然村1640米",24,91,2018,2018,43,43,,,43,"村支书","驻村扶贫工作队长","民宗局","项目验收合格100%","镇财整合(2018)1号",71,"踏步建设","新建/扩改建","南伞镇","南伞村","公里",,"毛石支砌.
全长262米105立方米.
",86,337,2018,2018,4,4,,,4,"村支书","驻村扶贫工作队长","民宗局","项目验收合格100%","镇财整合(2018)1号",72,"道路建设","扩建","南伞镇","班龙村","公里",11,"兴边富民大关房至四角田到散路坝向阳自然村道路建设路基、路面、排水及防护工程,每公里补助75万",44,220,2018,2018,828,828,,,828,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","临财建发[2017]40号",73,"安置点道路硬化","新建","南伞镇","南伞村","公里",2,"南伞村回落山安置点道路硬化2公里",86,337,2018,2018,96,96,,,96,"罗福","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇财整合[2018]3号",74,"安置点进村道路硬化","新建","南伞镇","道水村","公里",1,"道水村大河边安置点进村道路硬化1公里",26,96,2018,2018,45,45,,,45,"李廷美","杨新江","扶贫办","项目验收合格100%","镇财整合[2018]3号",75,"山头寨村内道路建设项","新建","南伞镇","麻栗坪村","公里",1.
6,"村内硬板路铺筑1.
6公里,设计宽度3m,厚度0.
2m,C30混凝土浇筑.
",96,354,2019,2019,58,,58,,58,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇财整合(2019)1号",76,"青树丫口村内道路建设","新建","南伞镇","麻栗坪村","公里",1.
8,"村内硬板路铺筑1.
8公里,设计宽度3m,厚度0.
2m,C30混凝土浇筑.
",96,354,2019,2019,65,,65,,65,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇财整合(2019)1号",77,"新寨道路建设","新建","南伞镇","田坝村","公里",0.
605,"新寨道路硬化0.
605公里,设计宽4度m,厚度0.
2m,C30混凝土浇筑.
",138,1009,2019,2019,42,,42,,42,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇财整合(2019)1号",78,"等爬河进村道路硬化","新建","南伞镇","轩岗村","公里",3.
5,"硬板路铺筑3.
5公里,设计宽度3.
5m,厚度0.
2m,C30混凝土浇筑;埋设涵管4道24m;挡墙支砌4道100m.
",187,775,2019,2019,145,,145,,145,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇财整合(2019)1号",79,"2017年农村公路安防工程南户线","扩建","南伞镇","户育村","公里",7.
6,"处置7.
6公里隐患路段,每公里补助6.
5万",43,215,2018,2018,49,49,,,49,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","临财建发(2017)8号",80,"城子自然村村组公路建设项目","扩建","南伞镇","南伞村","公里",2.
483,"路基、路面、排水及防护工程,每公里补助35万",12,60,2018,2018,86.
905,86.
905,,,86.
905,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","临财建发(2017)192/118号",81,"茶山二组自然村村组公路建设项目","扩建","南伞镇","南伞村","公里",7.
138,"路基、路面、排水及防护工程,每公里补助35万",11,55,2018,2018,249.
83,249.
83,,,249.
83,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","临财建发(2017)192/118号",82,"皮匠寨自然村村组公路建设项目","扩建","南伞镇","白岩村","公里",5.
753,"路基、路面、排水及防护工程,每公里补助35万",15,75,2018,2018,201.
355,201.
355,,,201.
355,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","临财建发(2017)192/118号",83,"帮小底自然村村组公路建设项目","扩建","南伞镇","白岩村","公里",7.
418,"路基、路面、排水及防护工程,每公里补助35万",16,80,2018,2018,259.
63,259.
63,,,259.
63,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","临财建发(2017)192/118号",84,"刺树丫口自然村村组公路建设项目","扩建","南伞镇","红岩村","公里",5.
406,"路基、路面、排水及防护工程,每公里补助35万",7,35,2018,2018,189.
21,189.
21,,,189.
21,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","临财建发(2017)192/118号",85,"卡贺居民点村组公路建设项目","扩建","南伞镇","红岩村","公里",5.
507,"路基、路面、排水及防护工程,每公里补助35万",13,65,2018,2018,192.
745,192.
745,,,192.
745,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","临财建发(2017)192/118号",86,"营盘自然村村组公路建设项目","扩建","南伞镇","营盘村","公里",28.
25,"路基、路面、排水及防护工程,每公里补助35万",12,60,2018,2018,988.
75,988.
75,,,988.
75,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","临财建发(2017)192/118号",87,"麦地河自然村村组公路建设项目","扩建","南伞镇","营盘村","公里",5.
888,"路基、路面、排水及防护工程,每公里补助35万",15,75,2018,2018,206.
08,206.
08,,,206.
08,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","临财建发(2017)192/118号",88,"麻栗树自然村村组公路建设项目","扩建","南伞镇","营盘村","公里",5.
421,"路基、路面、排水及防护工程,每公里补助35万",16,80,2018,2018,189.
735,189.
735,,,189.
735,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","临财建发(2017)192/118号",89,"滚掌自然村村组公路建设项目","扩建","南伞镇","营盘村","公里",4.
769,"路基、路面、排水及防护工程,每公里补助35万",8,40,2018,2018,166.
915,166.
915,,,166.
915,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","临财建发(2017)192/118号",90,"小邦东自然村村组公路建设项目","扩建","南伞镇","营盘村","公里",9.
006,"路基、路面、排水及防护工程,每公里补助35万",6,30,2018,2018,315.
21,315.
21,,,315.
21,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","临财建发(2017)192/118号",91,"大寨自然村村组公路建设项目","扩建","南伞镇","哈里村","公里",11.
625,"路基、路面、排水及防护工程,每公里补助35万",7,35,2018,2018,406.
875,406.
875,,,406.
875,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","临财建发(2017)192/118号",92,"下胶场(娥傣)自然村村组公路建设项目","扩建","南伞镇","哈里村","公里",6.
094,"路基、路面、排水及防护工程,每公里补助35万",14,70,2018,2018,213.
29,213.
29,,,213.
29,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","临财建发(2017)192/118号",93,"哈里下寨自然村村组公路建设项目","扩建","南伞镇","哈里村","公里",12.
285,"路基、路面、排水及防护工程,每公里补助35万",16,80,2018,2018,429.
975,429.
975,,,429.
975,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","临财建发(2017)192/118号",94,"村级公益事业一事一议建设财政奖补项目","新建","南伞镇","药皮山","个",1,"硬板路1条",61,245,2018,2018,30,30,,,30,"村支书","驻村扶贫工作队长","财政局","项目验收合格100%","镇政财预字[2018]67号",95,"村级公益事业一事一议建设财政奖补项目","新建","南伞镇","青树丫口","个",1,"硬板路1条",24,99,2018,2018,16,16,,,16,"村支书","驻村扶贫工作队长","财政局","项目验收合格100%","镇政财预字[2018]67号",96,"南伞镇班龙村老龙寨自然村道路硬化项目","新建","南伞镇","班龙村","公里",7,"冷硝到老龙寨道路路面硬化7公里.
",230,897,2019,2019,410.
8746,,410.
8746,,410.
8746,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","镇财整合(2019)20号",97,"县乡道安全生命防护项目","新建","镇康县",,"公里",306,"危险路段实施安防工程",9575,38069,2019,2019,2142,,2142,,2142,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","镇财整合(2019)1号"98,"军弄至木场"县乡公路改造"","新建","军弄至木场",,"公里",30,"军弄至木场"县乡公路改造"",3878,15563,2018,2018,2400,2400,,,2400,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","财政整合[2018]5号"99,"2018年农村公路养护工程","新建","镇康县","全县范围内","公里",1643,"实施全县范围内列入养护库的道路日常性养护",9575,38069,2018,2018,440.
14,440.
14,,,440.
14,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","临财建发(2017)8号"100,"镇康县凤尾镇至帮海村道路建设","新建","镇康县",,"公里",15,"农村公路基本级,水泥混泥土路面",9575,38069,2019,2019,1200,,1200,,1200,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","镇政财预字〔2019〕78号"101,"字家寨自然村通硬化路工程","新建","勐捧镇","酸格林村","公里",4.
989,"混凝土路面改造,长4.
989公里、路面宽3.
5-4.
5米、排水、防护等.
",34,127,2020,2020,77,,,77,77,"村支书","驻村扶贫工作队长","交通局","完成路面改造4.
989公里及排水防护工程,项目验收合格率100%",102,"皮匠寨自然村通硬化路工程","新建","南伞镇","白岩村","公里",5.
753,"混凝土路面改造,长5.
