"防城港市2018年"六个一百"项目建设计划表(第一批)
"填报单位:防城港市重大项目建设推进领导小组办公室",,,,,"43133",,"43192",,,,,"单位:万元",,,,,"序号","项目名称","建设规模及内容","建设起止年限","总投资","2017年底累计完成投资","2017年底项目推进情况或前期工作情况","实际或计划开工时间","计划竣工时间","2018年工作目标",,"项目业主","责任单位及责任人","备注",,,,计划投资","建设或前期工作目标",,,,,,,,"合计","632",,"40499941.
186","4788011.
92",,,,"3729615.
486""一","工业升级类","100",,"18756794.
12","2995496",,,,"2139283.
7""(一)","续建项目","15",,"9958932","2630483",,,,"1876200""1","金川铜冶炼配套硫酸蛇纹石综合利用项目(原防城港蛇纹石综合利用项目)","年资源化利用金川铜业副产硫酸90万吨,年产硫酸镁80万吨、年产石英砂105万吨、年产氢氧化镍8.
25万吨.
主要建设石英砂制备车间、中和浸出车间、洗砂及制砖车间、提镍车间、镁盐车间等主体工程及配套公辅工程.
分两期建设,其中一期建成后年产硫酸镁27万吨、年产石英砂35万吨、年产氢氧化镍2.
75万吨,利用硫酸30万吨.
","2017-2018","103500","1000","完成项目用地清表工作.
","42887","43405","25000","2018年3月一期全面开工建设,争取年内竣工投产.
","广西赛可昱新材料科技有限公司","市港工公司徐钦帮",,"工业升级","续建","重点推进项目","2","防城港核电项目(二期)","建设核电3、4号机组,单机容量为118万千瓦.
","2015-2022","4029325","2427505","2017年底3号机组反应堆厂房钢衬里施工完成、内部结构11.
6米板施工完成;4号机组反应堆厂房底板施工完成.
","42339","44621","600000","3号机组反应堆厂房穹顶吊装.
","广西防城港核电有限公司","防城港经开区管委林柱昌",,"工业升级","续建",,"3","防城港钢铁基地","建设含原料场、冶炼、轧钢、公辅、能源环保、循环经济等全流程的年产钢1000万吨的钢铁生产基地.
","2017-2019","3600000","1000","完成项目总图、总体方案设计和初步设计;完成广西钢铁集团公司资产评估、审计和重组工作;成立项目指挥部.
","43070","43800","280000","1.
完成项目备案、四项审批等前期工作;2.
完成初步设计、施工图及审查;3.
完成主要设备招标、采购;4.
项目全面开工建设.
","广西钢铁集团","防城港经开区管委林柱昌",,"工业升级","续建",,"4","广西生态铝工业基地(广西华昇新材料有限公司氧化铝及配套项目)","年产氧化铝400万吨、铝水80万吨的生产线,配套供热设施及相关辅助设施,其中一期工程年产氧化铝200万吨、铝水50万吨的生产线,配套相关辅助设施.
","一期工程:2017-2019","840000","84128","完成环评、征地等前期工作,一期工程达到开工条件.
","42979","43709","550000","前期工作基本完成,进行一期电解生产线主体建设.
","广西华昇新材料有限公司","防城港经开区管委林柱昌",,"工业升级","续建",,"5","50万吨级/年高端合金新材料","建设2条8.
2万吨/年镍合金生产线,2条20万吨/年铬合金生产线,以及50万吨/年高端合金新材料生产线.
","2017-2020","549000","30000","已完成注册、备案、环评、能评,10月23日进场场平,截至11月11日场平30亩.
","43009","44166","80000","完成部分场平及基础建设.
","广西景昇隆新材料科技有限公司","防城港经开区管委林柱昌",,"工业升级","续建",,"6","年产30万吨高技术智能化麦芽生产线项目一期","项目主要建设生产车间(塔式)、原料库房(立仓)、成品库房(立仓)、办公楼、公寓楼、检验中心、科研中心等基础设施和配电室、换热站等配套设施,购置专业啤酒麦芽生产设备和检验检测设备138套,建成智能化、标准化啤酒麦芽加工生产线.
项目计划规模为年产30万吨,分两期建设,一期工程年产15万吨麦芽.
","2017-2019","47000","40000","目前已完成公司工商注册登记、项目备案、环评批复、国有建设用地使用权出让合同签订、建设用地规划许可证的领取、土地清表及平整、地块地质勘查工作.
2017年底完成主工艺设备采购、总图设计、施工图设计、项目建设工程规划许可证领取、土建施工单位、设备安装单位及监理单位确定、施工许可证领取、桩基单位进场.
","42887","43617","10000","完成建筑桩基工程、完成建筑地面工程、完成设备安装工程、完成总图工程.
","广西聚馨麦芽有限公司","防城港经开区管委林柱昌",,"工业升级","续建",,"7","碳纤维热塑性复合材料预浸料及制品项目","年产1000吨碳纤维热塑性复合材料预浸料及制品.
","2016-2019","5600","4000","完成土地摘牌,场平施工基本完成,其它前期工作正在持续推进.
正在报建阶段.
","42705","43617","3500","完成主体工程建设.
","广西博朗新材料科技有限公司","防城港经开区管委林柱昌",,"工业升级","续建",,"8","防城港钢铁辊类和钢卷鞍座制造基地项目","年产1000支辊类和钢卷鞍座、年修复1000支冷轧后处理工业辊和6000支轧辊.
","2016-2019","4000","1500","土地平整、地堪、总评及设计方案、钢结构车间一期建成.
","42705","43800","1000","开始进行厂房施工.
","防城港顺华冶金设备有限公司","防城港经开区管委林柱昌",,"工业升级","续建",,"9","广西盛隆冶金有限公司产业升级技术改造项目","建设机械化原料场、360平方米烧结机2台、120吨链箅机回转窑2座、1680立方米高炉2座、150吨转炉2座和1780毫米热轧卷板生产线1条等及其配套得公辅设施.
项目建成后,年产生铁298万吨、钢340万吨、热轧卷板钢材330万吨.
","2017-2019","700000","20000","项目于2017年6月20日获得备案,文号:防工信技改函[2017]05号.
项目环评报告预计于2017年10月中旬出具,节能评估、安全评估工作也相应展开.
目前已确定总图方案,设计单位中钢设计院正在做初步设计,烧结炼铁工程段标书已发放,准备进行第一次评标,预计于11月底前完成这两个工程段的招标工作.
同时,正在积极与各方协调,解决原料场区域、烧结区域的征地问题.
","43009","43829","300000","1.
2018年1-6月,进行炼钢、轧钢工程段招标;2.
完成办公楼、物资总库轧钢库、保安部大楼、废钢部露天堆场等区域搬迁;3.
完成原料场区域、烧结区域及办公大楼用地问题;4.
2018年6-12月,烧结、炼铁、炼钢、轧钢等主体工程施工.
","广西盛隆冶金有限公司","市工信委陈弘志",,"工业升级","续建",,"10","新型环保复合建筑材料项目","项目总用地面积10000平方米,主要生产新型复合建材,年生产50万平方米建材,新建生产线、厂房、仓储、办公楼、员工生活区.
","2017-2019","8000","300","完成选址、征地,土地招拍挂工作.
","42979","43800","3400","完成主体工程建设.
","广西万物宏瑞建材有限公司","上思县政府覃森",,"工业升级","续建",,"11","东兴冲榄工业园区标准厂房及附属设施工程","总建筑面积52078.
48平方米,其中建设标准厂房8栋(1-8#);配套建设设备用房370平方米(含生活消防水池,水泵房、配电机房、垃圾收集点)以及室外道路、货物堆场、水电、绿化等附属工程.
主要建设内容包括标准厂房主体工程、装修工程以及相关附属工程.
","2017-2019","12000","3000","完成2栋标准厂房及相关配套设施.
","42795","43586","1800","完成3#、4#厂房主体工程.
","广西东兴冲榄工业园开发投资有限公司","东兴市政府陈建林",,"工业升级","续建",,"12","东兴市金滩管业新型塑胶管道生产加工厂二期工程","项目新增建设用地128.
69亩,设计总建筑面积86020平方米,技术中心楼4680平方米,分三期进行,将建设配套建设,60余条管件、管材生产线,其中HDPE管道挤出生产线20条、PPR管道挤出生产线8条、PVC管道挤出生产线10余条及相应辅助生产设备、30台注塑机、900套模具和5套自动输送系统,及相应公用工程设施.
生产采用数字程序化生产流程,过程涉及CAD、CAM、CAPP、ERP等先进的生产和管理技术,达到国内先进的技术及管理水平.
项目设计年加工PP、PVC、PE原生塑35000吨,项目建设后,将提升公司在广西的市场地位,同时,满足市场高速增长的管道市场需求.
","2013-2018","33507","12550","项目已完成前期的基础工作,完成一号车间及5号办公楼的建设,一号车间已于2015年9月投产.
","41365","43435","5000","建设二号、三号生产车间并投入生产.
建设相关配套办公楼及其他剩余建设内容.
","广西金滩管业科技有限公司","东兴市政府陈建林",,"工业升级","续建",,"13","东兴市荣胜羽绒加工厂","建筑面积19000平方米.
建设生产车间、辅助车间、仓库、业务综合楼、宿舍楼及相关配套设施;购置安装生产线及相关设备.
","2016-2019","6000","3000","土建工程.
","42583","2019年","3000","建设生产车间、辅助车间.
","东兴市荣胜羽绒加工有限公司","东兴市政府陈建林",,"工业升级","续建",,"14","防城区印建奇涂料及保温材料生产项目","建设原料库、生产加工车间、成品库、办公楼及宿舍等.
","2017-2020","15000","2000","土地平整基本完成,土地已摘牌.
项目已开始全面施工.
","42767","2020年","8000","一期竣工投产.
","广西印建奇新型建筑材料有限公司","防城区政府荣毅宏",,"工业升级","续建",,"15","广西虎麦中药饮片厂","1.
中药饮片生产;中药材种植、养殖、收购、加工、销售;2.
贵重中药材精细加工销售;3.
保健用品生产、销售;4.
保健药酒的生产销售;5.
中草药材、中药饮片的进出口贸易.
","2017-2019","6000","500","土地平整已完成,目前正在办理国有划拨土地回收手续.
","42887","2019年","5500","生产厂房建设.
","广西草根堂药业有限公司","防城区政府荣毅宏",,"工业升级","续建",,"(二)","竣工投产项目","29",,"495666.
7","365013",,,,"111283.
7""1","云朗科技园一期工程(厂房及综合业务楼建设项目)","项目总建筑面积240705平方米(其中地下室26159平方米),其中9栋工业厂房建筑面积93066平方米,4栋综合业务楼A建筑面积83370平方米,1栋综合业务楼B建筑面积7460平方米,3栋综合业务楼C建筑面积30050平方米.
主要建设内容包括上述主体建筑、外接水电工程、场地土方工程及地下室.
","2015-2018","94568","103990","9栋厂房全部竣工投入使用.
综合业务楼全部完成主体工程,进入装修工程.
","42217","43313",,"竣工投入使用.
","市港工公司","市港工公司徐钦帮",,"工业升级","竣工投产",,"2","中电广西防城港电厂新灰场","建设1条灰场围堤(主坝),2座副坝、运灰场道路、给排水设施、电气设备及一座灰场管理站.
","2017-2018","8077","1000","完成部分土石方工程.
","43009","43374","7077","在解决征地拆迁前提下,项目竣工投入使用.
","市港工公司","市港工公司徐钦帮",,"工业升级","竣工投产",,"3","中海油广西LNG储运库项目","中海石油气电集团有限责任公司在广西防城港与防城港务集团有限公司合作建设广西LNG储运项目,项目包括:LNG储运库项目和501号泊位项目(液体散货码头项目).
LNG储运库项目主要包括:建设两座30000立方米的LNG储罐、10个槽车装车橇、BOG液化处理、公用工程.
","2015-2018","96638","96631","完成工艺管道试压吹扫,完成电气、仪表安装及测试,完成设备安装及调试工作.
","42186","43435","0","2018年12月底前完成项目安装调试,开始试运行.
","中海油广西防城港天然气有限责任公司","防城港经开区管委林柱昌",,"工业升级","竣工投产",,"4","菌海铜渣、镍渣综合利用项目","年处理150万吨镍铁渣、120万吨铜渣.
","2017-2018","15000","15000","土建工程基本完工,设备安装完成70%以上.
","42917","43374","0","完成设备安装,投入试运营.
","广西菌海冶金建材有限公司","防城港经开区管委林柱昌",,"工业升级","竣工投产",,"5","五硫化二磷生产项目","年产2万吨五硫化二磷.
","2016-2018","6600","5800","完成土建工程,基本完成设备安装.
","42522","43344","800","投产运行.
","防城港越洋化工有限公司","防城港经开区管委林柱昌",,"工业升级","竣工投产",,"6","广西科元新材料年产10万吨ABS装置项目","年产10万吨ABS装置工程建设项目总投资45107万元,分两期建设.
其中,一期工程计划投资29535万元,主要建设一条年产5万吨ABS的生产线和10万吨装置的配套公用工程及相关辅助设施.
二期工程计划投资15572万元,建设第二条年产5万吨ABS的生产线.
","2017-2020","45107","40000","已完成项目建议书编制、立项备案、安评等;现场办公区配套已完成主体建筑浇筑,正在进行地基的夯实工程;厂区设备已完成订购.
","42795","43435","5000","加快前期审批工作和码头建设工程进度,力争在2018年12月底前将配套码头建成投产运营.
","广西科元新材料有限公司","市工信委陈弘志",,"工业升级","竣工投产",,"7","广西盛隆冶金有限公司石墨烯基海洋工程用防腐钢材产业化生产线项目","建设年产100万吨高速棒材生产线,在钢材成品表面添加石墨烯防锈涂层,并结合石墨烯防腐耐磨特性进一步研发改善钢材性能,使其满足海洋工程用钢的性能需求,将石墨烯产品与钢材产品有机结合,在科技创新方面拓展新材料制品,并进一步言申报地方、行业及国家标准.
项目建成后可新增产值37亿元,符合国家产业政策鼓励类目录,属高新科技产业.
","2017-2018","38000","30000","土地出让款已全部支付,国土局未发证.
已完成项目备案,环评及节能报告正在编制,年底完成项目厂房建设及所有设备订货.
","42979","43221","2800","5月份正式投产.
","广西盛隆冶金有限公司","市工信委陈弘志",,"工业升级","竣工投产",,"8","广西杭氧气体有限公司38000立方米/小时氧气空分装置技术升级改造项目","项目建设立方米每小时氧气空分装置,以置换掉原有的6500立方米/小时和10000立方米/小时两套空分设备,并将原有的25000立方米/小时作为空分运行备机.
主要新增建设设备有空气过滤系统、空气预冷系统、分子筛纯化系统、氧气压缩机、液氧贮存系统、夜氮储存系统、液氩贮存系统、供配电、给排水系统等.
","2017-2018","19400","7000","项目土建施工及安全、消防、环境等预先评价和许可规划办理.
","42979","43374","12400","建成投产.
","广西杭氧气体有限公司","市工信委陈弘志",,"工业升级","竣工投产",,"9","中电广西防城港电力有限公司一期2*630兆瓦机组节能减排综合升级改造项目","对一期工程的两台机组实施节能改造和超低排放综合升级改造.
节能改造内容包括:冷端系统综合治理、热力及疏水系统综合治理、吹灰汽源优化、开式水泵双速改造、闭式水泵永磁调速改造等;超低排放改造内容包括:加装低温省煤器、脱硝改造、低低温电除尘器改造、脱硫改造、风机改造、烟囱防腐改造等.
","2017-2018","25500","9000","完成#1机组的节能减排综合升级改造.
","42948","43435","9000","2018年12月完工.
","中电广西防城港电力有限公司","市工信委陈弘志",,"工业升级","竣工投产",,"10","广西金川有色金属有限公司冶炼环保系统综合技术改造项目","新建一套烟气脱硫装置,增加一台富液缓冲槽、一套脱盐装置和一套脱钠装置,同时对原有的脱硫系统进行技术改造.
脱硫装置的设计处理烟气量为450330立方米/小时.
","2016-2018","12423","4882","1.
2016年3月开工建设;2.
2017年8月完成第一部分新建脱硫系统的建设,投入试生产;3.
2017年12月完成第二部分工程的方案修订.
","42430","43435","5000","2018年12月第二部分建成投用.
","广西金川有色金属有限公司","市工信委陈弘志",,"工业升级","竣工投产",,"11","嘉里粮油(防城港)有限公司包装车间自动化生产及配套设施智能工厂建设项目","新增5L自动化生产线控制系统、10L自动化生产线及控制系统,72腔自动化注塑机、自动码垛机器人等.
增加SCADA生产管理系统,与现有PLC系统、生产车间数据采集与监视控制系统实现协同集成,实现生产制造、辅料管理、过程管理、设备维护管理的自动智能化.
","2017-2018","7210","3800","完成5L、10L自动化生产控制系统、自动码垛机器人设备安装并投产使用.
","42795","43435","3410","计划2018年12月份竣工交付投产.
","嘉里粮油(防城港)有限公司","市工信委陈弘志",,"工业升级","竣工投产",,"12","防城港澳加粮油工业有限公司智能仓储项目","项目扩建2个大豆散粕仓库,单仓仓容5000吨,2个豆皮仓,单仓仓容250吨,配套建设智能自动化控制室、机械楼、自动化包装成套设备及其它辅助配套输送系统.
","2017-2018","10000","5600","前期备案工作已经完成,环评正在办理中、项目累计完成投资5600万元,散泊仓土建部分已经完成,机械楼已经吊装完成,内部设备已经制做完成.
已经完成工程建设形象进度80%.
","42917","43221","1500","竣工投产.
","防城港澳加粮油工业有限公司","市工信委陈弘志",,"工业升级","竣工投产",,"13","嘉里粮油(防城港)有限公司包装车间配套技术改造项目","对包装车间的配套设施进行技术升级改造,主要包括小包装车间新增2个100吨和2个50吨称重调油罐、中包装车间辅料仓库改造、中包装车间新增10L自动化生产线、小包装车间自动拆箱、原料储罐区新增6个250吨的储油罐等.
","2017-2018","3410","3410","完成设备的安装.
","42826","43160","676","竣工投产.
","嘉里粮油(防城港)有限公司","市工信委陈弘志",,"工业升级","竣工投产",,"14","防城港澳加粮油工业有限公司机器人智能码垛、装车及配套设施项目","对现有车间的控制子系统进行改造,集成到一套软件中,实现集中监视功能管理.
新增LP130机器人智能码垛、自动化装车、自动化包装产品等设备.
","2017-2018","3000","1400","前期备案工作已经完成,项目累计完成投资1400万元,对车间现有控制系统的改造已经完成,机器人及相关装车设备正在制作中.
已经完成工程建设形象进度70%.
","42795","43221","1500","竣工投产.
","防城港澳加粮油工业有限公司","市工信委陈弘志",,"工业升级","竣工投产",,"15","铜产业链延伸循环经济配套项目铼酸铵综合回收利用子项工程","计划建成一套采用废酸预处理和铼萃取精制工艺从铜冶炼污酸中回收稀贵金属铼的生产系统,制得纯度为99%的铼酸铵产品.
设计建设年处理污酸396000立方米,设计能力达到年产铼酸铵产品4.
7吨.
","2017-2018","2825",,"目前正在设备安装,计划年底完成设备安装调试.
","42917","43313","2825","完成项目建设,开始试生产及调试工作.
","广西金川有色金属有限公司","市工信委陈弘志",,"工业升级","竣工投产",,"16","广西动物及其制品无害化处理及仓储建设项目","建设预处理车间、高温高压水解车间、成品加工车间、废气处理、锅炉房、中控室、成品仓库、冷库、办公及生活区,以及政府公物仓储等,建成后可日处理非法冻品120吨、日生产氨基酸有机肥料204吨.
","2016-2018","12000","7000","1.
已立项,选址、环评已出具初步意见等相关工作正在进行中;2.
密锣紧鼓地办理相关手续,申报土地使用审批,建设项目规划报批;3.
项目已开工建设,进场道路已通,临时便桥已完工,临时用水、电已解决;4.
目前已完成无害化处理中心干化加工车间、冷库仓、冷库机房、锅炉房、成品车间、有机肥车间、配电房等建设工程,完成道路硬化80%;厂区绿化80%;办公楼、宿舍楼主题的建设80%;供电系统和供水系统已投入使用;无害化处理中心、冷库、有机肥车间设备已进入调试阶段;完成总建设的90%.
","42583","43435","5000","完成基建工程,安装调试生产线并正式投入运营.
","广西碧昇生态环保科技有限公司","市投促局陈源清",,"工业升级","竣工投产",,"17","上思县壮传食品加工基地","项目建筑面积为50000平方米,新建原料仓库、生产车间、冷库、物流仓库、办公楼及职工宿舍.
","2017-2018","10000","1500","完成项目备案、选址、征地、环评、土地招拍挂、地基开挖等工作.
","42979","43374","7000","一期竣工投产.
","广西上思壮传实业有限公司","上思县政府覃森",,"工业升级","竣工投产",,"18","东兴硒美有机茶籽油加工厂项目","建筑面积14700平方米.
建设内容:仓库、厂房、综合楼,配套道路、水电、绿化等相关设施;购置加工生产线及相关设备.
","2017-2018","8177",,"基础工程.
","42856","43374","1000","完工.
","东兴市仲辉实业有限公司","东兴市政府陈建林",,"工业升级","竣工投产",,"19","东兴市中越泰食品加工厂项目","建设项目用地约19.
66亩,总建筑面积11597平方米.
主要建设:生产车间、检测楼,配套道路、水电、绿化等相关设施;购置安装生产线及相关设备.
","2016-2018","7000","3000","在建厂房.
","42675","43435","2000","完成厂房主体建设.
","东兴市中越泰国际食品有限公司","东兴市政府陈建林",,"工业升级","竣工投产",,"20","东兴市广利食品加工厂项目","该项目占地50亩,主要加工品种:草鱼、墨鱼、鱿鱼、虾类、鳗鱼、中华鳖、带鱼、鲟鱼等;主要建设急冻间、低温库、包装车间、制冰车间、吊水养殖区、生活区、办公区,消毒区与更衣室以及化验室,停车场等.
","2016-2018","5434","1000","在建厂房.
","42583","43435","4000","厂房建设,设备购置,预计2018年12月试运行.
","东兴市广利进出口贸易有限责任公司","东兴市政府陈建林",,"工业升级","竣工投产",,"21","东兴亿源饮料加工生产项目","建设规模:建筑面积10532平方米.
建设内容:综合楼、生产车间、成品仓库、原料仓库、综合仓库、科研楼,配套道路、水电、绿化等相关设施;购置加工生产线及相关设备.
","2016-2018","4802","3000","在建厂房.
","42583","43313","1800","厂房建设,设备购置,预计2018年6月试运行.
","东兴亿源食品开发有限公司","东兴市政府陈建林",,"工业升级","竣工投产",,"22","顺誉化工","年产3万吨电子级磷酸.
","2016-2018","4500","3400","项目开工,平整土地,厂房建设.
","42583","43313","1100","项目竣工.
","广西防城港顺誉化工有限公司","港口区政府朱靓",,"工业升级","竣工投产",,"23","广西防城港市港口区光坡镇80MWP渔光互补光伏发电项目","一期装机容量60MWP.
利用养殖池的上层空间安装60MWP光伏发电系统.
主要包括太阳能电池方阵、直流系统、逆变系统、交流升压系统及相关辅助设施.
","2017-2018","45000","15000","1.
完成前期工作;2.
项目开工建设.
","42767","43374","30000","项目竣工.
","广西西江环境能源科技产业有限公司","港口区政府朱靓",,"工业升级","竣工投产",,"24","年产60万吨钢渣微粉","年产60万吨钢渣微粉生产线.
厂房、原料仓、成品仓、烘干及粉磨设备以及相关配套设施.
","2017-2018","3000","1000","1.
完成前期工作;2.
项目开工建设.
","42767","43101","2000","项目竣工.
","广西盛翔新环保材料有限公司","港口区政府朱靓",,"工业升级","竣工投产",,"25","坤达水产品加工","年加工水产品生产能力3000吨.
","2017-2018","3000","1000","项目开工建设,平整土地.
","42887","43282","2000","项目竣工.
","防城港市坤达水产有限公司","港口区政府朱靓",,"工业升级","竣工投产",,"26","岗松产业核心示范区","新建岗松培育示范区3000亩,拓展示范区30000亩,辐射带动示范区60000亩等.
","2017-2018","3000","1000","1.
完成前期工作;2.
项目开工建设.
","42948","43160","2000","项目竣工.
","防城港市宝兴工艺品有限公司","港口区政府朱靓",,"工业升级","竣工投产",,"27","芝麻仁二线生产项目","项目占地1200平方米,依托公司现有的生产厂房以及公用工程,新增一条年产1.
2万吨芝麻仁生产线.
","2017-2018","795.
700625",,,"42979","43101","795.
700625","2018年建成投产.
","防城港富味乡油脂食品有限公司","港口区政府朱靓",,"工业升级","竣工投产",,"28","防城港金嘉益油脂分装厂项目","项目租用厂房3636平方米,其中加工厂房1000平方米,原料仓库1000平方米,办公室300平方米,生活区336平方米,购置安装3条生产线及相关设备,年分装油脂40000吨.
","2017-2018","600","300","正在进行前期工作,电路调整安装中,厂房已租赁.
","2017年","43221","300","项目竣工.
","防城港金嘉益油脂科技有限公司","港口区政府朱靓",,"工业升级","竣工投产",,"29","防城港德瑞塑料制品生产项目","建设规模:项目租用厂房970平方米,其中生产车间400平方米,原料仓库200平方米,成品仓库200平方米,办公室100平方米;购置安装1条生产线及相关设备;年生产塑料瓶胚制品600吨.
建设内容:购置安装1条塑料瓶胚制品生产线及相关设备.
","2017-2018","600","300","正在进行前期工作,电路调整安装中,厂房已租赁.
","43070","43222","300","项目竣工.
","防城港德瑞塑料制品有限公司","港口区政府朱靓",,"工业升级","竣工投产",,"(三)","新开工项目","30",,"1222610.
74",,,,,"151800""1","装配式建筑构件生产基地","初步预定规划东湾物流园用地面积300亩,建设3条生产线(3条PC生产线+1条钢筋加工生产线),拟建厂区厂房(总建筑面积10万平方米),年产装配式建筑构件建筑面积100万平方米.
","2018-2019","75000",,"已完成项目备案、项目建议书,正在进行土地招拍挂、测量、环评等前期工作.
","43221","2019年","3000","完成施工图设计等前期工作,开工建设.
","市城投公司","市城投公司兰宏",,"工业升级","新开工""2","防城港储能新材料产业基地190万吨钒电解液一期项目","190万吨钒电解液项目,分两期建设.
其中,一期建设100万吨钒电解液配套25万吨烧碱项目,二期建设90万吨钒电解液项目.
一期一阶段建设20万吨钒电解液及配套5万吨烧碱项目.
","2018-2020","540000",,"一期共三个项目,钒电解液已完成备案、选址批复、正在开展用地预审和用海手续办理;烧碱项目材料已收集完待上"两高"会议审批;码头项目正在做可研.
","43282","2020年","30000","完成前期工作和开展场平.
","广西储能新材料有限公司","防城港经开区管委林柱昌",,"工业升级","新开工""3","防城港工业废物综合利用及资源化处理项目","年综合处理5万吨危险废物处置中心项目.
","2018-2020","16600",,"完成选址批复、正在编制可研、办理项目核准.
","43344","2020年","5000","完成场平及开始基础建设.
","深圳市深投环保科技有限公司、广西科丽能环保有限公司","防城港经开区管委林柱昌",,"工业升级","新开工""4","湿法磷酸净化及精细磷酸盐项目","建成投产后可年产20万吨工业级磷酸及其他副产品,年萃取磷酸30万吨、浓缩磷酸30万吨、净化磷酸20万吨(工业级)、磷酸二氢钾20万吨、氟硅酸钠2万吨、重过磷酸钙30万吨、石膏粉100万吨、石膏板5000万平方米、精细磷酸钠盐8万吨、饲料级磷酸钙盐15万吨.
","2018-2019","240000",,"已完成公司注册、备案、选址批复,正在开展可研.
","43160","43800","30000","完成场平及开始基础建设.
","广西川金诺化工有限公司","防城港经开区管委林柱昌",,"工业升级","新开工""5","新绿环标准厂房","拟建设9栋3层的标准厂房,总建筑面积约40777平方米.
","2018-","6000","5800","已平整场地85%,已完成总平面图设计,完成土地挂牌出让.
正在进行高压线路迁移.
","43435",,"500","完成大部分项目前期工作.
","防城港市新绿环建筑装饰材料有限公司","防城港经开区管委林柱昌",,"工业升级","新开工",,"6","酸油加工项目","年加工约1万吨酸油渣,年产酸油约1000吨.
","2018-2019","1200",,"已完成公司注册、备案、选址批复.
","43374","2019年","500","完成场平及开始基础建设.
","防城港尚上油脂有限公司","防城港经开区管委林柱昌",,"工业升级","新开工",,"7","晟宇通自保温砖生产项目","年产3亿块城市建筑工业弃土烧结多孔自保砖.
","2018-2019","15000",,"已完成备案、规划选址,完成可研报告.
","43344","2019年","5000","完成场平及开始基础建设.
","广西晟宇通建材有限公司","防城港经开区管委林柱昌",,"工业升级","新开工",,"8","嘉里粮油精炼厂200吨/天生产线脱蜡技术改造项目","200吨/天脱蜡工艺生产线技术改造升级.
","2018-2019","1047",,,"43252","43497","800","完成前期工作,实现新开工.
","嘉里粮油(防城港)有限公司","市工信委陈弘志",,"工业升级","新开工""9","大海粮油储运、锅炉技术改造技术改造项目","该项目主要对动力车间50吨锅炉进行臭氧脱销、膨化大豆粉生产车间.
","2018-2019","6300",,,"43252","43466","6000","完成前期工作,实现新开工.
","大海粮油(防城港)有限公司","市工信委陈弘志",,"工业升级","新开工""10","金川冶炼烟气硫资源综合利用技术改造项目","采用国内先进钠法脱硫工艺技术对冶炼制酸烟气处理系统进行技术改造,建设一套脱硫副产品加亚硫酸钠生产装置及其配套的厂房.
","2018-2020","13487.
74",,"已完成项目可研及备案.
","43282","43831","4000","完成项目建设,开始试生产及调试工作.
","广西金川有色金属有限公司","市工信委陈弘志",,"工业升级","新开工""11","铜产业链延伸循环经济配套项目稀有气体子项工程","项目分两期建设,一期计划在现有氧气站的基础上增加一套从空气中提取氪氙气体的系统,设计能力达到年产氪气5720.
5Nm、氙气476Nm.
其中利用自有生产系统生产氪气2864.
5Nm,氙气238Nm,其余部分外购粗制混合液提取氪气、氙气.
二期建设一套粗氖氦预浓缩与氖氦精制装置系统,年生产纯氖气84150Nm,纯氦气23885Nm.
","2018-2019","8411",,"计划年底完成项目可研设计.
","43313","43800","3000","完成项目前期工作,开始设备安装.
","广西金川有色金属有限公司","市工信委陈弘志",,"工业升级","新开工""12","澳加粮油年加工9万吨的小包装厂","建设年加工9万吨包装油生产厂,新增一批设备,主要包含激光刻码机、贴标机、灌装机、装箱机、纸箱成型机、封箱机、理压提环机、配套输送系统、智能机器手码垛系统、PLC控制系统等以及配套的办公楼、配电、生产车间、仓储、油罐区等设施.
","2018-2019","5000",,"已完成可研报告的编制,正在进行项目地块预算.
","43101","43800","3000","完善前期工作报批手续,争取年内开始安装设备.
","防城港澳加粮油工业有限公司","市工信委陈弘志",,"工业升级","新开工""13","惠禹年产10万吨发酵豆粕及浓缩饲料生产线","项目分两期建设,一期主要建设两条年吨发酵豆粕及浓缩饲料生产线.
二期建设一条生产线.
","2018-2019","4994",,"正在进行可研报告的编制,正在进行项目地块预算.
","43313","43800","1000","完成项目前期工作,开始设备安装.
","广西惠禹粮油工业有限公司","市工信委陈弘志",,"工业升级","新开工""14","年加工配送200万吨废钢项目","购置或租用广西盛隆冶金有限公司废钢材破碎机及生产线、大型龙门剪切机、磁选机、辐射检测仪、鳄鱼式废钢剪切机、金属液压打包机、除尘设备等先进设备,采用先进生产工艺,投产后年加工配送废钢200万吨.
","2018-2018","4000",,"项目已备案,正在开展项目前期工作.
","43221","43435","4000","完成项目建设,开始试生产及调试工作.
","广西欣贸再生资源回收有限公司","市工信委陈弘志",,"工业升级","新开工""15","敬业制药公司原料药及制剂生产项目","拟设计产能工业水杨酸30000吨/年,升华水杨酸10000吨,阿司匹林5000吨/年,磺基水杨酸8000吨/年,水杨酸甲酯20000吨/年,水杨酸酰胺5000吨/年,乙酰水杨酸脂5000吨/年,强力霉素2000吨/年,制剂片剂15亿片/年,散剂5亿袋/年,膏剂1亿剂/年,植物药及食品添加剂3000吨/年.
","2018-2021","85000",,"1.
企业已提交项目建议书;2.
与高新区管委签订投资协议书;3.
已完成新公司的工商注册.
","43160","2021年","20000","争取2018年开工建设.
","广西敬业制药有限公司","防城港高新区管委韩凯",,"工业升级","新开工","重点推进项目""16","广西宇之源智慧低碳科技产业园项目","建设光伏发电站、太阳能光伏终端应用和智慧城市系列产品的产业园,产业园区主要从事太阳能电站系统集成(离网、并网)、太阳能电池组件、太阳能路灯庭院灯、太阳能杀虫灯、太阳能农业水泵、太阳能礼品、智能物联系统、LED系列产品的科研开发以及生产经营.
项目建设周期暂定为3年,实际建设周期以实际完成时间为准,具体分三期实施.
第一期:产业孵化阶段,用产业园孵化基地厂房,预计4个月建成投产,产业园包含研发,综合智能展示系统,办公、仓储、生产、生活等,面积约6000平方米.
确定项目第一期租用云朗科技园(一期)5#标准厂房1~2层(每层建筑面积为2278平方米),综合业务楼(A1)1层2号展厅(建筑面积为220平方米),总建筑面积为4776平方米.
第二期:自建生产基地阶段,预计30个月完成.
第三期:产业园配套供应链建设阶段,预计3-5年内完成.
","2018-2019","32000",,,"43160","2019年","5000","一期已签约,争取2018年3月开工.
","广东宇之源太阳能科技有限公司","防城港高新区管委韩凯",,"工业升级","新开工","重点推进项目","17","中俄通用飞机制造厂一期项目","一期工程计划租赁云朗科技园标准厂房3000平方米厂房,建设首条生产线,并总装下线小型通用飞机.
预计投资2000万元,引进设备模具及厂房改造.
","2018-2019","2000",,"1.
完成厂房设计;2.
开始装修.
","43101","43800","1000","完成装修并入驻云朗科技园.
","广西航空新城投资股份有限公司","防城港高新区管委韩凯",,"工业升级","新开工""18","循环冷却水CEC电化学处理设备研发设备生产项目","一是建立研发中心,将钦州学院的部分研发项目转移到云朗科技园内,研发方向主要是废酸的综合利用,电化学水处理技术的深入开发,二是建立CEC电化学水处理设备的综合组合工厂,将关键的生产过程转移到云朗高科技园内,三是建立一套废酸综合利用的中试装置,对烷基化废酸的综合利用进行深度的生产试验.
","2018-2019","1000",,"签订入驻协议.
