FM ENV 016 Waste Management Environmental Management Procedure

Safety,Health&Environment Section

Environmental Management System(EMS)

FM/ENV/016

Waste Management

Environmental ManagementP roced u re

June2015

Version 3.0

Document review due:June 2016

Please Note:Prior to migration to SharePoint this document was on version 6.0.This is acontrol led document,please ensure you are using the most recent version avai lable on theUCLan intranet.

FM ENV 016 Waste Management Environmental Management ProcedureDocument History

References

FM ENV 016 Waste Management Environmental Management ProcedureDocument Control

FM ENV 016 Waste Management Environmental Management ProcedureC o n te n ts

1 Introduction

2 UCLan Waste Streams

3 Process Overview of Waste Management at UCLan

4 Non-Hazardous Waste Disposal

5 Waste Electrical and Electronic Equipment (WEEE)Disposal6 Hazardous Waste Disposal

7 Clinical Waste Disposal

8 Food Waste

9 Liquid Effluent

10 Flytipping

11 Radiological Waste Management

12 Contractor Management and Dutyof Care

13 Data Management

14 Legal or Other Requirements

15 Appendix A:Waste Management Definitions

16 Appendix B:Waste Management Hierarchy

17 Appendix C:Non-Hazardous Waste Codes

18 Appendix D:Categories of EEE covered bythe WEEE Regulations19 Appendix E:Hazard Properties&Risk Phrases

FM ENV 016 Waste Management Environmental Management Procedure

1 Introduction

1.1 Purpose

This procedure describes the approach UCLan wi l l take to manage and mitigate its‟wastemanagement as a category of significant environmental aspects (FMENV004),within theUniversity‟s Environmental Management System (EMS), to ensure the University‟soperations remain compl iant with relevant parts of its:

 Environmental Sustainabi l ity Pol icy;

“Use natural resources prudently and prevent pollution by identifying improvement targets,whilst adhering to the following key principles:

- Provide training and information to all staff and students to facilitate prudent use ofnatural resources;

- Champion the reduction of waste following the reduce, reuse, recycle hierarchy, toinclude the provision of suitable segregation and composting facilities;

- Address the root cause,rather than the symptoms,of resource wastage whereverpossible;”

 Environmental Management Plan 2013-2016

 Contribution to compl iance/maintenance of the University‟s position in relation towaste reduction and recycl ing as measured in initiatives l ike the People and Planet

Green League,HEFCE/HESAEstate Management Records

 Register of Legal Compl iance and Other Requirements (see Newground Business

Services).Contact Greenteam@uclan.ac.uk for log-in accesso Environmental Protection Act 1990o The Waste(England&Wales)Regulations 2011 amended 2012o Control led Waste(England&Wales)Regulations 2012o The Hazardous Waste(England and Wales)Regulations 2005 amended

2009o Landfi l l Tax(England&Wales)Regulations 1996,amended 2013o WEEE Regulations 2013o The Environmental Permitting(England and Wales)Regulations 2010amended 2014o List of Wastes(England)Regulations 2005o Site Waste Management Plans Regulations 2008o The Animal By-Products(Enforcement) (England)Regulations 2011o The Waste Batteries and Accumulators Regulations 2009

UCLan‟s Environmental Aspects Register (FMENV004) identifieswaste disposal as theaspect of University‟s waste management activities that hasthe most significant impact onthe environment.Waste disposal wi l l therefore be the focus of our mitigation andmanagement within the EMS. However, as a matter of good practice we wi l l also outl ineissues to be considered to improve reduction, re-use and recycl ing of waste throughout theUnivers ity.

Please note that site waste management plans for building contracts will only be touchedupon within this procedure,FM ENV 015 Land Development and Buildings will deal with thisarea of waste management in further detail.

FM ENV 016 Waste Management Environmental Management Procedure

1.2 Scope

This document appl ies to operations conducted from the University‟s Preston campusesincluding those of UCLan maintenance engineers.Contractors working on University sitesare required to manage and dispose of their own waste.

1.3 Responsibilities

This document appl ies to staff within the University who are responsible for elements of thewaste managementprocess l isted in section 1.1 . These general responsibi l ities aresummarized in the table below.

