结构施工图的识图_飘渺的火柴的空间_百度空间The structureconstruction drawing of the map _ the space of the matchThe structure construction drawing of the map_ the space ofthe match of the ethereal match _ baidu space user name:password: log on the space home page of the match of the match,personal archive friend
To view the article
A map of construction drawings
June 08, 2009 04:51
A map of construction drawings
I. structure design description
1. Main design basis. Expound the approval of the higherauthority (the government) , the national standards, norms andso on.
2. Natural conditions and usage requirements. Geologicalexploration data, seismic fortification cracking, snow loadand special requirements for structure from use.
3. Construction requirements
4. Quality requirements for materials.
Structure layout plan
1. Basic layout plan and basic details.
2. Layout plan and node details of floor structure.
3. Layout plan and node details of stage top structure.
3. Detail drawings of components
1. Detailed drawings of beam column and other components.
2. Detailed diagram of stair structure.
3. Detailed drawings of other components.
Iv. Basic chart reading
Find out whether the plane layout of the foundation wall isconsistent with the first floor plan of the construction plan.2, combined with layout and detail of reading, clearly thelocation of wall and axis, axis symmetric axis or partial, ifpartial axis, the note which side wide, narrow, which side sizei s how much.
3. Identify the dimensions of each part and the elevation ofthe main parts in the basic details.
4. Find out the location, size and specific practice of thetrench.
5. Identification of various materials and requirements formaterials.
5. Main contents of the layout plan of prefabricated assemblybuildings
1. Axis.
2. Walls and columns.
3. Beam and beam mat. When the beam is suspended on a brick orzhuan column, a reinforced concrete beam mat is required toavoid the wall or column being crushed. LD.
4. Precast floor.
5. Overbeam and canopy.
6.
Read the diagram and the steps
1. Find out the meanings of various words, letters and symbols.To understand the meaning of various symbols, you must firstunderstand the common building codes, the combination of thepictures and the words.
2. Find out the space position of various components. If thefloor is on the first floor, which room will be decorated witha few varieties of components, the number of each variety ofcomponents and so on.
3. The layout of the building is combined with the statisticaltable of the components to find out the number of variouscomponents in the building, and the location of the drawing setand detailed drawing.
4. Understand the interconnection and construction practicesof various components. In order to strengthen the whole bodyof prefabricated assembly building and improve earthquakeresistance, it is necessary to place steel bar inside theprefabricated slab and sew with C20 fine stone concrete.Read the instructions and understand the design intention andconstruction requirements. The text description is placed inthe structure layout and some in the structure design.
6. Now water the whole building to try the method
1. Find out the section size, external shape and location ofthe member.
2. The diagram shows the shape, quantity and position of varioussteel bars.
3. Check whether the quantity required in the chart isconsistent.
4. Understand the level of reinforcement, grade of concretestrength and requirements of construction and components.
5. Specify the location of the embedded iron and reservedholes.
A map of architecture
1. Read the general plan
1
This is the basic knowledge that the general plan should have.
2. Understand the engineering nature and surroundingenvironment
The purpose of the building of the engineering properties.
3. View the elevation and terrain
The elevation and topographic map can be used to construct theoriginal landform of the pre-building area.
4. Find the location basis
Determining the location of the building is the main functionof the overall plan.
5. Roads and greening
Road and greening are the supporting projects of main project.
2. Reading the floor plan
(1) reading the method of floor plan
1. Check the orientation, shape, layout and interrelation ofthe building.
The size of each part of the composite building.
3. Refer to the building materials used in the building wall(column) . May be choreographed in the design of the totalstatement, also may be choreographed in the structure designspecification.
4. Check the elevation of each part. The main reference is theroom, toilet, stair and outdoor floor elevation.
5. Check the size and number of doors and Windows. The checkmethod is to check whether the actual number in the chart isconsistent with the number of the Windows and doors.
6. Check the plane location of the ancillary facilities. Be liketoilet wash trough, toilet room of squat and urine the planeposition of urine trough etc.
7. Refer to the text description and consult the requirementson construction and materials. To combine architectural designinstructions with this question.
(2) reading the notes of other floor plans
1. Find out whether the layout of each room is the same as thefloor plan. There will be great changes in the layout of thebuildings along the street.