","43191","43800","500","完成装修并入驻云朗科技园.
","广西绿创环保科技有限公司","防城港高新区管委韩凯",,"工业升级","新开工""19","华润水泥(上思)有限公司水泥窑协同处置固废项目","年处理固废10万吨(含危废、垃圾).
","2018-2019","20000",,"规划.
","43313","43617","4500","完成项目立项、环评、报建等手续,开工建设.
","华润水泥(上思)有限公司","上思县政府覃森",,"工业升级","新开工""20","上思县仁盛制药GMP新生产基地","年新增中成药生产能力3500吨.
","2018-2020","13000",,"规划.
","43282","2020年","3500","完成用地征用等前期工作.
","广西恒拓集团仁盛制药有限公司","上思县政府覃森",,"工业升级","新开工""21","华润水泥(上思)有限公司碎石、机制砂生产项目","年产骨料及机制砂200万吨.
","2018-2019","5000",,"规划.
","43252","43525","3000","完成项目征地,采矿许可证的办理,安全生产许可证的办理,项目报批、报建,开工建设.
","华润水泥(上思)有限公司","上思县政府覃森",,"工业升级","新开工""22","工业集中区标准厂房暨农民工创业园建设项目(一期)","计划一期建设2幢6层的标准厂房,二期建设4幢6层的标准厂房,三期建设6幢6层的标准厂房,每幢约24000平方米,共288000平方米.
","2018-2019","1800",,"完成设计.
","43313","43525","1200","完成地基及部分主体工程.
","上思县城市建设投资有限责任公司","上思县政府覃森",,"工业升级","新开工""23","年产2万吨生物农药和药肥项目","占地面积约80亩,建筑面积26667平方米,年产2万吨生物农药和药肥.
","2018-2020","1300",,"完成选址工作.
","43282","44166","500","完成地基以及部分主体工程建设.
","广西拜科生物科技有限公司","上思县政府覃森",,"工业升级","新开工""24","复合肥厂","建设一座小型复合肥厂,年产0.
5万吨,新建厂房、仓库及办公房,建筑面积为600平方米.
","2018-2018","800",,"完成备案.
","43191","43435","800","竣工投产.
","广西上思满地绿农林科技服务有限公司","上思县政府覃森",,"工业升级","新开工""25","东兴市硒美有机芝麻花生深加工项目","拟建项目用地约23.
69亩,建设面积约16675平方米,加工车间建筑面积13675平方米,厂房建筑面积3000平方米,配套道路、水电、绿化等相关设施,购置加工生产线2套及相关设备.
",,"5000",,,"43221","2020年","2000","开工建设厂房主体工程.
","东兴市仲辉实业有限公司","东兴市政府陈建林",,"工业升级","新开工""26","年产15万吨人造金红石及8万吨还原钛技改扩建项目","煤原料库、配料车间、焙烧还原区、锈蚀车间、洗涤酸浸车间、氧化铁红加工车间、活性炭车间、矿原料库以及其他配套设施.
","2018-2020","50000",,,"43313","2020年","3000","正在平整土地.
","防城港华晨矿业有限公司","港口区政府朱靓",,"工业升级","新开工""27","年产8000吨卡拉胶二期工程改扩建项目","投资规模6000万元,其中建设投资4200万元,流动资金1800万元.
项目建设位于现有厂区内,把现有粗胶生产设备拆除重新改造成精胶生产线.
在现有设备基础上将增加20吨锅炉一台、10000立方米二期污水处理线、储碳区等.
","2018-2019","6000",,,"43435","43800","500","完成项目备案,正在办理能评、环评,实现新开工.
","防城港市捷康生物科技有限公司","港口区政府朱靓",,"工业升级","新开工",,"28","年产2000吨赤磷扩建项目","生产线、厂房、仓库及相关配套设施.
","2018-2019","2000",,,"43282","43617","500","完成前期工作,实现新开工.
","广西越洋科技股份有限公司","港口区政府朱靓",,"工业升级","新开工",,"29","防城南山风电场","风电场规划开发总规模为50MW.
","2018-2019","48671",,,"43374","2019年","3000","开工建设.
","新天绿色能源股份有限公司","防城区政府荣毅宏",,"工业升级","新开工""30","防城区年产10万吨生物柴油项目","生产车间及配套设施建设.
","2018-2019","12000",,"完成前期工作.
","43282","43800","7000","完成土方平整及厂房建设.
","防城港市防城区兴旺大豆渣加工厂有限公司","防城区政府荣毅宏",,"工业升级","新开工""(四)","前期工作项目","26",,"7079584.
68","0","0""1","胜宝钢铁集团400万吨钢铁异地搬迁项目","项目业主为河北胜宝钢铁集团,年产408万吨铁,年产476万吨钢(含计划购买92万吨产能),同时建设配套产业,包括酸洗冷轧、制管、镀锌带钢、焦化,形成一体化产业链.
建设4座220平方米烧结机、4套烧结机各自配套脱硫、脱硝设施;3座1560立方米高炉、第一炼钢厂设2座140吨转炉、1座140吨钢包精炼炉、8机8流方坯连铸机2台、8机8流方圆坯连铸机1台;第二炼钢厂设1*140吨转炉、1*140吨电炉、1*140吨钢包精炼炉、1*140吨真空炉、2机2流板坯连铸机2台.
","2018-2021","1500000",,,,,,"完成项目备案、可研、环评、能评等前期工作.
","河北胜宝钢铁集团","防城港经开区管委林柱昌",,"工业升级","前期工作",,"2","敬业集团年产570万吨钢铁项目","项目业主为敬业集团,年产生铁548万吨、粗钢570万吨、一次材554万吨.
建设2台460平方米烧结机、1台200万吨/年链箅机-回转窑、4座1580立方米高炉,4座135吨顶吹转炉,4座150吨钢包精炼炉,4座150吨精炼炉,四台连铸机,一条设计年产量为40*104吨高品质钢短流程薄带铸轧生产线.
","2018-2021","2090000",,,,,,"完成公司注册、项目备案、可研编制、规划选址.
","敬业集团","防城港经开区管委林柱昌",,"工业升级","前期工作",,"3","防城港储能新材料产业基地20万吨工业钒生产项目","项目建成年产20万吨工业钒、150万吨酸溶性钛渣、1000万吨半钢水生产规模.
该项目将与储能产业园项目有机结合,最终产品为全钒液流电池.
一期投资60亿元,占地约2200亩,建成年产6万吨工业钒、45万吨酸溶性钛渣、300万吨半钢水的生产规模;建设周期为24个月.
二期投资140亿元,占地约3277亩,建成年产14万吨工业钒、105万吨酸溶性钛渣、700万吨半钢水的生产规模;建设周期为30个月.
","2018-2020","2000000",,"钢铁产能指标问题.
项目生产中的铁水副产品涉及到钢铁产能指标调控问题.
",,,,"争取协调解决铁水指标,完成用海手续办理.
","广西中储能材料有限公司","防城港经开区管委林柱昌",,"工业升级","前期工作",,"4","恒通高端装备制造产业园","多种高端装备制造及乏燃料处理装备制造.
","2019-2021","330000","完成在东盟博览会分会场签约、项目建议书.
",,,,,"完成备案规划选址等前期工作.
","中核恒通(北京)物质有限公司清研(上海)智能工程有限公司","防城港经开区管委林柱昌",,"工业升级","前期工作",,"5","高强度新材料船舶制造","项目分两期建设,一期用地50亩,投资1.
5亿元,建设完成可年生产渔船300艘、快艇200艘、游艇100艘;二期用地59亩,投资3亿元.
","2018-2020","45000",,"已完成选址批复、备案,正在开展用海手续办理.
",,,,"填海工程开工建设.
","广西金龙达船舶制造有限公司","防城港经开区管委林柱昌",,"工业升级","前期工作",,"6","硫酸钾及水溶肥项目","项目规划用地面积约27万平方米,装置预留用地约100亩,产业园规划用地约500亩.
一期:年产10万吨硫酸钾、副产12万吨工盐酸生产装置(曼海姆法)、年产3万吨氯化钙生产装置、5万吨粉状水溶肥生产装置、5吨液体水溶肥生产装置.
二期:年产10万吨硫酸钾、副产12万吨工业盐酸生产装置(曼海姆法)、年产3万吨氯化钙生产装置.
三期:年产30万吨硫酸钾、副产36万吨工业盐酸生产装置(曼海姆法)、年产20万吨氯化钙生产装置.
","2019-2021","17400",,"完成项目建议书.
",,,,"完成备案规划选址等前期工作.
","四川川化青上化工有限公司","防城港经开区管委林柱昌",,"工业升级","前期工作",,"7","年产15万吨畜禽饲料项目","项目建设教、保料生产线,育肥料、膨化料生产线各一条;建设预混料生产线2条,预计年产20万吨畜禽饲料.
","2018-2020","14000",,"完成项目建议书、选址已批复.
","2019年","2020年",,"完成公司注册,项目备案,可研编制,选址规划调整.
","防城港播恩生物技术有限公司","防城港经开区管委林柱昌",,"工业升级","前期工作",,"8","金花茶精深加工产品开发项目","计划用地30.
5亩,建成符合SC认证要求的年产30吨金花茶精深加工产品生产线.
厂房建设包括精深加工产品生产厂房、办公场所、仓库宿舍,金花茶观赏园等,建设厂房26200平方米,容积率达1.
28.
","2019-2020","10500",,"完成项目备案等前期工作.
","43466","44166",,"争取项目开工建设.
","广西囯茗金花茶科技有限公司","防城港高新区管委韩凯",,"工业升级","前期工作""9","防城港市天然香料系列生物制品生产项目","计划用地28亩,建设年产200万支妆字号产品生产线、年产100万支消字号产品生产线、年产3000吨植物栽培基质生产线和年产2000吨食用香料生产线4条生产线.
建设办公场所1600平方米、宿舍食堂2000平方米、厂房6000平方米、仓库2000平方米等.
","2019-2020","8500",,"完成项目备案等前期工作.
","43466","44166",,"争取2018年开工建设.
","广西天源岗松油有限公司","防城港高新区管委韩凯",,"工业升级","前期工作""10","年产15000吨纳米级氧化锌粉、12000吨细锌粉综合技术改造项目","在广西菌海公司"金川冶炼固废综合利用项目"厂区内新建氧化矿球磨、湿法、电解、蒸馏车间厂房6栋11800平方米,原料仓库、成品仓仓库2栋3500平方米,封闭式料场一个7500平方米,倒班楼2栋1500平方米.
",,"14163.
86",,"项目已备案,正在开展项目前期工作.
",,,,"开展前期工作.
","广西菌海治金建材有限公司","市工信委陈弘志",,"工业升级","前期工作",,"11","年产12万吨动力电池用镍钴新材料工程(含镍量3万吨)一期","一期项目年产4万吨动力电池用镍钴新材料,产品中含镍金属量约1万吨,年处理红土镍矿原料约(干基)81万吨.
","2019-2019","117100",,"完成项目初步设计及部分施工图设计.
","43525","43829",,"完成项目前期工作.
","广西金川有色金属有限公司","市工信委陈弘志",,"工业升级","前期工作""12","年产12万吨动力电池用镍钴新材料工程(含镍量3万吨)二期","二期项目年产8万吨动力电池用镍钴新材料,产品中含镍金属量约10000吨,年处理红土镍矿原料约(干基)81万吨.
","2019-2020","234092",,"项目正在进行可研报告的编制.
","43525","44195",,"完成可研报告的编制工作.
","广西金川有色金属有限公司","市工信委陈弘志",,"工业升级","前期工作""13","华能防城港市东湾天然气分布式能源项目","规划建设5套6F等级热、电、冷三联供能源站,一期计划建设3套.
","2018-2020","210000",,"安排上规委会.
可研初稿已经完成.
",,"44166",,"1.
完成供热规划的批复;2.
开展项目可研.
","华能广西公司","市工信委陈弘志",,"工业升级","前期工作""14","防城港钢研锌业科技有限公司年产10万吨氧化锌功能材料项目","利用我国自主研发的高端氧化锌生产新技术,生产的产品为高端氧化锌.
项目分两期建设完成,一期建成一条2万吨/年的新型直接法氧化锌生产线;二期建成一条7万吨/年的新型直接法氧化锌生产线.
","2019-2020","50000",,"目前已出可行性研究报告,正在开展项目前期工作.
","43525","43983",,"完成前期工作报批手续.
","防城港钢研锌业科技有限公司","市工信委陈弘志",,"工业升级","前期工作""15","广西盛隆冶金有限公司年处理40万吨高锌除尘灰工程","年处理38.
35万吨高锌除尘灰工程.
新建1条回转窑或转底炉直接还原生产线,年生产含铁料或球团28.
02万吨,次氧化锌灰3.
04吨.
",,"18828.
82",,"目前已出可行性研究报告,正在开展项目前期工作.
",,,,"完成前期工作报批手续,早日实现新开工.
","广西盛隆冶金有限公司","市工信委陈弘志",,"工业升级","前期工作""16","精制铜箔项目","金川集团本部正在进行2500吨/年精制铜箔小型工业化试验,计划根据试验结果择机在防城港进行投资建设.
",,,,"目前正在进行可研编制工作.
",,,,"完成审批手续.
","广西金川有色金属有限公司","市工信委陈弘志",,"工业升级","前期工作""17","益海嘉里(防城港)生物科技有限公司发酵豆粕项目","1.
对原三号粕库进行改造,建设成洁净厂房;2.
建设540吨/天发酵豆粕生产线一条;3.
新建540吨/天发酵豆粕自动打包装车及配套设施一套.
",,,,"项目于2017年9月4日获得备案,文号:防发改[2017]219号.
项目环评报告预计于2018年3月出具,节能评估、安全评估工作也相应展开.
",,,,"有序开展项目用地等推进工作,完成前期报批手续等工作.
","益海嘉里(防城港)生物科技有限公司","市工信委陈弘志",,"工业升级","前期工作""18","小麦加工项目(大海粮油所属益海嘉里集团)","目前还未出可行性研究报告,正在申请用地.
",,,,"目前还未出可行性研究报告,正在申请用地.
",,,,"拟写项目可行性研究报告,正在有序开展项目用地等推进工作.
","大海粮油工业(防城港)有限公司","市工信委陈弘志",,"工业升级","前期工作""19","正邦防城港年产100万吨生物饲料及饲料研发中心产业基地项目","项目将建设占地约100亩的年产100万吨现代生物饲料及其添加剂生产车间、国家企业技术研发中心、办公及营销展示厅、生活区等相应配套设施;项目建成达标生产后,实现年产各类生物发酵饲料产品100万吨.
预计实现产值120亿元,产生直接税收500万元.
","2019-2020","100000",,"已签订合作框架协议.
已注册公司.
启动项目已落户上思县思阳镇,项目业主已开展前期工作,已完成测绘.
现项目业主正在饲料厂选址工作.
","43617","44166",,"完成项目选址、规划、立项等前期工作.
","正邦集团有限公司","市投促局陈源清",,"工业升级","前期工作","重点推进项目""20","防城港粮油产业链项目","建设办公楼、宿舍楼等3900平方米、生产车间1600平方米(中包装厂、吹瓶厂),库容1800吨油罐区一个、50个泊位的半拖挂槽车大型停车场一个;购置中转油储罐、调和油生产线及吹瓶厂相关设备等.
","2019-2020","12000",,"正在开展前期工作.
","43803","44166",,"完成项目选址、征地等前期工作.
","广州一丰粮油有限公司","市投促局陈源清",,"工业升级","前期工作""21","中国壮医药健康产业园项目","项目总用地面积200亩,其中建设年生产要饮片5000吨,年产天然药物提取物500吨.
","2019-2022","5000",,"选址工作.
","2019年","2022年",,"完成选址工作.
","广西上思县玲芝堂药业有限公司","上思县政府覃森",,"工业升级","前期工作""22","渔洲坪磷酸工业园搬迁项目","将渔洲坪磷酸工业园的项目全部搬迁到大西南临港工业园并建成投产.
","2019-2021","60000",,"正在进行前期工作.
","2019年","2021年",,"完成部分前期工作.
","各磷化企业业主","港口区政府朱靓",,"工业升级","前期工作""23","年产30万立方米蒸压加气混凝土砌块生产线项目","年产30万立方米蒸压加气混凝土砌块.
","2019-2020","7000",,"项目进行前期规划.
","2019年","2020年",,"完成部分前期工作.
","广西晟宇通建材有限公司","港口区政府朱靓",,"工业升级","前期工作""24","防城港市防城区门崖岭风电场","项目分两期开发,总体规划装机容量为250MW,总投资约为22亿元.
其中,一期门崖岭门装机容量为50MW;二期羊古顶风电场装机容量为200MW.
","2019-2025","220000",,"开展前期工作.
","2019年","2025年",,"完成前期工作.
","防城港华时风力发电有限公司","防城区政府荣毅宏",,"工业升级","前期工作""25","华鹰达调味品项目","一期占地50亩,拟建厂房2800平方米,原料及成品仓库568平方米,综合用房2300平方米,晾晒场6500平方米,购置制冷设备、蒸汽夹层锅、圆盘制曲机、压滤机等加工设备100台(套).
","2019-2020","8000",,"开展前期工作.
","2019年","2020年",,"完成前期工作.
","广西华鹰达投资股份有限公司","防城区政府荣毅宏",,"工业升级","前期工作""26","防城港市年产100万吨膨化及全价配合饲料厂项目","主要建设生产车间,原料库,成品库,化验室及员工宿舍配套设施.
","2019-2020","8000",,,"2019年","2020年",,"完成前期工作.
","防城港防城区一洋饲料有限公司","防城区政府荣毅宏",,"工业升级","前期工作""二","现代服务业类","103",,"8557977.
186","366036",,,,"442743.
786""(一)","续建项目","22",,"1735850","288435","0",,,"173000""1","北部湾创业大厦","项目总建筑面积8.
97万平方米.
其中,北部湾创业投资大厦主楼5.
1万平方米;裙楼1.
5万平方米,地下室面积2.
37万平方米,主楼高25层,裙楼5层,地下两层,负一层层高6.
0米,负二层层高4.
0米.
裙楼政务服务中心首层层高6.
0米,2~5层层高5.
4米,主楼首层层高6.
0米,第二层层高5.
4米,三层及三层以上标准层层高3.
8米.
大厦平面结构布局呈长形,长86米,宽82米.
","2014-2019","36100","37934","主楼施工至第9层楼面,裙楼(北面)主体已封顶.
","41791","43617","20000","主楼完工.
","市城投公司","市城投公司兰宏",,"现代服务","续建",,"2","三块石海洋乐园(江山半岛海上世界)","按国家4A级景区的标准打造,集五星级度假酒店、帆船游艇码头、温泉钛沙疗养、水上游乐园、滨海浴场、千米休闲海滩等于一体的全天候滨海旅游景点.
","2007-2025","120000",,,"2007年","2025年","4000","完成酒店内外装修.
","防城港浩洋房地产公司","市江山旅管委黄晓昀",,"现代服务","续建",,"3","中国·防城港体育小镇","占地4659亩,其中建设用地约580亩,租赁用地约4079亩;项目用海737.
316亩.
项目功能包括六大特色主题分区:特色风情小镇、滨海旅游区、高尚住宅区、健康运动区、医疗康复中心、野奢度假区,形成三湾、一带、一公园的空间结构.
","2011-2025","350000","1500","完成一湾项目5栋商业配套楼内外装修及马拉松赛组委会办公室的建设.
","40664","2025年","5000","项目全面复工建设.
","防城港和居置业有限公司","市江山旅管委黄晓昀",,"现代服务","续建",,"4","白浪滩商务酒店","总用地面积16946平方米,建筑面积16713平方米,酒店设计客房约300间,床位约600个(含套间、标准间、家庭间),约13000平方米,配套餐厅、会议室等约3720平方米.
并配套景观园林、购物商店、咖啡厅等配套设施.
","2017-2019","7000","2500","完成酒店二层框架结构建筑工程.
","42795","2019年","1000","完成酒店主体部分建设.
","防城港鸿海置业投资有限公司","市江山旅管委黄晓昀",,"现代服务","续建",,"5","桂海国际农产品冷链物流中心","项目规划总占地面积300亩,总建筑面积约194200平方米.
主要建设内容:冷库4座,总库容14万吨,冷库建筑面积84000平方米,农产品交易市场62000平方米,农产品物流配送中心6000平方米,水产品加工包装用房8000平方米,农产品电子商务及办公楼21000平方米,农产品市场商务住宿及其它配套服务用房13200平方米.
","2017-2020","89000","4800","1.
项目业主全面开工并完成土方平整;2.
防城区征地办完成全面一期161.
5亩项目用地的征地工作.
","43070","2020年","20000","完成一期交易中心及2栋冷库的主体建设.
","广西桂海农产品冷链物流有限公司","防城港高新区管委韩凯",,"现代服务","续建",,"6","广西检验认证公共服务平台","1.
综合实验室及办公场地面积:购买云郎科技园标准厂房1号楼,并按国家级实验室认可(CNAS)的标准条件进行装修,建立专业检测实验室;2.
检测仪器设备:共200台/套;3.
服务能力(通过CNAS认可项目):4000项,每年可接受10000个样品,120000个检测项目的检测.
","2017-2019","5000","3500","1.
完成一号标准厂房转让;2.
中检开始全面装修.
","42856","2019年","1500","完成全面装修,中检集团总部搬迁至云朗科技园.
","中检广西检测有限公司","防城港高新区管委韩凯",,"现代服务","续建",,"7","中外运东湾仓储物流基地二期","项目位于东湾物流园区内.
项目二期在一期基础上,提升建设国际集装箱物流中心,并新建物流信息交易服务中心和物流分拨配送服务中心:1.
国际集装箱物流中心占地660亩,投资6亿元.
建设内容包括已建成的铁路专用线3302米,改造建设铁路货场8.
8万平方米,国际集装箱中心的箱管中心堆场10万平方米,拆装箱仓库4.
5万平方米;2.
物流信息交易服务中心占地面积14.
434亩,投资6300万元,建设17层信息中心大楼,办公用房面积2.
12万平方米;3.
物流分拨配送服务中心占44.
052亩,投资3200万元,建设钢结构仓库8000平方米及贵重物品仓库9000平方米.
","2014-2019","69500","19000","1.
项目一期于2012年底投产,建成铁路专用线3302米、堆场、仓库,库区总容量可存放60万吨货物;项目二期计划在一期基础上改造建设国际集装箱物流中心;2.
2016年,完成清理堆场散货8000吨,并完成安装13座冷藏集装箱取电插座.
项目正逐步由散货堆场转型升级开展集装箱和冷柜拆装箱业务;3.
项目被交通运输部列为多式联运示范工程点培育项目;4.
2016年4月28日获铁路总公司批准办理集装箱业务,集装箱业务呈快速发展态势.
2017年1-10月份完成集装箱4700TEU.
","2014年","2019年","500","1.
提升改造国际集装箱物流中心;2.
开展物流信息交易服务中心前期工作.
","广西中外运东湾仓储物流公司(国际集装箱物流中心子项目由中外运、泰港公司、鸿基贸易公司合作开发)","市物流办朱清华",,"现代服务","续建",,"8","防城港新港公铁海联运物流中心","项目主要建设5条铁路专用线、大宗物资堆场及加工区、普通仓储区,形成年装卸到发货物能力150万吨;二期:投资额约3亿元人民币,建设工期约12个月,主要建设6条铁路专用线、保税仓储区、增值加工服务区、电商快递区、商贸交易区、综合服务中心,形成年装卸到发货物能力600万吨.
","2014-2020","60000","10000","1.
水管迁改工程已经完成招投标工作,签订了施工合同;2.
三组高压线迁改工程已完成开标工作,已完成合同签订工作.
施工队已开始进场开展现场勘察等施工准备工作.
","41640","44166","4000","铺轨建设、站台路面硬化及厂房建设.
","广西防城新港置业有限公司","市物流办朱清华",,"现代服务","续建",,"9","上思县十万大山温泉项目","项目一期规划面积1000亩,建筑面积38702平方米,目前启动303亩项目建设,建设接待中心,养生餐厅,员工宿舍.
露天主体温泉等设施,建成集温泉养生、休闲度假、会务接待、观光体验等功能一体的国际温泉旅度假小镇.
","2017-2020","15000","703","建设完成了温泉泡浴游泳区2300平方米、桥涵2座、凉亭2个、旅游厕所2个、停车场3300平方米、道路硬化绿化亮化1600平方米,在建综合服务中心2560平方米等配套设施.
","42917","44166","2500","建设温泉养生区、综合接待中心,养生餐厅,员工宿舍、温泉民宿、生态停车场、护河堤、游览步道、景观带等基础设施.
","上思可乐旅游发展有限公司","上思县政府覃森",,"现代服务","续建",,"10","东兴市东盟汽车机电贸易城","建设专业市场交易区、仓储物流区、金融商务区、会展中心、服务管理区、生活配套区、停车场及配套相关设施、设备.
","2013-2020","360000","23000","建成6幢商铺楼,完成3万平方米的主体工程.
并引进红木经营商家近20户等.
","41487","44013","10000","建设专业市场交易区、仓储物流区、金融商务区、会展中心.
","广西东兴众鑫建设投资开发有限公司","东兴市政府陈建林",,"现代服务","续建",,"11","东兴市北仑河国际商贸城","建设市场交易区、仓储物流区、流通加工区和商务办公区.
","2012-2020","250000","103000","各项前期工作均已完成,征地拆迁工作基本完成,其中北部湾国际海产品市场已投入使用,其他分项目正在建设前招商工作.
","41091","44166","40000","建设仓储物流区、流通加工区和商务办公区项目.
","广西北投建设投资有限公司","东兴市政府陈建林",,"现代服务","续建","20000","12","东兴市金沙海景商贸广场","建设五星级产权式度假酒店,配套相关基础设施、设备.
","2014-2019","56000","5000","完成基础工程.
","41791","43739","8000","酒店主体建设.
","东兴金满园房地产开发有限公司","东兴市政府陈建林",,"现代服务","续建",,"13","东兴富安居领秀城","项目占地100亩,建筑面积136988平方米,主营中高档品牌家具、瓷砖、洁具、卫浴等.
建设家居建材博览中心、电子商务中心、红木家具设计制作中心及相关配套设施.
","2017-2020","50000","1000","已落户,土方工程已开工.
完成主体建筑设计,完成土方工程35%.
","43040","44075","15000","土建工程.
","广西富安居家居建材广场物业管理有限公司","东兴市政府陈建林",,"现代服务","续建",,"14","东兴市国门景区","华美达广场、中越人民友谊公园、"三街"风貌改造、景区配套设施及标识系统、关帝庙、中越人民友谊公园配套基础设施.
","2016-2020","5000","1000","景区标识系统建设招标完成,准备开工;景区门楼勘探完成,准备开工;完善景区公共服务设施建设及游览设施建设;中越人民友谊公园改造项目二期完成70%;公园景区生态停车场已开工建设;公园景区游览环道建设完成90%.
","42430","44013","1000","土建装修工程.
","广西东兴边海旅游文化发展有限公司","东兴市政府陈建林",,"现代服务","续建""15","东兴市旅游基础设施","停车场及配套旅游、旅游咨询服务中心、标识标牌、导览图;旅游厕所、景区道路拓宽、旅游观光步道(栈道)平台等设施、排水排污工程、乡村旅游示范村(点)配套设施工程.
","2016-2020","5000","2000","已完成相关旅游景区、农家乐、乡村旅游示范区的游客中心、停车场、旅游厕所、旅游标识系统等相关基础设施及公共服务设施.
","2016年8月","2020年9月","1000","继续完善东兴市的旅游基础配套设施及公共服务设施的建设.
","东兴市旅游局","东兴市政府陈建林",,"现代服务","续建",,"16","东盟商贸中心","建设综合服务楼、产品展示大厅、物流服务中心、仓储中心及相关配套设施.
","2013-2019","100000","52000","1.
一期共22栋,现已全部主体封顶.
完成内、外墙抹灰,水电预埋全部完成,消防箱安装工作已完成2/3,消防地管已埋12栋;2.
完成除西面不能砌筑的现场工地围墙;3.
完成二期大部分土方平整.
","41395","2019年","5000","完成项目进度60%.
","广西桂海房地产开发有限公司","港口区政府朱靓",,"现代服务","续建",,"17","盛鑫物流中心","项目占地160亩.
停车场、仓储中心、食宿调度中心、标示牌楼、车辆和设备购置及其它配套设施.
","2017-2020","15000","5000","1.
完成前期工作;2.
项目开工建设.
","42767","2020年","5000","建设停车场、仓储.
","广西盛鑫物流有限公司","港口区政府朱靓",,"现代服务","续建",,"18","防城港市宝树金花茶科技企业孵化基地","研发大楼、中试厂房、中小企业创业孵化基地以及专家住宅等综合配套服务区.
","2014-2019","3500","550","目前项目一期工程完成中试及仓储厂房、产品展示报告厅和防城普通种金花茶基因库等服务平台设施建设,建筑内部正在装修.
二期工程正在筹备,即将开工.
孵化基地正在逐步完善软硬件配套,争取尽快达到使用条件.
","41852","43800","1500","完善一期工程的装修、硬件配套.
建设二期工程,完成二期工程主要建筑的施工.
","广西宝树金花茶科技有限公司","防城区政府荣毅宏",,"现代服务","续建""19","冲仑公路港","建设信息中心大楼、二手车交易市场、4s店、零配件交易中心、考试中心、物流仓储、停车场等配套设施.
","2017-2020","50000","2000","平整土地.
","42887","44166","13000","建设仓储用房等.
","广西晟源投资有限公司","防城区政府荣毅宏",,"现代服务","续建",,"20","十万山七星顶生态综合旅游度假区","1.
建设游客接待中心;2.
建设产权式酒店、度假别墅;3.
建设会展中心、娱乐购物区、宗教活动区等.
","2017-2020","49750","8948","已基本建好南天门、10栋共1800平方米的木别墅、1栋水吧、1栋木宾馆(主体建好,准备装修)、2栋宾馆酒店(主体建好,正在装修)、人工湖、游泳池、凉亭、观景等设施.
景区配套道路按四级公路标准建设,总长5.
8千米,可以开展无障碍施工约3千米,目前已完成路基建设1.
8千米;供电线路已完成塔基建设.
","42887","44166","1000","综合运动场,景区内道路硬化,观光百果园,南天门停车场等配套设施,争取试业.
","防城港市华澳国际商贸有限公司","防城区政府荣毅宏",,"现代服务","续建",,"21","宝树园林景观综合市场","建筑面积约50000平方米;主要建设内容:花木园林、园林景观专业批发市场、商铺及配套设施.
","2017-2020","10000",,"前期工作.
","42856","44166","4000","开工建设.
","防城港市宝树园林景观工程有限公司","防城区政府荣毅宏",,"现代服务","续建""22","华业汽车文化产业园","建设规模及主要建设内容:项目共分为三期建设,项目总占地面积150亩,总建筑面积100000平方米;主要建设汽车展厅、汽配商铺、汽车售后维修、汽车文化园、车展广场、汽车金融、汽车保险、办证大厅、汽车检测线、车管所、阿里巴巴平台、物流平台、公寓楼及相关配套设施.
","2016-2019","30000","5000","完成1-6号楼竣工验收工作.
","42430","43800","10000","开工建设二期.
","广西华建机电市场有限公司","防城区政府荣毅宏",,"现代服务","续建",,"(二)","竣工投产项目","13",,"167057.
786","77001","0",,,"58759.
786""1","防城港市针鱼岭服务区","选址位于针鱼岭大桥西岸针鱼岭至李子潭一级公路北侧,总占地面积约15亩,建筑面积约3200平方米,建设内容包括加油加气站、综合服务中心、汽车维修站、停车场以及其它水电配套设施.
","2017-2018","2989","1000","项目建设情况:1.
完成预制管桩;2.
完成地基毛石混凝土及垫层浇筑;3.
完成底板土方回填及夯实;4.
完成承台、基础梁、底板混凝土浇筑.
","42948","43221","1989","竣工.
","广西东投集团有限公司","广西东投集团赖子机",,"现代服务","竣工投产""2","防城港口岸通关一体化综合服务中心","1.
总建筑面积为32518平方米5A级写字楼一幢及相关配套基础设施.
打造以口岸联检为中心,引进港航、物流龙头企业、金融信息服务等总部基地,构建通关一体化产业平台,促进形成北部湾高端现代物流集聚区;2.
对口岸联检大楼主楼2-5层进行设计、装修,积极推进各口岸查验部门进驻.
","2014-2018","16600",,,"2014年12月","2018年6月","600","1.
主体建设、外装饰装修工程、中央空调、消防工程、水电工程等各子项工程基本完成,并完成主体验收、消防验收、防雷验收.
正着手外装工程验收以及人防和规划验收.
2.
已作出设计方案初稿.
","防城港新联有限公司","市商务局袁学顺",,"现代服务","竣工投产",,"3","广西国际贸易"单一窗口"申报系统(国家标准版)","2015年,首期建设的广西国际贸易"单一窗口",重点开发建设船舶进出口岸一次申报应用系统.
2016年,广西国际贸易"单一窗口"二期在全国率先试点建设陆路口岸"单一窗口",首次将交通运管部门纳入"单一窗口",重点开发建设车辆进出境管理应用系统.
推动口岸查验部门和工商、税务、银行、外管等配套服务部门依托电子口岸公共信息平台,加快实现共用数据标准化,共享监管资源,实施联合监管,推动执法流程再造和简化.
将口岸现行的多人员、多客户端、多单证系统操作的繁琐流程,优化为一口对外、一次受理和一次操作的新型执法模式,通过"单一窗口"平台为企业提供一站式办结所有通关手续服务.
","2015-2018","2000",,,"2015年6月","2018年8月","由自治区商务厅统一安排.
","2017年1-4月,按照自治区"单一窗口"建设的统一部署,"单一窗口"系统平台已完成一期的建设.
目前,已进入二期系统建设及试运行阶段.
","自治区商务厅/防城港市商务局","市商务局袁学顺",,"现代服务","竣工投产",,"4","防城港丰源二手车交易市场","项目占地30亩,分两期进行建设,建设内容包括:车辆交易展示区、交易手续办理服务大厅及相关配套设施.
","2017-2018","2000",,,"2017年1月","2018年3月","1000","项目一期已投产运营.
","防城港丰源二手车交易市场有限公司","市商务局袁学顺",,"现代服务","竣工投产""5","防城港口岸客运旅检大厅过渡性改造项目","旅检大厅过渡性改造后总建筑面积为2516平方米(比原大厅增加简易铁棚顶结构面积450平方米),由旅客候检区、旅客查验区、旅客摆渡区、现场监管办公区4个区域组成.
","2017-2018","902.
786",,,"42917","2018年4月","272.
786","增补完善设备设施.
","防城港市商务局(市口岸办)","市商务局袁学顺",,"现代服务","竣工投产""6","防城港中良仓储有限公司仓储物流项目","新建10.
8万吨具有储备、中转功能的现代数字化储备库,其中30米*91米平房仓5栋,单仓仓容1.
347万吨;Φ28米*28.
6米浅圆仓4栋,单仓仓容1.
0万吨;以及业务楼(含办公、化验、食堂)、机械器材库、辅助性用房(含氮气房、变配电间、发电机房、公共厕所、辅料库、值班室、消防汞房)、400立方米消防水罐、汽车衡房和120T汽车衡、门房及大门、铁路罩棚铁路专用线、道路、围墙等附属建筑及相关配套设施等.
项目分两期完成建设,第一期建设6.
8万吨平方仓(5栋)、配套使用的辅助用房及水电工程等;二期建设4万吨浅圆仓(4栋)及铁路专用线等.
","2018-2018","15100",,"项目目前正在进行招标工作.
","43101","2018年12月","15100","争取年内项目竣工.
","防城港中良仓储有限公司","市物流办朱清华",,"现代服务","竣工投产""7","安派达矿产品防城港仓储物流配送中心","项目用地104.