753公里、路面宽3.
5-4.
5米、排水、防护等.
",10,56,2020,2020,86,,,86,86,"村支书","驻村扶贫工作队长","交通局","完成路面改造5.
753公里及排水防护工程,项目验收合格率100%",103,"白岩自然村通硬化路工程","新建","南伞镇","白岩村","公里",3,"混凝土路面改造,长3公里、路面宽3.
5-4.
5米、排水、防护等.
",38,141,2020,2020,45,,,45,45,"村支书","驻村扶贫工作队长","交通局","完成路面改造3公里及排水防护工程,项目验收合格率100%",104,"张笑自然村通硬化路工程","新建","勐堆乡","帮东村","公里",14.
253,"混凝土路面改造长,14.
253公里、路面宽3.
5-4.
5米、排水、防护等.
",19,77,2020,2020,214,,,214,214,"村支书","驻村扶贫工作队长","交通局","完成路面改造14.
253公里及排水防护工程,项目验收合格率100%",105,"麦地河自然村通硬化路工程","新建","南伞镇","营盘村","公里",5.
888,"混凝土路面改造,长5.
888公里、路面宽3.
5-4.
5米、排水、防护等.
",52,183,2020,2020,88,,,88,88,"村支书","驻村扶贫工作队长","交通局","完成路面改造5.
888公里及排水防护工程,项目验收合格率100%",106,"青木林自然村通硬化路工程","新建","勐堆乡","蚌孔村","公里",18.
257,"混凝土路面改造,长18.
257公里、路面宽3.
5-4.
5米、排水、防护等.
",8,29,2020,2020,274,,,274,274,"村支书","驻村扶贫工作队长","交通局","完成路面改造18.
257公里及排水防护工程,项目验收合格率100%",107,"老沈寨自然村通硬化路工程","新建","勐堆乡","蚌孔村","公里",11.
615,"混凝土路面改造长,11.
615公里、路面宽3.
5-4.
5米、排水、防护等.
",9,31,2020,2020,174,,,174,174,"村支书","驻村扶贫工作队长","交通局","完成路面改造11.
615公里及排水防护工程,项目验收合格率100%",108,"大寨自然村通硬化路工程","新建","勐堆乡","蚌孔村","公里",7.
901,"混凝土路面改造,长7.
901公里、路面宽3.
5-4.
5米、排水、防护等.
",24,85,2020,2020,119,,,119,119,"村支书","驻村扶贫工作队长","交通局","完成路面改造7.
901公里及排水防护工程,项目验收合格率100%",109,"茶山二组自然村通硬化路工程","新建","南伞镇","南伞村","公里",7.
138,"混凝土路面改造,长7.
138公里、路面宽3.
5-4.
5米、排水、防护等.
",30,125,2020,2020,107,,,107,107,"村支书","驻村扶贫工作队长","交通局","完成路面改造7.
138公里及排水防护工程,项目验收合格率100%",110,"麻栗树自然村通硬化路工程","新建","南伞镇","营盘村","公里",5.
421,"混凝土路面改造,长5.
421公里、路面宽3.
5-4.
5米、排水、防护等.
",35,126,2020,2020,81,,,81,81,"村支书","驻村扶贫工作队长","交通局","完成路面改造5.
421公里及排水防护工程,项目验收合格率100%",111,"刺树丫口自然村通硬化路工程","新建","南伞镇","红岩村","公里",5.
406,"混凝土路面改造,长5.
406公里、路面宽3.
5-4.
5米、排水、防护等.
",60,267,2020,2020,81,,,81,81,"村支书","驻村扶贫工作队长","交通局","完成路面改造5.
406公里及排水防护工程,项目验收合格率100%",112,"章奎小寨自然村通硬化路工程","新建","勐捧镇","酸格林村","公里",7.
772,"混凝土路面改造,长7.
772公里、路面宽3.
5-4.
5米、排水、防护等.
",18,84,2020,2020,117,,,117,117,"村支书","驻村扶贫工作队长","交通局","完成路面改造7.
772公里及排水防护工程,项目验收合格率100%",113,"小炉场自然村通硬化路工程","新建","勐堆乡","蚌孔村","公里",18.
828,"混凝土路面改造,长18.
828公里、路面宽3.
5-4.
5米、排水、防护等.
",7,36,2020,2020,753,,,753,753,"村支书","驻村扶贫工作队长","交通局","完成路面改造18.
828公里及排水防护工程,项目验收合格率100%",114,"营盘自然村通硬化路工程","新建","南伞镇","营盘村","公里",28.
25,"混凝土路面改造,长28.
25公里、路面宽3.
5-4.
5米、排水、防护等.
",47,180,2020,2020,424,,,424,424,"村支书","驻村扶贫工作队长","交通局","完成路面改造28.
25公里及排水防护工程,项目验收合格率100%",115,"田洼自然村通硬化路工程","新建","勐捧镇","岔沟村","公里",3.
774,"混凝土路面改造,长3.
774公里、路面宽3.
5-4.
5米、排水、防护等.
",10,33,2020,2020,57,,,57,57,"村支书","驻村扶贫工作队长","交通局","完成路面改造3.
774公里及排水防护工程,项目验收合格率100%",116,"新城社区通硬化路工程","新建","南伞镇","南伞村","公里",7.
138,"混凝土路面改造,长7.
138公里、路面宽3.
5-4.
5米、排水、防护等.
",86,337,2020,2020,286,,,286,286,"村支书","驻村扶贫工作队长","交通局","完成路面改造7.
138公里及排水防护工程,项目验收合格率100%",117,"邦东自然村通硬化路工程","新建","勐堆乡","帮东村","公里",16.
632,"混凝土路面改造,长16.
632公里、路面宽3.
5-4.
5米、排水、防护等.
",31,144,2020,2020,665,,,665,665,"村支书","驻村扶贫工作队长","交通局","完成路面改造16.
632公里及排水防护工程,项目验收合格率100%",13,"(二)通生产用电",,,,,,,18553,73633,—,—,549.
98,31.
43,518.
55,0,549.
98,,,,,,"1.
自然村生产用电输变电线路和设施"13,"2.
建档立卡贫困户生活生产用电输变电线路和设施"18553,73633,549.
98,31.
43,518.
55,0,549.
98,,,,,1,"村组电力改造项目","新建/扩改建","勐堆乡",,"项",1,"电力线房安全距离不足隐患造成建房停工整改资金",796,3215,2018,2018,1.
75,1.
75,,,1.
75,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇财整合[2018]3号"2,"村组电力改造项目","新建","忙丙乡",,"项",1,"电力线房安全距离不足隐患造成建房停工整改资金",1662,6655,2018,2018,6.
23,6.
23,,,6.
23,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇财整合[2018]3号"3,"村组动力电改造","新建/扩改建","军赛乡",,"项",1,"村组电线路改造",624,2341,2018,2018,2.
87,2.
87,,,2.
87,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇财整合[2018]3号"4,"村组动力电改造","新建","勐捧镇",,"项",1,"电力线房安全距离不足隐患造成建房停工整改",2007,7940,2018,2018,3.
37,3.
37,,,3.
37,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇财整合[2018]3号"5,"村组电力改造项目","新建","南伞镇",,"项",1,"电力线房安全距离不足隐患造成建房停工整改",2319,9168,2018,2018,12.
57,12.
57,,,12.
57,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇财整合[2018]3号"6,"村组电力改造项目","新建","木场乡",,"项",1,"电力线房安全距离不足隐患造成建房停工整改资金",1570,6245,2018,2018,4.
64,4.
64,,,4.
64,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇财整合[2018]3号"7,"电力改造项目","改造","南伞镇",,"项",1,"农村危房改造过程中电线迁杆改迁745200元、南伞镇哈里村半坡电力线路架设36000元.
",2308,9318,2019,2019,78.
12,,78.
12,,78.
12,"村支书","驻村扶贫工作队长","供电局","项目验收合格100%","镇财整合(2019)1号"8,"电力改造项目","改造","勐捧镇",,"项",1,"农村危房改造过程中电线迁杆改迁",2007,7940,2019,2019,74.
94,,74.
94,,74.
94,"村支书","驻村扶贫工作队长","供电局","项目验收合格100%","镇财整合(2019)1号"9,"电力改造项目","改造","凤尾镇",,"项",1,"农村危房改造过程中电线迁杆改迁",608,2355,2019,2019,64.
79,,64.
79,,64.
79,"村支书","驻村扶贫工作队长","供电局","项目验收合格100%","镇财整合(2019)1号"10,"电力改造项目","改造","勐堆乡",,"项",1,"农村危房改造过程中电线迁杆改迁",796,3215,2019,2019,13.
8,,13.
