FM ENV 016 Waste Management Environmental Management Procedure

Safety,Health&Environment Section

Environmental Management System(EMS)

FM/ENV/016

Waste Management

Environmental ManagementP roced u re

June2015

Version 3.0

Document review due:June 2016

Please Note:Prior to migration to SharePoint this document was on version 6.0.This is acontrol led document,please ensure you are using the most recent version avai lable on theUCLan intranet.

FM ENV 016 Waste Management Environmental Management ProcedureDocument History

References

FM ENV 016 Waste Management Environmental Management ProcedureDocument Control

FM ENV 016 Waste Management Environmental Management ProcedureC o n te n ts

1 Introduction

2 UCLan Waste Streams

3 Process Overview of Waste Management at UCLan

4 Non-Hazardous Waste Disposal

5 Waste Electrical and Electronic Equipment (WEEE)Disposal6 Hazardous Waste Disposal

7 Clinical Waste Disposal

8 Food Waste

9 Liquid Effluent

10 Flytipping

11 Radiological Waste Management

12 Contractor Management and Dutyof Care

13 Data Management

14 Legal or Other Requirements

15 Appendix A:Waste Management Definitions

16 Appendix B:Waste Management Hierarchy

17 Appendix C:Non-Hazardous Waste Codes

18 Appendix D:Categories of EEE covered bythe WEEE Regulations19 Appendix E:Hazard Properties&Risk Phrases

FM ENV 016 Waste Management Environmental Management Procedure

1 Introduction

1.1 Purpose

This procedure describes the approach UCLan wi l l take to manage and mitigate its‟wastemanagement as a category of significant environmental aspects (FMENV004),within theUniversity‟s Environmental Management System (EMS), to ensure the University‟soperations remain compl iant with relevant parts of its:

 Environmental Sustainabi l ity Pol icy;

“Use natural resources prudently and prevent pollution by identifying improvement targets,whilst adhering to the following key principles:

- Provide training and information to all staff and students to facilitate prudent use ofnatural resources;

- Champion the reduction of waste following the reduce, reuse, recycle hierarchy, toinclude the provision of suitable segregation and composting facilities;

- Address the root cause,rather than the symptoms,of resource wastage whereverpossible;”

 Environmental Management Plan 2013-2016

 Contribution to compl iance/maintenance of the University‟s position in relation towaste reduction and recycl ing as measured in initiatives l ike the People and Planet

Green League,HEFCE/HESAEstate Management Records

 Register of Legal Compl iance and Other Requirements (see Newground Business

Services).Contact Greenteam@uclan.ac.uk for log-in accesso Environmental Protection Act 1990o The Waste(England&Wales)Regulations 2011 amended 2012o Control led Waste(England&Wales)Regulations 2012o The Hazardous Waste(England and Wales)Regulations 2005 amended

2009o Landfi l l Tax(England&Wales)Regulations 1996,amended 2013o WEEE Regulations 2013o The Environmental Permitting(England and Wales)Regulations 2010amended 2014o List of Wastes(England)Regulations 2005o Site Waste Management Plans Regulations 2008o The Animal By-Products(Enforcement) (England)Regulations 2011o The Waste Batteries and Accumulators Regulations 2009

UCLan‟s Environmental Aspects Register (FMENV004) identifieswaste disposal as theaspect of University‟s waste management activities that hasthe most significant impact onthe environment.Waste disposal wi l l therefore be the focus of our mitigation andmanagement within the EMS. However, as a matter of good practice we wi l l also outl ineissues to be considered to improve reduction, re-use and recycl ing of waste throughout theUnivers ity.

Please note that site waste management plans for building contracts will only be touchedupon within this procedure,FM ENV 015 Land Development and Buildings will deal with thisarea of waste management in further detail.

FM ENV 016 Waste Management Environmental Management Procedure

1.2 Scope

This document appl ies to operations conducted from the University‟s Preston campusesincluding those of UCLan maintenance engineers.Contractors working on University sitesare required to manage and dispose of their own waste.