69亩,建筑总面积约37490.
25万平方米;项目总投资8938.
15万元,折合美元1300万元.
主要建设试验用房、办公服务用房各一幢,建筑面积为14240.
25平方米,地磅及设备用房270平方米,机械修理房1080平方米,钢结构室内仓库21900平方米,以及辅助配套设施.
","2017-2018","8938","2000","1.
项目施工许可证正在办理;2.
项目已完成场地围栏和临建搭建,完成钢筋加工场地硬化,完成400多条基础孔桩施工,项目用电已解决,施工生活临时用水架设已完成.
","42826","43435","6938","争取全面竣工,投入使用.
","安派达仓储(防城港)有限公司","市物流办朱清华",,"现代服务","竣工投产""8","防城港粮食现代物流项目","项目位于广西壮族自治区储备粮防城港直属库库区内,计划建设1栋平房仓,1万吨仓容.
","2017-2018","1060","1060","目前期工作已完成,已完成平房仓桩基础.
","2017年","2018年12月","1060","争取年内项目竣工.
","广西壮族自治区储备粮防城港直属库","市物流办朱清华",,"现代服务","竣工投产""9","东兴十八方农产品进出口交易中心一期工程","建筑面积400002平方米.
建设内容:办公服务区、进口加工交易区、出口加工交易区,配套水电、消防、道路、绿化等相关设施.
","2016-2018","39000","27000","完成办公服务区,正在建设进口加工交易区.
","42522","43221","12000","完工.
","东兴市兴源投资有限公司","东兴市政府陈建林",,"现代服务","竣工投产""10","东兴市口岸二桥综合服务区一期工程","规划用地面积115072.
65平方米,总建筑面积50102.
84平方米,其中新建联建大楼1栋,建筑面积49261.
70平方米,其他用房841.
14平方米;配套建设广场20083.
80平方米、绿化11474.
79平方米、道路16491.
85平方米、停车场14216.
83平方米、围网5600平方米、连廊4724平方米等附属设施;购置安装电梯11套等相关设备.
主要建设内容包括土建工程、安装工程及相关配套工程等.
","2016-2018","25998","17000","完成大部分的外装施工及设备安装.
","42491","43435","4000","完工.
","东兴市开发投资有限责任公司","东兴市政府陈建林",,"现代服务","竣工投产""11","中国东兴-越南芒街跨境经济合作区标准厂房及服务配套工程","规划用地面积约63662平方米,总建筑面积101297平方米,主要建设内容为标准厂房、研发中心、职工宿舍、食堂及相关附属工程.
","2016-2018","25490","10755","完成一期九幢厂房建筑面积63662平方米厂房及部份配套设施.
","42370","43252","7000","完工.
","东兴市城市建设投资有限责任公司","东兴市政府陈建林",,"现代服务","竣工投产""12","源盛仓储物流","占地100亩.
","2017-2018","5000","3000","1.
完成前期工作;2.
项目开工建设.
","42767","43132","2000","项目竣工.
","广西源盛仓储物流公司","港口区政府朱靓",,"现代服务","竣工投产""13","防城港市豪丫市场综合配套项目","总建筑面积126896平方米,其中:住宅建筑面积98000平方米,约249套,市场建筑15120平方米,商铺建筑面积13776平方米,机动车位65个.
建设内容包括土方工程、楼房土建、行车道路、广场铺装、绿化、亮化及室外水电等相关配套设施.
","2016-2018","21980","15186","1.
项目用地105.
8亩,已基本平整完成;2.
配套市场综合楼基础已完成主体封顶,进入装修阶段;回建房(01组、02组、03组)72户主体施工,(04-08组)(04-08组)128户,其中74户主体施工,54户基础施工;3.
配套工程:市场配套正在主体施工.
","2016年","43252","6800","项目竣工.
","港口区城投公司","港口区政府朱靓",,"现代服务","竣工投产""(三)","新开工项目","43",,"4159292.
4",,,,,"210984""1","赤港城综合体项目","项目位于桃花湾片区赤港城综合体总用地350亩.
拟建住宅建筑面积300000平方米,商铺建筑面积14000平方米,社区文化中心4000平方米;公寓楼建筑面积40000平方米,商业步行街30000平方米,商场70000平方米.
假日酒店建筑面积30000平方米,客房约400套,地下建筑面积6500平方米.
","2018-2020","370000",,"待开展项目前期工作.
","43435","2020年","1000","完成施工图设计等前期工作,并开工建设.
","市城投公司","市城投公司兰宏",,"现代服务","新开工""2","新能源汽车分时租赁一体化运营项目","项目以实现我市所辖市区为中心,重点旅游景点为辐射点的全覆盖为目标.
预计投入新能源汽车租赁点60个、新能源租赁汽车1000辆、1500个充电桩、6000个停车位(费用预算含购车、建桩、停车位改造、监控系统等).
","2018-2019","23000",,"已完成前期工作,对该项目已出详细策划案(内容包含合作方式、总投资额、建设规模,社会效益等),目前正在与合作商洽谈签约事项.
","43435","2019年","2000","完成施工图设计等前期工作,并开工建设.
","市城投公司","市城投公司兰宏",,"现代服务","新开工""3","北码头游艇会","该项目配套完备的中高低端游艇,以游艇港运营管理为依托,整合港口岸线、滨海地产综合体等配套资源,提供包含会籍销售、泊位服务、游艇托管、船艇贸易、游艇驾驶培训、船艇服务、保税仓库、会展赛事在内的游艇综合服务.
","2018-2019","6000",,"正在商谈合作框架协议.
","43344","43800","1000","开工建设.
","市城投公司","市城投公司兰宏",,"现代服务","新开工""4","华石·金花茶田园综合体","以金花茶为特色的现代旅游农业综合项目,包括金花茶种植、加工及配套产业、旅游科普观光、养生度假及配套基础设施等.
","2018-2023","100000",,"完成前期调研,开展初步方案设计工作.
","43405","45261","5000","开展项目前期工作,开工建设部分配套设施.
","广西东投集团有限公司","广西东投集团赖子机",,"现代服务","新开工""5","防城港市里火边民互市区基础设施三期工程","选址位于防城区里火边民互市点西侧和北侧,总占地面积约300亩,建筑面积约61000平方米,建设内容包括综合办公楼、物流信息服务中心、员工宿舍区、餐饮区、互市交易场、加工厂房、停车场、地磅、公共厕所以及水电等其它配套设施.
","2018-2019","18500",,,"43435","43800","600","12月份完成项目前期工作,并开工建设.
","广西东投集团有限公司","广西东投集团赖子机",,"现代服务","新开工","重点推进项目""6","防城港针鱼岭加油(气)站","面积:7.
5亩;60立方米LNG气罐,90立方米柴汽油罐.
","2018-2018","3500",,"项目已取得自治区商务厅规划确认、市住建建设用地规划许可证,初步总平规划方案已完成.
现在已重新向市发改委申报项目立项备案材料.
","43221","43435","3500","开展项目前期工作,并开工建成.
","东湾石化公司","广西东投集团赖子机",,"现代服务","新开工""7","中国-东盟(防城港江山)旅游接待基地","项目占地约2300亩,拟建设东盟国际会议中心、五星级度假酒店、产权式酒店、体育休闲活动场、国际游艇俱乐部、滨海浴场及相关配套设施等.
","2018-2025","300000",,"1.
开展项目备案、编制总体规划设计方案等工作;2.
开展征地拆迁工作.
","43435","2025年","1000","完成备案、项目总体规划等前期工作,开工建设.
","广西旅游发展集团公司","市江山旅管委黄晓昀",,"现代服务","新开工""8","白沙湾自驾车营地","建设自驾营地,提升防城港旅游水平.
","2018-2020","30000",,"开展备案、项目总体规划设计方案的编制工作.
","43435","2020年","500","完成备案、项目总体规划等前期工作,开工建设.
","广西旅游发展集团公司","市江山旅管委黄晓昀",,"现代服务","新开工""9","万欧国际名流艺术家园——艺术家广场","占地约300亩,拟建设万鸥国际艺术家广场;万鸥国际当代艺术馆、国魂美术馆、万鸥电影大厦;当代国际艺术家工作室、文化艺术经纪人工作室、宋庄当代艺术家(万鸥)工作室;商务配套设施等内容.
","2018-2021","50000",,"项目已备案,选址已通过规委会,下一步准备开展征地拆迁工作.
","43435","2021年","500","完成征地、规划设计等前期工作,开工建设.
","广西万鸥家园文化产业投资有限公司","市江山旅管委黄晓昀",,"现代服务","新开工""10","广西职工劳模疗休养基地(广西壮族自治区总工会防城港工人疗养院)","总建筑面积为56000平方米,分两期建设.
一期为宾馆主楼,建筑面积为36000平方米,拥有300间客房;二期为配套的娱乐、文化、体育设施建设,建筑面积为20000平方米.
","2018-2020","50400",,"完成规划设计方案.
","43435","2020年","500","完成设计前期工作,开工建设.
","防城国际海员俱乐部","市江山旅管委黄晓昀",,"现代服务","新开工""11","广西防城港华银医学检验所","租用2000平方米以上标准厂房.
项目一期建立临床检验中心、临床病理诊断中心、分子病理检测中心、远程病理诊断中心等目前主流技术平台,开展临床需求迫切的大部分常规项目以及少部分特色项目.
根据平台发展,项目二期将侧重发展基于第二代人类高通量基因测序技术、生物细胞治疗技术等的现代分子医学检测与生物治疗技术服务,开展精准医学、生物治疗、遗传性疾病产前基因诊断等相关一系列医疗服务,进一步提升区域针对重大疾病的高端医疗服务能力.
","2018-2020","3000",,"完成自治区卫计委审批.
","43252","44166","1000","1.
开始全面装修;2.
正式入驻标准云朗科技园.
","广西华科银康医疗科技有限公司","防城港高新区管委韩凯",,"现代服务","新开工""12","防城港市电信普遍服务试点项目","防城港市54个未通光纤行政村(防城区43个,上思县11个)实现光纤网络全覆盖,宽带接入能力不低于20Mbps,项目建成后,至少6年持续稳定的运行维护.
","2018-2018","3888",,"按照工作安排,市工信委起草了《防城港市2017年电信普遍服务试点实施方案》,并于2017年5月获批成为工信部2017年度电信普遍服务试点地市,成为试点城市后,中央财政将下达一次性补助资金1341.
6万元,我市补助资金194万元,重点保障防城港市农村光纤宽带建设和运行维护费用补偿,经市工信委起草的《2017年防城港市电信普遍服务试点项目协议》已征求政府相关部门及中国电信、中国移动等企业修改意见,于11月24日在自治区通信管理局召开的2017年度电信普遍服务试点工作会议上正式与中国电信广西分公司、中国移动广西分公司签订《2017年防城港市电信普遍服务试点项目协议》.
","43101","43344","3240","完成防城港市54个未通光纤行政村(防城区43个,上思县11个)光纤网络全覆盖.
","中国电信股份有限公司防城港分公司、中国移动通信集团广西有限公司防城港分公司","市工信委陈弘志",,"现代服务","新开工""13","大数据云中心机房","汇聚政务业务数据,实现政府数据交换共享及初步的大数据分析,以数据辅助政府科学决策.
集约建设系统承载资源平台,同时集中监控与维护,实现集中运维、集中监控、安全、灾备以及费用核算.
","2018-2020","7800",,"前期调研、建设规划方案基本完成.
","43344","44166","1000","基本完成云机房建设、政务云、教育、卫生、物流、旅游等云平台建设.
","中国电信股份有限公司防城港分公司","市工信委陈弘志",,"现代服务","新开工""14","中国铁塔防城港市分公司2018年通信基础设施建设项目","全年新建铁塔276座,改造存量铁塔480座,微站项目120座,建设室分项目45万平方米.
","2018-2018","6344",,"2018年前期工作情况:目前根据已批复的专项规划,已完成防城港市全年站址规划布点,重点进行中心城区高密度小区5G补点、防东高铁沿线、防城港市园博园、东兴市跨国经济园区、企沙工业园区等区域路段覆盖,以上区域前期已完成实地勘察设计,目前正在对接三大运营商进行需求收集.
","43101","43435","6344","1.
完成全年新建铁塔276座,改造存量铁塔480座,微站项目120座,建设室分项目45万平方米;2.
针对全市弱覆盖区域及小区的123个疑难站址协同政府部门共同完成选址建设,进一步夯实通信设施基础.
","中国铁塔股份有限公司防城港市分公司","市工信委陈弘志",,"现代服务","新开工""15","中国电信防城港分公司通信业务生产楼项目","建设1栋通信业务生产楼,总建筑面积9999平方米,建设内容主要包括土建、室内外装修、电气、给排水、消防、智能化弱电、空调、电梯、室外总平工程.
该大楼具有防城港电信通信指挥调度功能,与港口、防城分局同等级别.
分别安装通信网络运行监控中心,传输机房、数据机房、无线通信机房、运数据机房、服务器托管中心等.
","2018-2019","4660",,"项目已完成方案设计和宗地地表土石方量清运单项工程设计,方案设计现正在报市住建委审批,宗地地表土石方量清运单项工程正在进行施工单位的公开招标.
","43252","43525","1000","项目施工图深度设计和报建报批.
施工单位招标,完成地面正负零一下的基础施工;楼主体7层以下施工量.
","中国电信股份有限公司防城港分公司","市工信委陈弘志",,"现代服务","新开工""16","广西三月三文化旅游度假区","第一期建设三月三广场、停车场、访客中心、广西记忆、老书店、商业街的起步段、客栈、古运河改造、伏波将军故事氛围营造、小吃街、京族村、越南村、壮族村、道路、标识、三月三塔、亲子公园、人员培训、健康社区等,第二期建设老挝村、泰国村、新加坡村、印尼村、亲子公园、健康社区等,第三期将道路系统完善、管理系统完善,建设柬埔寨村、菲律宾村、文莱村、缅甸村、马来西亚村、健康社区等.
","2018-2021","232700",,"洽谈项目投资协议.
","2018年3季度","2021年","250","签订项目投资协议,完成立项、选址等前期工作.
","海南一二三创投有限公司","市旅发委陆健文",,"现代服务","新开工","重点推进项目""17","广西南山长寿谷文化旅游度假区","1.
广西南山文化旅游度假区基础设施建设;2.
南山长寿宫;3.
金花茶展示及示范种植;4.
游客集散中心、商业街区、酒店、休闲养生地产及部分园区等其他符合规划定位的项目.
","2018-2021","150000",,"洽谈项目投资协议.
","2018年3季度","2021年","250","签订项目投资协议,完成立项、选址等前期工作.
","海南一二三创投有限公司","市旅发委陆健文",,"现代服务","新开工","重点推进项目""18","中国东盟义乌小商品边境特色小镇","总建设规模约234万平方米,总规划用地2.
5平方公里,其中建设用地约1平方公里.
主要建设内容:义乌小商品交易中心(小商品城、小商品特色商业街、小商品电商平台及展示区等),小商品研发中心,加工装配区,仓储物流中心,写字楼酒店,学校,大学生创业园,商贸电商学院,人才公寓、住宅,体育健身场所,儿童游乐中心,生活超市,结算金融中心,大数据信息中心及其他配套设施.
","2018-2022","1200000",,,"2018年(以项目供地时间为准)","44896","20000","完成项目前期工作,并开工建设.
","广西桂海实业集团有限公司","市商务局袁学顺",,"现代服务","新开工","重点推进项目","19","防城港外贸综合服务平台","构建"关、检、汇、税、商、物、融"为一体的贸易综合服务体系,提供外边贸进出口货物代理、代理报关报检、贸易结算、货币兑换、出口退税垫付、外边贸及加工贸易融资借款、票据贴现、押汇、保理、福费廷等金融供应链服务,实现快速通关、资金快速流转,提升企业运营能力.
服务平台建成后,将有促于进一步优化我市外边贸产业结构,推动我市外边贸及加工贸易产业快速健康持续发展.
","2018-2018","2000",,,"43282","2018年12月","2000","年内完成项目一期建设.
","中国-东盟信息港股份有限公司、广西联程供应链管理有限公司、防城港市城市建设投资有限责任公司、东兴市京华实业有限公司","市商务局袁学顺",,"现代服务","新开工""20","广西东盟特色产品网上交易中心","广西东盟特色商品网上交易中心项目总投资2000万元.
建设内容包括:边民扶贫电商平台、国内电商分销平台、跨境B2B平台、跨境B2C平台和海外电商分销平台等五种模式的电子商务平台.
完成包括商品管理系统、会员管理系统、支付(跨境)系统、物流(跨境)系统、商家助手系统、在线融资系统等研发.
","2018-2018","2000",,,"43282","2018年12月","2000","完成项目建设并投入运营.
","中国-东盟信息港股份有限公司、广西京越通电子商务科技发展有限公司","市商务局袁学顺",,"现代服务","新开工""21","开放型经济高端人才防城港集聚工程","建立开放型经济人才资源库、网络智库平台系统(线上线下)等,重点培育5个开放型经济发展研究教授(博士)团队.
","2018-2020","1000",,,"43282","2020年6月","300","待自治区湾办批复.
","中共防城港市委组织部防城港市商务局","市商务局袁学顺",,"现代服务","新开工""22","防城港市肉菜流通追溯体系","建设防城港市肉类蔬菜流通追溯体系城市管理平台及各流通节点子系统,覆盖2家生猪屠宰企业、2家超市、1家农贸市场、1家配送中心、2家团体消费单位,并且预留衔接养殖环节信息接口.
","2018-2018","754",,,"43191","2018年12月","200","完成项目建设,并通过验收.
","防城港市商务局及各项目企业","市商务局袁学顺",,"现代服务","新开工""23","防城港保税物流中心(B型)(含防城港东湾保税物流中心工程)","项目位于东湾物流加工园区,紧靠513#—516#码头作业区,东临港区1号路,西面紧靠疏港通道东湾大道,防城港集装箱办理站和防城港火车站;项目占地面积750亩,一期用地300亩,预留约450亩作为项目二期用地;项目主要建设:海域陆地回填、公共基础设施、监管隔离设施、卡口、海关查验仓库及场地、信息管理系统;布局:拆装箱区、生产配套区、加工区、国际配送区、国际采购区和国际中转区等六大功能板块;具备:口岸通关、进口保税仓储、出口入区退税、国际物流配送、简单加工增值、检验检测、进出口贸易和转口贸易、商品展示交易、物流信息处理等多方面开放功能.
","2018-2019","12000",,"1.
申报审核方面:11月20日(周一晚)南宁海关加贸处反馈海关总署加贸司已预审通过我市保税物流中心(B型)的可研报告(电子版),同意将二期450亩和跨境电商产业纳入整体规划方案,申报进入最后的中央部委审核阶段;2.
取土、回填方面:港口区政府为了推动解决珠砂港大岭取土问题,于2017年9月19日依法开展了维护施工;港务集团泛宇房地产公司与施工方签订了保证工程进度的回填协议,施工方已增加了取土挖土运土的机械车辆,回填进度大幅加快.
项目用海范围内约1800亩(含513-516号泊位),已完成回填任务的50%.
","43191","43556","3000","完成一期工程施工建设.
","防城港务集团有限公司","市物流办朱清华",,"现代服务","新开工""24","大西南公路港","项目计划用地200亩,项目总体规划:物流信息交易中心4800平方米、智能车源中心150000平方米、货运班车总站8000平方米、快递集散中心5000平方米、加油加气站2500平方米、大型汽车超市、修理厂3000平方米、综合仓储中心10000平方米、驾驶员之家服务中心3000平方米.
","2018-2019","20000",,,"43313","43800","1000","完成前期工作,正式开工建设.
","广西盛鑫物流有限公司","市物流办朱清华",,"现代服务","新开工""25","东兴口岸二桥综合服务区二期工程(验货场)","总建筑面积24441平方米.
其中包括综合申报区、检验检疫区、现场查验区、海关监管区、H986查验区、入境服务区、通关通道、其他用房;主要建设内容包括建筑土建工程、给排水工程、消防工程、电气工程以及相关配套工程等.
","2018-2018","22107",,"完成项目EPC总承包招标.
","43101","43435","12700","建成投入使用.
","广西跨投公司","东兴试验区管委会规划处易纯",,"现代服务","新开工",,"26","十万大山国家森林公园森林康养综合体项目","主要在现有基础上进行改造提升,进一步完善基础设施,开发新景点,增加景区文化内涵,增设游客参与项目、儿童游乐设施,提升接待能力等.
打造集观光度假、休闲疗养、避暑探险及商务会议为一体的旅游胜地.
","2018-2020","100000",,"开展前期工作.
","43435","44166","3000","完成前期工作,并开工建设基础设施.
","广西广投文化旅游投资有限公司","上思县政府覃森",,"现代服务","新开工""27","东兴市东盟商品加工贸易中心","项目规划总用地面积877164平方米(约1315.
75亩),净用地面积828354平方米(约1242.
53亩).
划分为商贸旅游综合区、商品生产加工区、原材料交易及集中加工区、绿化景观区等四个大功能区,总建筑面积633490平方米.
","2018-2023","358721",,,"43435","2023年","20000","开展三通一平工程.
","东兴市开发投资有限责任公司","东兴市政府陈建林",,"现代服务","新开工",,"28","东兴东盟民族文化村国际旅游项目(一期)","本项目拟分三期建设.
总用地面积为5000亩一期200亩,主要建设中泰欢乐谷(泰国城),二、三期主要建设东盟九国风情园和中华园.
","2018-2020","128000",,,"43252","2020年","20000","泰国园大门、运营中心主体施工.
","东兴市桂海文化旅游投资有限公司","东兴市政府陈建林",,"现代服务","新开工",,"29","中国东盟自驾游总部(东兴)基地","建设规模:项目拟建自驾车汽车营位550个,建筑面积27600平方米.
建设内容:自驾车营地、大型游乐场、商务酒店、游客服务中心、办证中心、车辆检测服务中心、京族文化展示园、购物中心、美食街、保健中心、游泳池、厕所、停车场,配套水电、道路、绿化等相关设施.
","2018-2019","112200",,"规划委员会已确定项目用地选址位于防东高速公路东兴服务区西侧,项目分两期进行规划,其中:一期用地面积约338亩(启动区130亩),二期用地面积约536亩.
正在办理用地手续.
","43313","43739","15000","主体工程施工.
","广西拓鑫旅游发展限公司","东兴市政府陈建林",,"现代服务","新开工""30","东兴昊兴房车露营地","项目拟建房车营位30个,自驾板车营位50个,建筑面积7992平方米.
建设内容:房车露营区、自驾轿车露营区、败笔露营区、木屋休闲区、生态种植区、餐饮娱乐区、综合服务区、配套水电、道路、绿化等相关设施.
","2018-2020","15000",,"落实用地,办理林业砍伐、环评等手续.
","43282","44075","10000","主体工程施工.
","东兴昊兴旅游开发有限公司","东兴市政府陈建林",,"现代服务","新开工""31","广西东兴十八方农产品进出口交易中心(二级市场)","建筑面积118000平方米.
建设内容:综合服务区、加工包装区、冷链区、集散交易区,配套水电、消防、道路、绿化、通信、安防等相关设施.
","2018-2020","70000",,"已完成立项、可研等前期工作.
","43160","44105","15000","建设综合服务区和集散交易区主体.
","广西东兴市兴源投资有限公司","东兴市政府陈建林",,"现代服务","新开工""32","东兴海产品仓储加工冷链基地","项目建设主旨是整合东兴市的冻品市场资源,建设一个加工、仓储、物流、冷链、批发中转的基地,将东兴市建设成全国最大的冻品中转基地.
拟申请用地500亩,一期300亩,二期200亩,建筑总面积计划333500平方米,其中:冷库、加工区190亩,建筑面积126730平方米;仓储物流区190亩,建筑面积126730平方米,办公及中转基地100亩,建筑面积66700平方米;道路及配套设施20亩,建筑面积13340平方米.
","2018-2020","69000",,"落实土地,完成前期工作.
","43313","43952","10000","主体工程施工.
","济南维尔康实业集团有限公司(暂定)","东兴市政府陈建林",,"现代服务","新开工""33","东兴市民兴综合市场","建筑总面积26680平方米.
建设内容包括市场综合楼、商铺,配套水电、道路、绿化、停车场等相关设施.
","2018-2019","8000",,,"43160","43800","5000","主体施工.
","东兴嘉利市场有限公司","东兴市政府陈建林",,"现代服务","新开工",,"34","东兴宏阳预包装食品批发市场","总用地面积30亩,规划预包装产品展销区、各品牌体验中心及办事处和移动互联网商务中心、批发市场、仓储物流中心、员工宿舍区和其他配套设施等,拟建成一个预包装产品批发市场.
","2018-2020","5261",,,"43252","44105","3000","开工建设基础工程.
","东兴市悦阳商贸有限公司","东兴市政府陈建林",,"现代服务","新开工""35","东兴市金滩旅游综合市场","用地面积15.
96亩,总建筑面积19134平方米.
其中新建综合市场9500平方米,新建办公综合楼建筑面积9634平方米.
","2018-2019","3500",,"完成立项、可研等前期工作,正在进行征地工作.
","43313","43770","1000","主体工程施工.
","广西东兴农村商业银行股份有限公司","东兴市政府陈建林",,"现代服务","新开工""36","防城港天堂岛旅游开发项目","建设内容主要包括接待服务设施工程、公共设施工程、基础设施工程、环境整治工程等.
","2018-2020","49540",,"已完成立项、规划;正在编制可研报告.
","43265","2020年","10000","项目开工.
","港口区城投公司","港口区政府朱靓",,"现代服务","新开工""37","防城港市健康养老服务基地","总建筑面积82536平方米,主要建设养老公寓、老年医疗中心、护理中心、养生服务中心、文体活动中心、康体中心等相关配套设施.
","2018-2020","25000",,"已完成开展前期工作的批复,正在编制可研及初步设计.
","43263","2020年","6000","项目开工.
","港口区城投公司","港口区政府朱靓",,"现代服务","新开工""38","广西慎则物流有限公司仓储物流项目","项目计划用地约100亩,投资约1.
5亿元,总建筑面积约36920平方米,将按照国际一流标准建设智能化危化品仓储物流设施,主要建设业务综合楼、甲类仓库、乙类仓库、丙类仓库、加油站、分装站、集装箱堆场、停车场、修车间、洗箱间、消防水池、变电站、消防水站、事故及污水收集池等配套设施.
","2018-2019","15000",,"完成土地招拍挂工作、土地平整、项目总平方案设计等工作.
","43160","43739","3000","正式开工建设,完成地基打桩、仓储设施主体工程建设.
","广西慎则物流有限公司","港口区政府朱靓",,"现代服务","新开工""39","客天下·防城港东盟特色小镇","占地约4500亩,项目一期用地361亩,新建旅游生态园、金花茶园、生态工业循环经济示范园.
配套建设基础设施、道路、水网、电网、通讯网、金花茶广场、游客接待中心,商业步行街.
产权式酒店、会所、总部办公大楼,演艺中心、书院.
新建约200亩嘉泰湖.
","2018-2023","500000","75605","新建福贵园(种植沉香),种植沉香、金花茶苗.
防城区政府与广东客天下实业有限公司、防城港嘉泰投资集团有限公司签订了战略合作框架协议书.
正在开展公园大道相关前期工作.
","43221","45170","3000","公园大道、金花茶广场等配套设施.
","防城港嘉泰投资集团有限公司","防城区政府荣毅宏",,"现代服务","新开工",,"40","防城港市荣桂国际汽车城","4S店、汽车展示展销厅、检测维修中心、汽车用品交易中心、行政办公楼及其他配套设施.
","2018-2020","43000",,"完成土方平整.
","43344","44166","3000","开工建设.
","防城港市荣桂汽车交易有限公司","防城区政府荣毅宏",,"现代服务","新开工",,"41","海洋商贸综合批发市场","占地面积91.
3亩,总建筑面积8.
35万平方米;主要建设内容包括商铺、仓库、办公用房及其他配套设施建设.
","2018-2019","18000",,"完成土地平整.
","43160","43800","6000","完成主体建设.
","防城港市防城区海洋商贸仓储物流有限公司","防城区政府荣毅宏",,"现代服务","新开工",,"42","防城区年屠宰4万头肉牛生产线及冷链配送项目","建设厂房7262平方米、5万吨冷库、辅助生产车间;购置自动化肉牛屠宰加工生产线、制冷设备等.
","2018-2020","11117.
41","6000","正在开展项目征拆工作.
","43374","44166","5100","开工建设.
","广西博丰兴农业开发有限公司","防城区政府荣毅宏",,"现代服务","新开工""43","防城区(里火)景观树综合交易示范区项目","建筑面积3000平方米,主要建设商品进出口报关报检区、商品交易区、隔离区、商务中心、办公区.
","2018-2020","8300",,"开展前期工作.
","43282","44166","3000","办理用地手续,平整部分土地.
","中腾北部湾国际港口投资控股有限公司","防城区政府荣毅宏",,"现代服务","新开工","重点推进项目""(四)","前期工作项目","25",,"2495777","600""1","防城港东盟海鲜物流城","项目位于企沙镇北港村,总用地面积1036亩,总建筑面积约为56.
338万平方米,其中:海鲜和水产品市场52200平方米、农产品市场23940平方米、产品加工中心202000平方米、冷库15500平方米、会展中心27000平方米,以及相关的配套设施.
",,"92000",,"完成立项和测量.
",,,,"在项目选址确定后,完成项目可研批复.
","市港工公司","市港工公司徐钦帮",,"现代服务","前期工作",,"2","LNG加气站","与中海油在市区内合作建设7座LNG加气站,每个加气站计划用地10亩.
",,"7724",,"完成建设方案批复和初步选址工作.
",,,,"在取得项目土地使用权前提下,完成东湾大道加气站、中海油LNG储运库内加气站项目前期工作.
","市港工公司","市港工公司徐钦帮",,"现代服务","前期工作",,"3","江山半岛白浪滩旅游景区建设项目","拟建造白浪滩景区海洋文化及特色旅游元素为主的综合性国际文化旅游项目,总投资约25亿元,主要建设内容包括海滨广场、观光沙滩、休闲度假酒店、海洋主体公园、海洋文化体验中心、儿童海滨游乐场、海鲜美食街等一批特色文化主体项目及配套道路、绿化、照明等附属设施工程.
","2019-2024","250000",,"完成前期调研,开展初步方案设计工作.
","43800","45627",,"开展前期工作.
","广西东投集团有限公司","广西东投集团赖子机",,"现代服务","前期工作""4","防城港市江山半岛旅游度假区万鸥国际名流艺术家园","项目位于江山半岛万欧村,北至鹰婆岭,西至豆腐岭,南临环岛东路,东至大万岭,总面积为2300亩(包含300亩艺术家广场项目地块).
主要建设内容包含国际艺术家创意中心、艺术家太空农庄、艺术家休闲养生基地、影视动漫产业、艺术家个性工坊、艺术家个性配套经营区、湿地艺术公园区、海洋文化休闲区.
","2019-2021","100000",,"完成前期调研,正在开展初步方案设计工作.
","43800","44531",,"开展前期工作.
","广西东投集团有限公司","广西东投集团赖子机",,"现代服务","前期工作""5","江山半岛温泉度假村","主要建设温泉旅游度假酒店、国医养生馆、高端养生公寓、酒吧风情街及旅游相关配套设施等.
","2019-2022","150000",,"开展选址、规划设计及征地等前期工作.
","2019年","2022年",,"完成选址、规划设计等手续报批.
","广西广亨盛投资有限公司","市江山旅管委黄晓昀",,"现代服务","前期工作""6","潭蓬民居度假山庄","建设集住宿、海鲜美食城、沙滩娱乐场、游泳池、体育休闲、海滩文化、农家乐等综合海洋文化度假山庄.
","2019-2021","8000",,,"2019年","2021年",,"完成选址、规划设计等手续报批.
","防城港市森海湾旅游投资有限公司","市江山旅管委黄晓昀",,"现代服务","前期工作""7","防城港市"智慧海洋"综合信息管控平台","基于"一张图"策略架构和腾讯云技术着力构建全方位技术融合的集成GIS、AIS、北斗、雷达、FIS、视频监控等主要技术的海洋综合信息一体化智能管控平台,建成防城港市智慧海洋综合指挥中心、智慧海洋综合信息管控平台软件、AIS船舶自动识别系统、北斗卫星定位系统、雷达应用系统、双光谱视频监控系统、气象实时监测系统、水质实时监测系统、船载身份识别系统(FIS)、ARN认知无线网络系统,满足政府监管布局网络化、执法服务规范化、安全防范与救助一体化、指挥决策智能化的近海监管与服务的信息化总要求,提高政府监管服务质量、监管效能和管理效益,为近海安全保卫、综合治安防控、边界安全管理、船舶监管、海洋环境监测、海上重要目标警卫、海上生产经济区监控、海上灾害预警和紧急救援处置、走私偷渡行为的防范打击等领域提供全面高效的信息数据支撑.
","2018-2020","13416","600","已完成项目建设研讨、可行性调研、论证、需求调研、实地查勘,正在起草项目方案;9月份在企沙镇建成企沙智慧海洋系统试点工程并已投入使用.
",,,,"完成项目立项、招投标、实施.
","上海望海大数据信息有限公司","市工信委陈弘志",,"现代服务","前期工作""8","广西澳加商品交易中心项目","商品交易中心商品交割堆场、油罐、仓库.
","2018-2019","50000",,"项目公司名称已经审核通过:广西澳加商品交易中心有限公司.
项目资料已于2016年年底前经过几次修改后,并将最终材料上报到自治区金融办,待自治区金融办答复.
",,,,"密切对接自治区金融办,加快项目审批.
","广西澳加商品交易中心有限公司","市工信委陈弘志",,"现代服务","前期工作""9","快速制造国家工程研究中心防城港市政府共建防城港市3D打印数字化智造创新平台","1.
主要围绕工业设计、逆向工程及检测、3D打印数字化制造技术人才培养、科技成果转化等.
重点切入智能装备制造业、汽车零部件、海洋装备工程等行业,并通过3D打印数字化制造技术来实现.
推出行业系统整体解决方案并完成部分系统产品的自主研发和销售;2.
将数字化制造技术与双创培育相结合,加快教育市场的培育力度,以大众创新体验,有组织、有目标的团队创新、创业,技术与产业对接,以创新、创业能力提升为目的人才培育和企业孵化的模式,从而形成政、产、学、研、资"五位一体"的北部湾地区3D打印双创培育示范基地;3.
企业服务(产业转型升级)完善创新创意设计与检测中心、3D打印中心开发技术产业链.
","2018-2020","1400",,"已完成合同协议初稿,正请示上报审定.
",,"44166",,"完成合同签订、启动3D打印数字化智造创新平台建设.
","快速制造国家工程研究中心","市工信委陈弘志",,"现代服务","前期工作""10","防城港东兴机场航空经济区","项目建设用地规模为6500-10000亩,项目建设内容包括:通航运输机场、4C机场,航空商务园、空港物流园、航空维修制造产业园,航空制造业专科学校、航空服务业专科学校,航空小镇(空港商务住宅区、文旅区)、航空博览园等.
建成通航运输机场、4C机场及配套经济区,建设周期初定为6年,分3期进行开发建设.
","2018-2023","500000",,,,,,"完成项目投资意向框架协议、项目正式投资协议签订;项目投资者在我市注册成立独立法人企业,并实际到位项目前期经费1000万元,且缴纳项目投资建设保证金500万元.
","瞻望世纪航空有限公司","市商务局袁学顺",,"现代服务","前期工作""11","防城港国际航运服务中心","项目占地28.
428亩,建筑规模8.
9万平方米,建设内容包括:北部湾大宗商品(煤炭、矿石、粮食交易中心)、北部湾航运交易中心,主要功能为跨境电商、东盟产品展示、船舶服务、交易、免税购物、商务配套、报关报检,供应链整体服务等.