8,,13.
8,"村支书","驻村扶贫工作队长","供电局","项目验收合格100%","镇财整合(2019)1号"11,"电力改造项目","改造","忙丙乡",,"项",1,"农村危房改造过程中电线迁杆改迁",1662,6655,2019,2019,34.
66,,34.
66,,34.
66,"村支书","驻村扶贫工作队长","供电局","项目验收合格100%","镇财整合(2019)1号"12,"电力改造项目","改造","木场乡",,"项",1,"农村危房改造过程中电线迁杆改迁",1570,6245,2019,2019,147,,147,,147,"村支书","驻村扶贫工作队长","供电局","项目验收合格100%","镇财整合(2019)1号"13,"电力改造项目","改造","军赛乡",,"项",1,"农村危房改造过程中电线迁杆改迁",624,2341,2019,2019,105.
24,,105.
24,,105.
24,"村支书","驻村扶贫工作队长","供电局","项目验收合格100%","镇财整合(2019)1号","(三)通生活用电","1.
建档立卡贫困户生活生产用电输变电线路和设施","(四)光纤宽带接入"个","1.
移动基站"个","2.
乡镇到自然村光缆线路","3.
自然村内光缆线路和接入设备"60,"(五)产业路"4638,18463,—,—,14230.
42,3555.
46,7487.
9,3187.
06,14230.
42,60,"1.
生产便道(机耕路)4638,18463,14230.
42,3555.
46,7487.
9,3187.
06,14230.
42,1,"勐永自然村产业道路","改建","军赛乡","勐永自然村","公里",7,"四级公路,水泥路面,每公里建设标准55万元",40,157,2019,2019,174,,174,,174,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","镇财整合(2019)1号"2,"白岩自然村产业道路","改建","军赛乡","白岩自然村","公里",9,"四级公路,水泥路面,每公里建设标准55万元",11,44,2019,2019,218,,218,,218,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","镇财整合(2019)1号"3,"木场沟自然村产业道路","改建","军赛乡","木场沟自然村","公里",4,"四级公路,水泥路面,每公里建设标准55万元",13,58,2019,2019,109,,109,,109,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","镇财整合(2019)1号"4,"三棵桩自然村产业道路","改建","军赛乡","三棵桩自然村","公里",3,"四级公路,水泥路面,每公里建设标准55万元",8,32,2019,2019,74,,74,,74,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","镇财整合(2019)1号"5,"中场自然村产业道路","改建","军赛乡","中场自然村","公里",5,"四级公路,水泥路面,每公里建设标准55万元",33,125,2019,2019,125,,125,,125,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","镇财整合(2019)1号"6,"弯子田自然村产业道路","改建","军赛乡","弯子田自然村","公里",5,"四级公路,水泥路面,每公里建设标准55万元",9,31,2019,2019,127,,127,,127,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","镇财整合(2019)1号"7,"酒房坡自然村产业道路","改建","军赛乡","酒房坡自然村","公里",2,"四级公路,水泥路面,每公里建设标准55万元",2,8,2019,2019,49,,49,,49,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","镇财整合(2019)1号"8,"平掌组自然村产业道路","改建","军赛乡","平掌组自然村","公里",3,"四级公路,水泥路面,每公里建设标准55万元",18,63,2019,2019,75,,75,,75,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","镇财整合(2019)1号"9,"南翁自然村产业道路","改建","军赛乡","南翁自然村","公里",6,"四级公路,水泥路面,每公里建设标准55万元",20,75,2019,2019,146,,146,,146,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","镇财整合(2019)1号"10,"大东自然村产业道路","改建","勐堆乡","大东自然村","公里",7.
073,"四级公路,水泥路面,每公里建设标准55万元",25,97,2019,2019,177,,177,,177,"村支书","驻村扶贫工作队长","交通局","完成道路建设7公里,项目验收合格率100%,受益建档立卡贫困户人数≥97人","镇财整合(2019)1号"11,"轻木水坝自然村产业道路","改建","勐堆乡","轻木水坝自然村","公里",2.
109,"四级公路,水泥路面,每公里建设标准55万元",29,122,2019,2019,53,,53,,53,"村支书","驻村扶贫工作队长","交通局","完成道路建设2.
11公里,项目验收合格率100%,受益建档立卡贫困户人数≥122人","镇财整合(2019)1号"12,"土沙林自然村产业道路","改建","勐堆乡","土沙林自然村","公里",4.
645,"四级公路,水泥路面,每公里建设标准55万元",11,44,2019,2019,116,,116,,116,"村支书","驻村扶贫工作队长","交通局","完成道路建设4.
7公里,项目验收合格率100%,受益建档立卡贫困户人数≥44人","镇财整合(2019)1号"13,"小旧寨自然村产业道路","改建","勐堆乡","小旧寨自然村","公里",2.
995,"四级公路,水泥路面,每公里建设标准55万元",11,33,2019,2019,75,,75,,75,"村支书","驻村扶贫工作队长","交通局","完成道路建设3公里,项目验收合格率100%,受益建档立卡贫困户人数≥33人","镇财整合(2019)1号"14,"田坝寨自然村产业道路","改建","勐堆乡","田坝寨自然村","公里",9.
717,"四级公路,水泥路面,每公里建设标准55万元",24,108,2019,2019,243,,243,,243,"村支书","驻村扶贫工作队长","交通局","完成道路建设9.
72公里,项目验收合格率100%,受益建档立卡贫困户人数≥108人","镇财整合(2019)1号"15,"茶叶林二组产业道路","改建","勐堆乡","茶叶林二组","公里",3.
813,"四级公路,水泥路面,每公里建设标准55万元",13,55,2019,2019,95,,95,,95,"村支书","驻村扶贫工作队长","交通局","完成道路建设3.
81公里,项目验收合格率100%,受益建档立卡贫困户人数≥55人","镇财整合(2019)1号"16,"茶叶林自然村产业道路","改建","勐堆乡","茶叶林自然村","公里",0.
523,"四级公路,水泥路面,每公里建设标准55万元",13,55,2019,2019,13,,13,,13,"村支书","驻村扶贫工作队长","交通局","完成道路建设0.
52公里,项目验收合格率100%,受益建档立卡贫困户人数≥55人","镇财整合(2019)1号"17,"忙红自然村产业道路","改建","勐堆乡","忙红自然村","公里",6.
384,"四级公路,水泥路面,每公里建设标准55万元",60,234,2019,2019,160,,160,,160,"村支书","驻村扶贫工作队长","交通局","完成道路建设6.
38公里,项目验收合格率100%,受益建档立卡贫困户人数≥234人","镇财整合(2019)1号"18,"张笑自然村产业道路","改建","勐堆乡","张笑自然村","公里",14.
253,"四级公路,水泥路面,每公里建设标准55万元",19,78,2019,2019,356,,356,,356,"村支书","驻村扶贫工作队长","交通局","完成道路建设14.
25公里,项目验收合格率100%,受益建档立卡贫困户人数≥78人","镇财整合(2019)1号"19,"大缅寺自然村产业道路","改建","勐堆乡","大缅寺自然村","公里",1.
91,"四级公路,水泥路面,每公里建设标准55万元",17,75,2019,2019,48,,48,,48,"村支书","驻村扶贫工作队长","交通局","完成道路建设1.
91公里,项目验收合格率100%,受益建档立卡贫困户人数≥75人","镇财整合(2019)1号"20,"青木林自然村产业道路","改建","勐堆乡","青木林自然村","公里",18.
257,"四级公路,水泥路面,每公里建设标准55万元",9,31,2019,2019,456,,456,,456,"村支书","驻村扶贫工作队长","交通局","完成道路建设18.
62公里,项目验收合格率100%,受益建档立卡贫困户人数≥31人","镇财整合(2019)1号"21,"老沈寨自然村产业道路","改建","勐堆乡","老沈寨自然村","公里",11.
615,"四级公路,水泥路面,每公里建设标准55万元",9,31,2019,2019,290,,290,,290,"村支书","驻村扶贫工作队长","交通局","完成道路建设11.
62公里,项目验收合格率100%,受益建档立卡贫困户人数≥31人","镇财整合(2019)1号"22,"大寨自然村产业道路","改建","勐堆乡","大寨自然村","公里",7.
901,"四级公路,水泥路面,每公里建设标准55万元",16,59,2019,2019,198,,198,,198,"村支书","驻村扶贫工作队长","交通局","完成道路建设7.
