FM ENV 016 Waste Management Environmental Management Procedure

Safety,Health&Environment Section

Environmental Management System(EMS)

FM/ENV/016

Waste Management

Environmental ManagementP roced u re

June2015

Version 3.0

Document review due:June 2016

Please Note:Prior to migration to SharePoint this document was on version 6.0.This is acontrol led document,please ensure you are using the most recent version avai lable on theUCLan intranet.

FM ENV 016 Waste Management Environmental Management ProcedureDocument History

References

FM ENV 016 Waste Management Environmental Management ProcedureDocument Control

FM ENV 016 Waste Management Environmental Management ProcedureC o n te n ts

1 Introduction

2 UCLan Waste Streams

3 Process Overview of Waste Management at UCLan

4 Non-Hazardous Waste Disposal

5 Waste Electrical and Electronic Equipment (WEEE)Disposal6 Hazardous Waste Disposal

7 Clinical Waste Disposal

8 Food Waste

9 Liquid Effluent

10 Flytipping

11 Radiological Waste Management

12 Contractor Management and Dutyof Care

13 Data Management

14 Legal or Other Requirements

15 Appendix A:Waste Management Definitions

16 Appendix B:Waste Management Hierarchy

17 Appendix C:Non-Hazardous Waste Codes

18 Appendix D:Categories of EEE covered bythe WEEE Regulations19 Appendix E:Hazard Properties&Risk Phrases

FM ENV 016 Waste Management Environmental Management Procedure

1 Introduction

1.1 Purpose

This procedure describes the approach UCLan wi l l take to manage and mitigate its‟wastemanagement as a category of significant environmental aspects (FMENV004),within theUniversity‟s Environmental Management System (EMS), to ensure the University‟soperations remain compl iant with relevant parts of its:

 Environmental Sustainabi l ity Pol icy;

“Use natural resources prudently and prevent pollution by identifying improvement targets,whilst adhering to the following key principles:

- Provide training and information to all staff and students to facilitate prudent use ofnatural resources;

- Champion the reduction of waste following the reduce, reuse, recycle hierarchy, toinclude the provision of suitable segregation and composting facilities;

- Address the root cause,rather than the symptoms,of resource wastage whereverpossible;”

 Environmental Management Plan 2013-2016

 Contribution to compl iance/maintenance of the University‟s position in relation towaste reduction and recycl ing as measured in initiatives l ike the People and Planet

Green League,HEFCE/HESAEstate Management Records

 Register of Legal Compl iance and Other Requirements (see Newground Business

Services).Contact Greenteam@uclan.ac.uk for log-in accesso Environmental Protection Act 1990o The Waste(England&Wales)Regulations 2011 amended 2012o Control led Waste(England&Wales)Regulations 2012o The Hazardous Waste(England and Wales)Regulations 2005 amended

2009o Landfi l l Tax(England&Wales)Regulations 1996,amended 2013o WEEE Regulations 2013o The Environmental Permitting(England and Wales)Regulations 2010amended 2014o List of Wastes(England)Regulations 2005o Site Waste Management Plans Regulations 2008o The Animal By-Products(Enforcement) (England)Regulations 2011o The Waste Batteries and Accumulators Regulations 2009

UCLan‟s Environmental Aspects Register (FMENV004) identifieswaste disposal as theaspect of University‟s waste management activities that hasthe most significant impact onthe environment.Waste disposal wi l l therefore be the focus of our mitigation andmanagement within the EMS. However, as a matter of good practice we wi l l also outl ineissues to be considered to improve reduction, re-use and recycl ing of waste throughout theUnivers ity.

Please note that site waste management plans for building contracts will only be touchedupon within this procedure,FM ENV 015 Land Development and Buildings will deal with thisarea of waste management in further detail.

FM ENV 016 Waste Management Environmental Management Procedure

1.2 Scope

This document appl ies to operations conducted from the University‟s Preston campusesincluding those of UCLan maintenance engineers.Contractors working on University sitesare required to manage and dispose of their own waste.

1.3 Responsibilities

This document appl ies to staff within the University who are responsible for elements of thewaste managementprocess l isted in section 1.1 . These general responsibi l ities aresummarized in the table below.