","2018-2021","38000",,,"43405","2021年",,"2018年6月前完成项目前期工作,2018年11月前开工建设.
","防城港新地有限公司","市商务局袁学顺",,"现代服务","前期工作""12","防城港集装箱办理站","项目防城港集装箱办理站于2015年8月5日获铁路总公司下文批复办理集装箱业务,于同年9月8日揭牌成立.
项目选址位于防城港车站新货场,项目总按1500万吨能力建设.
建设铁路到发场、集装箱作业区、冷藏作业区、快运作业区及特货作业区等.
项目一期用地约375亩地,二期用地约400亩地.
","未确定","待定",,"1.
沿海铁路公司计划先利用既有的铁路货场用地约375亩建设集装箱办理站一期,设计吞吐能力20万TEU,目前已委托中铁四院项目一期方案设计,并完成初稿;2.
2017年3月2日,穿越铁路货场地块的3号箱涵正式开工建设;3.
2017年9月4日,召开规委会,原则同意防城港集装箱办理站范围内的110KV供电线路迁改方案采用方案二(即分开架设);目前项目业主正开展线路迁改设计工作;4.
截至2017年5月份,铁路货场原堆放的散货约6万吨煤炭已经清理完毕,同时所有货场转型开展集装箱业务.
",,,,"开展高压线塔迁改工作.
","广西沿海铁路股份有限公司","市物流办朱清华",,"现代服务","前期工作""13","防城港市天堂滩休闲度假中心项目","占地150亩,项目将建成包括6-8个围合院子,主楼2栋,会议中心、异域风情食廊、四季泳池、主题婚礼广场、大型海滨浴场、健身馆、异域风情食廊及相关配套设施等,集酒店住宿、度假、休闲娱乐、商务等综合配套等功能为一体的现代化、多功能、综合性酒店.
","2019-2020","160000",,"已经签约,正在征地.
","43802","44166",,"完成项目选址、征地等前期工作.
","深圳市粤新海投资有限公司","市投促局陈源清",,"现代服务","前期工作""14","防城港LNG车辆一站式服务中心项目","占地100亩,建设智能罐车停车服务中心、车辆维修区及综合业务用房,重点配套中海油防城港东湾LNG接收站槽车运输及销售服务.
","2019-2020","56000",,"已经签约.
","43800","44166",,"完成用林、用海许可等前期工作.
","安徽宏达汽车销售有限公司","市投促局陈源清",,"现代服务","前期工作""15","东兴房车露营地项目","占地100-150亩,分两期进行建设,打造吃、住、行、玩一体的房车露营地.
拟建设功能区:综合服务大厅、房车露营区、自驾轿车露营区、帐篷露营区、木屋休闲区、生态种植区、相关配套设施.
","2019-2020","10000",,"已经签约,正在租用场地试运营.
","43801","44166",,"完成用林、用海许可等前期工作.
","北京房建集团投资有限公司","市投促局陈源清",,"现代服务","前期工作""16","金花茶国际康养文化小镇","项目规划面积3000亩,建筑面积222000平方米,新建金花茶生态康养文化小镇.
","2018-2020","38000",,"开展前期工作.
","43586","44166",,"完成前期工作.
","广西桂人堂金花茶产业集团股份有限公司","上思县政府覃森",,"现代服务","前期工作""17","圆通东盟国际商贸物流综合枢纽","圆通速递计划在东兴市设立广西首个跨境快件监管中心、建立快递+电商综合商贸平台(即跨境电子商务产业园涵盖物流园区、快递分拣中心、电商服务平台以及电商人才培训等)、成立东盟商品加工产业园(对进口东盟商品进行落地加工,以产业推动快递发展).
其中:第一期建设用地100亩,用于建设国际快件监管中心、跨境电子商务产业园.
第二期建设用地300亩,用于建设东盟商品加工产业园.
第三期预留东盟商品加工产业园用地500亩.
","2019-2022","200000",,,"2019年",,,"完成前期工作,争取早日开工建设.
","上海圆通速递","东兴市政府陈建林",,"现代服务","前期工作",,"18","东兴北仑河口景区(跨境旅游合作区首期启动区项目)","主要建设游艇俱乐部、海陆地标游赏园、竹山古街修缮与环境营造、三圣宫修缮、沿边公路起点地标广场等;建设绿色海岸、蓝色海岸、金色海岸以及港口海岸四大特色项目;建设集出入境管理、游船停泊、餐饮、购物、休闲、文化娱乐于一体的国际旅游码头.
","2019-2021","100237",,"已完成竹山古街修缮与环境营造、三圣宫修缮和沿边公路起点地标广场建设.
","2019年",,,"完成前期工作,争取早日开工建设.
","广西东兴边海旅游文化发展有限公司","东兴市政府陈建林",,"现代服务","前期工作""19","东兴市东镜岭旅游景区","规划面积344公顷.
主要建设内容有:东镜岭景区入口设施.
东高朗新村项家寨、项家大窑的建设;东镜岭奇石清溪、乡野娱乐、生态游泳池、五谷丰登塔等休闲娱乐设施建设;彭祖生态园、揽胜健身区建设;加强宣传促销、员工培训和旅游软环境建设.
","2019-2020","8000",,,"2019年",,,"完成前期工作,争取早日开工建设.
","待定","东兴市政府陈建林",,"现代服务","前期工作""20","中国东盟国际水产品交易储备中心项目","50万吨储藏冷库,国际一流的室内恒温交易市场;活鲜水产品交易与观赏于一体的水族(海洋)馆;东盟国际海洋会展中心;体现海洋渔业文化集美食、娱乐、旅游于一体的海洋文化广场;海洋渔业专用码头;其它生活配套附属功能设施.
","2019-2020","500000",,,"2019年","2020年",,"完成协议签订、公司注册、备案、可研、选址、总平、征地拆迁、土地预审等前期工作,争取完成土地招拍挂.
","象山龙潮海洋经济开发有限公司","港口区政府朱靓",,"现代服务","前期工作","重点推进项目""21","中国—东盟(防城港)边海国际体育运动综合集训基地项目","建设国际级标准足球场(包含看台)1个,标准十一人制足球训练场18个,国家标准五人制足球场10个,运动康复中心及养生馆1个,足球商业街区以及相应的旅游、休闲、娱乐配套设施等.
","2019-2021","120000",,"完成了立项、规划选址、总平图编制以及项目策划.
","2019年","2021年",,"完成部分前期工作.
","港口区旅游局","港口区政府朱靓",,"现代服务","前期工作""22","港口区山新海滩项目","山新海滩位于企沙镇山新村东南面.
山新海滩的弧形沙滩岸线长约2千米,沙滩坡度小、滩面宽阔、沙粒细小、水质洁净,为天然沙滩浴场的优质旅游资源.
依托资源特色,拟规划建设旅游服务中心、海水浴场区、沙滩休闲区、游客集散广场、海鲜美食街区、水岸餐厅酒吧街区、游艇社区、滨海酒店等,打造成为我市精品滨海旅游休闲度假区.
","2019-2022","50000",,"项目进行前期规划.
","2019年","2022年",,"完成部分前期工作.
","港口区旅游局","港口区政府朱靓",,"现代服务","前期工作""23","综合市场开发运营项目","六个配套市场,建筑面积10万平方米.
","2019-2021","30000",,"豪丫市场主体已完成,其他市场正在进行前期工作.
","2019年","2021年",,"完成部分前期工作.
","港口区城投公司","港口区政府朱靓",,"现代服务","前期工作""24","台湾青年就业创业服务中心","台湾青年就业创业服务中心.
完成水电路、给排水、接通宽带网络等工作.
","2019-2020","8000",,"开展前期工作.
","2019年","2020年",,"完成前期工作.
","广西阳光玫瑰庄园投资有限公司","防城区政府荣毅宏",,"现代服务","前期工作""25","滩散互市区改造升级项目","互市点货场、综合设施(停车场、公共厕所)、业务用房、互市点道路等.
","2019-2020","5000",,"开展前期工作.
","2019年","2020年",,"完成前期工作.
","防城区商务局","防城区政府荣毅宏",,"现代服务","前期工作""三","城市建设类","126",,"2074374.
92","575574",,,,"321473""(一)","续建项目","14",,"500632.
98","218864","0",,,"149950""1","榕木江大街西段和葛坪路","榕木江大街西段长4.
67千米、葛坪路长2.
25千米,宽50米,按城市主干道标准建设.
","2014-2019","58148","58148","榕木江西段2段完成路基施工,榕木江西段1标开展清表工作.
","41974","43800",,"在2018年6月份前解决征地拆迁前提下,榕木江西段2标完工,榕木江西段1标路基拉通.
","市港工公司","市港工公司徐钦帮",,"城市建设","续建",,"2","堤路园(园博园、伏波大道)","1.
园博园:规划总用地面积约2191345平方米,约合3287亩.
主要建设规模:新建主场馆、配套服务和配套产业总建筑面积51950平方米、景观构筑物650平方米、园区道路104177平方米、广场铺装191417平方米、绿地面积1386157平方米、市政道路197720平方米、机动车停车位2751个;2.
伏波大道:路线全长4836米,实施长度4816米,红线宽度为40米/50米.
","2017-2019","155000","100000","1.
项目前期工作推进情况:完成项目测量、项目建议书、可研批复、用地预审、用地规划许可证、总平审批、初步设计批复、施工图设计,目前正在进行人防、消防、林地报批等前期工作.
已完成社会资本方资格预审工作;2.
项目建设推进情况:已完成园博园主场馆部分清表;伏波大道大塘江段进行清表100平方米.
","43070","43556","62000","园博园完成场馆类施工及装修,停车场、过街天桥及园区道路路基;伏波大道:完成600米路基施工及桥梁施工.
","市城投公司","市城投公司兰宏",,"城市建设","续建",,"3","城南新区B-3号路","总长2100米,宽40米.
建设内容为:路基、排污排水、绿化等配套工程.
","2017-2019","6102","10090","完成施工招标并开工建设.
","42917","43800","4200","完成排水排污施工.
","市城投公司","市城投公司兰宏",,"城市建设","续建",,"4","城南新区A-7号路","总长1880米,宽25米.
建设内容为:路基、排污排水、绿化等配套工程.
","2017-2019","8060","8866","完成施工招标并开工建设.
","42887","43800","3000","完成路基施工900米,排水工程施工1200米.
","市城投公司","市城投公司兰宏",,"城市建设","续建",,"5","城南新区路网A-9延长线","道路长830米,宽40米.
建设内容为:包括土石方、道路、桥梁、排水、电气、交通及绿化工程.
","2017-2019","4815","5297","完成施工招标并开工建设.
","43070","43617","3200","完成路基施工.
","市城投公司","市城投公司兰宏",,"城市建设","续建",,"6","城南新区路网A-8延长线","全长650米,路幅宽40米.
建设内容为:包括土石方、道路、桥梁、排水、电气、交通及绿化工程.
","2017-2019","4466","4913","完成施工招标并开工建设.
","43070","43617","2900","完成路基施工.
","市城投公司","市城投公司兰宏",,"城市建设","续建",,"7","高铁北站南路南延长线","总长920米,宽40米.
建设内容为:路基、排污排水、绿化等配套工程.
","2017-2019","4444","4945","完成施工招标并开工建设.
","43070","43617","2000","完成级配层施工.
","市城投公司","市城投公司兰宏",,"城市建设","续建",,"8","赤港路廉租房红线外配套道路","道路全长1780米,其中1号路长1114米,宽20米;2号路长416米,宽20米;3号路长250米,宽20米;主要建设内容为:路基工程、排污排水工程等配套工程.
","2017-2019","3800","4198","完成施工招标并开工建设.
","43070","43800","3000","完成道路雨污管铺设,路面砼浇筑以及人行道施工.
","市城投公司","市城投公司兰宏",,"城市建设","续建",,"9","冲孔路北段(界排路)","道路总长800米,宽40米,长400米,宽25米.
建设内容为:道路、排污排水、交通、绿化等配套工程.
","2017-2019","3151","3466","完成施工招标并开工建设.
","43070","43617","2000","完成路基、排水工程施工.
","市城投公司","市城投公司兰宏",,"城市建设","续建",,"10","东湾物流园加工区一、二路项目","项目分为河西大道和河西工业大道两个单项工程,施工的内容为道路、排水、绿化、交通及照明工程等.
河西大道,起于防东大道止于伏波西路,道路全长1899米,道路红线宽40米;河西工业大道,起于原防东公路收费站止于防城二桥头,道路全长1814米,道路红线宽50米.
","2017-2019","12154",,"基本完成项目前期工作.
","43070","43800","2000","完成部分路段施工.
","广西东投集团有限公司","广西东投集团赖子机",,"城市建设","续建""11","沙潭江生态科技产业园启动区(一期)","项目总建筑面积54997.
18平方米,包括A#研发中心,B#服务中心,C#研发中心和地下室架空层以及园区配套路网七条道路,七条道路为硅谷街、曙光街、神舟街、皇城坳大街、银河路、创富路、东湾大道延长线.
","2017-2020","86800","18700","完成全部前期工作.
","43009","43891","39500","1.
3栋研发中心投入使用;2.
完成2条以上路网路基工程.
","防城港高新区投资发展有限公司","防城港高新区管委韩凯",,"城市建设","续建",,"12","防城港市行政中心区配水厂及配套管网工程项目","供水能力到2017年为5万立方米/天,到2025年为10万立方米/天.
主要建设内容包括调节水池、加压泵站、配电间、控制室、加药间、综合楼、机修仓库、传达室、厂区管道工程以及厂外约14.
8千米配套管网工程.
","2017-2019","7565.
985","241","完成厂区土方平整和围墙建设.
","42856","43800","450","厂区土建工程施工,完成部分构筑物主体工程.
","广西防城港北投水务有限公司","市市政局包家友",,"城市建设","续建",,"13","110kV大龙(光坡)送变电工程","线路4千米,变电5万千伏安.
","2012-2019","3927",,,"43038","43615","700","变电:电气安装75%;线路:线路(电缆)施工75%;通信:设备、光缆施工75%.
","广西电网有限责任公司","防城港供电局黄应忠",,"城市建设","续建",,"14","东兴市高铁站路网工程","建设总长度约15788.
61米,前区涉及路网共13条,其中南北向10条,分别为友好大道北段、低丘缓坡片区经五路、低丘缓坡片区经七路、站前路(纬六路至长湖路段)、站前路(防东一级公路至纬六路段)、锦兴西路北段、低丘缓坡片区经九路、保税大道北段、西灶路、松柏路;东西向3条,分别为长湖路东段、锦绣路、纬六路,主要建设内容包括道路工程、交通工程、排水工程、给水工程、照明工程、绿化工程、电力电信管沟工程.
","2017-2022","142200",,,"2017年","2022年","25000","锦兴西路北段、保税大道北段、西灶路、站前路(防东一级公路至纬六路段)、低丘缓坡片区经七路、低丘缓坡片区经九路、纬六路、友好大道北段按计划施工建设,低丘缓坡片区经五路、站前路(纬六路至长湖路段)、松柏路、长湖路东段、锦绣路道路开工建设.
","东兴市开发投资有限责任公司","东兴市政府陈建林",,"城市建设","续建""(二)","竣工投产项目","49",,"360800","335556","0",,,"85646""1","公车物流园文昌大道东延长线","道路总长5666米,红线宽55米,按城市主干道标准建设.
","2015-2018","54963","60420","完成4千米路基贯通和部分桥涵工程.
","42156","43313",,"在2018年5月前解决征地拆迁前提下,项目竣工投入使用.
","市港工公司","市港工公司徐钦帮",,"城市建设","竣工投产",,"2","公车物流园玉石滩大道","道路总长3180米,红线宽70米,按城市主干道标准建设.
","2015-2018","44886","49360","完成全线路基贯通和部分桥涵工程.
","42339","43313",,"在2018年5月前解决征地拆迁前提下,项目竣工投入使用.
","市港工公司","市港工公司徐钦帮",,"城市建设","竣工投产",,"3","东湾园区3号箱涵","工程起点滨海公路南侧段铺设DN1800钢筋混凝土管501米,2*DN2400钢筋混凝土管597米,2*DN2600钢筋混凝土管215米,路线长度1313米,管道总长2125米.
滨海公路北侧段调整为临时排水明沟,长1141米.
","2017-2018","5625","6185","施工单位已进场开始施工.
","42795","43344",,"在解决征地拆迁前提下,项目竣工投入使用.
","市港工公司","市港工公司徐钦帮",,"城市建设","竣工投产",,"4","云约江大道维修工程","将现有的云约江大道(长3300米,红线宽40米)进行维修.
","2018-2018","2858","0","完成施工图设计工作.
","43252","43435","2858","竣工投入使用.
","市港工公司","市港工公司徐钦帮",,"城市建设","竣工投产",,"5","东湾物流加工园港区12号路及13号路延长线工程","道路总长638米,其中13号路长250米,红线宽20米;12号路长388米,红线宽30米,按简易道路修建.
","2018-2018","1500","0","完成项目前期工作和施工单位招标工作.
","43101","43344","1500","在解决征地拆迁前提下,项目竣工投入使用.
","市港工公司","市港工公司徐钦帮",,"城市建设","竣工投产",,"6","东湾物流园加工港区14号工程","道路长866米,红线宽50米,按简易道路修建.
","2018-2018","4393","4830","完成项目前期工作和施工单位招标工作.
","43101","43344",,"在解决征地拆迁前提下,项目竣工投入使用.
","市港工公司","市港工公司徐钦帮",,"城市建设","竣工投产",,"7","东湾物流园港区1号路北段工程","道路总长547米,红线宽50米,按简易道路修建.
","2018-2018","1000",,"前期工作全部完成,正在开展施工和监理招标工作.
","43160","43435","1000","在解决征地拆迁前提下,项目竣工投入使用.
","市港工公司","市港工公司徐钦帮",,"城市建设","竣工投产",,"8","三横二纵路网工程五号路","5号路长2645米,宽40米.
主要建设内容包括道路、排水、交通、照明、绿化等工程及相关配套设施建设.
","2010-2018","4352",,"完成江山大道南段砼路面.
","40299","43435","900","完工.
","市城投公司","市城投公司兰宏",,"城市建设","竣工投产""9","市中心区"三横二纵"路网工程2号路工程","建设规模:道路长3225米,路幅宽39米.
道路等级为次干路,设计行车速度50千米/小时.
建设内容:道路工程、排水工程、交通工程、绿化工程、照明工程及其它配套设施建设.
","2015-2018","22339","25165","A标:完成污水管400米,雨水管400米;B标:完成强夯施工及排水管400米.
","42217","43435","4000","完工.
","市城投公司","市城投公司兰宏",,"城市建设","竣工投产""10","长山新区路网工程","建设规模:长山新区路网工程由5条道路组成,路网总长5776米.
工程分成A标、B标两个施工标.
主要建设内容为:路基工程、排污排水工程、绿化工程等.
","2010-2018","17000","18697","完成雨污管铺设,道路砼浇筑以及人行道施工,路灯和交通标志标牌安装.
","40299","43435","3000","完工.
","市城投公司","市城投公司兰宏",,"城市建设","竣工投产""11","纬二线道路西段","新建城市次干路1855米,红线宽度40米.
主要建设内容包括道路工程、排水工程、交通工程、绿化工程、照明工程以及相关配套设施.
","2016-2018","14407","15849","完成K0+800-K1+913主车道沥青路面及该段雨污水施工.
","42614","43435","6400","完工.
","市城投公司","市城投公司兰宏",,"城市建设","竣工投产""12","江山大道西段","建设规模:江山大道西段长2890米,红线宽度55米;建设内容包括:道路、排水排污、绿化亮化、交通标志标线等配套工程.
","2008-2018","10000","11000","A标:完成路基贯通、K0+090-K1+200段水稳层;B标:完成路基1100米,强夯施工250米.
","A标:2016年4月(实际)B标:2008年12月(计划)","43435","3500","完工.
","市城投公司","市城投公司兰宏",,"城市建设","竣工投产""13","三都路","三都路长1304米,红线宽度40米;主要建设内容包括道路工程、排水工程、交通工程、照明工程、绿化工程以及相关配套设施.
","2016-2018","8928","9821","完成土方开挖50万方.
","42675","43435","5000","完工.
","市城投公司","市城投公司兰宏",,"城市建设","竣工投产""14","滨海东延长线","滨海东延长线长878米,红线宽度43-50米.
主要建设内容包括:道路工程、排水工程、照明工程、交通工程、绿化工程以及相关配套设施.
","2015-2018","7010","8030","完成桥梁工程2#、3#桥台桩基础施工.
","42217","43435","2500","完工.
","市城投公司","市城投公司兰宏",,"城市建设","竣工投产""15","港湾街","道路总长1662米,宽24米,设计标准按城市支路建设.
","2015-2018","6457","7102","已完成约1300米路基、排水排污、砼路面;2017年底完成约200路基土石方.
","42217","43252","500","完工.
","市城投公司","市城投公司兰宏",,"城市建设","竣工投产""16","CBD北面AB路","新建城市支路1479米,红线宽度25米,其中:A路路线长1172米(扣除交叉口范围),B路路线长308米(扣除交叉口范围).
主要建设内容包括道路工程、排水工程、交通工程、照明工程、绿化工程以及相关配套设施.
","2016-2018","6410","7051","完成K0+020-K0+420水稳层施工;完成K0+540-K1+000级配层施工.
","42370","43436","1500","完工.
","市城投公司","市城投公司兰宏",,"城市建设","竣工投产""17","独墩路","新建城市支路1396.
247米,红线宽度20米.
主要建设内容包括道路工程、排水工程、交通工程、绿化工程、照明工程以及相关配套设施.
","2017-2018","5580","6140","完成全段土方开挖及回填.
","42917","43435","2000","完工.
","市城投公司","市城投公司兰宏",,"城市建设","竣工投产""18","城南新区B-7号路","总长1374米,宽25米.
建设内容为:路基、排污排水、绿化等配套工程.
","2017-2018","4884","5940","完成500米清表、200米路基土方及排水施工.
","42979","43435","1300","完工.
","市城投公司","市城投公司兰宏",,"城市建设","竣工投产""19","城南新区路网工程","城南新区路网工程由9条道路组成,总长15748米,其中:A-1道路全长580米,宽40米;A-3道路全长653.
032米,宽30米;A-8道路全长1787米,宽40米;A-9道路全长2350米,宽40米;B-8道路全长1908米,宽40米;B-9道路全长2750米,宽40米;主要建设内容:包括道路工程、土方工程、涵洞工程、排水设施工程以及配套绿化、亮化工程等.
","2010-2018","4500","45004","A-1路:除部分非机动车道和人行道基本完工;A-3路:除K0+160-300段未完成路面外,其余已全部完成;A-8:完成路面及人行道施工.
A-9:完成1000米路面及人行道及800米路基施工.
B-8路:已完成220米排水及土石方工程;B-9号路:已完成370米排水、路基、级配及水稳层.
","40299","43435","4150","A-8、A-9道路完工.
","市城投公司","市城投公司兰宏",,"城市建设","竣工投产""20","豪丫路","新建城市支路1170米,红线宽度25米.
主要建设内容包括道路工程、排水工程、交通工程、照明工程、绿化工程以及相关配套设施.
","2016-2018","4238","4662","完成K0+060-K0+480第二层水稳层;完成K0+540-K1+170第一层水稳层施工.
","42675","43252","1000","完工.
","市城投公司","市城投公司兰宏",,"城市建设","竣工投产""21","大平坡路","大平坡路长1275米,红线宽度24米.
主要建设内容包括道路工程、排水工程、交通工程、照明工程、绿化工程以及相关配套设施.
","2016-2018","4068","4483","完成部分清表.
","42675","43435","4000","完工.
","市城投公司","市城投公司兰宏",,"城市建设","竣工投产""22","市纬二线道路工程K0-990+K1+607.
245","道路全长约600米,宽40米.
主要建设内容包括道路、排水、绿化照明等配套工程.
","2017-2018","2783","3061","完成部分清表工作.
","42948","43435","1500","完工.
","市城投公司","市城投公司兰宏",,"城市建设","竣工投产""23","北站南路西延长线","新建城市支路943米,红线宽度25米.
主要建设内容包括道路工程、排水工程、交通工程、照明工程、绿化工程以及相关配套设施.
","2016-2018","2732","3295","完工.
","42583","43252","200","竣工.
","市城投公司","市城投公司兰宏",,"城市建设","竣工投产""24","高铁北站西路南段","总长762米,宽25米.
建设内容为:路基、排污排水、绿化等配套工程.
","2017-2018","2637","3290","完成200米土方施工.
","43070","43437","1000","完工.
","市城投公司","市城投公司兰宏",,"城市建设","竣工投产""25","B-9中段","新建城市次干路627.
8米,红线宽度40米.
主要建设内容包括道路工程、排水工程、交通工程、绿化工程、照明工程以及相关配套设施.
","2016-2018","2973","3289","完成全部路面施工.
","42644","43252","800","竣工","市城投公司","市城投公司兰宏",,"城市建设","竣工投产""26","港口区渔洲坪桃中路中段(A路)","道路全长821.
48米,路面宽50米,按城市Ⅱ级主干道标准建设.
","2013-2018","2900","3190","完成200米雨污管铺设,道路砼浇筑以及人行道施工,路灯和交通标志标牌安装.
","41395","43435","600","完工.
","市城投公司","市城投公司兰宏",,"城市建设","竣工投产""27","龙琴路","龙琴路长744米,宽24米,道路等级为城市支路,设计行车速度30千米/小时.
建设内容:道路工程、排水工程、照明工程、交通工程、绿化工程及相关配套设施.
","2015-2018","1968","2159","完成照明工程.
","42217","43252","100","完工.
","市城投公司","市城投公司兰宏",,"城市建设","竣工投产""28","长泰路","新建城市支路796.
078米,红线宽度20米.
主要建设内容包括道路工程、排水工程、交通工程、绿化工程、照明工程以及相关配套设施.
","2016-2018","1961",,,"42522","43253","500","完工.
","市城投公司","市城投公司兰宏",,"城市建设","竣工投产""29","纬二线道路工程一标(K0+460-990)","长500米,宽40米.
主要建设内容包括道路工程、排水工程、交通工程、绿化工程、照明工程以及相关配套设施.
","2017-2018","1600",,"完成部分清表.
","42948","43435","1000","完工.
","市城投公司","市城投公司兰宏",,"城市建设","竣工投产""30","北站西路延长线","新建城市支路500米,红线宽度15米.
主要建设内容包括道路工程、排水工程、交通工程、照明工程、绿化工程以及相关配套设施.
","2017-2018","1558","1715","完成K0+000-K0+200土方开挖.
","42948","43435","600","完工.
","市城投公司","市城投公司兰宏",,"城市建设","竣工投产""31","缪屋路","新建城市支路586米,红线宽度25米.
主要建设内容包括道路工程、排水工程、交通工程、照明工程、绿化工程以及相关配套设施.
","2016-2018","1504","1654","完成K0+260-K0+586土方开挖.
","42583","43435","700","完工.
","市城投公司","市城投公司兰宏",,"城市建设","竣工投产""32","港安街","港安街长452米,红线宽度24米.
主要建设内容包括道路工程、排水工程、交通工程、照明工程、绿化工程以及相关配套设施.
","2016-2018","1219","1341","完成部分清表.
","42675","43252","600","完工.
","市城投公司","市城投公司兰宏",,"城市建设","竣工投产""33","百里黄金海岸工程一期(针鱼岭大桥至西湾跨海大桥段)","项目美化海岸线约6千米,主要建设内容包括沙滩改造、林地保育与生态景观改造,慢性绿道及其附属设施、滨海木栈道与景观平台、标志性景点与景观、市政基础设施、海绵城市与海堤护岸工程等.
","2017-2018","10800","3464","1.
项目经理部已建设完成,预制梁场已建设完成,目前已经完成50片空心盖板的浇筑;2.
针鱼岭到大王江桥段已完成400米的清表工作,已完成该段设计图纸工作;3.
已完成大王江景观桥全部10根桩基的施工,并完成桩基检测工作;大王江景观桥完成3号墩的墩柱砼浇筑;完成4号桥台台帽砼的浇筑;完成1号墩的破桩头和护坡砼的浇筑;2号墩和3号墩之间钢平台搭设完成70%;4.
利师组到大万组栈桥段完成抽沙填筑106000多立方,完成第三层沙袋的填筑700米;完成利师组村口50米施工便道的填筑;5.
已完成大万组段300米的便道填筑工作,桩头开挖54个,破除桩头45根,已完成桩基检测20根;6.
西湾环海大道护岸段防撞墙栏杆已经安装完成500米,第一层涂装已经完成;已完成护岸段1100米C25混凝土调平层的浇筑工作;已完成护岸段1100米透水混凝土面层的施工;已完成护岸段1100米仿木栏杆的安装工作;已完成1100米仿木栏杆立柱混凝土浇筑工作;已经完成1100米的仿木漆的涂装工作.
","42979","43435","7336","竣工验收.
","广西东投集团有限公司","广西东投集团赖子机",,"城市建设","竣工投产""34","企沙新区污水处理厂及截污管网一期","项目建设总规模为处理能力20万吨/日,其中一期工程建设规模为处理能力5万立方米/天;工程包括处理构筑物一套、配套截污管网49.
96千米,中途提升泵站4座等,服务范围企沙工业园区及周边生活污水处理.
","2016-2018","34490","6000","厂区主体完成施工,完成主要设备.
","42491","43435","4000","完成厂区建设投入试运营.
","广西防城港北投水务有限公司","防城港经开区管委林柱昌",,"城市建设","竣工投产""35","白浪滩污水处理厂","新建1万立方米/天的污水处理厂一座,敷设配套DN300-DN600污水收集管网约11千米.
主要建设内容为污水处理厂所需各单元构筑物、卫生间、配电间、维修间、库房等建筑物及污水收集管道的敷设.
","2014-2018","3900","1200","完成管网及泵站建设.
","41760","43435","100","竣工使用.
","广西防城港北投水务有限公司","市江山旅管委黄晓昀",,"城市建设","竣工投产""36","防城港湾(西湾)海域综合整治工程—Ⅱ区CK块海域清淤及疏浚工程","项目完成677815平方米的海域清淤,疏浚土方188.
1897万立方米.
主要建设内容包括清淤疏浚工程、吹填工程等.
","2017-2018","2620","1800","2017年底完成项目68.
7%.
","42887","43191","820","2018年4月项目竣工.
","防城港市土地储备中心","市国土局苏维成",,"城市建设","竣工投产""37","防城港市西湾长榄岛岛体修复整治工程(东南部2.
7千米护岸)","建设永久护岸2.
7千米.
","2017-2018","1680","1171","2017年底完成项目70%.
","42826","43191","509","2018年4月项目竣工.
","防城港市土地储备中心","市国土局苏维成",,"城市建设","竣工投产""38","防城港市污水处理厂防城区、港口区截污管网工程","建设污水管网49.
85千米,污水提升泵站3座,工程投资估算约6887万元.
","2014-2018","6887","5470","建设完成港口区白沙万片区、桃花湾片区、防城区河西片区、渔洲坪片区、金花茶大道等污水管道约40千米,泵站3座.
","41852","43435","300","完成剩余污水主管道及支管建设9千米.
","广西防城港北投水务有限公司","市市政局包家友",,"城市建设","竣工投产""39","电力架空线路入地改造二期工程","建设金花茶大道、站前路、茶山路、江山大道、永福路、将军路、北部湾大道、灵秀路、赤港路、龙琴路、白龙街等10千伏电力排管约12千米,包括路面开挖和恢复、电力排管敷设、电缆井砌筑等.
","2017-2018","2181","2181",,"43070","43435","2181","完工.
","市市政局","市市政局包家友",,"城市建设","竣工投产",,,"40","防城港市地下弱电综合管网及附属通信设施建设工程","投资建设地下弱电综合管网以及附属通信设施建设(含新建光交箱、人手孔、路灯型基站、监控杆等),提供通信光缆、广电网络等传输通道,同步进行架空光缆线路下地迁改、市政建设管线迁改等.
","2017-2018","2000","800","完成弱电管网建设18千米,累计完成投资800万元.
勘察2018年需建设路段,做好报审资料的收集.
","42795","43435","1200","建设弱电通信管道15千米.
","润建通信股份有限公司","市市政局包家友",,"城市建设","竣工投产""41","防城港市长榄岛东南段景观绿化工程","项目占地面积10公顷,新建管理用房及1号公厕、海堤绿道、景观绿化、给排水、车行道、停车场、地面铺装及附属设施等;主要建设内容包括土建工程、海堤绿道及铺装工程、停车场工程、绿化工程和给排水工程等.
","2017-2018","1200","150","预计完成项目建设12.
5%.
","43035","43191","1050","项目竣工.
","防城港市土地储备中心","市国土局苏维成",,"城市建设","竣工投产""42","2017年防城港供电局低压集抄改造","建设83524户低压集抄.
含电能表、集中器、电能表箱的购置和安装.
","2018-2018","3749","587","项目前期工作、定标、开工","43132","43464","3162","工程投产.
","广西电网有限责任公司","防城港供电局黄应忠",,"城市建设","竣工投产""43","防城港市南部220kV电网完善工程","线路52千米.
","2015-2018","8435",,,"42078","43464","974","工程投产.
","广西电网有限责任公司","防城港供电局黄应忠",,"城市建设","竣工投产""44","110kV那良送变电工程","线路43.
40千米,变电4万千伏安.
","2017-2018","7350",,,"42885","43373","1615","工程投产.
","广西电网有限责任公司","防城港供电局黄应忠",,"城市建设","竣工投产""45","新兴~深沟π接竹坪线路工程(含竹坪~江山T接竹坪~江平~黄桥线路)","线路10.
50千米.
","2013-2018","1094",,,"41304","43464","183","工程投产.
","广西电网有限责任公司","防城港供电局黄应忠",,"城市建设","竣工投产""46","220kV中路变电站110kV配套送出工程","线路23.
70千米.
","2015-2018","2134",,,"42287","43403","8","工程投产.
","广西电网有限责任公司","防城港供电局黄应忠",,"城市建设","竣工投产""47","蔗园大道","该项目道路全长2200米,红线宽度40米,按城市次干路Ⅰ级标准设计,双向4车道,采用双幅砼路面断面形式,设计行车速度为40千米/小时,路面标准轴载BZZ-100KN,设计使用年限20年.
主要建设内容包括道路、桥涵、排水、照明、交通和绿化工程等.
桥涵设计荷载为城A级.
","2017-2018","6020",,,"42583","43252","4000","项目竣工.
","防城区华达资产管理有限公司","防城区政府荣毅宏",,"城市建设","竣工投产""48","水营大道","该项目道路全长1650.
11米,路宽40米,按城市次干路Ⅱ级标准设计,双向4车道,行车速度30千米/小时,路面标准轴载BZZ-100KN,路面结构砼路面,交通重量等级为重级.
主要建设内容包括道路工程、排水工程、电气工程、交通工程和绿化工程.
","2013-2018","5042",,,"41426","43252","4000","项目竣工.
","防城区城投公司","防城区政府荣毅宏",,"城市建设","竣工投产""49","河西新区幸福路","该项目道路长度1008.
78米,红线宽度16至20米,按城市支路标准设计,设计行车速度为30千米/小时,路面标准轴载BZZ-100KN,设计使用年限20年.
主要建设内容包括道路、排水、照明、交通和绿化工程等.
","2017-2018","1985",,,"42979","43252","1500","项目竣工.
","防城区华达资产管理有限公司","防城区政府荣毅宏",,"城市建设","竣工投产""(三)","新开工项目","40",,"259892.
52","21154","0",,,"85677""1","云约江南作业区1#泊位疏港道路","道路全长约1319米,路基宽20米,路面不作硬化,采用混凝土连锁块处理.
","2018-2019","2100",,"完成施工图设计工作.
","43221","43617","1000","在解决征地拆迁前提下,项目完成路基工程.
","市港工公司","市港工公司徐钦帮",,"城市建设","新开工",,"2","洲尾路西段","道路总长458米,红线宽30米,按城市次干道标准建设.