9公里,项目验收合格率100%,受益建档立卡贫困户人数≥59人","镇财整合(2019)1号"23,"沪滇协作项目产业硬板路","新建","勐堆乡","茶叶林村","项",1,"结对帮扶2年,每年资金10万元",80,356,2019,2020,20,,20,,20,"马新强","彭新明","扶贫办","完成产业硬板路建设238米,项目验收合格率100%,建档立卡贫困户受益人数≥108人","沪滇项目"24,"羊槽产业道路建设项目","新建","勐捧镇","石桥村","公里",0.
7,"道路建设0.
7公里",140,531,2019,2019,45,,45,,45,"村支书","驻村扶贫工作队长","农业局","项目验收合格100%","镇财整合(2019)14号"25,"平水自然村产业道路","改建","木场乡","平水自然村","公里",7,"四级公路,水泥路面,每公里建设标准55万元",67,287,2019,2019,177,,177,,177,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","镇财整合(2019)1号"26,"大歇场自然村产业道路","改建","木场乡","大歇场自然村","公里",10,"四级公路,水泥路面,每公里建设标准55万元",42,177,2019,2019,258,,258,,258,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","镇财整合(2019)1号"27,"白地丫口自然村产业道路","改建","木场乡","白地丫口自然村","公里",6.
547,"四级公路,水泥路面,每公里建设标准55万元",40,152,2019,2019,164,,164,,164,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","镇财整合(2019)1号"28,"马茂山自然村产业道路","改建","木场乡","马茂山自然村","公里",3.
294,"四级公路,水泥路面,每公里建设标准55万元",86,392,2019,2019,82,,82,,82,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","镇财整合(2019)1号"29,"康临自然村产业道路","改建","木场乡","康临自然村","公里",6.
709,"四级公路,水泥路面,每公里建设标准55万元",51,206,2019,2019,168,,168,,168,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","镇财整合(2019)1号"30,"大新田自然村产业道路","改建","木场乡","大新田自然村","公里",3.
924,"四级公路,水泥路面,每公里建设标准55万元",20,84,2019,2019,98,,98,,98,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","镇财整合(2019)1号"31,"向阳自然村产业道路","改建","木场乡","向阳自然村","公里",16.
682,"四级公路,水泥路面,每公里建设标准55万元",32,145,2019,2019,417,,417,,417,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","镇财整合(2019)1号"32,"松树林格自然村产业道路","改建","木场乡","松树林格自然村","公里",4.
445,"四级公路,水泥路面,每公里建设标准55万元",49,190,2019,2019,111,,111,,111,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","镇财整合(2019)1号"33,"龙塘村龙塘自然村产业道路建设项目","扩改建","木场乡","龙塘村","公里",1.
1,"C25混凝土路面,长1.
1公里,宽3.
5米,厚度20厘米及附属工程",33,112,2019,2019,33,,33,,33,"李福保","驻村扶贫工作队长","农业局","项目验收合格100%","镇财整合(2019)12号"34,"木厂沟自然村产业道路建设项目","新建","南伞镇","道水村","公里",2.
5,"硬板路铺筑长2.
5公里,8750平方米.
设计宽度3.
5m,厚度0.
2m,C25混凝土浇筑.
",167,657,2019,2019,105,,105,,105,"村支书","驻村扶贫工作队长","农业局","项目验收合格100%","镇财整合(2019)14号",35,"南伞镇中林格片区澳洲坚果产业道路提升项目","新建","南伞镇","田坝村","公里",10,"改造产业道路弹石路面10公里,设计为路面宽3.
5m,路基宽4m,及其他附属工程.
",238,1009,2019,2019,385.
9,,385.
9,,385.
9,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","镇政财农字〔2019〕32号",36,"山头寨自然村产业道路","改建","忙丙乡","山头寨自然村","公里",6.
912,"四级公路,水泥路面,每公里建设标准55万元",99,357,2019,2019,173,,173,,173,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","镇财整合(2019)1号"37,"新水塘自然村产业道路","改建","忙丙乡","新水塘自然村","公里",8.
359,"四级公路,水泥路面,每公里建设标准55万元",18,81,2019,2019,209,,209,,209,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","镇财整合(2019)1号"38,"回掌自然村产业道路","改建","忙丙乡","回掌自然村","公里",8.
328,"四级公路,水泥路面,每公里建设标准55万元",31,126,2019,2019,208,,208,,208,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","镇财整合(2019)1号"39,"背荫寨自然村产业道路","改建","忙丙乡","背荫寨自然村","公里",4.
21,"四级公路,水泥路面,每公里建设标准55万元",15,64,2019,2019,105,,105,,105,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","镇财整合(2019)1号"40,"余家田自然村产业道路","改建","忙丙乡","余家田自然村","公里",8.
658,"四级公路,水泥路面,每公里建设标准55万元",19,77,2019,2019,216,,216,,216,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","镇财整合(2019)1号"41,"糯米竹自然村产业道路","改建","忙丙乡","糯米竹自然村","公里",6.
631,"四级公路,水泥路面,每公里建设标准55万元",8,35,2019,2019,166,,166,,166,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","镇财整合(2019)1号"42,"大寨自然村产业道路","改建","忙丙乡","大寨自然村","公里",4.
642,"四级公路,水泥路面,每公里建设标准55万元",19,68,2019,2019,116,,116,,116,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","镇财整合(2019)1号"43,"红木山自然村产业道路","改建","忙丙乡","红木山自然村","公里",4.
558,"四级公路,水泥路面,每公里建设标准55万元",13,59,2019,2019,114,,114,,114,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","镇财整合(2019)1号"44,"产业路建设","扩改建","忙丙乡","帮海村","公里",22,"凤帮线公路建设22公里,辐射忙丙乡忙汞村、回掌村、帮海村、马鞍山村、乌木村5个行政村32个自然村,其中深度贫困村2个(忙汞村、马鞍山村)、基础设施薄弱村1个(乌木村).
惠及农业人口2233户9808人,其中建档立卡人口849户3302人.
",1672,6589,2018,2018,3555.
46,3555.
46,,,3555.
46,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","临财农发(2017)183号"45,"2019年上海市对口支援云南省项目","新建","忙丙乡","马鞍山村","公里",6.
5,"按照"缺什么补什么"原则,在忙丙乡马鞍山村至勐捧镇岩子头村实施贫困村组产业道路建设.
新建贫困村马鞍山村至岩子头村组产业道路建设6.
5公里,设计路基宽4.
5米,路面宽3.
5米.
可恵及550户7472人,其中:建档立卡户678户2472人.
",215,791,2019,,450,,450,,450,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格100%","沪滇项目"46,"大坝村黑龙潭产业道路建设项目","新建","凤尾镇","大坝村黑龙潭组","公里",1.
5,"产业道路硬化1.
5公里,路基宽4.
5米,路面宽3.
5米;采用天然砂砾石底基层(5-8cm),水凝稳定碎石厚15cm,面层采用C30混凝土路面(15公分);村内道路0.
5公里,路基宽4米,路面宽3米;采用天然砂砾石底基层(10cm),面层采用C25混凝土路面(20公分);及附属设施.
",21,102,2019,2019,100,,100,,100,"李进强","吕金奎","交通局","项目验收合格100%","镇财整合(2019)17号"47,"搬旧寨产业道路建设项目","新建","凤尾镇","仁和村","公里",2.
5,"产业道路硬化2.
5公里,路基宽5米,路面宽4米,天然砂砾石底基层(5-8cm),水凝稳定碎石厚15cm,面层采用C30混凝土路面(15公分),共浇筑混凝土路面浇筑10000平方米;及附属设施",131,547,2019,2019,190,,190,,190,"村支书","驻村扶贫工作队长","交通局","项目验收合格100%","镇财整合(2019)20号"48,"勐堆乡青树寨上下组进村道路硬化工程","新建","勐堆乡","勐堆村","公里",6,"青树寨进村道路上组进村道路4公里,下组至上组2公里,水泥混凝土路面硬化、混凝土边沟、防护工程等.
",23,96,2020,2020,360,,,360,360,"夏应忠","李建朝","县交通运输局","项目完成率100%,项目验收合格率100%","镇财整合【2020】3号",49,"南伞镇户育村东风组进村道路硬化工程","新建/扩改建","南伞镇","户育村","公里",3,"东风组水泥混凝土路面硬化、混凝土边沟、防护工程等.
",9,41,2020,2020,174,,,174,174,"村支书","驻村扶贫工作队长","县交通运输局","项目完成率100%,项目验收合格率100%","镇财整合【2020】3号",50,"军赛乡中场村竹林头自然村进村道路硬化工程","改建","军赛乡","中厂村","公里",5,"水泥混凝土路面硬化、混凝土边沟、防护工程等.
",17,69,2020,2020,298,,,298,298,"禹征伟","驻村扶贫工作队长","县交通运输局","项目完成率100%,项目验收合格率100%","镇财整合【2020】7号",51,"凤尾镇大柏树大湾塘进村道路硬化工程","新建","凤尾镇","大柏树村","公里",2.
