结构施工图的识图_飘渺的火柴的空间_百度空间The structureconstruction drawing of the map _ the space of the matchThe structure construction drawing of the map_ the space ofthe match of the ethereal match _ baidu space user name:password: log on the space home page of the match of the match,personal archive friend

To view the article

A map of construction drawings

June 08, 2009 04:51

A map of construction drawings

I. structure design description

1. Main design basis. Expound the approval of the higherauthority (the government) , the national standards, norms andso on.

2. Natural conditions and usage requirements. Geologicalexploration data, seismic fortification cracking, snow loadand special requirements for structure from use.

3. Construction requirements

4. Quality requirements for materials.

Structure layout plan

1. Basic layout plan and basic details.

2. Layout plan and node details of floor structure.

3. Layout plan and node details of stage top structure.

3. Detail drawings of components

1. Detailed drawings of beam column and other components.

2. Detailed diagram of stair structure.

3. Detailed drawings of other components.

Iv. Basic chart reading

Find out whether the plane layout of the foundation wall isconsistent with the first floor plan of the construction plan.2, combined with layout and detail of reading, clearly thelocation of wall and axis, axis symmetric axis or partial, ifpartial axis, the note which side wide, narrow, which side sizei s how much.

3. Identify the dimensions of each part and the elevation ofthe main parts in the basic details.

4. Find out the location, size and specific practice of thetrench.

5. Identification of various materials and requirements formaterials.

5. Main contents of the layout plan of prefabricated assemblybuildings

1. Axis.

2. Walls and columns.

3. Beam and beam mat. When the beam is suspended on a brick orzhuan column, a reinforced concrete beam mat is required toavoid the wall or column being crushed. LD.

4. Precast floor.

5. Overbeam and canopy.

6.

Read the diagram and the steps

1. Find out the meanings of various words, letters and symbols.To understand the meaning of various symbols, you must firstunderstand the common building codes, the combination of thepictures and the words.

2. Find out the space position of various components. If thefloor is on the first floor, which room will be decorated witha few varieties of components, the number of each variety ofcomponents and so on.

3. The layout of the building is combined with the statisticaltable of the components to find out the number of variouscomponents in the building, and the location of the drawing setand detailed drawing.

4. Understand the interconnection and construction practicesof various components. In order to strengthen the whole bodyof prefabricated assembly building and improve earthquakeresistance, it is necessary to place steel bar inside theprefabricated slab and sew with C20 fine stone concrete.Read the instructions and understand the design intention andconstruction requirements. The text description is placed inthe structure layout and some in the structure design.

6. Now water the whole building to try the method

1. Find out the section size, external shape and location ofthe member.

2. The diagram shows the shape, quantity and position of varioussteel bars.

3. Check whether the quantity required in the chart isconsistent.

4. Understand the level of reinforcement, grade of concretestrength and requirements of construction and components.

5. Specify the location of the embedded iron and reservedholes.

A map of architecture

1. Read the general plan

1

This is the basic knowledge that the general plan should have.

2. Understand the engineering nature and surroundingenvironment

The purpose of the building of the engineering properties.

3. View the elevation and terrain

The elevation and topographic map can be used to construct theoriginal landform of the pre-building area.

4. Find the location basis

Determining the location of the building is the main functionof the overall plan.

5. Roads and greening

Road and greening are the supporting projects of main project.

2. Reading the floor plan

(1) reading the method of floor plan

1. Check the orientation, shape, layout and interrelation ofthe building.

The size of each part of the composite building.

3. Refer to the building materials used in the building wall(column) . May be choreographed in the design of the totalstatement, also may be choreographed in the structure designspecification.

4. Check the elevation of each part. The main reference is theroom, toilet, stair and outdoor floor elevation.

5. Check the size and number of doors and Windows. The checkmethod is to check whether the actual number in the chart isconsistent with the number of the Windows and doors.

6. Check the plane location of the ancillary facilities. Be liketoilet wash trough, toilet room of squat and urine the planeposition of urine trough etc.

7. Refer to the text description and consult the requirementson construction and materials. To combine architectural designinstructions with this question.

(2) reading the notes of other floor plans

1. Find out whether the layout of each room is the same as thefloor plan. There will be great changes in the layout of thebuildings along the street.

2. Find out if thewall thickness is the sameas thebottomplan.

3. Whether the doors and Windows are the same as the floor plan.In the civil building middle wall window generally should addsecurity measure. Like a window fence.

4. Whether the building materials used are the same as the floorplan. In architecture, the height of the house is different,and the quality of building materials is different.

(3) reading the main points of the floor plan

1. Drainage direction of roof, drainage slope and drainagearea.

2. Combine the details of the reading, to find out thewater-proof and water-repellent ways of the split joint, thepanshui, and the roof.