","2018-2019","2697",,"除施工和监理招投标工作外,其他前期工作全部完成.
","43252","43617","1000","在解决征地拆迁前提下,完成部分路基土石方工程.
","市港工公司","市港工公司徐钦帮",,"城市建设","新开工",,"3","北站南路西段和豪丫路西段","长500米,宽25米.
建设主要内容:道路、排水、绿化亮化、标志标线等配套工程.
","2018-2019","1500",,"待开展项目前期工作.
","43374","43800","900","完成施工图设计等前期工作.
","市城投公司","市城投公司兰宏",,"城市建设","新开工",,"4",""十三五"期间海湾新区电力管沟建设","拟新建14条道路电力管沟,路径总长41千米,电缆井820座.
道路分别为:白龙街、江山大道(金花茶大道路口以西段)、纬二线及纬二路西段、站前西段、红头坝路(A-9)、文昌大道、伏波大道、冲孔路北段、三都路、B-5路、B-8路、B-9路(文昌大道路口以北段)、将军山路(港湾路至红头坝路口段)、A-8路(B-9路至伏波大道).
","2018-2019","12000",,"待批准同意实施后,开展项目前期工作.
","43435","43800","5000","完成施工图设计等前期工作,并开工建设.
","市城投公司","市城投公司兰宏",,"城市建设","新开工""5","冲孔街","长1780米,宽24米;主要建设内容为:路基工程、排污排水工程、绿化工程等配套工程.
","2018-2019","5084","5592","完成勘察外业等前期工作.
","43282","43804","500","完成800米路基施工.
","市城投公司","市城投公司兰宏",,"城市建设","新开工",,"6","B-3南段","长820米,宽40米.
建设主要内容:道路、排水、绿化亮化、标志标线等配套工程.
","2018-2019","4500",,"未开展前期工作.
","43374","43800","1000","完成施工图设计等前期工作,并开工建设.
","市城投公司","市城投公司兰宏",,"城市建设","新开工",,"7","东园路","项目呈南北走向,起于白龙街,止于纬二线西段,道路全长1220米,宽24米.
建设主要内容:道路、排水、绿化亮化、标志标线等配套工程.
","2018-2019","4100",,"完成项目规划.
","43374","43617","1000","完成施工图设计等前期工作,并开工建设.
","市城投公司","市城投公司兰宏",,"城市建设","新开工",,"8","基围路","项目呈南北走向,起于白龙街,止于江山大道,道路全长780米,宽24米.
建设主要内容:道路、排水、绿化亮化、标志标线等配套工程.
","2018-2019","3500",,"待开展项目前期工作.
","43374","43800","500","完成施工图设计等前期工作,并开工建设.
","市城投公司","市城投公司兰宏",,"城市建设","新开工",,"9","北站中路","长710米,宽25米;主要建设内容为道路、排水、照明、绿化等配套工程.
","2018-2019","2850","3135","完成施工图设计等前期工作.
","43252","43620","1000","开工建设.
","市城投公司","市城投公司兰宏",,"城市建设","新开工",,"10","长泰路北段","道路长960米,宽20米.
建设内容:道路工程、排水工程、照明工程、交通工程、绿化工程及相关配套设施.
","2018-2019","2900","3280","完成施工图设计等前期工作.
","43252","43617","900","开工建设.
","市城投公司","市城投公司兰宏",,"城市建设","新开工",,"11","市江山大道西段绿化、亮化工程","新建绿化、亮化工程,实施长度为2.
805千米,分两段实施.
其中:A段(东西向道路)实际建设长度为1.
518千米;B段(南北向道路)实际建设长度为1.
287千米.
建设内容包括绿化工程、照明工程.
","2018-2018","3000",,"已完成立项批复、可研编制.
","43252","43435","1500","完成施工图设计等前期工作,并开工建设.
","市城投公司","市城投公司兰宏",,"城市建设","新开工",,"12","城南新区B-4号路","B-4号路长约913.
62米,宽30米,面积约32983平方米.
建设内容为:路基、排污排水、绿化等配套工程.
","2018-2019","3418",,"完成勘察外业等前期工作.
","43282","43617","2000","完成部分排水排污施工.
","市城投公司","市城投公司兰宏",,"城市建设","新开工",,"13","城南新区路网B-5","长2900米,宽40米;主要建设内容为:路基工程、排污排水工程、绿化工程等配套工程.
","2018-2019","24085","5890","完成勘察外业等前期工作.
","43282","43805","7000","完成路基施工1000米,排水工程施工1200米.
","市城投公司","市城投公司兰宏",,"城市建设","新开工",,"14","红头坝路","位于园博园北区西北角段长约620米,宽20米;主要建设内容为:路基工程、排污排水工程、绿化工程等配套工程.
","2018-2019","2000",,,"43374","43466","2000","完成施工图设计等前期工作,并开工建设.
","市城投公司","市城投公司兰宏",,"城市建设","新开工",,"15","大塘江街","位于园博园北区西北角段长约780米,宽24米;主要建设内容为:路基工程、排污排水工程、绿化工程等配套工程.
","2018-2019","2900",,,"43374","43466","2900","完成施工图设计等前期工作,并开工建设.
","市城投公司","市城投公司兰宏",,"城市建设","新开工",,"16","市职业教育中心配套道路育才路","长844米,宽15米;主要建设内容为:路基工程、排污排水工程、绿化工程等配套工程.
","2018-2019","2000",,,"43435","43805","500","完成施工图设计等前期工作,并开工建设.
","市城投公司","市城投公司兰宏",,"城市建设","新开工",,"17","市科教园区路网工程英才路","长864.
66米,宽30米;主要建设内容为:路基工程、排污排水工程、绿化工程等配套工程.
","2018-2019","3500",,,"43435","43805","500","完成施工图设计等前期工作,并开工建设.
","市城投公司","市城投公司兰宏",,"城市建设","新开工",,"18","市科教园区路网工程群英路","长2345.
1米,宽30米;主要建设内容为:路基工程、排污排水工程、绿化工程等配套工程.
","2018-2019","8500",,,"43435","43805","500","完成施工图设计等前期工作,并开工建设.
","市城投公司","市城投公司兰宏",,"城市建设","新开工",,"19","市科教园区路网工程学海路","长857.
24米,宽30米;主要建设内容为:路基工程、排污排水工程、绿化工程等配套工程.
","2018-2019","3500",,,"43435","43805","500","完成施工图设计等前期工作,并开工建设.
","市城投公司","市城投公司兰宏",,"城市建设","新开工",,"20","防城港市文昌大桥项目","项目位于防城区,设计起点位于河西新区,防城至东兴二级公路以东470米处,全长840米,其中桥梁长642米,两侧引道共长198米,主桥为金花茶型独塔斜拉桥,长200米,宽40米,西引桥长209.
5米,东引桥长232.
5米,宽30.
5米.
主要建设内容包括道路工程、桥梁工程及相关配套设施.
","2018-2020","24887","1080","项目前期工作已基本完成,正在开展招标控制价报批和招投标工作.
","43191","43922","5600","完成总工程量的30%.
","广西东投集团有限公司","广西东投集团赖子机",,"城市建设","新开工""21","百里黄金海岸工程二期(西湾跨海大桥至怪石滩段)","项目美化海岸线约27千米,主要建设内容包括沙滩改造、林地保育与生态景观改造,慢性绿道及其附属设施、滨海木栈道与景观平台、标志性景点与景观、市政基础设施、海绵城市与海堤护岸工程等.
","2018-2020","21800",,"前期工作完成立项、可研.
","43282","43891","3000","开展项目前期工作,并开工建设,完成部分路段施工.
","广西东投集团有限公司","广西东投集团赖子机",,"城市建设","新开工""22","防城三桥","桥梁全长240米,宽32米,河西侧引道长160米,路幅宽40米,河东侧引道长516米,路幅宽45米,建设内容包括道路、桥梁及相关配套设施.
","2018-2020","15696",,"完成项目立项、方案设计、规划选址、水土保持、设计招标、工可编制及评审、用地预审等工作,正在进行初步设计、通航论证、安全预评价预工作.
","43435","44166","2000","开展项目前期工作,力争年底实现项目开工建设.
","广西东投集团有限公司","广西东投集团赖子机",,"城市建设","新开工""23","防城港市江山半岛环岛东路延长支线(万鸥至白龙段)","该项目改扩建道路2400米,红线宽度24米,护腰建设内容包括道路工程、排水工程及交通、照明、绿化等相关配套设施建设.
","2018-2019","7200",,"项目前期工作已基本完成,正在开展招标控制价报批和招投标工作.
","43252","43617","7200","开展项目前期工作,并开工建设,完成部分路段施工.
","广西东投集团有限公司","广西东投集团赖子机",,"城市建设","新开工""24","防城港市环岛东路景观绿化工程项目","项目位于防城港市江山半岛环岛东路,规划范围北起西湾跨海大桥西端滨海公路交叉口,从滨海公路向南延伸至环岛西路,贯穿整个江山半岛,项目路线全长17.
195千米.
","2018-2018","1440",,,"43221","43313","1440","开展项目前期工作,并开工建成.
","广西东投集团有限公司","广西东投集团赖子机",,"城市建设","新开工""25","国门大道养护站","拟建设业务楼、宿舍综合楼各1栋,总建筑面积1840.
94平方米,其中业务楼建筑面积1318.
4平方米,宿舍综合楼建筑面积522.
54平方米;配套建设总平道路、绿化、水电、停车场、围墙、大门等附属工程.
主要建设内容包括建筑主体工程、装修工程及总平相关附属工程.
","2018-2018","1156",,"已完成项目立项批复,正在开展项目规划选址和用地预审工作.
","43313","43435","1156","开展项目前期工作,并开工建成.
","广西东投集团有限公司","广西东投集团赖子机",,"城市建设","新开工""26","白浪滩路网工程","项目由3条路组成,分别为平坡路、白浪滩景区路网工程1号路和白浪滩景区路网工程2号路,项目路线全长1829.
99米,其中平坡路设计道路等级为城市支路Ⅰ级,计算行车速度30公里/小时道路红线宽度18米;白浪滩景区路网工程1号路、白浪滩景区路网工程2号路设计道路等级为城市支路Ⅱ级,计算行车速度20公里/小时,道路红线宽度11米.
","2018-2020","5124.
52",,"已完成项目立项批复,正在开展项目规划选址和用地预审工作.
","43191","43922","1500","开展项目前期工作,并开工建设,完成部分路段施工.
","广西东投集团有限公司","广西东投集团赖子机",,"城市建设","新开工""27","2018市政燃气管线及配套项目","次高压管线1千米,市政中压管线8千米,庭院管线25千米,户内安装10000户,工商业用户120户.
","2018-2018","2100","1800","结合城市发展及市政基础配套工程的需要,已上报相关管线建设的规划许可.
","43101","43435","2100","完工.
","防城港中燃城市燃气发展有限公司","市市政局包家友",,"城市建设","新开工""28","垃圾填埋场封场","库区面积44772平方米.
工程建设内容包括堆体整形工程、封场覆盖系统、气体导排及处理工程、雨水导排工程、渗沥液收集处理工程、平台工程、环境监测工程、景观绿化工程等.
","2018-2019","900",,"目前已完成项目建议书.
","43435","43800","60","开工建设.
","防城港市垃圾无害化处理厂","市市政局包家友",,"城市建设","新开工""29","蜈蚣岭公园基础设施一期工程","建设登山步道、照明工程、避雨亭廊、公厕、公园出入口广场、公园南侧长渠水利健身步道(绿道).
","2018-2019","1800",,,"43435","43617","200","开工建设.
","市市政局","市市政局包家友",,"城市建设","新开工",,"30","创建国家森林城市中心区道路绿化提升改造(一期)项目","提升改造行政中心区(海湾新区)内的白龙街、港湾街、民乐街、永福路、北部湾大道路段长度约6.
15千米的中分带、侧分带及沿线两侧绿化带.
建设内容包括土方工程、绿化工程.
","2018-2020","1031",,"完成相关前期及审批工作.
","43160","43647","1031","完成白龙街、港湾街、永福路、北部湾大道、民乐街等路段长度约6.
15千米的中分带、侧分带及沿线两侧绿化带的景观提升改造.
","市林业局","市林业局凌光振",,"城市建设","新开工""31","2018年重点防护林工程","新建重点防护林1.
71万亩.
",,"855",,,"43313","44409","350","完成新造林1.
71万亩的林地储备.
","市林业基层工作站","市林业局凌光振",,"城市建设","新开工""32","防城区垌美加油站","项目按二级站建设,占地3000平方米,建筑面积800平方米,罩棚面积800平方米,加油机6台,油罐总容量240立方米.
","2018-2018","3000",,,"43221","2018年12月","3000","完成项目建设,并通过验收.
","防城港市广兆贸易有限公司","市商务局袁学顺",,"城市建设","新开工""33","港口区赤沙加油站","项目按二级站建设,占地3000平方米,建筑面积800平方米,罩棚面积800平方米,加油机6台,油罐总容量240立方米.
","2018-2018","3000",,,"43222","2018年12月","3000","完成项目建设,并通过验收.
","防城港市桂文投资有限责任公司","市商务局袁学顺",,"城市建设","新开工""34","港口区光坡加油站","项目按二级站建设,占地2500平方米,建筑面积700平方米,罩棚面积700平方米,加油机6台,油罐总容量120立方米.
","2018-2018","2000",,,"43223","2018年12月","2000","完成项目建设,并通过验收.
","防城港市顺亿投资有限公司","市商务局袁学顺",,"城市建设","新开工""35","仙鹤(防城北)送变电工程","线路8.
28千米.
","2018-2019","10929",,,"43250","43830","6500","变电:变电站主体施工50%;线路:线路(电缆)施工50%;通信:设备、光缆施工50%.
","广西电网有限责任公司","防城港供电局黄应忠",,"城市建设","新开工",,"36","220kV潭松变电站220kV接入线路完善工程","线路1.
092千米.
","2018-2018","1515",,,"43250","43465","1364","工程投产.
","广西电网有限责任公司","防城港供电局黄应忠",,"城市建设","新开工""37","220kV仙鹤(防城北)变电站配套110kV送出工程","线路12千米.
","2018-2019","935","377","线路:建设准备.
","43250","43829","200","线路:线路(电缆)基础施工.
","广西电网有限责任公司","防城港供电局黄应忠",,"城市建设","新开工",,"38","35kV大菉站变电站改造工程","线路0.
24千米,变电0.
9万千伏安.
","2018-2019","1070",,,"43464","43830","433","变电:施工、监理招标.
","广西电网有限责任公司","防城港供电局黄应忠",,"城市建设","新开工",,"39","35kV那勤变电站改造工程","线路3千米,变电1万千伏安.
","2018-2020","1360",,,"43464","44012","343","征地;变电:施工、监理招标;线路:施工、监理招标.
","广西电网有限责任公司","防城港供电局黄应忠",,"城市建设","新开工",,"40","冲仑园区ppp基础设施项目","横三路北段234标、望月路、纵二路、法院至长龙坳延长线4条路网共11.
34公里;日处理1万立方米污水处理厂1座,综合服务楼7000平方米.
","2018-2020","57960",,,"43282","44166","13000","开工建设.
","防城区城投公司","防城区政府荣毅宏",,"城市建设","新开工",,"(四)","前期工作项目","23",,"953049.
42","0","0",,,"200""1","康养智慧小镇","本项目占地面积409322平方米(约614亩).
主要建设内容包括医疗康养、居住、办公及研发、酒店、商业、社区文化中心、学校及相关配套设施建设.
","2018-2020","250000",,"待开展项目前期工作.
","43435","2020年",,"完成施工图设计等前期工作.
","市城投公司","市城投公司兰宏",,"城市建设","前期工作",,"2","海景智慧小镇","项目位于墨鱼港,本项目占地面积715314平方米(约1072亩),总建筑面积890800平方米,地上建筑面积712500平方米(其中住宅612200平方米,酒店10300平方米,商业15300平方米,停车楼5100平方米,地下建筑面积178300平方米(不计容).
容积率1,建筑密度24.
9%,绿地率30.
0%,住宅总户数3803户,机动车停车位4587个.
","2018-2020","270789",,"待开展项目前期工作.
","43617","2023年",,"完成施工图设计等前期工作.
","市城投公司","市城投公司兰宏",,"城市建设","前期工作",,"3","滨江西路","滨江西路位于防城江西岸,总长约8.
7千米,宽30米;主要建设内容包括道路、排水、照明、绿化、桥梁2座、景观、亮化等配套工程.
","2018-2020","100000",,,"43466","44166",,"立项、选址等前期工作.
","市城投公司","市城投公司兰宏",,"城市建设","前期工作",,"4","东盟国际马拉松赛道","拟新建42千米马拉松专业赛道,沿途规划建设,游客中心、东盟特色景观小品等市政配套设施工程.
","2018-2019","100000",,"正在开展规划设计.
","43617","44105",,"完成项目前期.
","市城投公司","市城投公司兰宏",,"城市建设","前期工作",,"5","北部湾大道立交改造工程","对北部湾大道、四川路、贵州路、中华路、港兴大道的现状立交进行改造.
","2018-2019","10000",,"正在进行方案设计.
","43617","44166",,"完成项目前期工作.
","市城投公司","市城投公司兰宏",,"城市建设","前期工作""6","防城港北站站前广场周边改造","拓宽北站站前广场周边道路、拟建L型风雨廊,以及停车楼一座(500个车位).
","2018-2019","9872",,"已完成立项,正在进行方案设计、可研等前期工作.
","43800","44531",,"完成施工图设计等前期工作.
","市城投公司","市城投公司兰宏",,"城市建设","前期工作",,"7","高新区皇城坳大街东延长线","皇城坳大街东延长线长约4263.
637米,红线宽50米,按城市主干路标准进行设计,设计行车速度60千米/小时.
","2019-2020","58749.
52",,"制定项目建设方案上报.
","43466","44166",,"完成项目前期工作.
","防城港高新区管委","防城港高新区管委韩凯",,"城市建设","前期工作",,"8","高新区沙潭江大道","沙潭江大道总长3389.
5米,红线宽50米,按城市主干路标准进行设计,设计行车速度60千米/每小时.
","2019-2020","37944.
9",,"制定项目建设方案上报.
","43466","44166",,"完成项目前期工作.
","防城港高新区管委","防城港高新区管委韩凯",,"城市建设","前期工作",,"9","银河路南延长线、乐业街","乐业街长1076米,宽24米;银河路南延长线800米,宽20米.
","2019-2020","7080",,"制定项目建设方案上报.
","43466","44177",,"完成项目前期工作.
","防城港高新区管委","防城港高新区管委韩凯",,"城市建设","前期工作",,"10","金花茶大道白改黑工程","更换路沿石等,在原有路面摊铺黑色沥青.
","2019-2020","7740",,,"43617","2020年",,"完成可研编制.
","市市政局","市市政局包家友",,"城市建设","前期工作""11","防城港市沙潭江中心区防洪防潮近期(三期)工程","按20年一遇防洪潮标准建设堤长4.
3千米.
","2019-2020","4300",,"完成可研批复,正在初步设计.
",,,,"完成初步设计.
","防城港市海河堤管理站","市水利局曾凡兴",,"城市建设","前期工作""12","防城港油库","项目占地450亩,库容35万立方米.
","2018-2020","50000",,,"2018年","2020年12月",,"开展前期工作.
","待定","市商务局袁学顺",,"城市建设","前期工作""13","港口区潭油第一加油站","项目按二级站建设,占地3000平方米,建筑面积800平方米,罩棚面积800平方米,加油机6台,油罐总容量240立方米.
","2019-2020","3000",,,"43617","2020年12月",,"开展前期工作.
","待定","市商务局袁学顺",,"城市建设","前期工作""14","防城区坜头加油站","项目按二级站建设,占地4050平方米.
建筑面积800平方米,罩棚面积800平方米,加油机6台,油罐总容量120立方米.
","2019-2020","3000",,,"43618","2020年12月",,"开展前期工作.
","待定","市商务局袁学顺",,"城市建设","前期工作""15","港口区江山大道加油站","项目按二级站建设,占地3000平方米,建筑面积700平方米,罩棚面积700平方米,加油机6台,油罐总容量120立方米.
","2019-2020","3000",,,"43619","2020年12月",,"开展前期工作.
","待定","市商务局袁学顺",,"城市建设","前期工作""16","港口区茅企第一加油站","项目按二级站建设,占地3000平方米,建筑面积700平方米,罩棚面积700平方米,加油机6台,油罐总容量120立方米.
","2019-2020","3000",,,"43620","2020年12月",,"开展前期工作.
","待定","市商务局袁学顺",,"城市建设","前期工作""17","220kV航洋(渔万)送变电工程","线路48千米,变电36万千伏安.
","2014-2020","15802",,,"43646","44196","200","变电:建设准备50%;间隔扩建:建设准备;线路:建设准备;通信:建设准备.
","广西电网有限责任公司","防城港供电局黄应忠",,"城市建设","前期工作""18","220kV防城港电厂~中路I线接线完善工程","线路:7千米.
","2018-2019","3600",,,"43464","43768",,"开展项目可研及核准.
","广西电网有限责任公司","防城港供电局黄应忠",,"城市建设","前期工作""19","220kV白鹭送变电工程","建设云约站π接防城港电厂~中路II线线路,线路长度2*0.
5千米,建设云约站π接防城港电厂~生态铝线路,线路长度2*0.
1千米,建设云约站π接中路~生态铝线路,线路长度2*0.
1千米.
线路暂按架空线路考虑,线路的具体架设形式待下一阶段论证确定.
","2019-2020","8000",,,"43554","44195",,"开展项目可研及核准.
","广西电网有限责任公司","防城港供电局黄应忠",,"城市建设","前期工作""20","110kV黄桥~深沟Ⅰ线线路完善工程","改造110kV线路2千米.
","2019-2019","550",,,"43554","43830",,"开展项目可研.
","广西电网有限责任公司","防城港供电局黄应忠",,"城市建设","前期工作""21","35kV十万山站改造工程(异地新建)","线路17.
13千米,变电0.
2万千伏安.
","2019-2019","2122",,,"43554","43830",,"开展项目可研.
","广西电网有限责任公司","防城港供电局黄应忠",,"城市建设","前期工作""22","35kV里火送变电工程","线路20千米,变电0.
5万千伏安.
","2019-2019","1500",,,"43554","43830",,"开展项目可研.
","广西电网有限责任公司","防城港供电局黄应忠",,"城市建设","前期工作""23","防城港至东兴铁路牵引站外部电源送电工程","线路6千米.
","2019-2020","3000",,,"43738","44134",,"开展项目可研.
","广西电网有限责任公司","防城港供电局黄应忠",,"城市建设","前期工作""四","社会民生类","104",,"1239320.
65","433607.
92",,,,"291796""(一)","续建项目","21",,"313854.
92","174724",,,,"64541""1","防城港市实验高级中学新校区项目(北部湾高级中学)","计划招收学生5000人,总建筑面积118181平方米,其中教学楼19365平方米,实验楼10920平方米,学生中心15715平方米,学生宿舍40355平方米,食堂10789平方米,教师周转房7957平方米,艺术楼5481平方米,风雨操场5289平方米.
","2015-2019","52458","57350","一期全部主体封顶,部分竣工投入使用;二期前期工作全部完成.
","42339","43617","3000","一期在解决规划问题前提下工程竣工,二期开工建设并完成部分主体.
","市港工公司","市港工公司徐钦帮",,"社会民生","续建",,"2","防城港市妇幼保健院公共卫生服务业务用房项目","建设公共卫生服务业务用房1栋,设置床位48张,总投资3352.
38万元,总建筑面积11184平方米,其中公共卫生服务业务用房5460平方米,医疗用房面积4224平方米,地下室1500平方米.
","2017-2019","3352.
3825","1200","项目正在进行桩基施工,2017年底完成±0以下结构施工.
","42795","43617","1500","完成主体建设,进行二次装修.
","防城港市妇幼保健院","市卫计委张传凯",,"社会民生","续建""3","防城港市食品药品检验实验楼项目","建设一栋7层检验检测实验室用房,总建筑面积为8521.
68平方米,其中中央投资建设食品检验实验室2500平方米.
","2017-待定","5988","1500","主体工程50%.
","42887","待定","1350","完成中央投资项目食品检验实验室建设.
","防城港市食品药品检验所","市食药监局杨尚秋",,"社会民生","续建""4","上思县第一初级中学二期工程建设项目","项目总用地面积为100926.
66平方米.
其中新建教学楼4栋建筑面积16576.
28平方米,图书馆综合楼1栋面积5828.
1平方米,1#、2#教师周转房,单栋面积:2484.
9平方米,3#教师周转房,单栋面积:1684.
5平方米,学生宿舍楼11栋建筑面积42476.
28平方米,科技楼1栋建筑面积3209.
6平方米,体育馆1栋建筑面积1891平方米,文艺馆1栋建筑面积1815.
15平方米,教学楼连廊建筑面积101.
41平方米,沐浴房建筑面积200平方米,公共厕所建筑面积200平方米,配电房建筑面积257平方米,大门建筑面积214平方米,2#食堂946.
96平方米,锅炉房建筑面积459平方米.
建设内容包括各单体的建筑工程、结构工程、给排水工程,配电工程、配套的总平、边坡、绿化、道路等室外工程.
","2017-2019","15050","4000","全部开工.
","43009","43739","12000","全部建筑完成主体建设,完成竣工验收.
","上思县宏兴建筑工程有限公司","上思县政府覃森",,"社会民生","续建""5","上思县粮食储备库建设项目","项目总建筑面积9026.
35平方米,建筑占地面积8615.
55平方米.
其中,新建5栋20间仓库,合计建筑面积6540平方米,仓库容量为21293吨;建设门卫室28.
44平方米,配电房47.
25平方米,泵房31.
5平方米,消防水池1个,地磅房23.
1平方米,地磅1台,检化验业务楼833.
7平方米,器材仓库504平方米,厕所37.
26平方米,药品库28.
8平方米,应急大米加工厂952.
3平方米,配置储粮设备与粮情检测设备,并配套大门、道路等工程.
","2015-2020","3507","700","项目第一期6000吨仓库竣工交付使用,4300吨仓库开工建设并完成基础建设.
","42339","44136","606","续建第一期4300吨仓库,争取项目第二期3900吨仓库及相关设施开工建设.
","上思县储备粮管理中心","上思县政府覃森",,"社会民生","续建""6","上思县南岸小学二期工程建设项目","总建筑占地面积1598.
77平方米,总建筑面积7901.
7平方米(其中:2#教学楼建筑面积2774.
44平方米,3#教学楼建筑面积2774.
44平方米,办公综合楼建筑面积1326.
14平方米,教师周转房建筑面积1026.
68平方米).
","2017-2019","8650","700","全部开工.
","43040","43770","1300","完成全部建筑主体建设.
","上思县宏兴建筑工程有限公司","上思县政府覃森",,"社会民生","续建""7","东兴市强制隔离戒毒所","按一类戒毒所标准建设.
建筑面积23589平方米.
建设内容包括建筑工程、装修工程,配套室外运动场所、道路、水电、绿化等附属工程,购置医疗器具等设备.
","2017-2019","13978.
54","1000","修路、收级放坡、挖场内排水沟.
","42864","43647","3000","主体施工.
","东兴市公安局","东兴市政府陈建林",,"社会民生","续建""8","东兴市人民医院门诊综合楼","新建一栋业务楼,项目占地面积2811平方米,总建筑面积约32370平方米,新增300张床位.
","2016-2019","11224","5000","完成地下室及主体结构施工4层.
","42614","43617","5000","主体完工.
","东兴市城市建设投资有限责任公司","东兴市政府陈建林",,"社会民生","续建","5000""9","东兴市城市带状公园","总建设面积198400平方米,主要建设内容为景观绿化、小品装饰、铺装工程及配套建设公共厕所、给排水、照明等附属工程.
","2017-2020","7685","600","预计完成该项目土石方及地下管线、自行车道路基等部分工程施工.
","43070","44105","2085","外滩公园至中越二桥段完工,中越二桥至罗浮江段开展前期工作.
","东兴市城市建设投资有限责任公司","东兴市政府陈建林",,"社会民生","续建""10","东兴市第七小学","总建筑面积11500平方米,建设教学楼、综合楼、食堂等教学及辅助用房以及学校运动场、校道、校门、围墙、排水、绿化等项目.
","2017-2018","4200","150","完成1#、2#教学楼及综合楼基础建设.
","43040","43435","2600","一期工程建成投入使用.
","东兴市教育局","东兴市政府陈建林",,"社会民生","续建""11","东兴育才幼儿园","建筑面积6930平方米.
建设内容:教学楼、教职工宿舍楼、饭堂、综合楼、等候室、门卫室,配套水电、道路、绿化、教学活动场地等相关设施.
","2017-2019","3000","1000","建设教学楼基础工程.
","42948","43617","1000","主体工程施工.
","东兴市兴东教育投资有限公司","东兴市政府陈建林",,"社会民生","续建""12","东兴育华幼儿园","总建筑面积约12200平方米,建设内容包括教学综合楼、办公楼、宿舍楼、室外活动场所,配套水电、绿化、消防等相关设施.
","2017-2019","2000","300","在建基础工程.
","42795","43586","1000","主体工程施工.
","东兴市育华投资有限公司","东兴市政府陈建林",,"社会民生","续建""13","防城港市和平安置住宅区","规划总面积约1538亩,规划建设3161户,项目建设内容包括土方平整、配套道路、超深基础、供水、供电、绿化、亮化及相关配套设施.
","2015-2019","46100","41100","土方平整工程总挖填方量300万立方米,已完成260万立方米,约1378亩.
一期配套道路工程、118户超深基础和221户桩基已完成.
二期配套翻挖路床及污水管施工,三期配套工程正在进行路基路床施工.
","2015年","2019年","2100","完成住宅建设.
","港口区城投公司","港口区政府朱靓",,"社会民生","续建",,"14","防城港市港口区企沙片区棚户区改造项目","项目采用底层公寓和统建公寓,共建安置房1943套,其中底层公寓515套,统建公寓1428套;总建筑面积30.
3155万平方米.
","2017-2019","46000","6000","已完成立项、可研、环评、水保,正在做初步设计.
大船岭地块正土方施工;地块二截止目前已回填土方210000方;大板地块316亩,交地100亩,175亩土地未征用.
","42979","2019年","9000","大船岭板块完成.
","港口区城投公司","港口区政府朱靓",,"社会民生","续建""15","防城港市北港安置住宅区(三、四期)项目","总建筑面积为322270.
2平方米,其中三期建筑面积114157平方米,四期建筑208113.
2平方米.
建设内容包括土建工程、安装工程、给排水工程、电气工程、绿化工程、道路工程及相关配套设施等.
","2016-2019","45969","33660","四期土方平整面积298亩,目前正在建设四期一组团43栋公寓住宅,除两栋因征拆原因外,其余41栋已全部封顶验收,正在装修阶段,四期二组团40栋公寓房楼已完成部分桩基,正在场地清理.
","2016年","2019年","7000","三期竣工,四期建设.
","港口区城投公司","港口区政府朱靓",,"社会民生","续建""16","防城港市冲孔住宅区建设项目","新建道路面积30823.
568平方米,绿化工程面积28976.
685平方米,附属设施面积120平方米.
建设内容包括土地平整工程、道路工程、绿化工程、给排水工程、供电工程及相关附属设施建设.
","2016-2019","27242","14986","新增加42亩(上二组)土方工程已进场完成清表及所有房屋拆除施工,平整土方12亩;需要外弃30万米3土方,目前弃土点问题尚未解决.
冲孔二期118.
4亩土地平整工程已完成约60.
4亩土方平整.
","2016年","2019年","5000","完成平整、供电、给排水,部分道路.
","港口区城投公司","港口区政府朱靓",,"社会民生","续建""17","大龙永久安置住宅区综合配套市场项目","总建筑面积18889.
32平方米(其中大龙市场为4层建筑,建筑面积12453.
92平方米,大龙旅店为6层建筑,建筑面积6435.
4平方米);大龙市场道路、广场面积5490平方米,景观绿化面积2803平方米,土方14202平方米;大龙旅店道路、广场面积1094平方米,景观绿化面积919平方米,土方3676平方米.
主要建设内容包括土建工程、装修工程、供水供电、排水排污、道路、绿化等相关配套工程.
","2017-2019","5496","2198","已完成立项、环评、可研、规划条件、总平、方案设计等前期工作;正在进行初步设计.
","43009","2019年","1300","完成主体工程.
","港口区城投公司","港口区政府朱靓",,"社会民生","续建""18","红南临时安置点(二期)","安装板房1220间,25022平方米.
","2017-2019","3409","1500","1.
前期工作已完成;2.
项目开工.
","42887","2019年","1500","完成板房建设1000间.
","港口区住建局","港口区政府朱靓",,"社会民生","续建""19","大坡社区住宅区基础配套设施","安置群众286户1026人,土方平整、道路、给排水、供电、照明、绿化等.
","2017-2019","2100","600","1.
前期工作已完成;2.
项目开工,平整土地.
","42917","2019年","700","完成土方平整,道路及给排水.
","港口区住建局","港口区政府朱靓",,"社会民生","续建""20","王府安置区配套设施建设","场地平整挖方97532立方米,填方98419立方米,铺筑砼路面11134平方米,安装路灯、绿化种植等.
","2017-2019","1446","500","1.
前期工作已完成;2.
项目开工,平整土地.
","42917","2019年","500","完成填土区,路面建设.
","港口区住建局","港口区政府朱靓",,"社会民生","续建""21","防城区中心储备粮库","土石方开挖,主要建设仓容为2.
5万吨粮食储备仓库6座;1个日产50吨大米应急加工厂等相关配套设施.
","2017-2019","5000","680","完成土石方开挖工程,取得施工许可证,施工队伍进场.
","42979","43800","3000","完成储备粮食仓库2栋主体工程.
","防城区粮食局","防城区政府荣毅宏",,"社会民生","续建""(二)","竣工投产项目","22",,"344325.
23","258763.
92",,,,"101493""1","安置小区","项目建设用地30.
525亩,新建四栋34层(地上32层,地下2层)住宅以及附属配套设施,总建筑面积12.
17万平方米,其中住宅建筑面积6.
55万平方米,商业建筑面积2.
94万平方米,地下室等建筑面积2.
67万平方米,计划安置400人.
","2013-2018","36373","39589","B区4#楼主体封顶.
","41456","43435","8000","完工.
","市城投公司","市城投公司兰宏",,"社会民生","竣工投产""2","百里黄金海岸(北码头滨海公园)","总用地55176.
567平方米.
1.
对海关码头、水产码头合围的海面范围实施填海,建设海岸防护带,改造项目区及周边的市政排水管道;2.
改造项目地块范围内的景观,打造百里黄金海岸(北码头滨海公园)广场.
","2017-2018","7060","5766","完成部分铺装、景观、电气、绿化工程.
","42979","43313","3000","完工.
","市城投公司","市城投公司兰宏",,"社会民生","竣工投产""3","市职业教育中心教师周转房","建设项目总建筑面积为16300平方米,其中:教师周转房11445平方米,共新建327间宿舍,每间建筑面积控制在35平方米以内;配套建设辅助用房、楼道、电梯等公摊建筑面积4855平方米.
","2017-2018","4558","4483","完成主体结构封顶施工,砌筑完成5-9层.
","42948","43435","3500","完工.
","市城投公司","市城投公司兰宏",,"社会民生","竣工投产""4","残疾人托养服务中心","新建业务大楼一幢,总面积4013.
6平方米.
","2017-2018","1093","100","正式开工建设.
","43009","43374","585","主体竣工.
","市残联","市残联严一帆",,"社会民生","竣工投产""5","防城港市公安消防支队冲仑消防站","防城冲仑消防站项目一期总建筑面积4000平方米(其中中队综合楼建筑面积3600平方米,训练塔建筑面积400平方米),主要建设内容包括消防站业务用房、业务附属用房、辅助用房等房屋建安工程,供电、给排水工程和配套设施建设以及购置设备等;二期建设公寓楼、食堂等.