5,"水泥混凝土路面硬化、混凝土边沟、防护工程等.
",48,163,2020,2020,150,,,150,150,"村支书","驻村扶贫工作队长","县交通运输局","项目完成率100%,项目验收合格率100%","镇财整合【2020】3号",52,"忙丙乡班海村进村道路硬化工程","新建/扩改建","忙丙乡","帮海村","公里",2.
6,"大寨一组、二组0.
8公里;帮海五组、团山寨子1公里;班流线至糯米竹0.
8公里.
水泥混凝土路面硬化、混凝土边沟、防护工程等.
",193,790,2020,2020,125.
41,,,125.
41,125.
41,"村支书","驻村扶贫工作队长","县交通运输局","项目完成率100%,项目验收合格率100%","镇财整合【2020】3号",53,"勐捧镇根基村至陈铁房自然村进村道路硬化工程","新建","勐捧镇","根基村","公里",4,"水泥混凝土路面硬化、混凝土边沟、防护工程等.
",49,197,2020,2020,250,,,250,250,"村支书","驻村扶贫工作队长","县交通运输局","项目完成率100%,项目验收合格率100%","镇财整合【2020】3号",54,"勐捧镇丫口村上下三村自然村进村道路硬化工程","新建","勐捧镇","丫口村","公里",6,"水泥混凝土路面硬化、混凝土边沟、防护工程等.
",49,209,2020,2020,350,,,350,350,"村支书","驻村扶贫工作队长","县交通运输局","项目完成率100%,项目验收合格率100%","镇财整合【2020】3号",55,"南伞镇麻栗坪至山头寨进村道路硬化工程","新建","南伞镇","麻栗坪村","公里",7,"水泥混凝土路面硬化、混凝土边沟、防护工程等.
",34,117,2020,2020,465,,,465,465,"村支书","驻村扶贫工作队长","县交通运输局","项目完成率100%,项目验收合格率100%","镇财整合【2020】3号",56,"南伞镇小红岩至刺树丫口白岩头山进村道路沥清路面建设工程","新建","南伞镇","红岩村","公里",3,"沥清路面宽4.
5米,混凝土边沟、防护工程等.
",194,785,2020,2020,250,,,250,250,"村支书","驻村扶贫工作队长","县交通运输局","项目完成率100%,项目验收合格率100%","镇财整合【2020】3号",57,"南伞镇班龙村朝天冒水自然村进村道路硬化工程","新建","南伞镇","班龙村","公里",4,"水泥混凝土路面硬化、混凝土边沟、防护工程等.
",23,95,2020,2020,230,,,230,230,"村支书","驻村扶贫工作队长","县交通运输局","项目完成率100%,项目验收合格率100%","镇财整合【2020】3号",58,"南伞镇班龙村和平村自然村进村道路硬化工程","新建","南伞镇","班龙村","公里",5,"水泥混凝土路面硬化、混凝土边沟、防护工程等.
",37,136,2020,2020,280,,,280,280,"村支书","驻村扶贫工作队长","县交通运输局","项目完成率100%,项目验收合格率100%","镇财整合【2020】3号",59,"木场乡龙塘村青树自然村进村道路硬化工程","扩改建","木场乡","龙塘村","公里",2,"水泥混凝土路面硬化、混凝土边沟、防护工程等.
",10,38,2020,2020,130,,,130,130,"村支书","驻村扶贫工作队长","县交通运输局","项目完成率100%,项目验收合格率100%","镇财整合【2020】3号",60,"镇康县林业产业道路建设","新建","南伞镇、勐捧镇、勐堆乡三乡(镇)",,"公里",20,"林业产业道路建设24公里:1.
南伞镇茶山脚至刺树丫口4公里;2.
勐捧镇岔沟村蒿子坝组至蒿子村转角箐10公里;3.
勐堆乡蚌孔村轻木林至竹瓦村轻木水坝10公里,路面平均宽5米.
",236,918,2020,2020,124.
65,,,124.
65,124.
65,"村支书","驻村扶贫工作队长","县林业和草原局","项目完成率100%,项目验收合格率100%","镇财整合【2020】7号",62,"(六)其他"56555,222750,11180.
92,2328.
16,6004.
76,2848,11180.
92,3,"1.
垃圾集中收集点"9849,39127,350.
2,0,350.
2,0,350.
2,1,"垃圾池建设项目","新建","南伞镇","户育村","项",1,"垃圾处理池3个54m3,垃圾堆放点1个26.
74m2",124,504,2019,2019,14,,14,,14,"村支书","驻村扶贫工作队长","住建局","项目验收合格100%","镇财整合(2019)1号",2,"凤尾村垃圾处理项目","新建","凤尾镇","凤尾村","项",1,"安装垃圾焚烧高温裂解设备1套,配套相关附属设施,日处理垃圾10吨.
",150,554,2019,2019,190,,190,,190,"村支书","驻村扶贫工作队长","住建局","项目验收合格100%","镇财整合(2019)18号",3,"全县488个自然村垃圾池建设项目","新建","镇康县",,"项",1,"建设488个自然村垃圾池,每个垃圾池9m,3000元/个.
",9575,38069,2019,2019,146.
2,,146.
2,,146.
2,"村支书","驻村扶贫工作队长","住建局","项目验收合格100%","镇财整合(2019)1号"2,"2.
污水处理"248,1008,568,0,568,0,568,1,"污水管建设","新建","南伞镇","户育村","项",1,"新建污水收集系统主管网4800米,串户管4000米",124,504,2019,2019,270,,270,,270,"村支书","驻村扶贫工作队长","住建局","项目验收合格100%","镇财整合(2019)1号",2,"南伞镇户育村下户育自然村污水整治项目","新建","南伞镇","户育村","项",1,"建设污水收集沉砂池一个(300m3);安装一体化污水处理设备3台(其中:日处理量10吨2台、20吨1台);建设排污管道5200m.
",124,504,2019,2019,298,,298,,298,"村支书","驻村扶贫工作队长","水务局","项目验收合格100%","镇财整合(2019)18号",,"3.
集中沼气池"1,"4.
两旁绿化、亮化"项"43,171,20,20,0,0,20,1,"亮化工程","新建","勐堆乡","蟒蛇山","项",1,"蟒蛇山村亮化工程",43,171,2018,2018,20,20,,,20,"村支书","驻村扶贫工作队长","民宗局","完成蟒蛇山村路灯安装25盏活动室建设1个70平方米、项目验收合格率100%,建档立卡贫困户受益人数≥171人","镇财整合(2018)1号","5.
旅游村停车场"2,"6.
防洪堤"项",0,"—",19150,76138,32,0,0,32,32,1,"镇康县2020年山洪灾害防治项目维护","改建","镇康县",,"个",10,"监测系统补充完善自动雨量站点维护10个,预警系统补充完善.
",9575,38069,2020,2020,10,,,10,10,"村支书","驻村扶贫工作队长","县水务局","项目完成率100%,项目验收合格率100%","镇财整合【2020】1号",2,"镇康县2020年山洪灾害防治项目","新建","镇康县",,"个",13,"预警系统补充完善5、群测群防设备更新6个,其他2个.
",9575,38069,2020,2020,22,,,22,22,"村支书","驻村扶贫工作队长","县水务局","项目完成率100%,项目验收合格率100%","镇财整合【2020】1号",1,"7.
护坡"6,28,10,0,10,0,10,1,"仓木厂大田安置点"三通一平"","新建","勐堆乡","铜厂村","项",1,"支砌挡墙长200m、设计底宽0.
8m,顶0.
4m,高1.
5m、挡墙建设180m",6,28,2019,2019,10,,10,,10,"村支书","驻村扶贫工作队长","扶贫办","完成挡墙支砌200米,项目验收合格率达到100%,建档立卡贫困户受益人数≥28人","镇财整合(2019)1号"53,"8.
其他"27259,106278,10200.
72,2308.
16,5076.
56,2816,10200.
72,1,"民族团结进步示范村建设项目","新建","凤尾镇","小落水","项",1,"1.
村内道路硬化3500平方米,投资42万元.
2.
村内环境整治:小广场建设150平方米,投资5万元.
3.
公厕2个总投资10万元,省级资金4万元.
4.
村内绿化:投资5万元.
5.
安装太阳能路灯16盏,投资10万元.
6.
产业互助发展资金成立互助社1个投资20万元.
7.
产业道路1公里投资5万元.
8.
小广场民族特色文化墙装饰.
投资2万元.
9.
开展民族团结宣传、爱国教育宣传,投资2万元.