Further detai ls of specific role responsibi l ities can be accessed in EMS Manual (FMENV003).Within SHE Training Needs Analysis(FMENV018) the training and development required bythe responsible parties are outl ined to ensure adequate experience and competence.

FM ENV 016 Waste Management Environmental Management Procedure

1.4 Continual Improvement

The University wi l l monitor the implementation of the operational controls identified withinthis procedure using a combination of internal audits and targets.

These targets wi l l be part of a programme of improvement under an overal l continualimprovement objective for Waste in the Environmental Management Plan (FMENV020).Each significant type of waste management identified as having a significant impact wi l l havean associated target.

FM ENV 016 Waste Management Environmental Management Procedure

2 UCLanWasteStreams

Al l Schools and Services at UCLan wi l l generate office type waste;

General waste, paper, confidential waste, plastics, card, batteries, packaging, glass andcans as wel l as surplus furniture,stationery and smal l items of WEEE.

Additional waste streams generated as a result of University activities are detai led in Figure2.The principal dispos‟al route is via Faci l ities Management with the exception of Learning andInformation Service s special waste streams.

Figure 2-UCLan Waste Streams

Learning and Information Services (LIS)special waste disposal is bui lt into contracts

FM ENV 016 Waste Management Environmental Management Procedure3 Process Overview of Waste Management at UCLan

DiyVM独立服务器:香港沙田服务器,5M带宽CN2线路,L5630*2/16G内存/120G SSD硬盘,499元/月

diyvm怎么样?diyvm商家VPS主机均2GB内存起步,三个地区机房可选,使用优惠码后每月69元起;DiyVM独立服务器开设在香港沙田电信机房,CN2线路,5M带宽,自动化开通上架,最低499元/月,配置是L5630*2/16G内存/120G SSD硬盘。DiyVM是一家成立于2009年的国人主机商,提供的产品包括VPS主机、独立服务器租用等,产品数据中心包括中国香港、日本大阪和美国洛杉矶等,...

UCloud新人优惠中国香港/日本/美国云服务器低至4元

UCloud优刻得商家这几年应该已经被我们不少的个人站长用户认知,且确实在当下阿里云、腾讯云服务商不断的只促销服务于新用户活动,给我们很多老用户折扣的空间不多。于是,我们可以通过拓展选择其他同类服务商享受新人的福利,这里其中之一就选择UCloud商家。UCloud服务商2020年创业板上市的,实际上很早就有认识到,那时候价格高的离谱,谁让他们只服务有钱的企业用户呢。这里希望融入到我们大众消费者,你...

ProfitServer$34.56/年,西班牙vps、荷兰vps、德国vps/不限制流量/支持自定义ISO

profitserver怎么样?profitserver是一家成立于2003的主机商家,是ITC控股的一个部门,主要经营的产品域名、SSL证书、虚拟主机、VPS和独立服务器,机房有俄罗斯、新加坡、荷兰、美国、保加利亚,VPS采用的是KVM虚拟架构,硬盘采用纯SSD,而且最大的优势是不限制流量,大公司运营,机器比较稳定,数据中心众多。此次ProfitServer正在对德国VPS(法兰克福)、西班牙v...

unavailable为你推荐
google地球打不开google earth打不开怎么办?湖南商标注册湖南商标注册代办公司arm开发板想购买一个ARM开发板,选什么类型的好ps抠图技巧ps抠图多种技巧,越详细越好,急~~~~~~~天天酷跑刷金币如何使用八门神器给天天酷跑刷钻刷金币idc前线钢铁雄心2修改器iphone6上市时间苹果6是什么时候出的 ?虚拟机软件下载谁有虚拟机软件的网址要好用的三星s8什么时候上市大约什么时候买S8合适微信电话本怎么用微信电话本如何使用?
国外php主机 美国主机网 omnis 美国主机论坛 国外私服 evssl证书 标准机柜尺寸 空间论坛 七夕快乐英文 asp免费空间申请 共享主机 上海服务器 四核服务器 ca187 新世界服务器 东莞idc 丽萨 广州虚拟主机 wordpress中文主题 学生服务器 更多