","2017-2018","5515","1000","2017年12月底完成房屋封顶.
","43040","43282","4515","完成进驻,投入执勤.
","防城港市公安消防支队","市消防支队梁雄松",,"社会民生","竣工投产""6","上思县2017年农村义务教育薄弱学校改造项目","续建公正乡信良村小学教学综合楼,建筑面积620平方米;在妙镇板文村小学教学综合楼,建筑面积791平方米;南屏瑶族乡江坡村小学教学综合楼,建筑面积1816平方米;教师进修学校附属小学教学综合楼,建筑面积1995平方米;教师进修学校附属小学学生食堂,建筑面积400平方米;昌菱小学教学综合楼,建筑面积1632平方米;民族中学教学综合楼,建筑面积2322平方米;民族中学学生宿舍楼,建筑面积2160平方米;思阳镇思阳初中教学综合楼,建筑面积2694平方米.
","2017-2018","3374","1400","12个项目主体在建.
","42887","43252","830","全部项目竣工.
","上思县教育局","上思县政府覃森",,"社会民生","竣工投产""7","中国东兴—越南芒街跨境经济合作区楠木山安置区工程","拟安置拆迁和改造群众共3447户.
其中楠木山片区612户,东郊片区2271户,北郊片区159户,中山及公园社区危旧房改造395户,国有企事业单位危旧房改造10户.
项目拟拆除楠木山片区、东郊片区、北郊片区旧建筑共614600平方米,补偿3042户低层公寓超深基础,建设东郊片区公共建筑14200平方米,配套东郊片区配电工程,建设楠木山片区公共建筑3550平方米,东兴市企事业单位危旧房改造1080.
73平方米,中山及公园社区危旧房改造面积49564平方米,新建6-40米宽道路共15.
307千米.
","2015-2018","38654","30000","完成75%的工程量.
","2015年","43313","10000","完工.
","东兴市开发投资有限责任公司","东兴市政府陈建林",,"社会民生","竣工投产""8","中国东兴-越南芒街跨境合作区拆迁安置区一期工程(东郊安置区)","2.
6平方千米范围内基础设施建设.
","2013-2018","17200","15000","1.
D2、D3、D4、D8地块已完成大部分宅基地"三通一平"建设;2.
D1地块已完成约60%宅基地土地平整,已回填路床500米;D6、D7地块分别已完成路面硬化约900米;D10地块已完成约50%宅基地平整,已完成路面硬化450米;D5地块已完成路床硬化约300米;3.
D11、D12地块已征土地约50%,D12已完成路面硬化约900米,D11存在较多菜地未征收无法施工.
对影响路网建设的房屋进行拆迁,加快安置区内路网的建设,为群众提供回建房屋的条件.
","2013年","43252","2200","完工.
","东兴市征地拆迁办","东兴市政府陈建林",,"社会民生","竣工投产""9","防城港市港口区公车物流园安置住宅区项目","占地面积246亩,总建筑面积275675平方米,其中住宅面积239615平方米,配套用房面积1925平方米,配套商业面积34135平方米,安置户数550户.
建设内容包括楼房土建、装修工程、以及供水供电、排水排污、雨水管道、小区道路、绿化、亮化工程等.
","2016-2018","8400","7300","项目分四个地块建设,总挖填土方213万立方项目分四个地块建设,总挖填土方213万立方.
现(大垌地块)39亩的土方及115户超深基础已完成;(茅坜地块)33.
3亩已完成土方平整,81户超深基础和配套工程正在组织机械进场;(塘边地块)131亩累计完成清表30亩;(红砖地块)43亩正在清表.
","2016年","43374","900","项目竣工.
","港口区城投公司","港口区政府朱靓",,"社会民生","竣工投产""10","防城港市港口区旧公车安置区项目","安置住户360户,总建筑面积160000平方米.
建设内容包括土方平整、超深基础、配套公建用房、生态停车位、小区道路铺装、小区广场铺装、硬化、绿化、供水供电、排水排污、照明等.
","2016-2018","5800","4600","土方平整完成162亩.
桩基开工106户,完成105户.
","2016年","43313","1200","项目竣工.
","港口区城投公司","港口区政府朱靓",,"社会民生","竣工投产""11","防城区铁路沿线宅基地安置点(一区至五区)","建永久安置683户,安置2153人.
","2015-2018","52768.
77","52268.
77","项目收尾.
","42339","43221","500","项目竣工.
","防城区城投公司","防城区政府荣毅宏",,"社会民生","竣工投产""12","防城港市江山半岛东岸棚户区改造工程","建永久安置438户,安置1542人.
","2016-2018","46042.
12","14491","完成总工程的30%.
","42614","43282","31551","项目竣工.
","防城区城投公司","防城区政府荣毅宏",,"社会民生","竣工投产""13","防城港市防城区易地扶贫搬迁工程(一期)","规划总用地面积为153.
72亩,总建筑面积149713.
81平方米,计划安置1242户4457人.
","2015-2018","35000","11000","完成总工程量约40%.
","42186","43435","24000","项目竣工.
","防城区鸿邦投资有限公司","防城区政府荣毅宏",,"社会民生","竣工投产""14","防城区铁路沿线宅基地安置点(六区至七区)","建永久安置395户,安置1142人.
","2015-2018","31345.
27","31045.
27","项目收尾.
","42339","43221","300","项目竣工.
","防城区城投公司","防城区政府荣毅宏",,"社会民生","竣工投产""15","防城区长榄岛安置小区","建永久安置房212户,安置508人.
","2015-2018","13830.
15","13330.
15","项目收尾.
","42339","43221","500","项目竣工.
","防城区城投公司","防城区政府荣毅宏",,"社会民生","竣工投产""16","水营体育中心","新建体育中心总建筑面积23175.
44平方米,其中:游泳馆建筑面积4375.
72平方米,综合馆建筑面积6275.
72平方米,辅助用房建筑面积12524平方米.
主要建设内容包括游泳馆1座、综合馆1座及辅助用房建安工程和室外篮球场、网球场、五人制足球场、体育中心场内道路、供电、给排水、停车场、绿化等相关配套设施建设.
","2012-2018","9780","3000","完成总工程量约50%.
","40909","43435","6780","项目竣工.
","防城区城投公司","防城区政府荣毅宏",,"社会民生","竣工投产""17","防城区冲湴安置小区","建永久安置房249户,安置920人.
","2016-2018","8842.
405","8542.
405","项目收尾.
","42491","43160","300","项目竣工.
","防城区城投公司","防城区政府荣毅宏",,"社会民生","竣工投产""18","防城港市佛堂村上排组安置小区","总用地面积46亩,安置86户,建设基础工程及配套设施.
","2015-2018","5209.
19","4900","项目收尾.
","42339","43252","300","项目竣工.
","防城区城投公司","防城区政府荣毅宏",,"社会民生","竣工投产""19","防城区大万安置小区","建永久安置房64户,安置211人.
","2015-2018","4368.
8025","4168.
8025","项目收尾.
","42339","43160","200","项目竣工.
","防城区城投公司","防城区政府荣毅宏",,"社会民生","竣工投产""20","防城区滨江公园","休闲广场、步行道路、江边护栏、广场及周边绿化、广场配套设施等.
","2014-2018","3832","2200","完成总工程量约60%.
","41974","43252","1632","项目竣工.
","防城区城投公司","防城区政府荣毅宏",,"社会民生","竣工投产""21","防城港市佛堂村下排组安置小区","总用地面积28亩,安置52户,建设基础工程及配套设施.
","2015-2018","2845.
75","2545.
75","项目收尾.
","42339","43252","300","项目竣工.
","防城区城投公司","防城区政府荣毅宏",,"社会民生","竣工投产""22","防城区云朗组安置小区","总用地面积40亩,安置138户,建设基础工程及配套设施.
","2016-2018","2433.
78","2033.
78125","项目收尾.
","42491","43252","400","项目竣工.
","防城区城投公司","防城区政府荣毅宏",,"社会民生","竣工投产""(三)","新开工项目","31",,"288008","20",,,,"125762""1","市第七小学","规划班级数24个班,规划学生数1080人.
","2018-2019","4392",,"完成立项、规划选址、测量和可研评审.
","43252","43617","2000","在解决征地拆迁前提下,完成基础和部分主体工程.
","市教育局","市港工公司徐钦帮",,"社会民生","新开工",,"2","市第八小学","规划班级数24个班,规划学生数1080人.
","2018-2019","4360",,"完成立项、规划选址、测量和可研评审.
","43252","43617","2000","在解决征地拆迁前提下,完成基础和部分主体工程.
","市教育局","市港工公司徐钦帮",,"社会民生","新开工",,"3","市第九小学","规划班级数24个班,规划学生数1080人.
","2018-2019","4731",,"完成立项、规划选址、测量和可研评审.
","43252","43617","2000","在解决征地拆迁前提下,完成基础和部分主体工程.
","市教育局","市港工公司徐钦帮",,"社会民生","新开工",,"4","市第十小学","规划班级数24个班,规划学生数1080人.
","2018-2019","4484",,"完成立项、规划选址、测量和可研评审.
","43252","43617","2000","在解决征地拆迁前提下,完成基础和部分主体工程.
","市教育局","市港工公司徐钦帮",,"社会民生","新开工",,"5","市第八中学","规划班级数30个班,规划学生数1500人.
","2018-2019","9033",,"完成立项、规划选址、测量和可研评审.
","43252","43678","3000","在解决征地拆迁前提下,完成基础和部分主体工程.
","市教育局","市港工公司徐钦帮",,"社会民生","新开工",,"6","市第九中学","规划班级数30个班,规划学生数1500人.
","2018-2019","9377",,"完成立项、规划选址、测量和可研评审.
","43252","43678","3000","在解决征地拆迁前提下,完成基础和部分主体工程.
","市教育局","市港工公司徐钦帮",,"社会民生","新开工",,"7","市第十中学","规划班级数30个班,规划学生数1500人.
","2018-2019","9231",,"完成立项、规划选址、测量和可研评审.
","43252","43678","3000","在解决征地拆迁前提下,完成基础和部分主体工程.
","市教育局","市港工公司徐钦帮",,"社会民生","新开工",,"8","市第十一中学","规划小学部班级数24个班,规划学生数1080人;规划初中部班级数24个班,规划学生数1200人.
","2018-2019","11860",,"完成立项、规划选址、测量和可研评审.
","43252","43678","5000","完成基础和部分主体工程.
","市教育局","市港工公司徐钦帮",,"社会民生","新开工",,"9","市第十二中学","规划小学部班级数24个班,规划学生数1080人;规划初中部班级数18个班,规划学生数900人.
","2018-2019","11606",,"完成立项、规划选址、测量和可研评审.
","43252","43678","5000","在解决征地拆迁前提下,完成基础和部分主体工程.
","市教育局","市港工公司徐钦帮",,"社会民生","新开工",,"10","防城港市第一人民医院迁建项目","项目按800张床位规模建设,总建筑面积96367平方米,其中地上业务用房面积48830平方米,地下室建筑面积47537平方米.
建设内容包括急诊部、门诊部、住院部、医技科室、药剂科室等基本业务用房及保障系统、行政管理、院内生活服务等辅助用房以及设备购置、地下停车场、给排水、配电、绿化、道路等配套设施建设.
","2018-2019","59000",,"已完成立项、可研、初步设计等前期工作.
正在与中医院办理代建移交手续.
","43435","43800","8000","完成施工图设计等前期工作,并开工建设.
完成土方工程.
","市城投公司","市城投公司兰宏",,"社会民生","新开工""11","外国语实验学校","建设学校一所规划小学部24个班,960人;初中部24个班,960人,高中部18个班,720人.
总建筑面积32600.
","2018-2019","27836",,"待开展项目前期工作.
","43435","43800","3000","完成施工图设计等前期工作,并开工建设.
","市教育局","市城投公司兰宏",,"社会民生","新开工""12","防城港市民兵训练基地项目","占地面积99.
52亩,其中进场道路18.
84亩,库区建设用地净面积80.
68亩,项目总建筑面积4386.
97平方米.
","2018-2019","3510",,,"43405","43800","1000","完成施工图设计等前期工作,并开工建设.
","市城投公司","市城投公司兰宏",,"社会民生","新开工""13","防城港市看守所","占地面积151亩,总建筑面积30995平方米.
建设内容:设计关押量990人,业务用房及劳动用房的建安工程、设备配置、训练场、停车场以及劳动种养基地建设等.
","2018-2019","14380",,,"43435","43800","1000","完成项目前期工作,并开工.
","市城投公司","市公安局王德明",,"社会民生","新开工",,"14","防城港市拘留所","占地面积98.
9亩,建筑面积6796平方米.
设计关押量299人,拘留室、教育用房、医疗技术用房、文体用房、劳动用房、行政管理用房等.
","2018-2019","3843",,,"43435","43801","1000","完成项目前期工作,并开工.
","市城投公司","市公安局王德明",,"社会民生","新开工",,"15","中越劳务人员技能培训基地(理工学院二期)","建筑面积约3万多平方米,包括5个单体建筑,分别为商贸实训楼,信息综合楼,体育管理用房,3#和4#宿舍楼.
","2018-2020","11600",,"项目已完成立项、可研批复等前期工作,正在开展初步设计工作.
","43313","44044","6960","开展项目前期工作,并开工建设,完成主体部分建筑.
","防城港市理工职业学院","广西东投集团赖子机",,"社会民生","新开工""16","改造思阳镇、在妙镇、叫安镇、华兰镇、平福乡、南屏乡、那琴乡、公正乡等十四个农村敬老院","对敬老院的消防系统、内部设施、应急设备等进行提升改造.
","2018-2020","1500",,"规划.
","43374","43831","500","完成立项,争取开工改造.
","上思县民政局","上思县政府覃森",,"社会民生","新开工""17",""智慧广电"村村通建设","行政村、自然村光纤联网.
","2018-2021","2424",,"前期工作.
","43221","44256","970","开工建设.
","广西广电网络上思分公司","上思县政府覃森",,"社会民生","新开工""18","2018年扶贫基础设施进屯道路建设项目","计划建设入屯道路15千米(按照扶贫道路施工标准),计划投入650万.
","2018-2018","650",,"无.
","43191","43435","650","完成道路项目建设.
","上思县扶贫办","上思县政府覃森",,"社会民生","新开工""19","上思县2018年农村义务教育薄弱学校改造项目","上思县第二中学学生食堂1660平方米;在妙初中教学综合楼2030平方米;南屏中心小学学生食堂700平方米;思阳镇广元村小学教学综合楼750平方米;思阳镇初中教学综合楼1640平方米.
","2018-2019","1492",,"项目规划.
","43252","43678","700","完成项目所有前期工作,争取项目开工.
","上思县教育局","上思县政府覃森",,"社会民生","新开工""20","上思县2018年农村饮水安全巩固提升工程","计划投资1209万元,建设农村饮水安全巩固提升工程39处,受益人口4407户1.
94万人.
","2018-2018","1209","20","2018年3月完成初设上报.
","43313","43435","1209","2018年底完成工程建设.
","上思县水利局","上思县政府覃森",,"社会民生","新开工""21","东兴市第三中学","总建筑面积61472平方米,建设教学楼、综合楼、食堂等教学及辅助用房以及学校运动场、校道、校门、围墙、排水、绿化等项目.
","2018-2020","11250",,"完成立项、可研、初步设计的编制及评审.
","43344","44136","5000","2019年建成一期工程投入使用.
","东兴市教育局","东兴市政府陈建林",,"社会民生","新开工""22","港口区工人文化宫","文化宫综合楼、室内运动场、五人制足球场等.
","2018-2020","5000",,"正在进行前期工作.
","43106","2020年","1500","项目开工.
","港口区总工会","港口区政府朱靓",,"社会民生","新开工""23","防城港市港口区改善农村人居环境项目(山新、沙螺寮)","建设内容包括乡村基础设施建设、污垃处理设施、水生态系统及水环境治理、文化教育卫生设施、乡村旅游开发、便民商业设施等.
","2018-2020","4000",,"正在编制可研.
","43231","2020年","1000","项目开工.
","港口区城投公司","港口区政府朱靓",,"社会民生","新开工""24","防城区下三滩西组安置小区","可安置三滩西组550人,建设内容为超深基础及配套道路等设施.
","2018-2020","13750",,"拟完成选址.
","43282","44166","13750","开工建设.
","防城区城投公司","防城区政府荣毅宏",,"社会民生","新开工""25","防城区义务教育均衡发展建设项目","86所学校校舍及校园附属设施.
","2018-2018","13573",,"完成项目立项、勘察、设计、预算等前期工作.
","43101","43435","13573","开工建设.
","防城区教育局","防城区政府荣毅宏",,"社会民生","新开工""26","防城区红头坝二组安置小区","可安置红头坝二组489人,建设内容为超深基础及配套道路等设施.
","2018-2020","12225",,"拟完成选址.
","43282","44166","12225","开工建设.
","防城区城投公司","防城区政府荣毅宏",,"社会民生","新开工""27","防城区红头坝一组安置小区","可安置红头坝一组465人,建设内容为超深基础及配套道路等设施.
","2018-2020","11625",,"拟完成选址.
","43282","44166","11625","开工建设.
","防城区城投公司","防城区政府荣毅宏",,"社会民生","新开工""28","防城区下三滩东组安置小区","可安置三滩东组380人,建设内容为超深基础及配套道路等设施.
","2018-2020","9500",,"拟完成选址.
","43282","44166","9500","开工建设.
","防城区城投公司","防城区政府荣毅宏",,"社会民生","新开工""29","防城区妇幼保健院迁建项目","防城妇幼保健院整体搬迁(医疗业务用房建设),建筑面积20341平方米.
","2018-2020","8012",,"完成初设.
","43374","44166","4000","开工建设.
","防城区妇幼保健院","防城区政府荣毅宏",,"社会民生","新开工""30","防城区残疾人康复中心","总建筑面积3500平方米,主要功能包括残疾人康复训练、培训,用品用具等相关功能设施;主要建设内容包括用房土建、装饰、水电工程及其配套设施.
","2018-2020","1255",,"向上级民委争取资金.
","43324","2020年","300","开工建设.
","防城区残疾人联合会","防城区政府荣毅宏",,"社会民生","新开工""31","滩营中学综合楼、实验楼、教学楼综合","综合楼、实验楼、教学楼综合7300平方米.
","2018-2018","1300",,"完成招投标.
","43221","43435","1300","完成建设内容交付使用.
","防城区教育局","防城区政府荣毅宏",,"社会民生","新开工""(四)","前期工作项目","30",,"293132.
5","100","0""1","北部湾养老中心(金湾家苑)","项目规划总用地面积401.
77亩,净用地面积337.
93亩,建设康体医疗中心300床;1000间照料中心,综合服务楼,老年活动中心(其中含健身房、棋牌室、图书馆、老年大学、垂钓等活动设施),养老公寓(30000平方米的普通老年公寓以及67000平方米的海滨颐养公寓),家属探视楼(200间客房).
",,"113395",,"正在开展项目选址相关工作.
",,,,"立项、选址等前期工作.
","市城投公司","市城投公司兰宏",,"社会民生","前期工作""2","防城港市强制隔离戒毒所(二期)","占地面积103亩,建筑面积20706平方米,包括戒毒人员用房、警察用房、业务用房、附属用房.
收戒人员700人.
","2018-2019","13955","100","完成项目立项、用地规划、选址、可研、用地预审、环评、地灾等前期工作.
目前土方平整、挡土墙、主体工程地质详勘工程已完成评审,下一步将进行招投标工作.
","43800",,,"开展前期工作.
","市城投公司","市公安局王德明",,"社会民生","前期工作""3","防城港市警用应急救援直升机临时起降点","占地面积50亩,满足至少2至4架直升机起降及相关配套设施.
","2018-2020","1600",,"完成项目选址,正在开展相关前期工作.
积极配合自治区发改委、区公安厅做好项目立项工作,争取完成征地工作,办理土地证.
",,,,"进一步细化前期工作,完成征地工作,办理土地证.
","市城投公司","市公安局王德明",,"社会民生","前期工作""4","市公安局业务技术用房","占地面积150亩,建筑面积17844平方米.
指挥中心用房、办案用房、窗口用房、信息通信用房及其它配套基础设施等.
","2018-2020","8996",,,,,,"完成项目前期工作.
","市城投公司","市公安局王德明",,"社会民生","前期工作",,"5","市公安局反恐技能训练基地","占地面积100亩,建筑面积15000平方米.
教学用房、训练用房、学员住宿用房及训练场地和其他附属设施等.
","2018-2020","9300",,,,,,"完成项目前期工作.
","市城投公司","市公安局王德明",,"社会民生","前期工作",,"6","市公安局警犬及配套设施用房","占地面积25亩,建筑面积1250平方米.
同时容纳50只警犬训练用房及配套设施,含警犬舍、教学及科研用房、学员宿舍用房、食堂及附属用房等.
","2018-2020","1100",,,,,,"完成项目前期工作.
","市城投公司","市公安局王德明",,"社会民生","前期工作",,"7","防城港市公安综合检查站","占地面积65亩,建筑面积4670平方米.
包括毒品检查站、环桂环邕检查站、交通执法服务站、反恐检查站、三非人员检查站、打私查缉站.
","2018-2020","6240",,,,,,"完成项目前期工作.
","市城投公司","市公安局王德明",,"社会民生","前期工作""8","防城港市体育中心项目","建筑面积:新建体育场31000平方米;体育馆12000平方米、观众座位4500个;游泳馆13500平方米、观众座位3000个,户外游泳池2000平方米;综合训练馆13000平方米;射击馆2.
5万平方米;网球馆5600平方米及飞碟场、户外网球场、篮球场、七人制足球场、气排球场等相关附属设施建设.
","2019-2021","50000",,,"43617","44348",,"开展项目前期工作.
","广西东投集团有限公司","广西东投集团赖子机",,"社会民生","前期工作""9","防城港市行政中心区文体运动训练场","建设框架钢结构室内训练场,以及配套用房,道路工程,生态停车场,绿化工程等.
",,"1900",,"完成立项、可研报告、项目用地选址规划等前期工作.
",,"43800",,"完成立项、可研报告、项目用地选址规划等前期工作.
","防城港市机关事务管理局","市机关事务管理局韩世文",,"社会民生","前期工作""10","上思县江平新区幼儿园","计划征地38亩,开设28班;建设幼儿活动室,办公及辅助用房,生活用房,科研用房,教育辅导等用房10000平方米.
","2019-2019","8300",,"正在商谈协议.
","2019年","2019年",,"完成选址工作.
","广西荣顾投资集团","上思县政府覃森",,"社会民生","前期工作""11","上思县实验中学等5所学校建设项目","新建上思县实验中学学生宿舍,建设面积2500平方米;上思县实验中学学生食堂,建筑面积2500平方米;在妙镇在妙初中学生宿舍,建筑面积2000平方米;昌菱小学学生宿舍,建筑面积2500平方米;那工村小学学生宿舍,建筑面积450平方米;板文村学生宿舍,建筑面积460平方米;建设内容为土建及装修装饰等.
","2018-2020","2602.
5",,,"43586","43983",,"开展前期工作.
","上思县教育局","上思县政府覃森",,"社会民生","前期工作",,"12","上思县强制隔离戒毒所建设项目","拟用地总面积20亩,按三类戒毒所标准建设,总建筑面积15620平方米,设计床位500张.
主要建设内容包括新建业务用房、附属设施用房,生产基地以及道路、绿化、停车场等附属配套设施,其中:病房、医疗技术用房、教育用房、行政管理用房、民警备勤用房等.
","2019-2021","5936",,"已完成规划选址(地字第450621201100163号)、立项(上计规字〔2012〕70号).
正等待新建项目可行性研究报告的批复,后续工作进行中.
","2019年","2021年",,"完成可研、初设等前期工作.
","上思县公安局","上思县政府覃森",,"社会民生","前期工作""13","上思县体育馆","按照中型馆标准设计,座位3000个以上,建筑面积10000平方米.
","2019-2020","5900",,"项目规划.
","43617","44166",,"制定可行性报告、初步设计等前期工作,争取建设资金.
","上思县文体广电新闻出版局","上思县政府覃森",,"社会民生","前期工作""14","上思县妇幼保健院整体搬迁项目","建筑面积15100平方米的妇幼保健院.
","2019-2020","5000",,"完成项目建议书批复和可研.
","2019年","2020年",,"开展勘探、可研前期工作.
","上思县妇幼保健院","上思县政府覃森",,"社会民生","前期工作""15","上思县殡仪馆","新建殡仪馆、停车场、火化炉、骨灰安放室、道路和行政办公区.
","2019-2021","5000",,"规划.
","2019年3月","2021年3月",,"完成立项及选址工作.
","上思县民政局","上思县政府覃森",,"社会民生","前期工作""16","上思县县级图书馆扩建项目","按中型图书馆标准进行设计建设,藏书量按25.
2万册考虑.
总建筑面积为5600平方米.
","2019-2020","4000",,"项目规划.
","43617","44166",,"完成立项及选址工作.
","上思县文体广电新闻出版局","上思县政府覃森",,"社会民生","前期工作""17","公共体育场(足球场)建设","占地80亩,新建20000个座位、标准105*68足球场、标准400米田径跑道.
","2019-2020","3500",,"项目规划.
","43617","44166",,"完成立项及选址工作.
","上思县文体广电新闻出版局","上思县政府覃森",,"社会民生","前期工作""18","上思县县级博物馆","占地面积53328平方米,分文博园、科普园、民俗园、美食园、创意园、养生园、游乐园等七个主题区,工程分三期施工.
第一期为文博园(博物馆)建设,占地约30亩.
","2019-2020","3000",,"项目规划","43617","44166",,"完成立项及选址工作.
","上思县文体广电新闻出版局","上思县政府覃森",,"社会民生","前期工作""19","防城港市上思县中医院","建筑面积7500平方米的中医医院.
","2019-2020","3000",,"完成项目建议书批复和可研.
","2019年","2020年",,"完成立项、选址工作和可研编制等工作.
","上思县卫计局","上思县政府覃森",,"社会民生","前期工作""20","上思县人民医院住院大楼","扩建住院大楼面积5400平方米.
","2019-2019","2160",,"完成项目建议书批复.
","2019年","2019年",,"完成立项、选址工作和可研编制等工作.
","上思县人民医院","上思县政府覃森",,"社会民生","前期工作""21","东兴市中越友好妇女儿童医院","项目占地面积约50亩,按200床位标准建设,业务用房面积约22500平方米.
","2019-2020","11000",,,"2019年",,,"争取落实项目建设用地,完成项目前期工作.
","东兴市妇幼保健院","东兴市政府陈建林",,"社会民生","前期工作""22","东兴市图书馆","新建县级图书馆1个规模4000平方米.
","2019-2021","3000",,"规划选址.
","2019年",,,"完成前期工作,争取早日开工建设.
","东兴市文体广电新闻出版局","东兴市政府陈建林",,"社会民生","前期工作""23","东兴市文化馆","新建县级文化馆1个规模4000平方米.
","2019-2021","3000",,"规划选址.
","2019年",,,"完成前期工作,争取早日开工建设.
","东兴市文体广电新闻出版局","东兴市政府陈建林",,"社会民生","前期工作""24","东兴市金湖体育公园","占地面积339亩,为改造新建园林建设工程.
主要建设内容有广场建设、园路建设、景观铺装、园景雕塑和小品、绿化种植、林相改造、园林建筑与环境设施小品建设、水系综合治理建设、给排水设施、电气安装、节能体系建设、无障碍建设.
建设规模拟建设公共绿地面积为188000平方米,建设园路面积为16950平方米,广场及铺装场地面积5650平方米,生态停车场面积为8000平方米,配套建筑面积7400平方米(其中包括游客服务中心1100平方米,公厕800平方米,景点各类建筑物5500平方米).
","2019-2020","2992",,"完成立项、可研、环评、初设、施工图设计等前期工作.
","2019年",,,"完成前期工作,争取早日开工建设.
","东兴市城市管理和综合执法局","东兴市政府陈建林",,"社会民生","前期工作""25","东兴市观音山生态陵园项目","项目用地280亩,拟建墓穴5万个,总建筑面积2550平方米.
","2019-2020","1500",,"规划选址,登记备案.
","2019年",,,"规划选址,开展项目前期工作,开工建设.
","东兴市民政局","东兴市政府陈建林",,"社会民生","前期工作""26","港口区妇幼保健院","计划新规划用地20亩,新建业务用房5000平方米及相关配套设施.
","2019-2021","5000",,"正在进行前期工作.
","2019年","2021年",,"完成部分前期工作.
","港口区卫计局","港口区政府朱靓",,"社会民生","前期工作""27","沙港新区小学新建项目","教学及辅助用房、生活用房等5栋共6600平方米,及大门、围墙、文化、绿化、硬化、运动场、排水排污等附属工程.
","2019-2021","2620",,"完成可研编制及批复工作,正在进行施工图设计费用的审定.
","2019年","2021年",,"完成部分前期工作.
","港口区教育局","港口区政府朱靓",,"社会民生","前期工作""28","港口区公车镇公车小学扩建项目","扩建面积7035.
14平方米.
","2019-2020","2452",,"项目进行前期规划.
","2019年","2020年",,"完成部分前期工作.
","港口区教育局","港口区政府朱靓",,"社会民生","前期工作""29","防城港市防城区人民医院门诊医技综合楼","新建门诊、医技综合楼,建筑面积12560平方米.
","2019-2021","5060",,"完成可研.
","2019年","2021年",,"落实建设用地,完成前期工作.
","防城区人民医院","防城区政府荣毅宏",,"社会民生","前期工作""30","基层医疗卫生机构能力建设项目","扩建3个乡镇卫生院业务用房,建设面积共1782平方米,其中扶隆乡那勤分院650平方米,那良镇那垌分院532平方米,十万山瑶族乡卫生院600平方米,为十万山瑶族乡卫生院配置基本诊疗设备1套.
","2019-2020","1624",,"完成立项、环评、节能前期.
","2019年","2020年",,"完成项目前期工作.
","防城区卫计局","防城区政府荣毅宏",,"社会民生","前期工作""五","交通港航类","99",,"8165588.
43","347442",,,,"380398""(一)","续建项目","10",,"1592430","296860",,,,"289118""1","广西滨海公路企沙至茅岭段(企沙至茅岭一级公路)","线路起点于企沙镇牛路村,终点位于防城至东兴高速公路茅岭互通点,全长34.
73千米,路基宽33.
5米.
设计行车时速100千米/小时,双向6车道.
","2017-2020","223000","100000","完成部分路基土石方和桥涵工程.
","42887","43983","70000","在解决征地拆迁前提下,完成路基土石方和部分桥涵工程.
","市港工公司","市港工公司徐钦帮",,"交通港航","续建",,"2","兰海高速公路钦州至防城港段改扩建项目","防城段路线起点桩号k8+500;路线终点为新建钦防高速公路防城港主线收费站,终点桩号K30+105.
862,路线全长22.
506千米.
原有公路为双向四车道,路基宽度为24.
50米.
采用两侧拼接方式扩建为8车道,整体式路基宽42米(每侧加宽8.
75米).
","2017-2019","208800","30000","2017年8月完成建设用地手续办理,施工单位于2017年7月进场,2017年8月底全面开工,至2017年底,计划完成总体路基80%、路面5%、桥涵40%、房建10%.
","42979","43709","50000","2018年底,计划完成总体路基80%、路面40%、桥涵60%、房建50%.
","广西北部湾投资集团有限公司","市交通运输局郑武珠",,"交通港航","续建",,"3","广西运宇仓储码头项目(511#、512#)","项目位于东湾物流园区内.
海岸线445米,计划投资8.
3亿元.
计划建设一个3万吨级泊位和一个5万吨级泊位、16万平方米仓储物流场地及堆场,设计年货物吞吐量为1000万吨,重点发展公共码头业务、集装箱和港口保税业务.
项目建成后,不断增加中外运阳光速航集装箱班轮密度.
","2016-2019","80000","20000","1.
已完成清理海域非法养殖;2.
完成陆域形成工程、码头前期各项论证、工可及港池用海开挖等前期工作;3.
码头泊位工程总平面设计方案已获市住建委审批;4.
完成海域使用证换土地使用证办理;5.
为推动我市实现打造"100万标箱工程"目标,业主已成功申请调整码头使用功能,由散货码头调整为多用途集装箱码头,自治区发改委已经同意并审批调整项目的备案核准;6.
正在向交通厅申报岸线使用申请;7.
港池疏浚工程正在进行中,已完成工程量的50%以上.
","2016年","2019年","5000","开展码头水工建设.
","广西运宇港务有限公司","市物流办朱清华",,"交通港航","续建",,"4","防城港至东兴铁路","全长47.
6千米,主要技术标准为国铁I级,双线电气化,全线设防城港北(改建)、江山半岛(预留)、东兴市站.
工期3年.
","2017-2020","648000",,"可研已批复,开工建设.
","43070","44166","100000","全年基本完成征地工作,完成拆迁任务60%,完成年度工程投资100%.
","南宁铁路局玉林铁路工程建设指挥部","市港铁机办李广斌",,"交通港航","续建",,"5","防城港渔澫港区第五作业区513~516号泊位工程","1个30000DWT多用途泊位和3个30000DWT通用泊位(水工结构均按兼靠30000DWT集装箱船考虑),设计年吞吐量为320万吨.
","2014-2020","126653","47898","1.
临时航道开挖,完工;2.
后方陆域回填工程,完成90%;3.
码头水工工程,完成75%.
其中,水下主体结构完成,疏浚量完成69%.
","41730","44166","5000","项目复工.
","防城港北部湾港务有限公司","市港铁机办李广斌",,"交通港航","续建",,"6","防城港渔澫港区第五作业区进港航道工程","3~5万吨级单向航道长6.
637千米.
","2016-2019","79785","17507","疏浚工程量累计完成300万立方米.
","42705","43800","10000","年内完成航道疏浚量120万方.
","防城港北部湾港务有限公司","市港铁机办李广斌",,"交通港航","续建",,"7","防城港马鞍岭1、2号旅游码头工程","建设3万吨级客运码头2个以及配套的候船大厅(联检大楼)、商业购物区、行李托运仓库等配套设施,项目占地面积32.
3公顷.
","2014-2020","66961","30739","1.
后方陆域回填工程,完工;2.
码头水工工程,完工.
","41730","44166","5000","开展码头护岸工程前期工作.
","防城港务集团有限公司","市港铁机办李广斌",,"交通港航","续建","500","8","榕木江西港点1-6号泊位工程","6个5000吨级泊位.
","2017-2021","128563","46666","1.
项目已完成核准、初步设计批复、施工图批复、施工招投标;2.
因东湾潭油航道尚未建设,直接影响码头水工工程施工.
目前市发改委(港铁机办)正在协调东湾潭油航道推进事宜;3.
目前只可施工码头预置场地,已填土1万平方米.
","42887","44531","25000","力争年底码头水工工程施工.
","广西盛隆码头有限公司","市港铁机办李广斌",,"交通港航","续建",,"9","上思县城至十万大山国家森林公园二级公路工程","总里程29.
6千米,路基、路面、桥涵、防护工程.
","2017-2019","30000","3750","三个标段全面施工.
","42979","43525","18750","完成涵洞工程100%,完成路基土方100%,级配碎石层100%,完成水稳层100%.
","上思县城市建设投资有限责任公司","上思县政府覃森",,"交通港航","续建",,"10","防城区横模大桥","维修改造中国峒中-越南横模口岸漫水桥和临时通道桥.
全线按四级公路技术标准建设,设计速度20千米/小时,桥梁宽度11米、路基宽10米、路面宽9米,路面结构形式采用水泥混泥土路面,桥涵设计荷载等级—I级.
","2016-2019","668","300","全部完成便道桥工程,待便道桥通车后将督促施工单位开工建设主桥.