10.
民族团结示范户建设.
扶持民族团结示范户10户,共投资1万元.
11.
小落水示范村项目标识碑建设1个,总投资2万元.
",23,85,2018,2018,100,100,,,100,"村支书","驻村扶贫工作队长","民宗局","项目验收合格100%","镇政民宗字〔2018〕15号"2,"特色村建设","新建","凤尾镇","轩莱佤族特色村","项",1,"1.
寨门建设1个(含民族图腾标志);2.
避难场建设41万元;3.
太阳能路灯20盏12万元;4.
魔芋种植62.
5亩,每亩补助3200元共20万元;5.
少数民族素质提升工程2万元;6.
开展民族团结宣传、民族特色文化墙装饰、布朗族图腾标志4万元;7.
民族团结进步示范户创建10户1万元.
",34,129,2019,2019,100,,100,,100,"李国文","杨士吉","民宗局","项目验收合格100%","镇财整合(2019)1号"3,"民族团结进步示范村建设项目","新建","军赛乡","忙吉利","项",1,"1.
浇筑村内C30#混凝土路面350米,宽4.
2米,1400平方米,投资10万元.
2.
埋设DN300mm雨、污管道2.
2公里,建设垃圾处理池一座、配备污水处理池和公厕建设20平方米,投资48万元.
3.
在村内道路两旁安装太阳能路灯40盏,4000元/盏,投资16万元.
4.
发展湾子田自然村种养殖产业互助资金项目1个,投资20万元.
5.
建设永久性民族特色公示碑一座,投资2万元.
6.
建设民族团结示范壁画和宣传标语600平方米,投资3万元.
7.
发展扶持民族团结进步示范户10户,每户扶持0.
1万元.
投资1万元.
",36,134,2018,2018,100,100,,,100,"村支书","驻村扶贫工作队长","民宗局","项目验收合格100%","镇政民宗字〔2018〕15号"4,"土沙林傈僳族特色村建设","新建","勐堆乡","竹瓦村","个",1,"1.
太阳能路灯安装20盏12万元;2.
村内道路硬化681m,2020㎡,28万元;3.
野茶种植100亩32万元;4.
村级产业发展互助资金20万元;5.
少数民族素质提升工程2万元;6.
民族团结示范户10户5万元;7.
民族团结进步示范宣传创建工程1万元.
",11,44,2019,2019,100,,100,,100,"马新强","彭新明","民宗局","完成示范村建设项目1个,项目验收合格率100%,建档立卡贫困户受益人口≥44人","镇财整合(2019)1号"5,"示范村建设","新建","勐堆乡","彭木山村","个",1,"1.
村内排污沟(管)1500m,污水处理池2座35万元;2.
太阳能路灯安装40盏22万元;3.
避难场建设390㎡,9万元;4.
花椒种植60亩10万元;5.
村级产业发展互助资金20万元;6.
少数民族素质提升工程2万元;7.
民族团结进步示范宣传创建工程1万元.
8.
民族团结示范户10户1万元.
",6,19,2019,2019,100,,100,,100,"韦忠军","李国忠","民宗局","完成示范村建设项目1个,项目验收合格率100%,建档立卡贫困户受益人口≥19人","镇财整合(2019)1号"6,"示范村建设","新建","勐堆乡","蚌孔村","个",1,"1.
村内串户路建设322m共853㎡,11万元;2.
太阳能路灯安装21盏12万元;3.
加强基层组织建设,12万元;4.
公厕建设一座蹲坑4个,24㎡,8万元;5.
避难场建设360㎡,10万元;6.
垃圾池2个,规格5*4m,1万元;7.
草果种植76亩22万元;8.
村级产业发展互助资金20万元;9.
少数民族素质提升工程2万元;10.
民族团结进步示范宣传创建工程1万元;11.
民族团结示范户10户1万元.
",11,40,2019,2019,100,,100,,100,"杨新军","李荣盛","民宗局","完成示范村建设项目1个,项目验收合格率100%,建档立卡贫困户受益人口≥40人","镇财整合(2019)1号"7,"勐堆乡帮东村2019年边疆党建长廊"四位一体"建设试点项目","新建","勐堆乡","帮东村","个",1,"1.
加强基层组织建设175万元;2.
扶持壮大村级集体经济100万元;3.
提升农村人居环境81万元;4.
提高公共服务水平145万元.
",127,530,2019,2020,500,,500,,500,"金国友","荆忠海","农业局","项目验收合格100%","镇财整合(2019)5号"8,"三块石边境小康村民族团结进步村示范村项目","新建","勐堆乡","茶叶林村","个",1,"一、基础设施建设:加强基层组织建设程,投资62万元.
二、亮化工程:定制太阳能路灯安装30盏,投资20万元.
三、特色产业项目:1.
桔子种植100亩,投资18万元;",80,358,2019,2019,100,,100,,100,"村支书","驻村扶贫工作队长","民宗局","项目验收合格100%","镇财整合(2019)12号"9,"勐堆乡帮东村村级集体经济建设项目","新建","勐堆乡","帮东村","项",1,"在勐堆乡农贸市场购买框架结构二层150平方米集市商铺,按4000元/平方米计算,总投入资金60万元,其中:申请中央资金50万元,村集体投入资金10万元(逐年累积村集体资金).
",127,530,2019,2019,50,,50,,50,"村支书","驻村扶贫工作队长","农业农村局","通过项目的实施,增加集体经济收入,项目验收合格率100%.
建档立卡贫困户受益人口≥530人.
","镇财整合(2019)15号"10,"勐堆乡帮东村张笑、忙红自然村抵边小康示范村创建项目","新建","勐堆乡","帮东村","项",1,"1.
村内道路建设及美化2.
5公里,设计路面宽3米;挡墙建设130米,高5米,底2米,顶0.
6米,投资177万元;2.
经济林果种植50亩,投资40万元;3.
宅基地平整11万元.
",127,530,2019,2019,228,,228,,228,"村支书","驻村扶贫工作队长","农业农村局","项目验收合格100%","镇财整合(2019)15号"11,"勐堆乡竹瓦村轻木水坝示范村项目","新建","勐堆乡","竹瓦村","个",1,"1.
在轻木水坝自然村种植橘子100亩,计划投资50万元;计划种植杨梅50亩,计划投资37万元;2.
新建竹瓦村轻木水坝自然村寨内串户路建设及绿化1.
5公里,设计路面宽3米(含边沟);新建挡墙长40米,设计高7米、底2米、顶0.
8米,计划投资125.
5万元.
",29,122,2019,2020,212.
5,,212.
5,,212.
5,"村委会支书","驻村扶贫工作队长","农业局","项目验收合格100%","镇财整合(2019)15号"12,"勐捧镇岔沟村2019年边疆党建长廊"四位一体"建设试点项目","新建","勐捧镇","岔沟村","个",1,"1.
加强基层组织建设123万元;2.
扶持壮大村级集体经济117万元;3.
提升农村人居环境178万元;4.
提高公共服务水平82万元.
",118,437,2019,2019,500,,500,,500,"村支书","驻村扶贫工作队长","农业局","项目验收合格100%","镇财整合(2019)5号"13,"110边民互市小集镇建设","新建","勐捧镇","包包寨村","项",1,"1.
彩钢瓦雨棚1000㎡,C30水泥地坪浇筑1200㎡,混凝土基础及挡土墙200m3,钢筋混凝土交易平台建设20个,共44.
4万元,其中民宗资金30万元,项目整合14.
4万元;2.
C30水泥路面浇筑5000㎡,路缘石安装1200m,流水石安装800m共115万元;3.
挡土墙基础100m3,回填压实400m3,混凝土垫层浇筑400㎡,透水砖铺筑400㎡,文化墙建设100㎡,浮雕墙建设60㎡,党旗国旗安装40面/扇,独立体红色文化单体安装10个共50万元.
",24,82,2019,2019,195,,195,,195,"村支书","驻村扶贫工作队长","民宗局","项目验收合格100%","镇财整合(2019)1号"14,"特色村建设","新建","勐捧镇","忙丙村","项",1,"1.
村内道路建设1.
87公里5630㎡,57万元;2.
太阳能路灯安装50盏21万元;3.
栀子种植180亩,每亩补助种肥1000元共18万元.
4.
民族团结示范户建设10户共1万元;5.
村庄民族团结彩绘墙图1万元;6.
少数民族素质提升工程共2万元.
",51,170,2019,2019,100,,100,,100,"村支书","驻村扶贫工作队长","民宗局","项目验收合格100%","镇财整合(2019)1号"15,"示范村建设","新建","勐捧镇","酸格林村","项",1,"1.
村内道路建设1.