1.3 Responsibilities

This document appl ies to staff within the University who are responsible for elements of thewaste managementprocess l isted in section 1.1 . These general responsibi l ities aresummarized in the table below.

Further detai ls of specific role responsibi l ities can be accessed in EMS Manual (FMENV003).Within SHE Training Needs Analysis(FMENV018) the training and development required bythe responsible parties are outl ined to ensure adequate experience and competence.

FM ENV 016 Waste Management Environmental Management Procedure

1.4 Continual Improvement

The University wi l l monitor the implementation of the operational controls identified withinthis procedure using a combination of internal audits and targets.

These targets wi l l be part of a programme of improvement under an overal l continualimprovement objective for Waste in the Environmental Management Plan (FMENV020).Each significant type of waste management identified as having a significant impact wi l l havean associated target.

FM ENV 016 Waste Management Environmental Management Procedure

2 UCLanWasteStreams

Al l Schools and Services at UCLan wi l l generate office type waste;

General waste, paper, confidential waste, plastics, card, batteries, packaging, glass andcans as wel l as surplus furniture,stationery and smal l items of WEEE.

Additional waste streams generated as a result of University activities are detai led in Figure2.The principal dispos‟al route is via Faci l ities Management with the exception of Learning andInformation Service s special waste streams.

Figure 2-UCLan Waste Streams

Learning and Information Services (LIS)special waste disposal is bui lt into contracts

FM ENV 016 Waste Management Environmental Management Procedure3 Process Overview of Waste Management at UCLan

wordpress外贸企业主题 wordpress经典外贸企业建站主题

WordPress经典外贸企业建站主题,经典配色扁平化简约设计+跨屏自适应移动端设备,特色外贸企业建站功能模块+在线Inquiry询单功能,更有利于Google等英文搜索优化和站点收录。采用标准的HTML5+CSS3语言开发,兼容当下的各种主流浏览器: IE 6+(以及类似360、遨游等基于IE内核的)、Firefox、Google Chrome、Safari、Opera等;同时支持移动终端的常用...

HostYun 新增美国三网CN2 GIA VPS主机 采用美国原生IP低至月15元

在之前几个月中也有陆续提到两次HostYun主机商,这个商家前身是我们可能有些网友熟悉的主机分享团队的,后来改名称的。目前这个品牌主营低价便宜VPS主机,这次有可以看到推出廉价版本的美国CN2 GIA VPS主机,月费地址15元,适合有需要入门级且需要便宜的用户。第一、廉价版美国CN2 GIA VPS主机方案我们可看到这个类型的VPS目前三网都走CN2 GIA网络,而且是原生IP。根据信息可能后续...

星梦云-年中四川100G高防云主机月付仅60元,西南高防月付特价活动,,买到就是赚到!

官方网站:点击访问星梦云活动官网活动方案:机房CPU内存硬盘带宽IP防护流量原价活动价开通方式成都电信优化线路4vCPU4G40G+50G10Mbps1个100G不限流量210元/月 99元/月点击自助购买成都电信优化线路8vCPU8G40G+100G15Mbps1个100G不限流量370元/月 160元/月点击自助购买成都电信优化线路16vCPU16G40G+100G20Mb...

unavailable为你推荐
淘宝收费淘宝都什么服务是收费的?ghostxp3目前最好的ghost xp3是什么?微信如何建群微信可以建立两个人的群吗?有一个是自己ps抠图技巧ps的抠图技巧是什么畅想中国未来的中国是什么样子的安装迅雷看看播放器迅雷看看不能播放,说我尚未安装迅雷看看播放器虚拟专用网安卓手机的虚拟专用网设置是什么东西?怎么用?电子商务网站模板网页制作模板微信怎么看聊天记录微信在手机上怎么查看聊天记录域名库域名赎回期过了多长时间可以注册
hostmaster 便宜建站 koss suspended evssl 国内加速器 html空间 ftp教程 hkt 购买国外空间 厦门电信 网通服务器 畅行云 注册阿里云邮箱 服务器托管价格 godaddyssl 建站论坛 机柜尺寸 zencart安装 byebyelove 更多