Further detai ls of specific role responsibi l ities can be accessed in EMS Manual (FMENV003).Within SHE Training Needs Analysis(FMENV018) the training and development required bythe responsible parties are outl ined to ensure adequate experience and competence.

FM ENV 016 Waste Management Environmental Management Procedure

1.4 Continual Improvement

The University wi l l monitor the implementation of the operational controls identified withinthis procedure using a combination of internal audits and targets.

These targets wi l l be part of a programme of improvement under an overal l continualimprovement objective for Waste in the Environmental Management Plan (FMENV020).Each significant type of waste management identified as having a significant impact wi l l havean associated target.

FM ENV 016 Waste Management Environmental Management Procedure

2 UCLanWasteStreams

Al l Schools and Services at UCLan wi l l generate office type waste;

General waste, paper, confidential waste, plastics, card, batteries, packaging, glass andcans as wel l as surplus furniture,stationery and smal l items of WEEE.

Additional waste streams generated as a result of University activities are detai led in Figure2.The principal dispos‟al route is via Faci l ities Management with the exception of Learning andInformation Service s special waste streams.

Figure 2-UCLan Waste Streams

Learning and Information Services (LIS)special waste disposal is bui lt into contracts

FM ENV 016 Waste Management Environmental Management Procedure3 Process Overview of Waste Management at UCLan

cyun29元/月,香港CN2 GIA云服务器低至起;香港多ip站群云服务器4核4G

cyun怎么样?cyun蓝米数据是一家(香港)藍米數據有限公司旗下品牌,蓝米云、蓝米主机等同属于该公司品牌。CYUN全系列云产品采用KVM架构,SSD磁盘阵列,优化线路,低延迟,高稳定。目前,cyun推出的香港云服务器性价比超高,香港cn2 gia云服务器,1核1G1M/系统盘+20G数据盘,低至29元/月起;香港多ip站群云服务器,16个ip/4核4G仅220元/月起,希望买香港站群服务器的站长...

HostYun 新增可选洛杉矶/日本机房 全场9折月付19.8元起

关于HostYun主机商在之前也有几次分享,这个前身是我们可能熟悉的小众的HostShare商家,主要就是提供廉价主机,那时候官方还声称选择这个品牌的机器不要用于正式生产项目,如今这个品牌重新转变成Hostyun。目前提供的VPS主机包括KVM和XEN架构,数据中心可选日本、韩国、香港和美国的多个地区机房,电信双程CN2 GIA线路,香港和日本机房,均为国内直连线路,访问质量不错。今天和大家分享下...

CloudCone(1.99美元),可以额外选择Voxility高防IP

CloudCone 商家也是比较有特点的,和我们熟悉的DO、Vultr、Linode商家均是可以随时删除机器开通的小时计费模式。这个对于有需要短租服务器的来说是比较有性价比的。但是,他们还有一个缺点就是机房比较少,不同于上面几个小时计费服务商可以有多机房可选,如果有这个多机房方案的话,应该更有特点。这次我们可以看到CloudCone闪购活动提供洛杉矶三个促销方案,低至月付1.99美元。商家也可以随...

unavailable为你推荐
郭吉军郭吉军和管鹏这两个站长怎么样?群里有人骂961556225317563152822是哪个银行的在线漏洞检测如何查看网站的漏洞?9flashIE9flash模块异常。iphone越狱后怎么恢复苹果越狱后怎么恢复出厂设置奇虎论坛奇虎是中国的吗?电子商务网站模板我想开发一个电子商务网站,但是想加入自己设计的模板,可以吗?分词技术怎么在SEO中学会运用关键词分词技术虚拟机软件下载那里可以下载虚拟系统,又该怎么安装呢??网站优化方案网站建设及优化的方案
重庆虚拟主机 linuxapache虚拟主机 申请免费域名 美国独立服务器 bluevm linode godaddy续费优惠码 win8升级win10正式版 亚洲小于500m 三拼域名 京东商城0元抢购 天互数据 已备案删除域名 域名转接 河南移动网 银盘服务 联通网站 空间登陆首页 www789 wordpress中文主题 更多