7公里5100㎡共56万元;2.
澳洲坚果种植100亩10万元;3.
太阳能路灯安装50盏21万元;4.

应急避难场所建设400㎡,公厕建设1个4个蹲坑,挡土墙支砌200m3共28万元,其中民宗资金8万元,项目整合19万元;5.
民族团结示范户建设10户共,1万元;6.
村庄民族团结彩绘墙图1万元.
7.
少数民族素质提升工程2万元.
",248,1069,2019,2019,100,,100,,100,"村支书","驻村扶贫工作队长","民宗局","项目验收合格100%","镇财整合(2019)1号"16,"2018年边境县"四位一体"建设试点项目","新建","勐捧镇","包包寨村","项",4,"一、提升农村人居环境;二、扶持集体经济发展,三、提高农村公共服务水平,四、支持农村基层组织建设",24,82,2018,2018,250,250,,,250,"村支书","驻村扶贫工作队长","财政局","项目验收合格100%","镇政财预字[2018]66号"17,"2019年边境县"四位一体"建设试点项目","新建","勐捧镇","包包寨村","项",4,"包包寨村村内道路硬化2公里.
新建垃圾池16个.
新建设公厕砖混结构70平方米.
安装路灯157盏.
排污管建设:新建下包包、酸耙树自然村排污管9400米.
强弱电网入地700米.
架设主管5000米;串户管3200米;压力池一个4立方米;蓄水池一个100立方米.
",24,82,2019,2019,250,,250,,250,"村支书","驻村扶贫工作队长","财政局","项目验收合格100%","镇财整合(2019)4号"18,"勐捧镇忙丙村村级集体经济建设项目","新建","勐捧镇","包包寨村","项",1,"建设砖混结构商铺第1层,4间共210平方米,投资50万元.
",24,82,2019,2019,50,,50,,50,"村支书","驻村扶贫工作队长","农业农村局","项目验收合格100%","镇财整合(2019)15号"19,"勐捧镇岔沟村村级集体经济建设项目","新建","勐捧镇","岔沟村","项",1,"1.
新建村级集体经济用房一栋,8间共300平方米,按2000元/平方米计算,预计投资60万元(申请中央资金50万元,村集体投入资金10万元).

2.
平整露天停车场600平方米,铺设沙子,预计可容纳车辆40辆,预计投资5万元(村集体投入资金5万元).
",16,64,2019,2019,50,,50,,50,"村支书","驻村扶贫工作队长","农业农村局","项目验收合格100%","镇财整合(2019)15号"20,"忙丙村大山自然村抵边小康村创建项目","新建","勐捧镇","忙丙村大山自然村","项",1,"1.
村内道路建设及绿化(透水砖铺筑实验路段)2.
1公里4550平方米,计划投资146.
5万元.
2.
新建养殖小区一个,面积605平方米(含附属工程),计划投资60.
5万元.
",4,14,2019,2019,207,,207,,207,"村支书","驻村扶贫工作队长","农业农村局","项目完成率100%,项目验收合格率100%","镇财整合(2019)15号"21,"岔沟村岔沟自然村抵边小康示范村创建项目","新建","勐捧镇","岔沟村岔沟自然村","项",1,"1.
新建村内道路建设村庄绿化2.
1公里7600平方米,投资110万元.
2.
污水管道建设1.
5公里(含路面恢复和6立方米氧化池建设2座),计划投资67.
5万元.
",46,156,2019,2019,177.
5,,177.
5,,177.
5,"村支书","驻村扶贫工作队长","农业农村局","项目完成率100%,项目验收合格率100%","镇财整合(2019)15号"22,"酸格林村章奎小寨自然村抵边小康示范村创建项目","新建","勐捧镇","酸格林村章奎小寨自然村","项",1,"1.
污水集中处理,新建管网2400米,新建污水氧化塘1个200立方米,计划投资46万元.
2.
整村风貌提升,彝族文化植入10万元.
3.
改厨80户,计划投资16万元4.
村内道路建设及村庄绿化,道路建设600米2000平方米,计划投资34万元.
",18,84,2019,2019,106,,106,,106,"村支书","驻村扶贫工作队长","农业农村局","项目完成率100%,项目验收合格率100%","镇财整合(2019)15号"23,"2019年木场乡木场村上寨自然村民族团结进步示范村建设项目","新建","木场乡","木场村","项",1,"一、特色产业项目30万元:野茶种植300亩,投资30万元.

二、应急避难场所建设20万元:1.
道路硬化200m2,投资2万元;2.
混凝土地坪1000m2,投资10万元;3.
混凝土挡墙300m3,投资7万元;4.
排水沟26m3,投资1万元;",259,1013,2019,2019,50,,50,,50,"村支书","驻村扶贫工作队长","民宗局","项目验收合格100%","镇财整合(2019)6号"24,"以工代赈示范工程","新建","南伞镇","班龙","项",1,"二、民族文化广场(陀螺场)建设25万元:1.
道路硬化140m2,投资1.
68万元;2.
混凝土地坪300m2,投资3.
6万元;3.
混凝土挡墙74m3,投资2.
59万元;4.
民族文化墙与标识碑一体化60m3,投资3.
975万元;5.
看台204m3,投资4.
0536万元;6.
排水沟25.
48m3,投资0.
8918万元.
",232,892,2018,2018,530,530,,,530,"王建斌","周伟","发改局","项目验收合格100%","临财建发[2018]126号",25,"民族特色村建设","新建","南伞镇","白岩村","项",1,"新建白岩二组民族特色寨门1座、白岩二组村民族文化墙800平方米、白岩二组德昂民族传承保护、白岩村民族迎宾广场建设、白岩二组民族文化广场绿化工程",151,654,2018,2018,84.
2,84.
2,,,84.
2,"村支书","驻村扶贫工作队长","民宗局","项目验收合格100%","镇财整合(2018)1号",26,"古树保护","新建","南伞镇","大青树根","项",1,"大青树根毛石支砌及村医室围墙、彩钢瓦棚等附属工程.
",22,90,2018,2018,3,3,,,3,"村支书","驻村扶贫工作队长","民宗局","项目验收合格100%","镇财整合(2018)1号",27,"民族团结进步示范村建设项目","新建","南伞镇","石场子","项",1,"1.
民族文化活动阵地建设:计划建设二层框架结构办公楼一栋、挡土墙浇灌、民族团结进步标识碑等,投资79万元.
2.
扶持民族团结进步示范户10户,每户补助1000元,估算投资1万元.
3.
产业发展互助资金项目1个,投资20万元.
",15,52,2018,2018,100,100,,,100,"村支书","驻村扶贫工作队长","民宗局","项目验收合格100%","镇政民宗字〔2018〕15号",28,"示范村建设","新建","南伞镇","道水村委会木场沟自然村","项",1,"1.
茶叶种植扶持500亩37.
9万元;2.
应急避难场所250㎡,5万元;3.
公厕建设1座8万元;4.
串户路建设600米1670㎡,21万元;5.
民族团结进步示范户创建11户1.
1万元;6.
组建民族歌舞打歌队1支,并采购民族服饰、民族乐器10套5万元;7.
太阳能路灯40盏20万元;8.
少数民族素质提升工程2万元.
",25,92,2019,2019,100,,100,,100,"村支书","驻村扶贫工作队长","民宗局","项目验收合格100%","镇财整合(2019)1号",29,"示范村建设","新建","南伞镇","哈里村","项",1,"1.
应急避难场所300㎡,34万元;2.
民族团结进步示范户创建40户每户0.
5万元共20万元;3.
太阳能路灯新建及修复20盏10万元;4.
养殖合作社1个20万元;5.
村庄绿化、美化、民族文化墙等建设共14万元;6.
少数民族素质提升工程2万元.
",139,537,2019,2019,100,,100,,100,"村支书","驻村扶贫工作队长","民宗局","项目验收合格100%","镇财整合(2019)1号",30,""四位一体"建设项目","新建","南伞镇","白岩村","项",1,"农村基础建设",153,669,2018,2018,30.
36,30.
36,,,30.
36,"王永新","袁文明","财政局","项目验收合格100%","财政整合[2018]2号",31,"卖盐场安置点建设","新建","南伞镇","田坝村","项",1,"安装太阳能路灯40盏,0.
5元/盏;排污管道建设893m;建设污水处理系统1套;土方开挖671m;村内道路硬化0.
813公里,设计宽度4m,厚度0.
2m,C30混凝土浇筑;公厕建设1座1座.
",238,1009,2019,2019,140.
56,,140.
56,,140.
56,"村支书","驻村扶贫工作队长","扶贫办","项目验收合格100%","镇财整合(2019)1号",32,"南伞镇红岩村2019年边疆党建长廊"四位一体"建设试点项目","新建","南伞镇","红岩村","个",1,"1.