2. Find out if thewall thickness is the sameas thebottomplan.
3. Whether the doors and Windows are the same as the floor plan.In the civil building middle wall window generally should addsecurity measure. Like a window fence.
4. Whether the building materials used are the same as the floorplan. In architecture, the height of the house is different,and the quality of building materials is different.
(3) reading the main points of the floor plan
1. Drainage direction of roof, drainage slope and drainagearea.
2. Combine the details of the reading, to find out thewater-proof and water-repellent ways of the split joint, thepanshui, and the roof.
3. Read the elevation plan
1. To read the plan, check the relationship between theelevation drawing and the plan, so that the three-dimensionalsense can be established, and the understanding of the plan andelevation drawing is deepened.
2. Understand the external shape of the building.
3. Refer to the elevation and corresponding dimensions of eachpart of the building.
4. Inspect the decorationpractices of the various parts of thebuilding. Such as porch, window sill, window eaves, rain shed,le foot.
5. Others. According to the related drawings, consult theexternal wall, the doors and Windows. Glass and otherconstruction requirements.
Iv. Reading methods and procedures for external walls
1. Grasp the scope of the wall body section.
2. Master the hierarchical representation method in the graph,
3. Master the relationship between building and wall. Therelation between floor board and wall is two kinds that relyon wall and wall commonly.
4. In combination with the architectural design description ormaterial practice reading, master the construction practice ofthe details.
Notes:
1. Based on the wall of + -0, 00 or below moisture proof, theconstruction practice should be based on the basic picture. In+ - 0, 00 or above the wall of moisture-proof layer above, theconstruction method is based on the building drawing, and payattention to the connection relation and the method ofmoisture-proof layer.
2. Floor, floor, roof, loose water, leproe, women' s wall,gutter and other details combined with architectural designinstructions or materials.
3. Pay attention to the difference between building elevationand structure elevation.
5. Reading methods and steps of stair detail
Find out the axis number and understand the position anddirection of the stair in the building.
2. Find out the dimensions of the staircase. It includes thesize of the stairway, the size of the staircase, the width ofthe tread, the plane size of the rest platform, etc.
3. According to the cutting position and projection directionof the mark on the plane graph, the height of each part of thestaircase is read by the section. Include floor, rest platform,floor elevation and kick, stair door and window entrance, rail,handrail height, etc.
4. Find out the construction materials and connection methodsused for handrails.
5. Combine the architectural designdescription to find out theway to decorate the steps (floor) , railings and handrails. Thecontents include the specific practice of stepping, railing,handrail (metal, wood etc. ) and paint color and paintingprocess etc.
3C云国内IDC/ISP资质齐全商家,与香港公司联合运营, 已超6年运营 。本次为大家带来的是双12特惠活动,香港美国日本韩国|高速精品|高防|站群|大带宽等产品齐全,欢迎咨询问价。3C云科技有限公司官方网站:http://www.3cccy.com/客服QQ:937695003网页客服:点击咨询客户QQ交流群:1042709810价目表总览升级内存 60元 8G内存升级硬盘 1T机械 90元 2...
Megalayer 商家在开始看到有提供香港服务器、香港站群服务器的时候有介绍过,后来就一直没有怎么关注。但是前几天有看到网友使用到他们家的美国独立服务器问其如何的,但是我没有使用过就不好评论,这不前几天也有介绍到Megalayer美国独立服务器。以及我们也有看到商家有提供美国站群服务器和美国大带宽服务器产品,可选30M不限制流量CN2优化线路,以及100M不限制流量国际带宽线路。新年元旦后,Me...
Hostodo商家算是一个比较小众且运营比较久的服务商,而且还是率先硬盘更换成NVMe阵列的,目前有提供拉斯维加斯和迈阿密两个机房。看到商家这两年的促销套餐方案变化还是比较大的,每个月一般有这么两次的促销方案推送,可见商家也在想着提高一些客户量。毕竟即便再老的服务商,你不走出来让大家知道,迟早会落寞。目前,Hostodo有提供两款大流量的VPS主机促销,机房可选拉斯维加斯和迈阿密两个数据中心,且都...