3. Read the elevation plan

1. To read the plan, check the relationship between theelevation drawing and the plan, so that the three-dimensionalsense can be established, and the understanding of the plan andelevation drawing is deepened.

2. Understand the external shape of the building.

3. Refer to the elevation and corresponding dimensions of eachpart of the building.

4. Inspect the decorationpractices of the various parts of thebuilding. Such as porch, window sill, window eaves, rain shed,le foot.

5. Others. According to the related drawings, consult theexternal wall, the doors and Windows. Glass and otherconstruction requirements.

Iv. Reading methods and procedures for external walls

1. Grasp the scope of the wall body section.

2. Master the hierarchical representation method in the graph,

3. Master the relationship between building and wall. Therelation between floor board and wall is two kinds that relyon wall and wall commonly.

4. In combination with the architectural design description ormaterial practice reading, master the construction practice ofthe details.

Notes:

1. Based on the wall of + -0, 00 or below moisture proof, theconstruction practice should be based on the basic picture. In+ - 0, 00 or above the wall of moisture-proof layer above, theconstruction method is based on the building drawing, and payattention to the connection relation and the method ofmoisture-proof layer.

2. Floor, floor, roof, loose water, leproe, women' s wall,gutter and other details combined with architectural designinstructions or materials.

3. Pay attention to the difference between building elevationand structure elevation.

5. Reading methods and steps of stair detail

Find out the axis number and understand the position anddirection of the stair in the building.

2. Find out the dimensions of the staircase. It includes thesize of the stairway, the size of the staircase, the width ofthe tread, the plane size of the rest platform, etc.

3. According to the cutting position and projection directionof the mark on the plane graph, the height of each part of thestaircase is read by the section. Include floor, rest platform,floor elevation and kick, stair door and window entrance, rail,handrail height, etc.

4. Find out the construction materials and connection methodsused for handrails.

5. Combine the architectural designdescription to find out theway to decorate the steps (floor) , railings and handrails. Thecontents include the specific practice of stepping, railing,handrail (metal, wood etc. ) and paint color and paintingprocess etc.

RackNerd 2022春节促销提供三款年付套餐 低至年付10.88美元

RackNerd 商家我们应该是比较熟悉的商家,速度一般,但是人家便宜且可选机房也是比较多的,较多集中在美国机房。包括前面的新年元旦促销的时候有提供年付10美元左右的方案,实际上RackNerd商家的营销策略也是如此,每逢节日都有活动,配置简单变化,价格基本差不多,所以我们网友看到没有必要囤货,有需要就选择。RackNerd 商家这次2022农历新年也是有几款年付套餐。低至RackNerd VPS...

创梦网络-江苏宿迁BGP云服务器100G高防资源,全程ceph集群存储,安全可靠,数据有保证,防护真实,现在购买7折促销,续费同价!

官方网站:点击访问创梦网络宿迁BGP高防活动方案:机房CPU内存硬盘带宽IP防护流量原价活动价开通方式宿迁BGP4vCPU4G40G+50G20Mbps1个100G不限流量299元/月 209.3元/月点击自助购买成都电信优化线路8vCPU8G40G+50G20Mbps1个100G不限流量399元/月 279.3元/月点击自助购买成都电信优化线路8vCPU16G40G+50G2...

盘点AoYoZhuJi傲游主机商8个数据中心常见方案及八折优惠

傲游主机商我们可能很多人并不陌生,实际上这个商家早年也就是个人主机商,传说是有几个个人投资创办的,不过能坚持到现在也算不错,毕竟有早年的用户积累正常情况上还是能延续的。如果是新服务商这几年确实不是特别容易,问到几个老牌的个人服务商很多都是早年的用户积累客户群。傲游主机目前有提供XEN和KVM架构的云服务器,不少还是亚洲CN2优化节点,目前数据中心包括中国香港、韩国、德国、荷兰和美国等多个地区的CN...

百度识图为你推荐
网易公开课怎么下载网易公开课的视频该如何下载?开机滚动条电脑开机滚动条要走好几次创维云电视功能创维电视怎么用,我买了个创维云电视,现在不知道怎么用手机往电视上传照片,谁能解答以下,人人逛街包公免费逛街打一成语bluestackbluestacks安卓模拟器有什么用gbk编码表GBK码表怎么查网站营运网站运营都分为哪些方面cisco防火墙cisco防火墙里k9是什么意思中国杀毒软件排行榜杀毒软件的最新排名?中国的排名?office2007简体中文版office2007绿色下载 office2007下载安装
沈阳虚拟主机 长沙域名注册 移动服务器租用 国外主机 namecheap 抢票工具 193邮箱 空间出租 hostloc 免费测手机号 web服务器搭建 腾讯总部在哪 四川电信商城 www789 太原联通测速 英雄联盟台服官网 photobucket 万网空间 浙江服务器 阿里云邮箱登陆地址 更多