加强基层组织建设249万元;2.
扶持壮大村级集体经济128万元;3.
提升农村人居环境63万元;4.
提高公共服务水平60万元.
",224,922,2019,2019,500,,500,,500,"村支书","驻村扶贫工作队长","农业局","项目验收合格100%","镇财整合(2019)5号"33,"南伞镇营盘村2019年边疆党建长廊"四位一体"建设试点项目","新建","南伞镇","营盘村","个",1,"1.
加强基层组织建设166万元;2.
扶持壮大村级集体经济84万元;3.
提升农村人居环境235万元;4.
提高公共服务水平16万元.
",163,598,2019,2019,500,,500,,500,"村支书","驻村扶贫工作队长","农业局","项目验收合格100%","镇财整合(2019)5号"34,"南伞镇轩岗村村级集体经济建设项目","新建","南伞镇","轩岗村","项",1,"在热水河村军弄街建设2层砖混结构房屋一栋,建筑面积960平方米,按1770元/平方米计算,预计投入建设资金170万元,其中:已投入扶贫项目资金99.
7万元,投入上海沪滇帮扶项目资金20万元,现申请中央资金50万元,轩岗村村集体投入资金0.
3万元.
",188,768,2019,2019,50,,50,,50,"村支书","驻村扶贫工作队长","农业农村局","项目验收合格100%","镇财整合(2019)15号(上海沪滇帮扶项目资金20万元)"35,"南伞镇白岩村皮匠寨自然村小康示范村创建项目","新建","南伞镇","白岩村","项",1,"1.
新建养殖小区1个,计划投资33.
4万元;2.
人居环境整治,计划投资11.
2万元;3.
新建道路硬化及绿化2.
5公里,宽4米,计划投资112.
4万元;4.
苗族文化植入,计划投资8万元.

",151,669,2019,2019,165,,165,,165,"村支书","驻村扶贫工作队长","农业农村局","受益建档立卡人口≥669人","镇财整合(2019)15号"36,"南伞镇红岩村刺树丫口自然村小康示范村创建项目","新建","南伞镇","红岩村","项",1,"1.
进村水泥硬板路建设1条0.
8公里,设计宽度5米,排水沟设计为三面光沟,计划投资75万元;2.
火柃菜种植100亩,每亩种植70株,共7000株,按照100元/株计算,计划投资70万元.
",57,189,2019,2019,145,,145,,145,"村支书","驻村扶贫工作队长","农业农村局","受益建档立卡人口≥189人","镇财整合(2019)15号"37,"南伞镇白岩村人居环境提升改造项目","新建","南伞镇","白岩村","项",1,"1.
新建排污沟(含盖板)300米;2.
新建排污沟(三面光沟)200米;3.
新建圆形检查井(含井盖)15个;4.
建设落差处理井1个;5.
安装φ800㎜水泥管20米;6.
安装φ500㎜水泥管25米;7.
安装φ400㎜水泥管50米;8.
安装φ300㎜水泥管32米;9.
安装φ300㎜波纹管100米;10.
安装φ200㎜波纹管80米;11.
安装φ160㎜波纹管50米;12.
安装φ110㎜PVC管300米;13.
砼C15混凝土砂垫层20立方米;14.
小砖挡墙支砌260平方米(单砖支砌);15.
土方开挖600平方米;16.
土方回填400立方米.
",151,654,2019,2019,50,,50,,50,"村支书","驻村扶贫工作队长","水务局","项目验收合格100%","镇财整合(2019)18号"38,"民族团结进步示范村建设项目","新建","忙丙乡","帮海村","项",8,"1.
村内道路硬化,长577米,宽4米,C20混泥土硬化,厚度20厘米,硬化面积2308平方米,单价0.
013元/㎡.
总投资30万元.
2.
安装太阳能路灯50盏,单价0.
5万元/盏.
总投资25万元.
3.
砂仁种植75亩,每亩投入0.
2万元.
投资15万元.
4.
开展种养殖技术培训4期200人次.
投资2万元.
5.
产业发展互助资金项目1个,投资20万元.
6.
制作永久性民族团结宣传标语2条,投资2万元.
7.
民族团结示范户建设10户,每户投入0.
5万元,投资5万元.
8.
民族团结进步示范村标识碑建设1块,投资1万元.
",193,780,2018,2018,100,100,,,100,"村支书","驻村扶贫工作队长","民宗局","项目验收合格100%","镇政民宗字〔2018〕15号"39,"民族团结进步示范村建设项目","新建","忙丙乡","帮海村","项",1,"1.
村内道路硬化.
路面长346m,宽4m,C20混泥土硬化,厚度20cm,硬化面积1384㎡,单价130元/㎡.
投资18万元.
2.
安装太阳能路灯50盏,单价5000元/盏,投资25万元.
2.
砂仁种植75亩,每亩投入2000元,投资15万元.
3.
开展种养殖技术培训4期200人次,投资2万元.
4.
.
产业发展互助资金项目1个,投资20万元.
5.
建设民族文化活动场所1个,长50m,宽40米,建设面积200㎡,投资12万元.
6.
开展民族团结宣传、爱国教育宣传2次以上,投资2万元7.
民族团结示范户建设10户,每户投入5000元,投资5万元,8.
民族团结进步示范村标识碑建设1块,投资1万元.
",193,780,2018,2018,100,100,,,100,"村支书","驻村扶贫工作队长","民宗局","项目验收合格100%","镇政民宗字〔2018〕15号"40,"2019年军赛民族乡岔路村红岩组德昂族特色村巩固提升示范村建设项目","新建","军赛乡","岔路村","项",1,"一、基础设施建设:道路修缮750平方米,投资9万元.

快云科技:香港沙田CN2云服务器低至29元/月起;美国高防弹性云/洛杉矶CUVIP低至33.6元/月起

快云科技怎么样?快云科技是一家成立于2020年的新起国内主机商,资质齐全 持有IDC ICP ISP等正规商家。云服务器网(yuntue.com)小编之前已经介绍过很多快云科技的香港及美国云服务器了,这次再介绍一下新的优惠方案。目前,香港云沙田CN2云服务器低至29元/月起;美国超防弹性云/洛杉矶CUVIP低至33.6元/月起。快云科技的云主机架构采用KVM虚拟化技术,全盘SSD硬盘,RAID10...

hostkey俄罗斯、荷兰GPU显卡服务器/免费Windows Server

Hostkey.com成立于2007年的荷兰公司,主要运营服务器出租与托管,其次是VPS、域名、域名证书,各种软件授权等。hostkey当前运作荷兰阿姆斯特丹、俄罗斯莫斯科、美国纽约等数据中心。支持Paypal,信用卡,Webmoney,以及支付宝等付款方式。禁止VPN,代理,Tor,网络诈骗,儿童色情,Spam,网络扫描,俄罗斯色情,俄罗斯电影,俄罗斯MP3,俄罗斯Trackers,以及俄罗斯法...

搬瓦工:香港PCCW机房即将关闭;可免费升级至香港CN2 GIA;2核2G/1Gbps大带宽高端线路,89美元/年

搬瓦工怎么样?这几天收到搬瓦工发来的邮件,告知香港pccw机房(HKHK_1)即将关闭,这也不算是什么出乎意料的事情,反而他不关闭我倒觉得奇怪。因为目前搬瓦工香港cn2 GIA 机房和香港pccw机房价格、配置都一样,可以互相迁移,但是不管是速度还是延迟还是丢包率,搬瓦工香港PCCW机房都比不上香港cn2 gia 机房,所以不知道香港 PCCW 机房存在还有什么意义?关闭也是理所当然的事情。点击进...

360免费建站为你推荐
0.21网易yeah特朗普吐槽iPhone华为余承东吐槽iPhone X,除了贵啥优点都没有重庆电信dns重庆电信 路由器连接另一个电脑,本地连接的IP是多少,?DNS首选,备用 服务器是多少?filezilla_serverFileZilla无法连接服务器怎么解决密码cuteftp瑞东集团中粮集团是什么性质的企业zhuo爱timi什么意思即时通EC营销即时通是什么?做什么的?三五互联股票三五互联是什么股票申请400电话400电话申请怎么办理?是不是免费的?
网站备案域名查询 国外空间 hostloc vip购优惠 香港新世界中心 海外空间 免费的域名 全能空间 阿里dns 免费获得q币 cdn加速 月付空间 hosts文件修改 时间同步服务器 西部主机 卡巴斯基免费下载 vpsaa ddos攻击器下载 最好的空间日志 qq空间技术网 更多