","42430","2019年","368","全部完成主桥工程.
","防城区交通运输局","防城区政府荣毅宏",,"交通港航","续建",,"(二)","竣工投产项目","3",,"130965.
43","39227""1","防城港渔澫港区第五作业区501号泊位工程","新建1个5万吨级液体散货码头,设计年吞吐能力为149万吨,其中液化石油气(LPG)85万吨,液化天然气(LNG)64万吨.
","2016-2018","41400","39227","1.
项目水工工程完工并交工;2.
项目上部结构安装与土建工程完成80%.
","42484","43101","2173","2018年1月项目竣工.
","防城港东湾港油码头有限公司","市港铁机办李广斌",,"交通港航","竣工投产",,"2","马路至峒中公路","二级公路全长87千米.
","2014-2018","56230",,,"41791","43374",,"主体完工.
","自治区公路局","市交通运输局郑武珠",,"交通港航","竣工投产",,"3","防城港云约江南作业区1号泊位工程","1号泊位水工工程及后方配套堆场工程.
","2012-2018","33335.
43",,,"41030","2018年6月",,"完成工作建设,并通过验收.
","防城港云约江码头有限公司","市商务局袁学顺",,"交通港航","竣工投产",,"(三)","新开工项目","13",,"1158900","6125","0",,,"90700""1","防城港企沙港区潭油作业区进港航道工程(原潭油航道工程)","一期建设规模:自东湾10万吨级航道终点起,沿东湾5万吨级航道、电厂航道至榕木江西港点1-6号泊位,按设计等级5000吨级单向航道建设;云约江段航道按设计等级为5000吨级单向航道建设;云约江口至17号泊位段航道按设计等级为5000吨级单向航道建设;总长11.
7千米;二期建设规模按港口总体规划建设规模建设完成.
","2018-2019","317829",,"完成立项、测量、可研和部分前置专题批复并开展施工图设计.
","43252","43617","5000","完成项目前期工作,先开工防城港电厂北端至盛隆公司码头段及云约江口至17号泊位段,总长11.
7千米,总投资6.
3亿元,其中电厂北端到风流岭江口段按5000吨级航道建设,风流岭江口至盛隆公司码头段按5000吨级建设,云约江口至17号泊位段按5000吨级建设.
","市港工公司","市港工公司徐钦帮",,"交通港航","新开工",,"2","公车至华祖园公路工程","道路全长约15千米,路基宽8.
5米.
","2018-2019","4500",,"完成立项、规划选址、测量、可研批复和施工图设计.
","43252","43617","1000","在解决征地拆迁前提下,完成部分路基土石方工程.
","市港工公司","市港工公司徐钦帮",,"交通港航","新开工",,"3","防城港市国门大道工程项目","道路全长31.
65千米,道路宽45-60米;道路等级为城市快速路,设计行车速度80千米/小时.
建设内容:道路工程、排水工程、照明工程、桥涵工程、交通工程、绿化工程及相关配套设施.
","2018-2020","255636","3725","目前已基本完成项目各项前期工作,项目用海、林地手续已批复,正在开展用地报批手续.
市交通局正在开展社会资本方的采购招标.
现场已经开始进行征地拆迁工作.
","43221","43983","50000","实现项目开工建设,完成总工程量的20%.
","广西东投集团有限公司","广西东投集团赖子机",,"交通港航","新开工","重点推进项目","4","沙企一级公路改扩建","项目拟对原沙企一级公路和电厂联线进行改扩建,四车道改为八车道;其中沙企一级公路主线长23.
63千米,设计速度60千米/小时,道路红线宽60米,共设桥梁23座(其中大桥5座、中桥10座,分离式立交桥8座);联线路线长6.
52千米,设计速度60千米/小时,道路红线宽25.
5米,共设桥梁3座(其中大桥1座、小桥2座).
","2018-2020","300000",,"开展项目建议书等前期工作.
","43435","44166","5000","开展项目前期工作,力争年底实现项目开工建设.
","广西东投集团有限公司","广西东投集团赖子机",,"交通港航","新开工","重点推进项目","5","G219防城峒中至东兴公路","建设一级公路24千米,二级公路23千米.
","2018-2020","111479","2400","项目工可、初步设计已获批,正开展施工图设计.
","43344","43983","1000","完成前期工作并开工建设.
","市交通运输局","市交通运输局郑武珠",,"交通港航","新开工""6","华兰至平福三级公路","路基、路面、桥涵、防护工程,三级公路14.
5千米.
","2018-2019","5000",,"前期工作.
","43347","43803","2000","完成前期工作并开工建设.
","上思县城市建设投资有限责任公司","上思县政府覃森",,"交通港航","新开工",,"7","在妙—公安三级公路","在妙、平福、那明、公安三级公路40.
8千米.
","2018-2019","10000",,"拟准备前期工作.
","43254","43803","2000","完成前期工作并开工建设.
","市交通运输局","市交通运输局郑武珠",,"交通港航","新开工",,"8","上思县2018年国家农业综合开发叫安镇高标准农田建设项目","渠道22.
567千米,硬化道路17.
097千米,晒场449.
5平方米.
","2018-2018","1500",,"完成相关前期工作.
","43313","43586","1200","计划2018年8月份开工.
","上思县农业综合开发办公室","上思县政府覃森",,"交通港航","新开工",,"9","中越铁路防城港至东兴段东兴站北移工程","规模建筑总面积15000平方米.
","2018-2020","40000",,"开展前期工作、征地工作.
","43374","44105","10000","开展土石方平整.
","东兴市开发投资有限责任公司","东兴市政府陈建林",,"交通港航","新开工",,"10","峒中口岸(含里火通道)综合服务区项目","口岸服务中心、验货场、监管仓库、查验通道、综合办公楼、检验检疫专用熏蒸房、新建口岸区内道路、硬化露天货场及停车场、货场供电、供水、排污项目、货场围墙及大门、道路改造工程、其他配套设施建设项目、海关、边检检验检疫局等三家联检部门在口岸区的机关办公生活用房.
","2018-2020","80000",,,"43374","44166","5000","开工建设.
","防城区商务局","防城区政府荣毅宏",,"交通港航","新开工""11","峒中口岸连接马峒公路支线(4车道)","总长约5.
5公里,双向4车道,按二级公路建设","2018-2020","15000",,,"43374","44166","5000","开工建设.
","防城区交通局","防城区政府荣毅宏",,"交通港航","新开工""12","峒中口岸人货分离通道(大桥)","总长约1000千米,宽30米,双向4车道,按园区次干路、支路建设","2018-2020","5000",,,"43374","44166","2000","开工建设.
","防城区交通局","防城区政府荣毅宏",,"交通港航","新开工""13","大菉那德至十万山乡二级公路","建设二级公路12千米.
","2018-2020","12956",,,"43315","44169","1500","完成前期工作并开工建设.
","防城区交通运输局","防城区政府荣毅宏",,"交通港航","新开工",,"(四)","前期工作项目","73",,"5283293","5230","0",,,"580""1","防城港企沙港区赤沙作业区212、213号泊位工程","2个8万吨级散货泊位.
",,"138573",,"完成测量和可研报告编制.
",,,,"完成可研.
","市港工公司","市港工公司徐钦帮",,"交通港航","前期工作",,"2","防城港企沙港区云约江作业区17号泊位工程","新建1个3000吨级液体化学品泊位,岸线总长124米,后方陆域总面积约为5万平方米.
",,"14000",,"正在开展项目前期工作.
",,,,"完成项目前期工作.
","市港工公司","市港工公司徐钦帮",,"交通港航","前期工作",,"3","防城港企沙港区赤沙作业区1、2号泊位工程","拟在广西钢铁集团现有20万吨码头南侧新建2个20万吨级散货泊位,泊位总长度为764米.
",,"288672",,,,,,"完成可研.
","市港工公司","市港工公司徐钦帮",,"交通港航","前期工作",,"4","潭油作业区5、6号泊位工程","自南向北依次布置2个5万吨级件杂泊位(5#、6#).
",,"119967",,,,,,"完成可研.
","市港工公司","市港工公司徐钦帮",,"交通港航","前期工作",,"5","防城港市茅岭至皇城坳铁路支线","新建正线长20.
5千米,主要技术标准为Ⅰ级、单线,设计时速120千米/小时.
与既有南防线~企沙支线形成企沙半岛铁路通道双线规模.
",,"119000",,"已完成项目立项、环评、节能、规划选址、可研修改和用地预审.
",,,,"完成可研批复.
","市港工公司","市港工公司徐钦帮",,"交通港航","前期工作",,"6","防城港潭油作业区铁路支线","新建正线长7.
9千米,主要技术标准为Ⅳ、单线,设计时速80千米/小时.
",,"64000",,"已完成项目立项、环评、节能、规划选址、可研修改和用地预审.
",,,,"完成可研批复.
","市港工公司","市港工公司徐钦帮",,"交通港航","前期工作",,"7","防城港云约江作业区铁路支线","新建正线长7.
2千米,主要技术标准为Ⅲ、单线,设计时速80千米/小时.
",,"54000",,"已完成项目立项、节能、环评评审和可研编制.
",,,,"完成可研批复和用地预审、环评.
","市港工公司","市港工公司徐钦帮",,"交通港航","前期工作",,"8","防城港企沙南作业区铁路","新建线路全长13.
8千米,主要技术标准为工企Ⅲ级,单线,设计速度60千米/小时.
",,"55000",,"准备开展项目前期工作.
",,,,"完成预可研批复.
","市港工公司","市港工公司徐钦帮",,"交通港航","前期工作",,"9","广西凌宇运通港务有限责任公司码头工程","建设2个3000吨级和1个2000吨级件杂货泊位(码头水工按5000吨预留),设计年泊位通过能力为125万吨.
",,"25000","5000","完成部分港池工程.
",,,,"项目恢复施工.
","广西凌宇运通港务有限责任公司","市港工公司徐钦帮",,"交通港航","前期工作",,"10","东湾跨海大桥","东湾大桥总长3930米、桥面宽38米,其中主桥长810米,引桥长3120米.
主桥段跨东湾潭油5万吨级航道,单孔双向通航净宽360米、净高49米,采用斜拉桥方案.
西湾大桥改建桥梁总长1500米,桥宽38米,道路扩建1400米.
","2019-2023","157000",,,"43800","45261",,"开展前期工作.
","广西东投集团有限公司","广西东投集团赖子机",,"交通港航","前期工作","重点推进项目","11","防城至江山二级公路江山段路面改造工程","该项目位于原防城至江山二级公路K2+900~K3+900段、K15+500~K17+500段,全长约3000米,路基宽度8.
5米,路面宽度7.
5米,主要建设内容包括道路硬化、修复附属设施及相关排水设施.
","2019-2019","550",,,"43466","43739",,"开展前期工作.
","广西东投集团有限公司","广西东投集团赖子机",,"交通港航","前期工作",,"12","东兴机场(支线机场)","项目拟按4C标准规划建设,跑道长2600米(远期预留至3200米),客机位数4个(远期6个),目标年(2025年)预测旅客吞吐量53万人次、货邮吞吐量4000吨,远期(2045年)预测旅客吞吐量127万人次、货邮吞吐量11600吨.
","2020-2022","150000",,"完成机场选址报告,正在开展预可行性研究.
","44166","44897",,"争取自治区明确在防城港布局运输机场,启动机场选址报批等前期工作.
","广西东投集团有限公司","广西东投集团赖子机",,"交通港航","前期工作","重点推进项目","13","G228茅岭至公车二级公路","建设二级公路27千米.
","2019-2021","32400","80","完成工可编制.
","43617","44348","580","完成全部前期工作.
","市交通运输局","市交通运输局郑武珠",,"交通港航","前期工作",,"14","吴圩经上思至东兴高速公路","采用双向四车道高速公路标准,设计时速为100千米/小时,路基宽26米,建设里程114.
769千米.
",,"1117200",,,,,,"力争列入自治区2018-2035年高速公路网规划.
","市交通运输局","市交通运输局郑武珠",,"交通港航","前期工作","重点推进项目","15","S516上思叫安至华兰二级公路","建设二级公路25千米.
","2019-2021","30000",,,"43811","44533",,"开展前期工作.
","市交通运输局","市交通运输局郑武珠",,"交通港航","前期工作",,"16","S516防城扶隆至东兴交东二级公路","建设二级公路48千米.
","2019-2021","41000",,,"43710","44533",,"开展前期工作.
","市交通运输局","市交通运输局郑武珠",,"交通港航","前期工作",,"17","防城港企沙港区企沙南作业区40万吨级矿石码头工程","1个30万吨级矿石码头(水工结构按40万吨级预留).
","2019-2022","389000",,"累计完成选址、工可阶段地质勘察钻孔129个,地形测量面积12.
1平方千米,工可阶段勘察测量均已全部完成;项目工可报告初稿已完成编制.
","2019年","2022年",,"加快推进项目前期工作,进一步完善项目可行性研究.
","防城港北部湾港务有限公司","市港铁机办李广斌",,"交通港航","前期工作",,"18","防城港企沙港区企沙南作业区防波堤工程","防波堤长14千米.
","2019-2022","353624",,"已完成工程可行性研究报告编制,正在开展其他专题报告的编制工作.
","2019年","2022年",,"加快项目前期工作,完成部分专题报告的编制.
","自治区北部湾港口管理局防城港分局","市港铁机办李广斌",,"交通港航","前期工作",,"19","防城港30万吨级进港航道工程","外海至30万吨级码头选址处,30万吨级航道长19千米.
","2019-2022","245447",,"已完成工程可行性研究报告编制,正在开展其他专题报告的编制工作.
","2019年","2022年",,"加快项目前期工作,完成部分专题报告的编制.
","自治区北部湾港口管理局防城港分局","市港铁机办李广斌",,"交通港航","前期工作",,"20","云桂沿边铁路(防城至上思)","防城港辖区里程133公里,国铁Ⅰ级、单线、160千米/小时.
","2019-2024","863200",,,"2019年","2024年",,"配合自治区相关部门,加快推进项目前期工作.
","待定","市港铁机办李广斌",,"交通港航","前期工作",,"21","防城港渔澫港区第四作业区401号泊位工程","1个20万吨散货泊位.
","2019-2019","95000",,"项目前期工作已完成,已具备招投标开工条件.
","2019年","43800",,"力争开展招投标工作.
","防城港北部湾港务有限公司","市港铁机办李广斌",,"交通港航","前期工作",,"22","通用机场","为一类通用机场.
二类及以上通用机场跑道长1200米、场内占地面积600-800亩.
","2019-2025","5000",,"注册成立中俄通用飞机总装合资公司,完成通用飞机制造核准,启动飞机生产;现已初步选定通用机场选址,正在编制机场可研报告;10月12日,防城港市高新区管委会与广西航空新城投资股份有限公司正式签订通用飞机制造总装厂(一期)入驻云朗科技园租赁合同.
","2019年","2025年5月",,"完成航空小镇概念规划、可研、详规;开展通用机场建设、空域许可报批等.
","广西航空新城投资股份有限公司","市港铁机办李广斌",,"交通港航","前期工作",,"23","雷德至那则一级公路","路基、路面、桥涵、防护工程,一级公路25千米.
","2019-2020","100500",,"前期工作.
","2019年","2020年",,"完成立项、可研究性报告.
","上思县城市建设投资有限责任公司","上思县政府覃森",,"交通港航","前期工作",,"24","南屏—常隆三级公路","渠坤、米强、枯叫、常隆三级公路31千米.
","2019-2020","46500",,"拟准备前期工作.
",,,,"开展测量、设计等前期工作.
","上思县交通运输局","上思县政府覃森",,"交通港航","前期工作",,"25","叫安-华兰公路","路基、路面、桥涵、防护工程,二级公路28.
5千米.
","2019-2020","34200",,"前期工作.
","2019年","2020年",,"开展测量、设计等前期工作.
","上思县城市建设投资有限责任公司","上思县政府覃森",,"交通港航","前期工作""26","七门—玉沙二级公路","联合、板文、雄杰、平福二级公路21千米.
","2019-2020","31500",,"拟准备前期工作.
",,,,"开展测量、设计等前期工作.
","上思县交通运输局","上思县政府覃森",,"交通港航","前期工作",,"27","上思县城绕城线公路","建设一级公路7.
1千米.
","2018-2020","30000",,"基本完成项目前期工作.
","2019年","2020年",,"开展测量、设计等前期工作.
","上思县城市投资有限公司","上思县政府覃森",,"交通港航","前期工作",,"28","S311线上思县江平至明哲段一级公路","路基、路面、桥涵、防护工程,一级公路7.
1千米.
","2018-2020","30000",,"已完成前期工作.
","43586","44166",,"年内完成可研审批.
","上思县城市建设投资有限责任公司","上思县政府覃森",,"交通港航","前期工作",,"29","华兰—南屏二级公路","华兰、南屏二级19千米.
","2018-2020","28500",,"正在前期工作.
",,,,"开展测量、设计等前期工作.
","上思县交通运输局","上思县政府覃森",,"交通港航","前期工作",,"30","那当—华兰二级公路","那当、提高、华城、华兰二级公路14.
5千米.
","2019-2020","21750",,"拟准备前期工作.
",,,,"开展测量、设计等前期工作.
","上思县交通运输局","上思县政府覃森",,"交通港航","前期工作",,"31","平福—板含三级公路","平福、明旺、板含三级公路20.
7千米.
","2019-2020","20700",,"拟准备前期工作.
",,,,"开展测量、设计等前期工作.
","上思县交通运输局","上思县政府覃森",,"交通港航","前期工作",,"32","东屏—肥鱼三级公路","吉彩-彩林三级公路20千米.
","2019-2020","19000",,"拟准备前期工作.
",,,,"开展测量、设计等前期工作.
","上思县交通运输局","上思县政府覃森",,"交通港航","前期工作",,"33","熟康—华兰三级公路","熟康、高福、华兰三级公路16.
5千米.
","2019-2020","15675",,"拟准备前期工作.
",,,,"开展测量、设计等前期工作.
","上思县交通运输局","上思县政府覃森",,"交通港航","前期工作",,"34","公正—那齐三级公路","公正至那齐三级公路16.
4千米.
","2019-2020","15580",,"拟准备前期工作.
",,,,"开展测量、设计等前期工作.
","上思县交通运输局","上思县政府覃森",,"交通港航","前期工作",,"35","那勿-南屏公路","路基、路面、桥涵、防护工程二级公路12千米.
","2019-2020","14400",,"前期工作.
","2019年","2020年",,"开展测量、设计等前期工作.
","上思县城市建设投资有限责任公司","上思县政府覃森",,"交通港航","前期工作""36","七门—板龙三级公路","联合至板龙三级公路14千米.
","2019-2020","13300",,"拟准备前期工作.
",,,,"开展测量、设计等前期工作.
","上思县交通运输局","上思县政府覃森",,"交通港航","前期工作",,"37","枯良—东屏三级公路","信良、那英、东屏三级公路13.
5千米.
","2019-2020","12825",,"拟准备前期工作.
",,,,"开展测量、设计等前期工作.
","上思县交通运输局","上思县政府覃森",,"交通港航","前期工作",,"38","上思县汽车客运中心","按部颁标准一级客运站标准建设,包含客运楼、旅游及公交业务楼、修理厂及商业配套设施,规划能力为日发送旅客10567人次.
总用地面积72.
29亩,建筑面积17983.
03平方米.
","2018-2020","11081",,"完成可研","43586","44075",,"2018年力争完成可研、初设的审批.
","广西防城港超大运输有限责任公司","上思县政府覃森",,"交通港航","前期工作",,"39","龙楼至那白公路","路面改建22千米(油反砂).
","2019-2019","9900",,"前期工作.
","2019年","43800",,"开展测量、设计等前期工作.
","上思县交通运输局","上思县政府覃森",,"交通港航","前期工作""40","柳桥—和星三级公路","思阳、和星三级公路10.
1千米.
","2019-2020","9595",,"拟准备前期工作.
",,,,"开展测量、设计等前期工作.
","上思县交通运输局","上思县政府覃森",,"交通港航","前期工作",,"41","昌墩-那厘三级公路","昌墩至那厘三级公路8.
9千米.
","2019-2020","8455",,"拟准备前期工作.
",,,,"开展测量、设计等前期工作.
","上思县交通运输局","上思县政府覃森",,"交通港航","前期工作",,"42","东屏—大吉三级公路","吉彩至大吉三级公路8.
3千米.
","2019-2020","7885",,"拟准备前期工作.
",,,,"开展测量、设计等前期工作.
","上思县交通运输局","上思县政府覃森",,"交通港航","前期工作",,"43","派罗—岜僚三级公路","联合至佛子三级公路8.
3千米.
","2019-2020","7885",,"拟准备前期工作.
",,,,"开展测量、设计等前期工作.
","上思县交通运输局","上思县政府覃森",,"交通港航","前期工作",,"44","伟华—百龙三级公路","伟华至百龙三级公路8.
1千米.
","2019-2020","7695",,"拟准备前期工作.
",,,,"开展测量、设计等前期工作.
","上思县交通运输局","上思县政府覃森",,"交通港航","前期工作",,"45","明兴—昌墩三级公路","那工、熟康、昌墩三级公路8千米.
","2019-2020","7600",,"拟准备前期工作.
",,,,"开展测量、设计等前期工作.
","上思县交通运输局","上思县政府覃森",,"交通港航","前期工作",,"46","城北至布透三级公路","建设三级公路6千米.
","2019-2020","7200",,"正在前期工作.
","2019年","2020年",,"开展测量、设计等前期工作.
","上思县交通运输局","上思县政府覃森",,"交通港航","前期工作",,"47","华兰-贡口三级公路","华兰至贡口三级公路7.
4千米.
","2019-2020","7030",,"拟准备前期工作.
",,,,"开展测量、设计等前期工作.
","上思县交通运输局","上思县政府覃森",,"交通港航","前期工作",,"48","昌墩—玉学三级公路","昌墩至玉学三级公路7.
1千米.
","2019-2020","6745",,"拟准备前期工作.
",,,,"开展测量、设计等前期工作.
","上思县交通运输局","上思县政府覃森",,"交通港航","前期工作",,"49","更所—有生三级公路","更所至有生三级公路7千米.
","2019-2020","6650",,"拟准备前期工作.
",,,,"开展测量、设计等前期工作.
","上思县交通运输局","上思县政府覃森",,"交通港航","前期工作",,"50","板细—高福三级公路","板细至高福三级公路6.
8千米.
","2019-2020","6460",,"拟准备前期工作.
",,,,"开展测量、设计等前期工作.
","上思县交通运输局","上思县政府覃森",,"交通港航","前期工作",,"51","那琴-那琶公路","路基、路面、桥涵、防护工程三级公路11.
7千米.
","2019-2019","5265",,"前期工作.
","2019年","2019年",,"完成项目书及可研阶段.
","上思县交通运输局","上思县政府覃森",,"交通港航","前期工作""52","平江至魔石谷三级公路","路基、路面、桥涵改建里程8千米.
","2019-2019","4400",,"前期工作.
","2019年","43466",,"完成项目书及可研阶段.
","上思县交通运输局","上思县政府覃森",,"交通港航","前期工作""53","枯胎-枯娄三级公路","枯胎至枯娄三级公路3千米.
","2019-2020","2850",,"拟准备前期工作.
",,,,"开展测量、设计等前期工作.
","上思县交通运输局","上思县政府覃森",,"交通港航","前期工作",,"54","昌墩-煤矿公路","路基、路面、桥涵、防护工程三级公路5.
4千米.
","2019-2019","2430",,"前期工作.
","2019年","2019年",,"完成项目书及可研阶段.
","上思县交通运输局","上思县政府覃森",,"交通港航","前期工作""55","东兴环城路","建设一级公路15千米.
","2018-2019","75000",,"正在开展项目前期工作.
","2018年","2019年",,"开展前期工作.
","东兴市交通运输局","东兴市政府陈建林",,"交通港航","前期工作",,"56","东兴市马路至江那公路","建设三级公路12千米.
","2020-2022","14400",,"准备开展项目前期工作.
","2020年","2022年",,"开展前期工作.
","东兴市交通运输局","东兴市政府陈建林",,"交通港航","前期工作",,"57","东兴市竹山至冲峰公路","马路镇竹围村、江平镇那漏村、横隘村、吒祖村三级公路13.
5千米.
","2018-2019","4100",,"已列入县道路网规划、立项.
",,,,"开展前期工作.
","东兴市交通运输局","东兴市政府陈建林",,"交通港航","前期工作",,"58","光坡至山心(企沙)三级公路","建设三级公路11千米.
","2019-2020","13200",,"正在前期工作.
","2019年","2020年",,"完成初步可研、初步设计,争取资金支持.
","港口区交通局","港口区政府朱靓",,"交通港航","前期工作",,"59","防城环城西路","新建道路7.
54千米,路基宽度24米,按双向四车道市政主干道标准建设.
主要建设内容包括道路、桥涵、排水、交通、照明、绿化等工程及相关配套设施.
","2019-2020","25094",,"正在前期工作.
","2019年","2020年",,"开展前期工作.
","防城区城市建设投资有限责任公司","防城区政府荣毅宏",,"交通港航","前期工作",,"60","垌美至那垌二级公路","建设二级公路86千米.
","2019-2022","104900","150","完成工可编制.
","2019年","44896",,"完成前期工作.
","防城区交通运输局","防城区政府荣毅宏",,"交通港航","前期工作",,"61","针鱼岭大桥至华石互通一级公路","建设一级公路12千米.
","2019-2020","60000",,,"2019年","2020年",,"开展前期工作.
","待定","防城区政府荣毅宏",,"交通港航","前期工作""62","那屋背至华石三级公路","建设三级公路15千米.
","2019-2020","18000",,"正在前期工作.
","2019年","2020年",,"开展前期工作.
","待定","防城区政府荣毅宏",,"交通港航","前期工作",,"63","板八至滩散三级公路","建设三级公路12千米.
","2019-2020","14400",,"正在前期工作.
","2019年","2020年",,"开展前期工作.
","待定","防城区政府荣毅宏",,"交通港航","前期工作",,"64","那良至那梭(东山)二级公路","那良大勉至那梭东山二级公路28千米.
","2019-2020","11200",,"还未开展.
","2019年","2020年",,"开展前期工作.
","待定","防城区政府荣毅宏",,"交通港航","前期工作""65","华石至大录公路","华石村、米中村、米丰村、百里村三级公路30千米.
","2019-2020","9000",,"还未开展.
","2019年","2020年",,"开展前期工作.
","待定","防城区政府荣毅宏",,"交通港航","前期工作""66","那梭-交东三级公路","建设三级公路21.
1千米.
","2019-2020","6330",,,"2019年","2020年",,"开展前期工作.
","待定","防城区政府荣毅宏",,"交通港航","前期工作""67","十万山-七星顶三级公路","建设三级公路12千米.
","2019-2020","3600",,,"2019年","2020年",,"开展前期工作.
","待定","防城区政府荣毅宏",,"交通港航","前期工作""68","华石至那河公路","那河村三级公路12.
6千米.
","2019-2020","3150",,"还未开展.
","2019年","2020年",,"开展前期工作.
","待定","防城区政府荣毅宏",,"交通港航","前期工作""69","垌中镇板八至板岸公路","板八村至板岸村公路21.
5千米.
","2019-2020","2580",,"还未开展.
","2019年","2020年",,"开展前期工作.
","待定","防城区政府荣毅宏",,"交通港航","前期工作""70","滩营乡那屋背至珠河街道办那天花道路","那屋背村至那天花村三级公路8千米.
","2019-2020","2400",,"还未开展.
","2019年","2020年",,"开展前期工作.
","待定","防城区政府荣毅宏",,"交通港航","前期工作""71","那湾至横江公路","横江村三级公路8千米.
","2019-2020","2000",,"还未开展.
","2019年","2020年",,"开展前期工作.
","待定","防城区政府荣毅宏",,"交通港航","前期工作""72","扶隆-电六三级公路","建设三级公路6.
6千米.
","2019-2020","1980",,,"2019年","2020年",,"开展前期工作.
","待定","防城区政府荣毅宏",,"交通港航","前期工作""73","里火-北烽生口岸桥","包含主桥和便道桥.
主桥,宽12.
5米,建双跨桥,双车道;便道桥,宽20米,建双跨桥,双向四车道.
","2019-2020","770",,,"2019年","2020年",,"开展前期工作.
","防城区交通局","防城区政府荣毅宏",,"交通港航","前期工作""六","乡村振兴类","100",,"1705885.
88","69856",,,,"153921""(一)","续建项目","23",,"497756.
88","40347","0",,,"68357""1","万鸥村古渔港改造项目","建设内容一是整治村容村貌;二是深入挖掘当地特色,融入现代理念,统一设计符合当地民族风情立面风格;三是对渔港码头、防浪堤等公共设施进行改造建设;四是对村内原有基础设施进行提档升级.
","2016-2019","2000","50","开展设计施工总承包招标工作.
","42705","2019年","200","完成施工总承包招标,加快推进改造建设.
","市江山旅管委","市江山旅管委黄晓昀",,"乡村振兴","续建",,"2","防城港市"双高"糖料蔗基地项目","建设"双高"糖料蔗基地面积10万亩,完善土地平整,实现水利化、农机化、良种化.
","2014-2020","18000",,"完成7.
5万亩.
","41760","44166","5000","建设2万亩"双高"糖料蔗基地.
","上思县"双高"办","市农委吴永明",,"乡村振兴","续建""3","防城港市三波水库除险加固工程","中型水库除险加固.
","2016-2019","2537","2280","1.
前期工作已完成;2.
建设进度:2016年12月开工建设.
Ⅰ标段和Ⅲ标段已于2016年12月开工建设.
完成大坝,1-5号副坝灌浆,完成防汛道路改造3千米,交通桥改造一座.
","42705","43800","257","完成机电设备采购、安装.
","防城港市三波水库管理所","市水利局曾凡兴",,"乡村振兴","续建""4","防城港市金花茶产业(核心)示范区(一期)","总规划面积为17050亩,其中核心区规划为2500亩.
","2016-2020","3239","1697","1.
完成主干道(华石至那河公路改道工程)土石方工程及部分路面混凝土浇注;2.
环园道路正在招标;3.
完成茶艺体验馆及相关设施建设;4.
完成种植大棚6000平方米;5.
完成200亩林下金花抚育管护.
","42491","2020年","320","完成华石至那河改道、环园路工程建设,交投入使用.
完成种质资源库建设.
","市林木良种繁育中心苗圃","市林业局凌光振",,"乡村振兴","续建""5","2016年新建沿海防护林工程","新建边海防护林1.
6万亩.
","2017-2019","800","640","完成新造林1.
6万亩.
","42736","43830","80","完成1.
6万亩第二年抚育.
","市林业基层工作站","市林业局凌光振",,"乡村振兴","续建""6","蓝湾旅游公司离岸深水抗风浪网箱养殖产业开发","建设深海抗风浪网箱,养殖水体达180万立方米,配套建设育苗场、水产品加工厂及饲料加工厂等相关产业项目.
","2015-2019","11000",,,"42005","43800","1000","新建深水网箱20口及养殖金鲳鱼.
","广西蓝湾旅游有限公司","市水产畜牧局裴光艳",,"乡村振兴","续建",,"7","江源工厂化养殖基地建设","建设工厂化养殖车间49600平方米,循环水处理设施60000平方米.
","2017-2019","4000",,"养殖车间在建设中,养殖生产在进行中.
企业希望在资金筹措方面得到政府担保或支持.
","42795","43800","1000","续建车间及水处理设施.
","东兴市江源水产有限公司","市水产畜牧局裴光艳",,"乡村振兴","续建",,"8","上思万亩檀香生态园项目","以檀香种植,发展檀香上下游产品链,导入中华传统文化,结合旅游开发,建设檀香生态产业园.
","2017-2019","32900",,"正在开展前期工作.
","42860","43800","5000","完成部分道路建设,扩大种植面积.
","广西上思县昱德森林开发有限公司","市投促局陈源清",,"乡村振兴","续建""9","万山溪谷庄园","项目占地面积500亩,建筑面积26200平方米,主要建设广场、游客接待中心、餐厅、金色田园区、垂钓休闲区、烧烤区、茶园、酒店、果蔬种植区、游乐区等,打造集农业生产、农业观光、休闲娱乐、文化体验和养生度假为一体的农业休闲旅游区.
","2017-2020","18000","500","开展前期工作,开工建设游客接待中心、停车场、路网等.
","42979","44166","2000","完成游客接待中心、停车场、路网等建设.
","防城港市万山溪谷庄园旅游有限公司","上思县政府覃森",,"乡村振兴","续建""10","万亩茶园","项目用地12000亩,新建万亩茶园,主要进行农业技术开发、茶叶种植、加工.
","2017-2022","10000","1000","完成选址、租地,一期种植工作.
","42917","44562","5000","完成茶园园区规划,灌溉工程安装、道路建设,持续扩大种植面积.
","广西万山宏益农业开发有限公司","上思县政府覃森",,"乡村振兴","续建""11","上思县千世界农业观光旅游休闲中心","项目占地面积120亩,建筑面积为79920平方米;新建钓鱼水塘、有机蔬菜和花卉园、水果园、游泳池、烧烤区、儿童游乐场、农家特色餐馆、公寓酒店、棋牌室、办公服务区,以及园区道路、绿化等配套工程.
","2017-2019","4500","200","开展前期工作,开工建设停车场、路网等.
","42736","43800","1000","完成停车场、花卉园等基础设施.
","上思县千世界农业旅游资源开发有限公司","上思县政府覃森",,"乡村振兴","续建""12","东兴市黄淡水库除险加固工程","除险加固中型水库1座,加固主副坝、溢洪道、放水设施及管理房、防汛道路等.
","2016-2019","6501","1000","完成江尾主坝防渗墙、大坝内坡护坡、坝体填筑、防浪墙、坝顶混凝土路面等内容.
","42644","43739","3500","加固黄淡主坝和副坝、溢洪道、放水设施及管理房、防汛道路等.
","东兴市黄淡水库管理处","东兴市政府陈建林",,"乡村振兴","续建""13","东兴市江平江江平镇吒伦村河段整治工程","按10年一遇防洪标准新建防洪堤4.
1千米,沿堤设泄洪挡潮闸3座、下河步级8座等.
","2017-2019","1279.
88","180","已完成工程清表和500米施工道路建设.
","42826","43678","1000","新建防洪堤4.
1千米,沿堤设泄洪挡潮闸3座、下河步级8座.
","东兴市水利局","东兴市政府陈建林",,"乡村振兴","续建""14","广西东兴大丰收生态休闲农业示范园项目","在马路镇大桥村整体开发山地10600亩,其中核心区6800亩,以种植、养殖、休闲养生、观光旅游为主.
辐射区200000亩,以推广名特优新水果品种及种植技术为主,开发农业观光及生态休闲旅游项目.
","2017-2020","160000","14900","山地平整开挖,种植特优新水果品种.
","42767","43862","10000","建设灌溉系统,种植1000亩果树.
","广西东兴大丰收农业科技发展有限公司","东兴市政府陈建林",,"乡村振兴","续建""15","东兴市边海乡村旅游带基础设施","建设七彩贝丘湾、墩浪滨秀、长湖生态园、埠源农庄、百果香山庄、桃缘山庄、百纳泉、远福农庄.
","2016-2020","30000","5000","1.
贝丘湾成功创建5A级乡村旅游区;2.
长湖生态园、百果香成功创建4A级乡村旅游区;3.
桃缘山庄、远福山庄创建;4.
星级农家乐;5.
其他农家乐完善基础设施并提升品质.
","42491","2020年","6000","继续完善农家乐、乡村旅游示范区的基础配套设施建设.
","贝丘湾、墩浪滨秀长湖生态园百果香桃缘山庄远福山庄","东兴市政府陈建林",,"乡村振兴","续建",,"16","广西东兴市马路镇现代农业综合开发及生态旅游基地项目","共租用土地7730亩,建设内容包括主功能区的中草药九节风种植基地,其他综合功能区,景观树培育基地、药王谷(铁皮石斛等)基地、无公害水果基地、无公害蔬菜基地、养生食用花卉基地、传统农耕文化儿童体验园、旅游接待中心、农产品收纳中心等,道路、管理用房及其他相应配套临时建筑等.
","2017-2020","20000","4300","山地平整开挖,青苗逐步种植中.
","42767","43891","5000","完成青苗种植.
","广西盛华农邦生物科技有限公司","东兴市政府陈建林",,"乡村振兴","续建""17","东兴不老峰石斛生态园","项目规划占地3000亩,布局石斛生态园、森林景观公园、水果采摘区、高档观赏行花卉栽植区4个区域,配套19个功能区,包括湖心景观岛、沿湖观景长廊、湖心观景桥、特色民宿、娱乐互动区、小型拦水坝、过水桥、观景三星湖、沿湖餐饮区、湖景别墅、游泳池、景观园林、景观亭、景区大门、园区广场、停车区、全景别墅、花海岭、迎客牌坊.
","2017-2019","3000","1000","已完成部分果树的种植,及灌溉设施的安装.
","42736","43800","1000","布局石斛生态园、森林景观公园.
","广西东兴山峰石斛有限公司","东兴市政府陈建林",,"乡村振兴","续建""18","东兴市绿丰生态农业名贵中药材养生种植基地","种植芳樟2700亩(一期700亩),沉香300亩(一期150亩).
","2017-2020","2500","600","正在种植芳樟.
","42856","43952","1900","计划种植2150亩,安装炼油设备.
","东兴市绿丰生态农业发展有限公司","东兴市政府陈建林",,"乡村振兴","续建""19","港口区大万渔业码头","建设规模:用地、用海约400亩,码头岸线长845.
38米,建设14个500吨以下渔业码头.
建设内容:码头、冰厂冰库、仓储、海产品分选区、海产品装卸区及排水排污等配套设施.
","2017-2019","38000","4000","项目开工,平整土地.
","42767","2019年","6000","完成基础工程.
","防城港市开华投资有限公司","港口区政府朱靓",,"乡村振兴","续建""20","海洋微藻利用电厂烟气和贫瘠土地大规模养殖之绿色防城港项目","年产藻粉160吨.
养殖基地、养殖池及大棚、实验室及办公用房、生产车间、仓库、生产设备购置以及相关附属配套设施.
","2017-2020","10500","2000","1.
完成前期工作;2.
项目开工建设.
","42826","2020年","5000","完成养殖池及大棚建设,实验室建设.
","广西小藻农业科技有限公司","港口区政府朱靓",,"乡村振兴","续建""21","扶贫攻坚项目","基础设施、危房改造、农村饮水、污水处理等项目建设.
","2016-2020","4000",,,"2016年","2020年","900","建成一批基础设施、危房改造、人饮、污水工程.
","港口区扶贫办","港口区政府朱靓",,"乡村振兴","续建",,"22","白龙海乐园","总占地面积500亩,珍珠文化体验区、海上运动休闲区、营地休闲游憩区、温泉养生度假区、卡丁车运动娱乐区、海鲜美食商业区、主题商业街区及渔业休闲旅游文化示范基地配套设施.
","2017-2020","100000",,,"42795","2020月12月","7000","平整土地,建设旅游厕所、海上运动休闲区、露营区以及相关配套设施.
","广西北部湾华业滨海投资有限公司","防城区政府荣毅宏",,"乡村振兴","续建",,"23","防城港市海湾文化生态旅游度假村","建设旅游餐厅、旅游厕所、建设采摘区等旅游基础设施.
","2017-2023","15000","1000","开荒种植了400多亩各类果树和种植绿化10万多棵树、完成建设景区餐厅与游泳池.
正在开工建设景区休闲长廊、文化长廊、厕所等配套设施.
","42917","45231","200","完成上山步行道、进库路、环水库路泳池、餐厅.
","防城区大王江生态农业示范区","防城区政府荣毅宏",,"乡村振兴","续建""(二)","竣工投产项目","8",,"48852","27790",,,,"20477""1",""美丽广西.
生态乡村"村屯绿化项目","实施村屯绿化317个,其中示范村屯67个,一般村屯绿化250个.
","2016-2018","879","785","完成村屯绿化317个,其中示范村屯67个,一般村屯绿化250个第一次抚育.
","42370","43465","94","完成67个示范村屯绿化第三次抚育.
","市林业局","市林业局凌光振",,"乡村振兴","竣工投产""2","百千山牛羊养殖培育项目","项目占地面积430亩,建筑面积7500平方米,新建牛栏、研发中心、博士工作站、国际技术交流中心等,年生产胚胎为3000枚,年销售牛仔400头、肉牛500头.
","2018-2018","3000","200","完成项目备案、选址、征地、环评等工作.
","43160","43435","3000","竣工投产.
","广西百千山牧业有限公司","上思县政府覃森",,"乡村振兴","竣工投产",,"3","东兴国有火光农场1队土地开垦项目","建设规模:1900亩,内容:土地平整、农田水利、田道路和农田防护与生态环境保持工程.
","2017-2018","700",,,"43070","43252","700","完工.
","东兴市国土海洋局","东兴市政府陈建林",,"乡村振兴","竣工投产",,"4","防城港市海岸保护与整治工程","1.
新建生态海堤9.
33千米,起于防城港市港口区渔洲坪红树林宾馆处,止于公车工业集中区.
其中渔洲坪红树林区至暗埠江桥3.
87千米为海堤设计,暗埠江桥至公车工业集中区5.
45千米为路堤结合设计;2.
沿堤线设置排水涵闸8座;管理站1座800平方米;3.
新建红树林广场1座,占地面积2500平方米.
","2014-2018","19690","17690","项目总长9.
189千米,目前已建好海堤4.
5千米,占比例的49%;已完成土方、抛填片石、排水管道及护堤1.
89千米,占比例的20%;正在土方和抛石施工0.
24千米,占比例的3%;因项目土地重叠未能正常施工路段总共2.
599千米,占比例的28%.
红树林广场的道路、铺装及配套工程已完成,教育中心综合楼已完成主体施工,进入装修阶段.
","2014年","43252","2000","项目竣工.
","港口区城投公司","港口区政府朱靓",,"乡村振兴","竣工投产""5",""虾光一体"工厂化养殖项目","年产对虾500万斤.
对虾工厂化养殖、生态养殖、莲藕塘养殖(兼养各类淡水鱼类)以及相关附属配套设施.
","2017-2018","12000","4000","1.
完成前期工作;2.
项目开工建设.
","42767","43374","8000","项目竣工.
","防城港市鑫润养殖有限公司","港口区政府朱靓",,"乡村振兴","竣工投产",,"6","光坡镇大龙口生态乡村建设","租用土地面积410亩,其中:产业发展230亩,休闲旅游设施180亩.
建设内容:果林木种植、林下养殖、绿化、生态广场及文化舞台、农家宾馆、池塘垂钓以及相关配套设施.
","2017-2018","1368","400","1.
完成前期工作;2.
项目开工建设.
","42826","43160","968","项目竣工.
","广西防城港长天龙投资有限公司","港口区政府朱靓",,"乡村振兴","竣工投产",,"7","光坡镇沙螺寮村乡土特色建设示范项目","沙螺寮村房屋外立面改造工程,村道路绿化工程,村级道路人行道铺装工程,村前进组新建道路项目,村进村大门工程.
","2017-2018","2215","500","1.
完成前期工作;2.
项目开工建设.
","42826","43374","1715","项目竣工.
","港口区住建局","港口区政府朱靓",,"乡村振兴","竣工投产",,"8","广西桂西肉牛养殖基地项目","建设成一个年存栏肉牛5000头标准化规模养殖示范场和年存栏母牛1000头、公牛500头良种繁殖基地,年均出栏优质肉牛9240头.
","2016-2018","9000","5000","养殖基地及辅助设施已基本完成.
已种植果树400亩,橡草200亩.
已购进母牛500头,小牛300头.
","42370","43160","4000","项目竣工.
","广西北部湾祥盛实业有限公司","防城区政府荣毅宏",,"乡村振兴","竣工投产""(三)","新开工项目","53",,"388661","184",,,,"65087""1","防城港大龙二级渔港(原防城港市企沙中心渔港扩建工程)","建设渔业码头400米,1000吨级泊位5个,护岸218米,进港道路970米,渔政管理用房1800平方米,以及生产生活配套工程等设施.
","2018-2019","17000",,"完成立项、测量、可研和各前置专题批复.
","43252","43800","5000","完成部分港池工程.
","市港工公司","市港工公司徐钦帮",,"乡村振兴","新开工",,"2","中越边关牛大力特色农业乡村旅游区","占地面积6537亩,建设集边关特色文化景观,牛大力产学研一体化基地等于一体的农业产业园.
","2018-2020","80000",,"完成项目备案,正在征地.
","43101","44166","5000","建设1080亩牛大力生产基地,建设产品加工生产线.
","防城港市防城区铭康贸易有限公司","市农委吴永明",,"乡村振兴","新开工""3","2016-2017年度冬春水利建设市本级资金项目","包含约75个小项目,总投资1550万元,计划建设农村饮水安全工程、水利水毁工程、海河堤防建设工程、中小型灌区节水改造工程、地方面上水利建设补助等.
","2018-2018","1550",,"进行初步设计.
","43160","43435","1550","渠道防渗加固28千米,建设打水井2口,建设蓄水池6座,铺设引水管道8.
2千米等.
","防城港市水利工程技术管理站","市水利局曾凡兴",,"乡村振兴","新开工""4","推进养殖设施升级改造,夯实生态养殖","实施微生物+高架床、微生物+机械化清粪、微生物+地平式+干清粪,改造或新建猪舍30000平方米.
","2018-2020","3000",,"正在开展项目前期工作.
","43101","2020月12月","1000","2018年计划完成10000平方米.
","各县(市区)水产畜牧兽医局","市水产畜牧局裴光艳",,"乡村振兴","新开工",,"5","东兴市富康生猪生态园扩建项目","建设1栋分娩舍、1栋妊娠舍;配套沼气发动机组;引种750头母猪.
","2018-2018","1800",,,"43101","43435","1800","建设1栋分娩舍、1栋妊娠舍;配套沼气发动机组;引种750头母猪.
","广西东兴市富康畜牧有限责任公司","市水产畜牧局裴光艳",,"乡村振兴","新开工",,"6","广西水产科学研究院海水养殖研发基地易地回建项目","计划200亩地用于回建新海水养殖研发基地,其中新建广西海洋水产种业中心、工作站、博物馆等科技平台大楼3栋共6000平方米;专家楼、职工宿舍楼、食堂等生活实施5栋共4000平方米;种业中心车间20座共15000平方米、生产用房一批共3000平方米、试验池塘62口及道路共100亩;科普旅游项目20亩.
","2018-2020","8000",,"正在开展前期工作.
","43256","44166","1000","完成前期工作.
","广西水产科学研究院","市水产畜牧局裴光艳",,"乡村振兴","新开工",,"7","防城港市白龙珍珠湾海域国家级海洋牧场示范区建设","在防城港市白龙珍珠湾海域建造投放人工鱼礁6万多空立方米、增殖放流海水水生生物5000万尾以上.
","2018-2019","2000",,,"43252","43800","800","建造投放人工鱼礁3万空立方米,增殖放流海水水生生物5000万尾以上.
","防城港市水产畜牧兽医局","市水产畜牧局裴光艳",,"乡村振兴","新开工",,"8","上思正邦生猪养殖规模项目","规划建设年出栏150万头商品猪生态养殖一体化项目,拟建设原(GP)种场1个,父母代种场(PS)3个,粪便有机处理站等,计划设施农用地6000亩.
","2018-2020","80000",,"完成选址、租地工作.
","43221","2020年","10000","完成主体工程建设.
","上思正邦畜牧发展有限公司","上思县政府覃森",,"乡村振兴","新开工""9","广西十万大山(皇袍山)大果山楂现代农业产业园","总建筑面积59837平方米,其中:十万大山旅游集散中心36437平方米;大果山楂双高基地漫游驿站400平方米;特色农业休闲庄园23000平方米;建设时令瓜果采摘园农庄等,总占地面积126875平方米.
","2018-2025","50000",,"开展前期工作.
","43374","45992","2500","完成前期工作并开工建设基础设施,完成果树种植等.
","广西皇袍山农业开发有限公司","上思县政府覃森",,"乡村振兴","新开工""10","上思县小型农田水利(五小)建设项目","实施项目150个,硬化渠道210千米,灌溉面积4万亩.
","2018-2019","5000",,"预计2018年6月完成初设.
","43435","43800","100","2018年6月完成初设,争取2018年12月开工.
","上思县水利局","上思县政府覃森",,"乡村振兴","新开工""11","上思县小型水库进库道路改造工程","改建扩建进库交通道路66千米,修建交通桥2座.
","2018-2019","3900",,"2018年3月完成初设上报.
","43313","43678","600","2018年3月完成初设,争取2018年9月开工.
","上思县水利局","上思县政府覃森",,"乡村振兴","新开工""12","上思县饮用水水源地保护建设工程","水源地隔离防护工程、污染防治工程等.
","2018-2019","3830",,"预计2018年6月完成初设上报.
","43435","43800","400","2018年6月完成初设,争取2018年12月开工.
","上思县水利局","上思县政府覃森",,"乡村振兴","新开工""13","上思县江那水库","新建小(2)型水库一座.
","2018-2019","3240",,"预计2018年6月完成初设上报.
","43435","43800","100","2018年6月完成初设,争取2018年12月开工.
","上思县水利局","上思县政府覃森",,"乡村振兴","新开工""14","上思县水生态文明试点项目","开展县城污染水体修复.
","2018-2019","3120",,"预计2018年6月完成初设.
","43435","43800","100","2018年6月完成初设,争取2018年12月开工.
","上思县水利局","上思县政府覃森",,"乡村振兴","新开工""15","广西上思县那板河百包河段整治工程","河道治理长度4.
2千米.
","2018-2019","2260",,"完成初步设计编制,准备上报审批.
","43435","2019年6月","1942","治理河长3.
6千米.
","上思县水利工程管理站","上思县政府覃森",,"乡村振兴","新开工""16","广西上思县驮林河驮卜、德安河段整治工程","河道治理长度6千米.
","2018-2019","2200",,"完成初步设计编制,准备上报审批.
","43435","2019年12月","1889","治理河长5.
2千米.
","上思县水利工程管理站","上思县政府覃森",,"乡村振兴","新开工""17","上思县华兰镇抗旱应急供水工程","修建抗旱应急水源1处,埋设管理12千米.
","2018-2020","2130",,"预计2018年6月完成初设上报.
","43435","43983","300","2018年6月完成初设,争取2018年12月开工.
","上思县水利局","上思县政府覃森",,"乡村振兴","新开工""18","广西上思县那板河赖平、松柏、渠厘河段整治工程","河道治理长度4.
2千米.
","2018-2019","2080",,"完成初步设计编制,准备上报审批.
","43435","2019年6月","1787","治理河长3.
6千米.
","上思县水利工程管理站","上思县政府覃森",,"乡村振兴","新开工""19","上思县凤凰水库供水工程","修建水源工程1处,埋设管路10千米.
","2018-2020","1800",,"预计2018年6月完成初设上报.
","43435","43983","300","2018年6月完成初设,争取2018年12月开工.
","上思县水利局","上思县政府覃森",,"乡村振兴","新开工""20","上思县国家水土保持重点工程","新增治理面积31.
8平方千米.
","2018-2019","1500",,"完成前期工作.
","43132","43647","800","2018年底完成60%.
","上思县水利局","上思县政府覃森",,"乡村振兴","新开工""21","水利工程维修养护工程","水库、泵站等水利工程维修养护.
","2018-2019","1500",,"预计2018年6月完成初设.
","43435","43800","100","2018年6月完成初设,争取2018年12月开工.
","上思县水利局","上思县政府覃森",,"乡村振兴","新开工""22","上思县凤凰灌区中型续建配套与节水改造","改造和加固配套渠道45千米,改造附属建筑物12座.
","2018-2019","1230",,"预计2018年3月完成可研,2018年6月完成初设上报.
","43435","43800","120","完成初设报批,争取开工.
","上思县水利局","上思县政府覃森",,"乡村振兴","新开工""23","上思县叫安镇松柏村大果山楂水利建设项目","水源建设、输水管网等,灌溉面积0.
12万亩.
","2018-2019","1200",,"预计2018年6月完成初设.
","43435","43800","100","2018年6月完成初设,争取2018年12月开工.
","上思县水利局","上思县政府覃森",,"乡村振兴","新开工""24","上思县在妙镇佛子村百定屯、枯练屯耕地提质改造(旱改水)项目","实施面积76.
3702公顷,预计新增旱改水面积70.
6886公顷.
计划总投资1118.
16万元.
","2018-2018","1118","55","完成项目规划设计、施工图设计、财评等前期工作.
","43252","43525","1063","完成建设.
","上思县国土局","上思县政府覃森",,"乡村振兴","新开工""25","上思县思阳镇明哲农业示范园区建设","水源建设、输水管网等.
","2018-2019","1100",,"预计2018年6月完成初设.
","43435","43800","100","2018年6月完成初设,争取2018年12月开工.
","上思县水利局","上思县政府覃森",,"乡村振兴","新开工""26","上思县在妙镇佛子村那目屯、兰奉屯耕地提质改造(旱改水)项目","实施面积67.
958公顷,预计新增旱改水面积64.
9132公顷.
计划总投资830.
54万元.
","2018-2018","830","41","完成项目规划设计、施工图设计、财评等前期工作.
","43252","43525","656","完成建设.
","上思县国土局","上思县政府覃森",,"乡村振兴","新开工""27","上思县驮从沟治理工程","10年一遇防洪标准治理河段长2.
5千米.
","2018-2019","820",,"2018年3月完成初设上报.
","43313","43678","250","2018年3月完成初设,争取2018年9月开工.
","上思县水利局","上思县政府覃森",,"乡村振兴","新开工""28","上思县叫安镇松柏村、那当村耕地提质改造工程项目","实施面积68.
6913公顷,预计新增旱改水面积62.
9787公顷.
计划总投资760.
48万元.
","2018-2018","760","38","完成项目规划设计、施工图设计、财评等前期工作.
","43101","43435","658","完成建设.
","上思县国土局","上思县政府覃森",,"乡村振兴","新开工""29","广西上思县南屏乡渠坤河治理工程","10年一遇防洪标准治理河段长2千米.
","2018-2019","730",,"2018年6月完成初设上报.
","43435","43800","100","2018年6月完成初设,争取2018年12月开工.
","上思县水利局","上思县政府覃森",,"乡村振兴","新开工""30","广西上思县在妙镇在妙河平良段治理工程","10年一遇防洪标准治理河段长1.
8千米.
","2018-2019","720",,"2018年6月完成初设上报.
","43435","43800","100","2018年6月完成初设,争取2018年12月开工.
","上思县水利局","上思县政府覃森",,"乡村振兴","新开工""31","广西上思县八尺江上英河段整治工程","河道治理长度1.
6千米.
","2018-2019","686",,"完成初步设计编制,准备上报审批.
","2018年6月","2019年6月","589","治理河长1.
4千米.
","上思县水利工程管理站","上思县政府覃森",,"乡村振兴","新开工""32","上思县凤凰水库水质净化工程","净化饮用水水质.
","2018-2019","680",,"预计2018年6月完成初设上报.
","43435","43800","120","2018年6月完成初设,争取2018年12月开工.
","上思县水利局","上思县政府覃森",,"乡村振兴","新开工""33","广西上思县那巴河那造河段整治工程","河道治理长度1.
5千米.
","2018-2018","640","50","完成初步设计编制,准备上报审批.
","43435","43678","550","治理河长1.
3千米.
","上思县水利工程管理站","上思县政府覃森",,"乡村振兴","新开工""34","广西上思县华兰镇德安河侯苗河段治理工程","10年一遇防洪标准治理河段长2.
3千米.
","2018-2019","630",,"2018年6月完成初设上报.
","43435","43678","150","2018年6月完成初设,争取2018年12月开工.
","上思县水利局","上思县政府覃森",,"乡村振兴","新开工""35","广西上思县平福乡汪楼河枯娄段治理工程","10年一遇防洪标准治理河段长1.
6千米.
","2018-2019","620",,"2018年6月完成初设上报.
","43435","43800","100","2018年6月完成初设,争取2018年12月开工.
","上思县水利局","上思县政府覃森",,"乡村振兴","新开工""36","广西上思县公安河岽磨河段整治工程","河道治理长度2.
2千米.
","2018-2019","620",,"完成初步设计编制,准备上报审批.
","43435","2019年6月","533","治理河长2千米.
","上思县水利工程管理站","上思县政府覃森",,"乡村振兴","新开工",,"37","那琴乡农村养老服务中心","新建农村养老服务中心大楼,建筑面积2000平方米,床位数60张,及其配套设备设施.
","2018-2020","600",,"规划.
","43374","43983","180","完成立项,争取开工建设.
","上思县民政局","上思县政府覃森",,"乡村振兴","新开工""38","上思县南屏乡抗旱应急工程","修建抗旱应急水源1处,埋设管理6千米.
","2018-2020","588",,"预计2018年6月完成初设上报.
","43435","43983","150","2018年6月完成初设,争取2018年12月开工.
","上思县水利局","上思县政府覃森",,"乡村振兴","新开工",,"39","广西上思县在妙镇那固河治理工程","10年一遇防洪标准治理河段长2.
6千米.
","2018-2019","580",,"2018年6月完成初设上报.
","43435","43800","100","2018年6月完成初设,争取2018年12月开工.
","上思县水利局","上思县政府覃森",,"乡村振兴","新开工",,"40","上思县那琴乡抗旱应急供水工程","修建抗旱应急水源1处,埋设管理7千米.
","2018-2020","530",,"预计2018年6月完成初设上报.
","43435","43983","100","2018年6月完成初设,争取2018年12月开工.
","上思县水利局","上思县政府覃森",,"乡村振兴","新开工",,"41","广西上思县华兰镇华兰河华兰段治理工程","10年一遇防洪标准治理河段长2.
2千米.
","2018-2019","520",,"2018年6月完成初设上报.
","43435","43800","100","2018年6月完成初设,争取2018年12月开工.
","上思县水利局","上思县政府覃森",,"乡村振兴","新开工",,"42","广西上思县在妙镇兰奉河七门段治理工程","10年一遇防洪标准治理河段长2.
5千米.
","2018-2019","520",,"2018年6月完成初设上报.
","43435","43800","100","2018年6月完成初设,争取2018年12月开工.
","上思县水利局","上思县政府覃森",,"乡村振兴","新开工",,"43","上思县平福乡抗旱应急工程","修建抗旱应急水源1处,埋设管理6千米.
","2018-2020","520",,"预计2018年6月完成初设上报.
","43435","43983","100","2018年6月完成初设,争取2018年12月开工.
","上思县水利局","上思县政府覃森",,"乡村振兴","新开工",,"44","广西上思县那琴乡天平河治理工程","10年一遇防洪标准治理河段长2千米.
","2018-2019","510",,"2018年6月完成初设上报.
","43435","43800","100","2018年6月完成初设,争取2018年12月开工.
","上思县水利局","上思县政府覃森",,"乡村振兴","新开工",,"45","上思县凤凰水库进库道路改造工程","改建扩建进库交通道路6千米,修建交通桥1座.
","2018-2019","500",,"2018年3月完成初设上报.
","43313","43678","200","2018年3月完成初设,争取2018年9月开工.
","上思县水利局","上思县政府覃森",,"乡村振兴","新开工",,"46","广西上思县叫安镇凤凰河枯娄段治理工程","10年一遇防洪标准治理河段长2.
2千米.
","2018-2019","500",,"2018年6月完成初设上报.
","43435","43800","100","2018年6月完成初设,争取2018年12月开工.
","上思县水利局","上思县政府覃森",,"乡村振兴","新开工",,"47","上思县汉森现代农业园区建设","水源建设、输水管网等.
","2018-2019","500",,"预计2018年6月完成初设.
","43435","43800","100","2018年6月完成初设,争取2018年12月开工.
","上思县水利局","上思县政府覃森",,"乡村振兴","新开工",,"48","东兴市东兴镇农业农村基础设施项目","改善人居环境、道路、桥梁、水利、文化体育、乡村旅游、产业扶持、电子商务、信息化建设等基础设施.
","2018-2020","8000",,"规划方案.
","43221","44166","2500","按计划推进各项基础设施建设.
","东兴市发改局、财政局、民族扶贫宗教局、农业局、林业局、水利局、水库移民局、东兴镇人民政府","东兴市政府陈建林",,"乡村振兴","新开工""49","东兴市江平镇农业农村基础设施项目","改善人居环境、道路、桥梁、水利、文化体育、乡村旅游、产业扶持、电子商务、信息化建设等基础设施.
","2018-2020","8000",,"规划方案.
","43221","44166","2500","按计划推进各项基础设施建设.
","东兴市发改局、财政局、民族扶贫宗教局、农业局、林业局、水利局、水库移民局、江平镇人民政府","东兴市政府陈建林",,"乡村振兴","新开工""50","东兴市马路镇农业农村基础设施项目","改善人居环境、危房改造、道路、桥梁、水利、安全饮水、文化体育、乡村旅游、产业扶持、电子商务、信息化建设等基础设施.
","2018-2020","8000",,"规划方案.
","43221","2020年","2500","按计划推进各项基础设施建设.
","东兴市发改局、财政局、民族扶贫宗教局、农业局、林业局、水利局、水库移民局、马路镇人民政府","东兴市政府陈建林",,"乡村振兴","新开工""51","防城港市港口区大东沙特色渔村休闲旅游配套工程","占地300亩,绿化、亮化、给排水工程、道路照明等其他配套设施.
","2018-2020","30000",,"正在做项目建议书.
","43353","2020年","8000","项目开工.
","港口区城投公司","港口区政府朱靓",,"乡村振兴","新开工",,"52","深水抗风浪网箱养殖项目","设计建设周长80米、网深7-8米HDPE框架深水抗风浪网箱200口、养殖水体约76.
4万立方米,配套建设岸上设施占地20亩,规划建设饲料仓库600平方米、维修车间260平方米、员工宿舍600平方米,网箱维修场9000平方米;完善基地岸上育苗池塘、实验室等设施建设.
","2018-2020","30499",,"已提交项目申请用海手续,海洋部门正在开展海域使用招拍挂前期工作.
","43101","44166","2000","开工建设.
","防城港中海养殖有限公司","防城区政府荣毅宏",,"乡村振兴","新开工""53","那梭原种猪场建设项目","项目建设用地460亩,总建筑面积约42000平方米,项目计划分为:生产母猪繁殖区、后备种猪培育区;其中生产母猪繁殖区存栏原种猪3000头,年产种猪7.
8万头,哺乳仔猪存栏5000头.
后备种猪培育区存栏18000头.
","2018-2019","10000",,,"43313","43800","4000","开工建设.
","广西防城港市防城区园丰牧业有限公司","防城区政府荣毅宏",,"乡村振兴","新开工""(四)","前期工作项目","16",,"770616","1535","0""1","企沙渔港进港航道","建设进港航道路约6千米,按1000到10000吨级航道建设.
",,"98000",,"完成建议书编制.
",,,,"完成可研批复和各前置专题的批复.
","市港工公司","市港工公司徐钦帮",,"乡村振兴","前期工作","重点推进项目","2","珍珠湾边海田园·综合体","田园综合体东临邻珍珠湾、西邻东兴湾,包含巫头村、万尾村、山心村、贵明村4个行政村,总面积约40平方公里.
","2019-2022","200000",,,"43800","44925",,"开展前期工作.
","广西东投集团有限公司","广西东投集团赖子机",,"乡村振兴","前期工作",,"3","防城港市美术馆","建筑面积约1万平方米,建设内容包括展厅、画室、储藏库、会议室、办公室等,拟选址于笔架山.
","2019-2021","10000",,,"43556","44287",,"开展前期工作.
","广西东投集团有限公司","广西东投集团赖子机",,"乡村振兴","前期工作",,"4","江平海水工厂化养殖","项目建设规划占地500亩,设计建设轻钢结构养殖车间、车间内建设养殖池;配套建设蓄水沉淀池、生物净化处理池.
养殖场公共设施包括养殖废水处理池,饲料和药品仓库,场内道路建设.
","2019-2021","36000",,"完成前期调研,开展初步方案设计工作.
","43617","44317",,"开展前期工作.
","广西东投集团有限公司","广西东投集团赖子机",,"乡村振兴","前期工作""5","广西北部湾祥盛实业有限公司年屠宰4万头肉牛生产线及冷链配送项目","项目规划占地面积72亩,初步设计建厂房7262平方米、5000吨冷库4378平方米、辅助生产车间8480平方米、配套设施8400平方米;厂区道路1470平方米,停车场9810平方米,绿化1712平方米,年屠宰肉牛4万头,销售冷鲜牛肉产品约6980吨.
","2019-2020","15000","1500","征地工作正在招拍挂,项目已到防城区发改局备案.
","43466","44166",,"开展前期工作.
","广西北部湾祥盛实业有限公司","市水产畜牧局裴光艳",,"乡村振兴","前期工作",,"6","农潮果乡休闲旅游项目","按国家5A级景区标准,打造农业、工业、旅游业三种产业融合,形成第六产业的农业观光、乡村风情体验、休闲名宿度假三大功能版块,建设旅游接待中心、休闲民宿、烧烤垂钓区、观景亭、火龙果深加工区及宣传展示区,打造荷花池、花海、桃李梨园、竹海等景点,种植红心番石榴采摘区、南方水果种源区、火龙果品种源区等.
",,"23000",,"已经完成土地测绘.
",,,,"完成设计规划等前期工作.
","新加坡农潮控股私人有限公司","市投促局陈源清",,"乡村振兴","前期工作""7","上思县那板灌区中型续建配套与节水改造","改造和加固配套渠道83千米,改造附属建筑物35座,修建配套管护道路65千米.
","2019-2020","5500",,"预计2018年6月完成可研,2018年10月完成初设上报.
","43466","44166",,"完成初设上报.
","上思县水利局","上思县政府覃森",,"乡村振兴","前期工作""8","上思县在妙镇更所村等3个村耕地提质改造(旱改水)项目","实施面积47.
6562公顷,预计新增旱改水面积42.
0815公顷.
","2018-2018","695","35","完成项目规划设计、施工图设计、财评等前期工作.
","43586","43891",,"完成前期工作.
","上思县国土局","上思县政府覃森",,"乡村振兴","前期工作""9","东兴市京族海洋特色小镇","海洋生态休闲区、国际海洋渔业示范区、海上跨境旅游合作区.
","2019-2022","251921",,,"2019年",,,"完成项目前期工作,做好项目开工前准备.
","江平镇人民政府","东兴市政府陈建林",,"乡村振兴","前期工作""10","海洋微藻利用电厂烟气和贫瘠土地大规模养殖之绿色防城港项目二期","占地4000亩,扩大建设微藻养殖基地,后期将建设企业总部、博士后工作站、研发中心、培训中心、深加工基地等,实现养殖、深加工、研发、培训、销售厂区一体化.
",,"30000",,,,,,"开展前期工作.
","广西小藻农业科技有限公司","港口区政府朱靓",,"乡村振兴","前期工作","重点推进项目""11","北部湾乾坤物流有限公司东部渔业码头项目建设","规划用地面积256亩,建设海产品加工厂.
","2019-2021","40000",,"正在进行前期工作.
","2019年","2021年",,"完成部分前期工作.
","广西北部湾乾坤物流有限公司","港口区政府朱靓",,"乡村振兴","前期工作""12","桂海水产养殖项目","开展桂海水产养殖项目,一期建设"桂海大蚝养殖基地",投资3000万,租赁25公顷海面养殖高品质大蚝;二期继续投资深海网箱养殖多品类海鱼等.
","2019-2022","12000",,"用海使用未解决,业主正与海洋局协调,协调不下用海项目只能取消.
","2019年","2022年",,"完成部分前期工作.
","广西桂海农业技术开发有限公司","港口区政府朱靓",,"乡村振兴","前期工作""13","光坡镇沙螺寮村榄埠休闲渔业基地","规划在沙螺寮村榄埠屯外海滩涂建设文蛤、方格星虫混养休闲渔业示范区,示范区养殖场配备各种生产、采捕、娱乐等工具及相关设施,除从事传统养殖生产外,重点兼顾旅游、观光、休闲等功能.
","2019-2022","10000",,"项目进行前期规划.
","2019年","2022年",,"完成部分前期工作.
","港口区水产畜牧兽医局","港口区政府朱靓",,"乡村振兴","前期工作""14","港口区抗风浪浮筏养殖牡蛎项目","项目用海面积约250亩,建设期一年.
新建牡蛎养殖抗风浪浮筏156672平方米,优化浮筏锚固系统.
","2019-2022","1500",,"正在进行前期工作.
","2019年","2022年",,"完成部分前期工作.
","广西双合盛业水产养殖有限公司","港口区政府朱靓",,"乡村振兴","前期工作""15","企沙镇簕山村打造传统村落建设项目","1.
完善道路拍水排污等基础设施;2.
村容村貌的改造及古建筑的维修.
","2019-2021","1000",,"正在进行前期工作.
","2019年","2021年",,"完成部分前期工作.
","港口区住建局","港口区政府朱靓",,"乡村振兴","前期工作"
搬瓦工最新优惠码优惠码:BWH3HYATVBJW,节约6.58%,全场通用!搬瓦工关闭香港 PCCW 机房通知下面提炼一下邮件的关键信息,原文在最后面。香港 CN2 GIA 机房自从 2020 年上线以来,网络性能大幅提升,所有新订单都默认部署在香港 CN2 GIA 机房;目前可以免费迁移到香港 CN2 GIA 机房,在 KiwiVM 控制面板选择 HKHK_8 机房进行迁移即可,迁移会改变 IP...
提速啦的来历提速啦是 网站 本着“良心 便宜 稳定”的初衷 为小白用户避免被坑 由赣州王成璟网络科技有限公司旗下赣州提速啦网络科技有限公司运营 投资1000万人民币 在美国Cera 香港CTG 香港Cera 国内 杭州 宿迁 浙江 赣州 南昌 大连 辽宁 扬州 等地区建立数据中心 正规持有IDC ISP CDN 云牌照 公司。公司购买产品支持3天内退款 超过3天步退款政策。提速啦的市场定位提速啦主...
这两天Linode发布了十八周年的博文和邮件,回顾了过去取得的成绩和对未来的展望。作为一家运营18年的VPS主机商,Linode无疑是有一些可取之处的,商家提供基于KVM架构的VPS主机,支持随时删除(按小时计费),可选包括美国、英国、新加坡、日本、印度、加拿大、德国等全球十多个数据中心,所有机器提供高出入网带宽,最低仅$5/月($0.0075/小时)。This month marks Linod...
双线托管为你推荐
网络服务器租用网络公司租用什么服务器好(想开个网络公司,租用服务器,但是不知道哪个好?什么价位?求高手指导。)免费虚拟主机申请找免费好用的虚拟主机申请地址,域名服务商如何更换域名服务商云服务器租用谁知道租用服务器、云主机去哪里租?服务器租用费用价格是多少呀成都虚拟空间虚拟主机哪家最好~~~深圳网站空间深圳网站设计 哪家好一些?山东虚拟主机青岛网络公司哪家好淘宝虚拟主机请问在淘宝的代购国外虚拟主机可以买吗?jsp虚拟主机jsp中文网的虚拟主机有人用过没?觉得怎么样?顶级域名什么是顶级域名
花生壳域名 北京域名注册 阿里云搜索 php主机 线路工具 大容量存储 京东商城双十一活动 52测评网 台湾谷歌地址 isp服务商 爱奇艺vip免费试用7天 空间技术网 国外视频网站有哪些 闪讯官网 西安服务器托管 贵阳电信 万网主机 腾讯网盘 宿迁服务器 远程登录 更多